9181 SOW.pdf

PDF 89 KB Posted

Attached to
Electrical & Automation Services
Solicitation number
9181
Issued by
Denton County, Texas

About this file

This is a Scope of Work document issued by the City of Denton, Texas for Electrical and Automation Services related to the Denton Energy Center's generating equipment. The procurement covers maintenance and repair services for 12 Wartsila 18V50SG generating units located at 8161 Jim Christal Road, Denton, TX 76207. The scope includes general services encompassing all repairs necessary to maintain electrical and automation systems in good operating order per Original Equipment Manufacturer (OEM) specifications, 24/7 remote support services including troubleshooting and control system validation, and field services covering inspections, troubleshooting of engine control, safety, and emission control systems, and parts sourcing. The vendor must respond to requests for personnel availability within one week of notice, provide service offers and estimated start dates within one week, and complete repairs and services within five weeks of evaluation unless otherwise agreed upon. The contract will be awarded based on ability to deliver services within reasonable timeframes and criticality of equipment operation, with consideration given to past performance with the City of Denton.

Vendor selection will be evaluated using a weighted scoring methodology: Timeliness (30%), Compliance with Specifications and Quality Reliability (30%), Indicators of Probable Performance including past vendor performance and financial resources (20%), and Price/Total Cost of Ownership (20%). The respondent must be an OEM-approved distributor authorized to sell products to the City of Denton and must provide manufacturer representation for warranty issues. All services must be warranted for no less than one year from receipt of accepted units, with written guarantees detailing replacement basis terms. The vendor must demonstrate experience with Programmable Logic Controllers, generators, safety shutdown systems, and emission control systems, along with familiarity with applicable safety procedures. Proposals must include company history, equipment types serviced, parts fulfillment processes, compliance certifications, inspection procedures, repair plans with timelines, parts acquisition and installation timelines, and detailed warranty terms and conditions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

RFP 9181 Electrical & Automation Services

The City of Denton DME Denton Energy Center is soliciting proposals for Electrical and Automation Services for the 12 Wartsila 18V50SG installed at the Denton Energy Center which is located at 8161 Jim Christal Road, Denton TX, 76207.

The vendor performing the work after the (RFP) contract has been awarded will be selected based on ability to deliver the services within a reasonable amount of time and the criticality to have the equipment in service as outlined in the Vendor Selection section of this document . In addition, the vendor may be selected based on past performance with the City of Denton.

Work perform under this contract shall not void any guarantees or warrantees provided by the OEM in cases where warranty still exists.

Scope

Following is a description of the scope of services being procured:

SERVICES:

A. General Services

a. All repairs necessary to plant electrical and automation systems to keep generating units for the Denton Energy Center equipment in good operating order as intended by the OEM. This will include corrective or preventive work.

b. Repairs to include, but not limited to:

i. Replacement Services

ii. Any other activity to ensure the equipment operates within the OEM specifications.

c. Programming, commissioning, and testing as needed.

B. 24/7 Remote Support Services

a. Provide remote support to plant personnel.

b. Provide troubleshooting assistance.

c. Review and validate control systems.

C. Field Services

a. All inspections and troubleshooting necessary to keep generating units for the Denton Energy Center equipment in good operating order as intended by the OEM.

This will include corrective or work.

b. Services to include, but not limited to:

i. Troubleshooting engine control systems

ii. Troubleshooting engine safety systems

iii. Troubleshooting emission control systems

iv. Source parts and material for repairs

v. Any other activity to ensure the equipment operates within the OEM specifications

D. For the purposes of this document reasonable times shall be defined as follows:

a. Respond with person(s) available to perform work- no more than 1 week from notice.

b. Provide service offer and estimated start date- no more than 1 week from notice.

c. Repairs and services- no more than 5 weeks from evaluation unless otherwise agreed upon by city representative.

Locations

Equipment within this scope of work will be located at the following locations as noted above:

1. Denton Energy Center: 8161 Jim Christal Rd. Denton, TX 76207

Hours of Operation

Denton Energy Center- 24/7

Qualifications

The vendor shall submit a proposal including company history, including previous experience with the City of Denton and its relationship with engine control systems, Programable logic controllers, generators, safety shutdown systems, and emission control systems.

Due to the unknown nature of the work, the City will consider hourly pricing in its evaluation, however, pricing will not be the only consideration used in deciding which vendor is awarded the contract.

Emergency Repairs

Emergency repairs shall be those that need to be completed in the least amount of time due to the possibility of compromised safety and equipment health within the Denton Energy Center

Vendors for emergency repairs shall be selected based on response time and ability to perform the work.

Warranty

All services performed under this contract shall be warranted no less than 1 year. Including needed equipment, tools, or machinery to perform and complete warranty work as needed.

Written guarantees shall include any limitations as to the nature of failure or time limitations.

The guarantee shall begin upon receipt of the accepted units, not on the date of manufacture.

Guarantees shall indicate whether or not it is made on a full replacement basis or a prorated basis and if prorated then what are the terms. The Manufacturer/Supplier guarantees that the products furnished under this specification are of new Original Equipment Manufacturer (OEM) specifications and quality. All replacements by the Manufacturer/Supplier shall be free of charge F.O.B. at the same delivery point called for in the original order.

The respondent must be an approved distributor by the Original Equipment Manufacturer (OEM) of these products, and is authorized to sell the products to the City of Denton. The respondent also guarantees that the City will be represented by the Manufacturer/Supplier, should an issue arise, and that all Manufacturer’s warranties will be in effect for the life of the contract.

Safety

The vendor shall be familiar with safety procedures related to the equipment being worked on.

The City of Denton shall have any safety data sheets (SDSs) for all bulk chemicals used at its treatment facilities.

The City of Denton will assist the vendor in shutting down and deenergizing equipment for the purposes of performing maintenance and repairs. Lock out/Tag out procedures will be followed.

The vendor shall have all tools and equipment necessary. Due to liability reasons, The City cannot lend any tools or equipment to the company performing the work other than approved manufacturer tools on site.

Scoring

Schedule Timeliness (FACTOR: 30%)

Ability to timely start and complete project. This includes the schedule to complete project and may include ability to meet required milestones of completion. For supplies, the estimated delivery after receipt of order and meet delivery windows.

Compliance with specifications, quality, reliability, characteristics to meet stated or implied needs

(FACTOR: 30%)

Compliance with the stated specification(s) coupled with the quality and reliability of the goods and services such that bear on its ability to meet the stated/implied needs.

Indicators of Probable Performance under contract (FACTOR: 20%)

Indicators of probable performance under the contract to include: past vendor performance, financial resources and ability to perform, experience of demonstrated capability and responsibility, references, and the vendor’s ability to provided reliable maintenance agreements and support.

Price, Total Cost of Ownership (FACTOR: 20%)

The price of items, to include total cost of ownership, such as installation costs, life cycle costs, and warranty provisions.

Proposal Requirements

1. Please itemize proposal per section outlined below.

Section A. Introduction

• Briefly describe company experience in PLC systems, hardware installation, programming, commissioning and testing, and installation support for Wartsila W50SG-B units.

Section B. Scope of Work

• List equipment types serviced.

• Include:

o Parts fulfillment process for services.

o Logistics and support during service.

o Inspection and quality control steps.

Section C. Compliance and Safety

• Confirm compliance with industry standards and regulations.

• List certifications, compliance and safety measures.

• Confirm repairs meet safety standards.

Section D. Assessment & Inspection

• Explain initial inspection for damage or maintenance is documented.

• Describe how findings are documented and communicated.

Section E. Repair Plan & Timeline

• Step-by-step repair process.

• Special tools/techniques used.

Section F. Acquisition Timeline

• Delivery and installation timeline for parts and material.

• Logistics and support during installation.

Section G. Warranties

• Include detail of warranties on repairs and parts used.

• Include terms and conditions.

File details come from the government source that posted it. Updated .