About this file

This is an addendum issued by the City of Madison Department of Public Works Engineering Division on October 27, 2022, for Contract No. 9246 concerning a topographic survey at Robin Greenway and West Towne Pond. The project requires topographic, bathymetric, and boundary survey work to support future design and reconstruction activities. The Robin Greenway site is located at 4613 Gregg Road and encompasses approximately 3 acres, while the West Towne Pond site is located at 6715 Mineral Point Road and encompasses approximately 25 acres, with additional survey work required outside the defined project limits. Addendum No. 2 revises the project description in Attachment B of the Scope of Services to clarify that this Request for Bid excludes reconstruction work, limiting the scope to survey activities only.

The addendum does not specify pricing terms, response dates, or contract award information within its content. No set-asides, incumbent information, or detailed funding sources are identified in this document. The addendum serves solely to modify the original contract documents by providing clarification on project scope exclusions to ensure bidders understand that reconstruction activities are not part of this contract opportunity.

View the file

Other files

File Type Posted
9246 Addendum 3.pdf PDF
Topographic Survey Bids.pdf PDF
9246 Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Public Works

Engineering Division James M. Wolfe, P.E., City Engineer

City-County Building, Room 115 210 Martin Luther King, Jr. Boulevard Madison, Wisconsin 53703

Phone: (608) 266-4751 Fax: (608) 264-9275 engineering@cityofmadison.com www.cityofmadison.com/engineering

October 27, 2022

NOTICE OF ADDENDUM

ADDENDUM NO. 2

CONTRACT NO. 9246

TOPOGRAPHIC SURVEY AT ROBIN GREENWAY AND WEST TOWNE POND

Revise and amend the contract document(s) for the above project as stated in this addendum, otherwise, the original document shall remain in effect.

REVISE:

Attachment B Scope of Services: Revised Project Description to clarify this Request for Bid excludes reconstruction.

PROJECT DESCRIPTION

This project will consist of topographic, bathymetric and boundary survey work. This work must be sufficient to support future design work that includes eventual reconstruction of existing greenway channels, ponds, utility, and street reconstruction as necessary for Robin Greenway (4613 Gregg Rd) and

West Towne Pond (6715 Mineral Point Road, Madison, WI). See Attachment A for project information.

The total project area for Robin Greenway is approximately 3 acres and total project are for West Towne

Pond is approximately 25 acres (not including required survey outside of project limits identified below).

for

James M. Wolfe, P.E., City Engineer

CC:

Deputy City Engineer Bryan Cooper, AIA

Gregory T. Fries, P.E.

Chris Petykowski, P.E.

Deputy Division Manager Kathleen M. Cryan

Principal Engineer 2 John S. Fahrney, P.E.

Janet Schmidt, P.E.

Principal Engineer 1 Christina M. Bachmann, P.E.

Mark D. Moder, P.E.

Financial Manager Steven B. Danner-Rivers mailto:engineering@cityofmadison.com http://www.cityofmadison.com/engineering

File details come from the government source that posted it. Updated .