911th Paratech Servicing PWS _31JUL2026.pdf

PDF 224 KB Posted

Attached to
Paratech Equipment
Solicitation number
PANCC26P0000053338
Issued by

About this file

This is a Performance Work Statement (PWS) for the Paratech Preventative Maintenance Program (PMP) for the 911th Technical Rescue Engineer Company located at Fort Belvoir, Virginia.

The contract requires the contractor to provide comprehensive on-site preventative maintenance, inspection, and function checks for Paratech rescue equipment used by the 911th TREC, an urban search and rescue unit supporting the National Capital Region. The total contract value is $8,000.00, which includes a dedicated $1,000.00 allowance for replacement parts and gaskets. Services include comprehensive inspection and function checks of each Paratech component, light cleaning and lubrication as required, checking and adjusting fluid levels in all equipment pumps, formal documentation of worn or broken components, and application of updated service stickers. Beyond the scheduled maintenance visit, the contractor provides a 10% discount on additional Paratech repair parts, 10% discount on on-site repair labor outside standard service, and priority scheduling for troubleshooting and repairs. The base year performance period runs from August 2026 to August 2026. The contract type is Firm Fixed Price. The contractor must consolidate all items requiring maintenance at a single central location prior to arrival and return signed service agreements to the contracting officer upon award. All work is performed at the 911th TREC facility between 0800 and 1700, Monday through Friday, excluding federal holidays. The contractor must develop and maintain a written Quality Control Plan addressing continuous process improvement, inspection procedures, discrepancy identification and correction, root cause analysis, trend analysis, and customer feedback procedures.

View the file

Other files

File Type Posted
Sources Sought Notice 911th TREC PARATECH EQUIPMENT.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

911th Technical Rescue Engineer Company

Paratech Servicing

PART 1

GENERAL INFORMATION

1. General: This is a non-personal services contract to provide the Paratech Preventative Maintenance Program (PMP). The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn, is responsible to the government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, tools, materials, supervision, and labor to perform on-site preventative maintenance, inspection, and function checks for the unit's Paratech rescue equipment as defined in this Performance Work Statement.

1.2 Background: The 911th Technical Rescue Engineer Company (TREC), located on Fort Belvoir, VA, relies on Paratech rescue equipment to conduct critical technical rescue and emergency response missions. The 911th TREC is an urban search and rescue unit with a critical mission in the National Capital Region (NCR). To ensure operational readiness, safety, and equipment longevity, these assets require specialized annual preventative maintenance. The Paratech Preventative Maintenance Program ensures that all components function correctly and are ready for immediate deployment in life-saving scenarios.

1.3 Objectives: To conduct comprehensive, on-site preventative maintenance and repair on Paratech rescue equipment to ensure mission readiness. The objective is to proactively identify worn or broken components, maintain optimal fluid levels, and provide documented serviceability of all rescue assets to support the unit's critical mission requirements.

1.4 Scope: The contractor shall provide the Paratech Preventative Maintenance Program (PMP) for the designated rescue equipment at a total cost of $8,000.00, which includes a dedicated $1,000.00 allowance for replacement parts and gaskets. The contractor's on-site services shall include a comprehensive inspection and function check of each Paratech component, light cleaning and lubrication as required, and checking and adjusting the fluid levels in all equipment pumps. Furthermore, the contractor shall identify and formally document any worn or broken components and apply updated service stickers to all inspected items. In addition to the physical on-site maintenance, the PMP agreement provides the government with a 10% discount on any additional Paratech repair parts, a 10% discount on any on-site repair labor outside the standard service, and priority scheduling for troubleshooting and repairs required outside of the scheduled PMP visit. To facilitate this service, all items requiring maintenance must be consolidated at a single, central location prior to the contractor's arrival. Upon award, signed service agreements must be returned to the designated contracting officer or representative.

1.5 Period of Performance: The period of performance as follows:

Base Year: August 2026 to August 2026

1.6 General Information

1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure there is no delay of Rescue Certification and to ensure that services are performed in accordance with this PWS. The contractor shall develop, implement and maintain an effective quality control system that includes a written quality control plan (QCP). The QCP shall implement standardized procedure/methodology for monitoring and documenting contract performance to ensure all contract requirements are met. The contractors’ QCP must contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the government. The QCP, as a minimum, shall address continuous process improvement;

procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; and procedures for collecting and addressing customer feedback/complaints. The contractor shall upon request provide to the government its quality control documentation.

[Insert when and how the QCP is to be delivered, i.e., within 30 days after contract award or with the contractor’s proposal if it is an evaluation factor, three copies of a comprehensive written QCP shall be submitted to the contracting officer (KO) and contracting officer representative (COR) within five (5) working days when changes are made thereafter.] After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to its QC system.

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is a government only document primarily focused on what the government must do to assure that the contractor has performed in accordance with the requirements of the contract.

1.6.3 Federal Government Holidays: The contractor is not required to perform services on Federal holidays.

New Year’s Day 1st day of January Martin Luther King Jr. Day 3rd Monday of January Presidents Day 3rd Monday of February Memorial Day Last Monday of May Juneteenth Day 19th day of June Independence Day 4th day of July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11th day of November Thanksgiving Day 4th Thursday of November

Christmas Day 25th day of December

1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0800 and 1700 Monday through Friday except federal holidays or when the government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.4.1. The contractor is responsible for providing all personnel, equipment, tools, materials, supervision, and safety items to perform the services necessary for Rescue Certification Training as defined in this Performance Work Statement. The rescue Training Center will be available for access between the hours of 0800 and 1700, five days a week (Monday through Friday) during the period of performance.

1.6.5 Place of Performance: The work to be performed under this contract will be performed at the 911th TREC’s facility. The site will be available for access between the hours of 0800 and 1700, five days a week (Monday through Friday) during the period of performance.

1.6.6 Type of Contract: The government will award a Firm Fixed Price contract.

1.6.7 Security Requirements: Contractor personnel (to include subcontractors) performing work under this contract must have a does not require at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached DD Form 254, Department of Defense Contract Security Classification Specification

1.6.7.1 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information, and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.7.2 Key Control N/A

1.6.7.3 Lock Combinations N/A

1.6.8 Personal Identity Verification (PIV). N/A

1.6.9 Visit Notification. N/A

1.6.10 Special Qualifications: N/A

1.6.11 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The contracting officer, COR, and other government personnel, as appropriate, does not need to meet periodically.

1.6.12 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including government drawings, designs, and specifications; monitor contractor's performance and notify both the contracting officer and contractor of any deficiencies;

coordinate availability of government furnished property; and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.13 Key Personnel: The follow personnel are considered key personnel by the government:

CPT Nia Crump, 911th TREC Commander, 1SG Jeffrey Maroko, 911th TREC First Sergeant.

The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 5:00 p.m., Monday through Friday except federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:

N/A

1.6.14 Identification of Contractor Employees: No special identification is required

1.6.16. Supervision of Contractor Employees: The government will not exercise any supervision or control over contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the contractor, not the government.

The contractor, in turn, shall be accountable to the government for contractor or subcontractor employees.

1.6.17 Contractor Travel N/A

1.6.18 Other Direct Costs N/A

1.6.19 Data Rights N/A

1.6.20 Organizational Conflict of Interest:

a. Purpose. The primary purpose of this clause is to aid in ensuring that:

(1) The Contractor does not obtain an unfair competitive advantage by establishing the ground rules for a future competition;

(2) The Contractor's objectivity and judgment are not biased because of its present or future interests (financial, contractual, organizational, or otherwise) which relate to work performed under this contract; and

(3) The Contractor does not obtain an unfair competitive advantage by virtue of its access to non-public or proprietary information belonging to others.

b. Definitions.

(1) The term “Contractor” herein used means: (a) the organization (hereinafter referred to as "it" or "its") entering into this agreement with the Government; (b) all business organizations with which it may merge, join or affiliate now or in the future and in any manner whatsoever, or which hold or may obtain, by purchase or otherwise, direct or indirect control of it; (c) its parent organization if any and any of its present or future subsidiaries, associates, affiliates, or holding companies, and; (d) any organization or enterprise over which it has direct or indirect control now or in the future.

(2) The term "proprietary information" for purposes of this clause means any information considered so valuable by its owners that it is held secret by them and their licensees.

Information furnished voluntarily by the owner without limitations on its use, or which is available without restrictions from other sources, is not considered proprietary.

c. Organizational Conflicts of Interest Examples. The following examples illustrate situations in which organizational conflicts of interest may arise. These examples are not all inclusive.

(1) Biased Ground Rules. This type of conflict may arise in situations where a company sets the ground rules for a future competition. For example, when a Contractor develops requirements then competes to provide products or services to satisfy those requirements, thus obtaining a competitive advantage.

(2) Impaired Objectivity. This type of conflict may exist where a Contractor’s obligations under a contract require objectivity, but another role of the Contractor casts doubt on its ability to be truly objective. An example of this type of conflict is where a Contractor’s work under one contract entails evaluating itself, its affiliates, or its competitors under a separate contract.

(3) Unequal Access to Information. This type of conflict may arise when a Contractor has access to nonpublic or proprietary information as part of its performance under a contract that gives it an unfair advantage in a competition for a later contract.

d. General Constraints. The provisions of FAR Subpart 9.5, Organizational and Consultant Conflicts of Interest, concerning organizational conflicts of interest govern this contract.

Potential conflicts may exist in accordance with FAR 9.505-1, Providing Systems Engineering and Technical Direction, through 9.505-

4, Obtaining Access to Proprietary Information. In this regard, the Contractor is responsible for identifying any actual or potential organizational conflicts of interest to the Contracting Officer that arise as the result of performance under this contract. To avoid or mitigate a potential conflict related to performance under this contract, the Contracting Officer will impose appropriate constraints such as the constraints discussed below. Since it is impossible to foresee all of the circumstances that might give rise to organizational conflicts of interest, the constraints discussed below are not all inclusive and the Contracting Officer may impose constraints other than, or in addition to, the constraints listed below.

(1) The Contractor agrees that if it provides, under a contract or task order or delivery order, systems engineering and technical guidance for systems and programs, but does not have overall contractual responsibility, it will not be allowed to be awarded a contract or task or delivery order to supply the system or any of its major components or be a Subcontractor or consultant to a supplier of the system or any of its major components

(2) The Contractor agrees that if it prepares complete specifications for non-developmental items or assists in the preparation of work statements for a system or services under a contract or task order or delivery order, it shall not be allowed to furnish these items, either as a prime Contractor, a Subcontractor or as a consultant.

(3) The Contractor agrees that it shall neither evaluate nor advise the Government with regard to its own products or activities. The Contractor shall objectively evaluate or advise the Government concerning products or activities of any prospective competitors.

(4) The Contractor agrees that if it gains access to proprietary information of other companies, it shall exercise diligent effort to protect such proprietary information from unauthorized use or disclosure. In addition, the Contractor agrees to protect the proprietary information of other organizations disclosed to the Contractor during performance of this contract with the same caution that a reasonably prudent Contractor would use to safeguard highly valuable property.

The Contractor also agrees that if it gains access to the proprietary information of other companies it shall enter into written agreements with the other companies to protect their information from unauthorized use or disclosure for as long as it remains proprietary and to refrain from using the information for any purpose other than that for which it was furnished.

The Contractor shall provide copies of such agreements to the Contracting Officer.

(5) If the Contractor, in the performance of this contract, obtains access to plans, policies, reports, studies, financial plans, data or other information of any nature which has not been released or otherwise made available to the public, the Contractor agrees that without prior written approval of the Contracting Officer, it shall not: (a) use such information for any private purpose unless the information has been released or otherwise made available to the public, or

(b) release such information unless release is otherwise authorized under the contract or such information has previously been released or otherwise made available to the public by the Government.

e. Non-Disclosure Agreements. The Contractor shall obtain from each employee who has access to proprietary information under this contract, a written agreement which shall in substance provide that such employee shall not, during his/her employment by the Contractor or thereafter, disclose to others or use for their benefit, proprietary information received in connection with the work under this contract. The Contractor shall educate its employees regarding the restrictions so that they shall not use or disclose proprietary information or data generated or acquired in the performance of this contract except as provided herein.

f. Training. The Contractor shall effectively educate its employees, through formal training, company policy, information directives and procedures, in an awareness of the legal issues so that each employee shall know and understand the bsolute necessity of safeguarding information from anyone other than the Contractor's employees who have a need to know, and the U.S.

Government.

g. Subcontracts. The Contractor agrees that it shall include the provisions in paragraphs d., e., and f. above and this paragraph in consulting agreements, teaming agreements, and subcontracts of all tiers which involve access to information or the performance of services described in paragraph d. above. The use of this clause in such agreements shall be read by substituting the word "consultant" or "Subcontractor" for the word "Contractor" whenever the latter appears.

h. Additional Constraints. If this contract provides for the issuance of task or delivery orders, such orders may impose additional requirements and restrictions relating to this clause to include the requirement for the Contractor and its Subcontractors and employees to furnish the Government with written non-disclosure agreements or statements of no conflict of interest.

With regard to any proposal submitted by the Contractor in response to a Request for Task or Delivery Order Proposal, by submitting its proposal the Contractor represents that it has disclosed to the Contracting Officer, prior to the issuance of the task or delivery order, all facts relevant to the existence or potential existence of organizational conflict of interest.

i. Conflicts Involving Future Procurements. The award of this contract, task or delivery orders issued under this contract, Government taskings, or acquiescence in the Contractor’s performance of services hereunder shall not constitute or be interpreted as a determination that the Contractor is eligible to participate in future procurements, developmental efforts, implementation efforts, or related activities. Only the Contracting Officers for such efforts, applying the rules, principles, and procedures have the authority to determine whether a conflict exists in connection with such procurements.

j. Representations and Disclosures.

(1) The Contractor represents that it has disclosed to the Contracting Officer, prior to award of this contract, all facts relevant to the existence or potential existence of organizational conflict of interest.

(2) The Contractor represents that if it discovers an organizational conflict of interest or potential conflict of interest after award of this contract, a prompt and full disclosure shall be made in writing to the Contracting Officer. This disclosure shall include a description of the action the Contractor has taken or proposes to take in order to avoid or mitigate such conflict.

k. Remedies and Waiver.

(1) For breach of any of the above restrictions or for non-disclosure or misrepresentation of any relevant facts required to be disclosed concerning this contract, the Government may terminate this contract for default, disqualify the Contractor for subsequent related contractual efforts, and pursue such other remedies as may be permitted by law or this contract. If, however, in compliance with this clause, the Contractor discovers and promptly reports an organizational conflict of interest (or the potential thereof) subsequent to contract award, the Contracting Officer may terminate this Contract or any task or delivery order issued under this Contract for convenience if such termination is deemed to be in the best interest of the Government.

(2) The parties recognize that this clause has potential effects which will survive the performance of this contract and that it is impossible to foresee each circumstance to which it might be applied in the future. Accordingly, the Contractor may at any time seek a waiver from the cognizant Contracting Officer by submitting a full written description of the requested waiver and the reasons.

1.6.21 COMBAT TRAFFICKING IN PERSON.

IAW FAR 52-222-50. Contractor Requirements.

The Contractor shall –

(1) Notify its employees of

(i) The U.S. Government's zero tolerance policy.

(ii) Actions that will be taken against employees for violations of this policy.

(2) Take appropriate action.

Part II, Trafficking in Persons (TIP)

1. The Contractor has a procedure for notifying employees of TIP and proof of such notification on file via:

i. Training records or

ii. Employee signature

2. Has documented actions on file citing appropriate action to TIP violations.

3. Record of documented violations to date (if any).

4. The Contractor has a procedure for notifying the Contracting Officer if information is received or actions related to TIP are observed.

1.6.22. Intentionally left blank

1.6.23 PHASE IN /PHASE OUT PERIOD N/A

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACT ADMINISTRATOR. The official government representative delegated authority by the contracting officer to administer a contract. This individual is normally a member of the appropriate contracting/procurement career field and advises on all technical contractual matters.

2.1.2. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or services to the government. The term used in this contract refers to the prime.

2.1.3. CONTRACTING OFFICER. A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government.

Note: The only individual who can legally bind the government.

2.1.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.

government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does not have authority to change the terms and conditions of the contract.

2.1.5. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the performance work statement.

2.1.6. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.7. GOVERNMENT-FURNISHED PROPERTY (GFP) OR GOVERNMENT PROPERTY

(GP). Property in the possession of, or directly acquired by, the government and subsequently made available to the contractor.

2.1.8. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the key personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.9. PHYSICAL SECURITY. Actions that prevent the loss or damage of government property.

2.1.10. QUALITY ASSURANCE. The government procedures to verify that services being performed by the contractor are acceptable in accordance with established standards and requirements of this contract.

2.1.11. QUALITY ASSURANCE SPECIALIST. An official government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the contracting officer in these areas.

2.1.12. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.13. QUALITY CONTROL. All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.14. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The government does not have privity of contract with the subcontractor.

2.1.15. WORK DAY. The number of hours per day the contractor provides services in accordance with the contract.

2.1.16. WORK WEEK. Monday through Friday, except for federal holidays unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation AT Anti-Terrorism CFR Code of Federal Regulations CMR Contract Manpower Reporting CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer NCR National Capital Region

OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: N/A

3.2 Facilities: N/A

3.3 Utilities: N/A

3.4 Equipment: Paratech equipment: 911th TREC will provide access to all Paratech equipment for contractors to perform preventative maintenance on.

3.5 Travel: N/A

3.6 Materials: N/A

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General: The contractor shall furnish all supplies, equipment, and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.1.1. The contractor shall provide all necessary equipment to adequately perform preventative maintenance on all 911th TREC Paratech equipment.

4.2. Secret Facility Clearance: N/A

4.3. Materials: The Contractor shall provide all necessary materials not provided by the Government and specified in Part 3 of this PWS.

4.4. Equipment: The Contractor shall provide all compatible materials and equipment to perform services described in the PWS and associated contract documents.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1. Basic Services. The contractor shall provide all personnel, equipment, tools, materials, and supervision to perform the training and testing necessary to maintain Paratech equipment.

5.2. Task Heading.

5.2.1 Debris Removal: N/A

5.2.2 Personal Protective Equipment: The contractor shall provide protective equipment to their personnel as needed.

5.2.3 Meals: N/A

5.2.4 Project Management and Safety: The contractor must provide personnel to ensure prevenative maintenance adheres to safety standards.

5.2.5 Class Schedule and Equipment: N/A

5.2.6 Instruction: N/A

5.2.7 Materials for Instruction: N/A

5.2.8 Training and Testing: N/A

5.3. Environmental Mitigation Efforts:

5.3.1. Contractor shall strictly comply with federal, local, and state environmental regulations will to prevent any adverse impacts on surrounding ecosystems and communities.

5.3.2. During operations, if hazardous spills occur, the contractor shall report it immediately to the government PM and/or COR.

5.3.4. Project Management and Safety: The contractor must provide project management and safety personnel to ensure work adheres to safety standards.

5.3.5. General Cleanup: The contractor shall provide a thorough cleanup of the site after work is done.

5.4. Service Contract Report (SCR): N/A

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The contractor (to include sub-contractors) must abide by all applicable regulations, publications, manuals, and local policies and procedures.

6.1.1 Department Of Defense Contract Security Classification Specification (DD Form 254)

6.1.2. Department of Defense Security Agreement (DD Form 441)

6.1.3. National Industrial Security Program Operating Manual (DoD 5220.22-M)

6.1.4. Installation Access Control (AE Reg 190-16)

6.1.5. The Army Physical Security Program (AR 190-13)

6.1.6. Contractor Identification (AE Reg 27-715)

6.1.7. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)

6.1.8. Information Assurance Workforce Improvement Program (DoD 8570-M)

6.1.9. Information Assurance Training Certification and Workforce Management Directive (DoDD 8570.01)

6.10. Information Assurance (AR 25-2)

6.11. Electromagnetic Compatibility Directive (2004/108/EC)

6.12. Policies and Procedures for Property Accountability (AR 735-5)

File details come from the government source that posted it. Updated .