9222 - Example BOM.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Rogue River-Siskiyou NF-Communications Shelter Manufacture, Delivery, and Installation
Solicitation number
127604259222
Issued by

About this file

This is a Bill of Materials (BOM) for a communications shelter project at Fiddler Mountain for the Rogue River-Siskiyou National Forest. The document details requirements for an 8x8 walk-in enclosure with DC power layout to be installed at coordinates 42N 14' 24.94", 123W 48' 2.75" at 4,916 ft elevation. The shelter specifications include two 19" telecom equipment racks, battery trays, DC LED lighting, power entry provisions tied to a Faraday cage, passive ventilation, and a 50' integrated tower structure rated for TIA-222 Risk category II with capability to support five Command 150-5N antennas.

The scope includes manufacture, delivery to Cave Junction, OR, installation at the site location, and backhaul/disposal of an existing 8'x8'x8' shelter weighing approximately 3,000 lbs. Key requirements include solar mounting provisions, cable entry panels, antenna mounting brackets with 18-inch standoffs, and an OSHA-compliant fall restraint system. The contractor is responsible for project management activities and must repair any damage to adjacent facilities at their own expense. Site preparation and subsurface work are explicitly excluded from the scope.

View the file

Other files

File Type Posted
9222 -RFI for Comm Shelters.pdf PDF
PWS_Shelter.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R6 Fiddler Mtn.

Bill of Materials

Unit Name to Ship to:Rogue River-Siskiyou NF
Point of Contact (Local SAT):TBD
Phone (Local SAT):TBD
Street Address:26568 Redwood Highway
City, State:Cave Junction, OR
Zip:97523
Additional Information needed for request.
Project Point of Contact (name and phone):TBD
Additional Technical Contact (name and phone), if applicable:TBD
WR# or Incident Number:20253800
Override/Job Code:2505/ITJVAA25
Q-CodeTBD
IAS PMOTBD
UAITBD
BOC3290
AAP#RPSH
POW Line Item # and Project DescriptionFiddler Mtn. Shelter Replacement
COR, if applicable:TBD
Comments:Drive-in install: Lat 42N 14' 24.94", Long 123W 48' 2.75", Elevation: 4916ft. Door location: West, Tower: East
LINE
ITEMDESCRIPTIONManufacturers Part NumberUnit of IssueQTYUNIT
PRICETOTAL

PRICE

1SHELTER DESCRIPTION
28x8 Walk-in Enclosure w/ DC power layoutEA1$ - 0
3INTERIOR LAYOUT
519" Telecom Equipment rackEA2$ - 0
6Battery Tray for 19" telecom rackEA2$ - 0
7Rack Mounted Busbar for 19" Telecom rackEA1$ - 0
9First Aid KitEA1$ - 0
10Wall mounted light switchEA1$ - 0
11DC led lights with fixtures mounted to ceilingEA2$ - 0
12POWER ENTRY
13DC Power EntryEA2$ - 0
1424-volt surge suppression deviceEA2$ - 0
15Note: Power entry provisions must be tied to Faraday Cage
16VENTILATION
17Passive ventilationEA1$ - 0
18TOWER
1950' integrated tower structureEA1$ - 0
20Notes: Antennas used for loading calculations shall be (5) Command 150-5N antennas; (1) each at 50',45',40,35 & 30' marks. Tower rating shall follow TIA-222 Standards for a Risk category II structure. Site 3-second wind speed is 94mph, and radial ice loading is less than 1 inch.
21SOLAR
22Provisions for Roof and Wall mounted solar bracketsEA1$ - 0
23Solar bracketEA1
24CABLE ENTRY
256-port telecom entrance panel for coaxial cablesEA1
264-inch cable entry glands (Cable Type: LDF4, 1-Hole per entry gland)EA3$ - 0
27Cable Entry CoversEA3$ - 0
28Note: CAble entry provisions must be tied to Faraday Cage
29ANTENNA MOUNTING
30Mounting Brackets, hardware, and 18-inch standoffs suitable for attaching (3) Command 150-5N antennas onto tower structureEA3$ - 0
31Fall restraint: anchor point on roof of shelter that meets OSHA standard 29 CFR § 1926.502(d)(15) capable of sustaining 5,000lbs. (22.2KN) of forceEA1$ - 0
32Site Specific DrawingEA1$ - 0
33Delivery & Offload at FS Staging Location: 26568 Redwood Highway Cave Junction, OR 97523EA1$ - 0
34Drive-In Install: Transport shelter form staging location, transport, and install shelter at: Lat 42N 14' 24.94", Long 123W 48' 2.75", Elevation: 4916ft. Door location: North, Tower: EastEA1$ - 0
35Backhaul: 8'x8'x8' shelter weighing approx. 3,000 lbs. and dispose at landfill.EA1$ - 0
36Mob & DemobEA1$ - 0
37Project Management: Requirements for PM activities outlines in Performance Work StatementEATBD
38NOTES: Items excluded from the BOM include any subsurface work and/or site preparation. The adjacent tower, guy wires, and radio equipment will be removed prior to shelter installation. Any damage to adjacent facility including the perimeter fence will be the responsibility of the contractor to repair a their own expense.
39GRAND TOTAL$ - 0

File details come from the government source that posted it. Updated .