95332418Q01230002_US_final_signed_by_CO.pdf
PDF 348 KB Posted
- Solicitation number
- 95332418Q0123
- Issued by
-
Millennium Challenge Corporation
About this file
Modification 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COR_Designation_Letter_sample.pdf | ||
| 95332418Q01230001_US_final_signed_by_CO.pdf | ||
| Annex_J2.docx | DOCX document | |
| 95332418Q0123_0_US_final_signed_by_CO.pdf | ||
| ANNEX_ONE_final.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dra ft
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE
DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Responses to questions:
1. Graphics - Creating graphics with searchable, extractable content is a significant burden on proposal production. Can figures appearing in the proposal document be un-editable images, such as .jpg or .png images, as long as the complete image may be capable of being cut and pasted as a whole image?
A – .jpg or .png images are permitted. Bidders are advised against presenting large amounts of narrative or numeric information in image formats that are not searchable or extractable.
2. Assessment – The assessment period is outlined at 8 weeks of the 10 month base period. Is it possible to allocate additional time for the assessment to account for field visits to rural areas with the greatest
HIV burden?
A - The RFP states in ANNEX ONE regarding the due date for carrying out the assessment mission:
“Within eight weeks of the technical directive being issued, the mission should be completed.” The
“assessment mission” referred to here is the time the Contractor’s consultant team will spend in Lesotho
(or elsewhere) undertaking activities that the Contractor proposed to accomplish the mission objectives.
The eight week time period referred to should include the preparation of the financial plan and draft schedule/timetable, preparation of the assessment mission terms of reference and the time spent in
Lesotho (or elsewhere) undertaking the activities the Contractor proposes to accomplish the objectives laid out in Objective 2.1 and 2.2 of Annex One.
It is unlikely that MCC could extend the eight week time period for the activities mentioned because the results of the assessment are required to meet compact development milestone deadlines.
3. Staffing - The Team Leader has The estimated hours breakdown of the staff has the team lead at approximately 500 hours, or roughly 1/3 of the 10-month base period, with specialists at the same or lower LOEs. Would MCC be open to a staffing model with 2-3 staff on the project at a higher-level LOE with reachback to additional technical specialists as needed?
A - MCC is open to the staffing model proposed in this question. MCC has tried to provide sufficient information to allow bidders maximum flexibility to structure their consultant team in the most efficient and effective manner possible. The Total Labor Hours table is meant to exemplify that consultants with different amounts of expertise or relevance to the tasks required in the SOW will have varying levels of
LOE.
4. Budget Template – No Attachment J.3 is provided as mentioned in the RFP. Should offerors submit their own budget template?
A – The budget template is provided in the Attachment J.1 on Page 44.
5. Section B.1 states “This is a combined synopsis/solicitation for commercial items prepared in accordance with Subpart 12.6” however, the requirements in L.5 Volume III Price/Business Quote pg 54 requesting the cost details behind our commercial rates would seem to be in conflict. Would MCC please confirm our understanding that the fully burdened commercial rates and prices for the CLINs enumerated in Section B are required without additional cost detail substantiation?
A – MCC requires to submit fully burdened labor rates in the budget template in section J.1 and in the budget narrative the quotes must provide with a split for the labor rates that consists of all elements included in the fully loaded labor rate for this requirement.
End of modification 0002.
| Text52: |
| Text54: 1 |
| Check Box91: Yes |
| Check Box92: Off |
| Check Box95: Yes |
| Check Box96: Off |
| Check Box97: Off |
| Check Box98: Off |
| Check Box99: Off |
| Check Box100: Yes |
| Check Box101: Off |
| CUST_PROJ_CODE: |
| NO_OF_COPIES: 1 |
| TOTAL_NO_OF_PAGES: 2 |
| Text1: AMENDMENT CONTROL NUMBER : |
| AMENDMENT_DESCRIPTION: to respond to questions received. |
| Text134: SUMMARY OF CHANGES : |
| SOL_DOCUMENT_NUMBER: 95332418Q0123 |
| OPEN_BIDDING_DATE: 08/20/2018 |
| Text2: Same As Issuing Office |
| SOL_OPEN_BID_DATE: 08/20/2018 |
| AMD_ISSUING_OFFICE_LADDR: MCC-HQ |
Millennium Challenge Corporation, Contracts and Grants Management Division, 1099 Fourteenth St NW, Suite 700 Washington, DC, 20005-3550, US
| AMD_ISSUING_OFFICE_LOCCODE: | |
| CLOSE_DATE_EXTEND_FLAG: Off | |
| HDR_DOCUMENT_NUMBER: 95332418Q01230002 | |
| 2018-08-20T11:26:33-0400 | |
| TAYLOR J. WOLF (affiliate) |
File details come from the government source that posted it.