949_Ponder_Ave._2-24-26_.pdf
PDF 7 MB Posted
- Solicitation number
- 2026-QQ-760
- Issued by
- Sarasota County, Florida
About this file
This is a project specification document for septic abandonment services at 949 Ponder Avenue in Sarasota, Florida, prepared by Sarasota County. The project involves the complete abandonment of an existing septic system at the residential property located in Sarasota County (PID 0048110055). The scope of work requires the bidder to pump and clean the septic tank, remove all septic system components including the tank and drain field, properly dispose of all waste materials in accordance with Florida Department of Environmental Protection regulations, and restore the site to a safe condition. The work must be completed in compliance with all applicable local and state codes, and the bidder is responsible for obtaining any necessary permits and conducting inspections as required by Sarasota County.
The document specifies technical requirements for the abandonment process, including proper decommissioning procedures and environmental compliance standards. Pricing terms and specific contract duration are to be negotiated based on competitive quotes submitted by interested bidders. No set-asides, incumbent information, or specific funding amounts are referenced in this specification. The project represents routine maintenance services for county-owned or county-regulated property, with all work to be performed in accordance with current Florida environmental regulations and Sarasota County standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
949 Ponder Ave. 2-24-26 LC
Page | 1
Page | 2
Page | 3
Page | 4
Page | 5
Page | 6
Page | 7
Page | 8
Page | 9
Page | 10
Page | 11
Page | 12
Page | 13
Page | 14
Page | 15
Page | 16
Page | 17
Page | 18
Page | 19
Page | 20
Page | 21
Page | 22
Page | 23
Page | 24
Page | 25
Page | 26
Page | 27
Page | 28
File details come from the government source that posted it. Updated .