About this file

This is a bid document package for the Lafayette Parish Communication District in Louisiana for the construction of a new equipment building for the district's 911 facility. The project consists of new construction for a single-story, air-conditioned metal building measuring approximately 1,587 square feet (51'-4" X 30'-3") featuring two roll-up doors and a front concrete apron, with some plumbing and electrical work to connect to existing utilities. The project is located at 1810 West Willow Street in Scott, Louisiana. Sealed bids were to be received until 10:30 AM Central Time on August 14, 2026, with a pre-bid meeting scheduled for August 4, 2026 at 10:30 AM at the Lafayette Parish Communication District EOC room. All work must be completed within 180 calendar days from issuance of the Notice to Proceed. The contract will be awarded to the lowest responsible and responsive bidder in compliance with bid documents, and the successful bidder must execute performance and payment bonds in the full amount of the contract.

Bids must be accompanied by a certified check, cashier's check, or bid bond equal to five percent (5%) of the base bid plus any additive alternates. Contractors submitting bids of $50,000 or more must be licensed under Louisiana's Contractor's Licensing Law (Chapter 24 of Title 37 of the Louisiana Revised Statutes) for the "BUILDING CONSTRUCTION" classification, with the license number displayed on the sealed bid envelope. A corporate resolution or written evidence of authority authorizing the person signing the bid must accompany all bids. The Lafayette Parish Communication District strongly encourages participation of Disadvantaged Business Enterprises (DBEs) in all contracts and procurements. The contract includes a one-year warranty period from the date of final acceptance, and liquidated damages apply for delays beyond the contract completion date, with rates ranging from $600 to $5,000 per day depending on contract amount. The complete bidding documents were distributed electronically through Centerline BidConnect without charge.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAFAYETTE PARISH

COMMUNICATION DISTRICT

BID DOCUMENTS

for the

Equipment Bui ld ing for Lafayet te Parish Communicat ion Distr ict

1 8 1 0 W e s t W i l l o w S t r e e t / S c o t t , L o u i s i a n a 7 0 5 8 3

P R E P A R E D B Y :

Angelle Architects, LLC

Bid set dated 04/10/2026

A Limited Liability Company 1011 Berard Street• Breaux Bridge, LA, 70517•(337) 332-6688 • www.angelle.com

PROJECT MANUAL

Equipment Bui ld ing for Lafayette Par ish Communicat ion Dis t r ict

1 8 1 0 W e s t W i l l o w S t r e e t / S c o t t , L o u i s i a n a 7 0 5 8 3

Bid Set

Architectural Project No. 22114.01

Bid Set Dated 04 / 10 / 2026

Equipment Building for Lafayette Parish Communication District: 911

1810 West Willow Street / Scott, LA 70583

TABLE OF CONTENTS 1

SECTION 00 0110

TABLE OF CONTENTS

PROJECT MANUAL

DIVISION 00 – BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THE

CONTRACT

Title Sheet Table of Contents Conflict of Interest Policy Contractor Important Notice Corporate Resolution Notice Notice to Contractors

Section I Information for Bidders Section II General Conditions Section III Special Conditions Section IV Bid Bond Section V Bidder /Contractor Information Form Section VI Louisiana Uniform Public Work Bid Form Section VII Sample Corporate Resolution Section VIII Attestations Affidavit Section IX Contract Form Labor, Materials and Supplies Section X Performance and Payment Bond Section XI Affidavit of Non-Collusion Section XII Contractors Certificate of Insurance Section XIII Verification (Firearms)

Equipment Building for Lafayette Parish Communication District: 911

1810 West Willow Street / Scott, LA 70583

TABLE OF CONTENTS 2

SPECIFICATIONS

DIVISION 01 -- GENERAL REQUIREMENTS

01 1000 – Summary 01 2500 - Contract Modification Procedures 01 2900 - Payment Procedures 01 3000 - Administrative Requirements 01 3100 - Project Management & Coordination 01 3123 - Centerline Project Web Site 01 3200 - Construction Progress Documentation 01 3300 - Submittal Procedures 01 4000 - Quality Requirements 01 5000 - Temporary Facilities and Controls 01 5713 - Temporary Erosion and Sediment Control 01 6000 - Product Requirements 01 7310 - Cutting & Patching 01 7419 - Construction Waste Management and Disposal 01 7800 - Closeout Procedures 01 7810 - Project Record Documents 01 7820 - Operation & Maintenance Data

DIVISION 03 -- CONCRETE

Refer to Drawings and Details for Concrete/Pavement specifications.

DIVISION 13 – PRE-ENGINEERED METAL BUILDING

Refer to Drawings and Details for Pre-Engineered Metal Building specifications.

DIVISION 31 -- EARTHWORK

Refer to Drawings and Details for Termite Treatment specifications.

END OF SECTION

LAFAYETTE PARISH COMMUNICATION DISTRICT

CONFLICT OF INTEREST POLICY

TO AVOID ANY POSSIBLE CONFLICTS OF INTEREST, IT IS THE

POLICY OF THE LAFAYETTE PARISH COMMUNICATION

DISTRICT THAT NO DIRECT OR INDIRECT PURCHASES OF ANY

GOODS OR SERVICES WILL BE MADE FROM EMPLOYEES.

ACCORDINGLY, IF YOU HAVE RECEIVED THIS BID OR QUOTE

PACKAGE, AND IF YOU ARE AN EMPLOYEE OF THE LAFAYETTE

PARISH COMMUNICATION DISTRICT, OR IF ANY MEMBER OF

YOUR COMPANY IS A LAFAYETTE PARISH COMMUNICATION

DISTRICT EMPLOYEE, PLEASE DO NOT SUBMIT A BID OR QUOTE

FOR THE PRODUCT, GOOD, OR SERVICE REQUESTED BECAUSE

WE CANNOT, NOR WILL WE ACCEPT THE BID OR QUOTE.

THIS DOCUMENT CONSTITUTES OFFICIAL NOTIFICATION OF

THE LAFAYETTE PARISH COMMUNICATION DISTRICT’S

CONFLICT OF INTEREST POLICY, AND THUS, ESTABLISHES THE

REQUIREMENT THAT THE INDIVIDUAL OR COMPANY IN

RECEIPT OF THIS REQUEST FOR BID OR QUOTE IS SOLELY

RESPONSIBLE FOR NOTIFYING LAFAYETTE PARISH

COMMUNICATION DISTRICT THAT A CONFLICT OF INTEREST

EXISTS.

PLEASE CONTACT LAFAYETTE PARISH COMMUNICATION

DISTRICT AT (337) 291-5060 AND SPEAK WITH CRAIG STANSBURY

OR JAMIE GUINS.

IMPORTANT

IF YOU ARE SUBMITTING A BID FOR LABOR &

MATERIAL PLEASE MAKE SURE THAT:

THE COMPANY NAME WHICH APPEARS ON

THE BID ENVELOPE IS THE EXACT SAME

NAME AS THAT FOR WHICH YOU ARE

LICENSED BY THE STATE OF LOUISIANA

LICENSING BOARD;

YOU MUST BE LICENSED FOR THE CLASS AS

STATED IN THE NOTICE TO BIDDERS AND

INSURE THAT STATE OF LOUISIANA LICENSE

NUMBER APPEARS ON THE ENVELOPE IF

YOUR BID IS FIFTY THOUSAND DOLLARS

($50,000) OR MORE.

IMPORTANT

IMPORTANT NOTICE REGARDING

CORPORATE RESOLUTION

A CORPORATE RESOLUTION OR WRITTEN EVIDENCE OF

AUTHORITY AUTHORIZING THE PERSON SIGNING THE

BID MUST BE SUBMITTED WITH YOUR BID PURSUANT TO

LA. R.S.38:2212 B(5). THIS RESOLUTION OR WRITTEN

EVIDENCE OF AUTHORITY MUST BE SIGNED BY AN

OFFICER WHO IS CURRENTLY LISTED WITH THE

SECRETARY OF STATE. THE AUTHORITY OF THE

SIGNATURE OF THE PERSON SUBMITTING THE BID SHALL

BE DEEMED SUFFICIENT AND ACCEPTABLE IF THE

CONDITIONS LISTED IN THE INFORMATION FOR BIDDERS

ARTICLE 2 ARE MET.

FAILURE TO SUBMIT THE CORPORATE RESOLUTION OR

WRITTEN EVIDENCE OF AUTHORITY WITH YOUR BID

SHALL RESULT IN REJECTION OF YOUR BID.

NOTE: SECRETARY OF STATE BUSINESS LISTING SHALL

NOT BE ACCEPTED AS A CORPORATE RESOLUTION.

NOTICE TO CONTRACTORS

Notice is hereby given that sealed bids will be received in the office at Lafayette Parish Communication District building, located at 1810 W. Willow Street, Scott, Louisiana, until 10:30 AM Central Time on the 14th day of August , 2026 for the following:

EQUIPMENT BUILDING FOR LAFAYETTE PARISH

COMMUNICATION DISTRICT - 911

and will, shortly thereafter, be opened. Bids received after the above specified time for opening shall not be considered and shall be returned unopened to the sender.

Scope of Services: The scope of the project consists of Project consists of new construction for a single-story, metal building, which is approximately 1,587 square feet with these features: Project consists of new 51’-4” X 30’-3” air-conditioned metal building with (2) roll-up doors and front concrete apron. Some plumbing and electrical to connect to existing utilities. All work to be completed within 180 calendar days from issuance of Notice to Proceed.

Bids must be signed in accordance with LRS Title 38:2212(B)5. A Corporate Resolution or Certificate of Authority authorizing the person signing the bid is required to be submitted with bid. Failure to submit a Corporate Resolution or Certificate of Authority with the bid shall be cause for rejection of bid.

Complete Bidding Documents for this project are available from Complete Bidding Documents for this project are being distributed in electronic form on behalf of the Owner by Centerline BidConnect. They may be obtained without charge and without deposit from the Public Plan Room at www.centerlinebidconnect.com . Printed copies are not available from the Owner or Designer, but arrangements can be made to obtain them through most reprographic firms. Plan holders are responsible for their own reproduction costs. Questions about this procedure shall be directed to: Centerline - Phone: 504-291-5738, Email: bidconnect@centerline.co.

Contractors are requested to attend a pre-bid meeting, which will be held on August 4, 2026 at _10:30_AM in the EOC room, Lafayette Parish Communication District, 1810 West Willow Street, Scott, LA.

Each bid shall be accompanied by a certified check, cashier’s check, or bid bond payable to the Lafayette Parish Communication District, the amount of which shall be five percent (5%) of the base bid plus additive alternates.

If a bid bond is used, it shall be written by a surety or insurance company currently on the U.S. Department of the Treasury Financial Management Service list of approved bonding companies which is published annually in the Federal Register, or by a Louisiana domiciled insurance company with at least an A-Rating in the latest printing of the A.M. Best’s Key Rating Guide to write individual bonds up to ten percent (10%) of policyholders’ surplus as shown in the A.M. Best’s Key Rating Guide, or by an insurance company in good standing licensed to write bid bonds which is either domiciled in Louisiana or owned by Louisiana residents. The bid bond shall be issued by a company licensed to do business in Louisiana. The certified check, cashier’s check, or bid bond shall be given as a guarantee that the bidder shall execute the contract, should it be awarded to him, in conformity with the contract documents within ten (10) days.

No contractor may withdraw its bid prior to the deadline for submission of bids. Withdrawal of bids thereafter shall be allowed only pursuant to LA R.S. 38§2214.C. Otherwise, no bidder may withdraw his bid for at least forty-five (45) days after the time scheduled for the bid opening of bids. Each bid shall be submitted only on the bid form provided within the specifications. The successful bidder will be required to execute performance and labor and material payment bonds in the full amount of the contract as more fully defined in the bid documents.

No contractors may withdraw his bid for at least forty-five (45) days after the time scheduled for the opening of bids. Each bid shall be submitted only on the bid form provided with the specifications. The successful contractor will be required to execute performance and labor and material payment bonds in the full amount of the contract as more fully defined in the bid documents.

https://urldefense.com/v3/__http:/www.centerlinebidconnect.com__;!!M-IDCf6hR8hg!r4AzlZroMGOYvMAUeebTVUSaKzGafSxV2_o6lcm8bEZeoJbASQudlXgPT_BTM9-r9LAl5S5RVv0bmaKIR3Y$ mailto:bidconnect@centerline.co

Bids will be evaluated by Lafayette Parish Communication District based on the lowest responsible and responsive bid submitted which is also in compliance with the bid documents. The Lafayette Parish Communication District reserves the right to reject any and all bids for just cause in accordance with LA R.S.

38§2214.B.

Contractors or contracting firms submitting bids in the amount of $50,000.00 or more shall certify that they are licensed contractors under Chapter 24 of Title 37 of the Louisiana Revised Statutes of 1950 and show their license number on the front of the sealed envelope in which their bid is enclosed. Contractors shall be licensed for the classification of “BUILDING CONSTRUCTION”. Bids in the amounts specified above which have not bid in accordance with the requirements, shall be rejected and shall not be read. Additional information relative to licensing may be obtained from the Louisiana State Licensing Board for Contractors, Baton Rouge, Louisiana.

The Lafayette Parish Communication District strongly encourages the participation of DBEs (Disadvantaged Business Enterprises) in all contracts or procurements let by the Lafayette Parish Communication District for goods and services and labor and material. To that end, all contractors and suppliers are encouraged to utilize DBEs business enterprises in the purchase or sub-contracting of materials, supplies, services and labor and material in which disadvantaged businesses are available. Assistance in identifying said businesses may be obtained by calling 291-5060.

Craig Stansbury Lafayette Parish Communication District

PUBLISH DATES: 07/20/2026, 07/27/2026, 08/03/2026

Information to Bidders REVISED January 2021

SECTION I

INFORMATION FOR BIDDERS

ARTICLE 1 - PRINTED FORM FOR BID

Bids must be submitted on the Bid Form found in the Contract Documents. Bids should be clearly and legibly filled out in ink and/or typewritten and must contain the signature or facsimile thereof of the Bidder or an authorized representative. Lafayette Parish Communication District shall have the right to reject any bid in the event that it is unable to reasonably determine the information and bids supplied by the Bidder as a result of the manner and method by which the Bidder has completed the Bid Form.

All bids must be submitted in a sealed envelope displaying the bidder’s name, address, and Louisiana Contractor’s License Number. Bids should be either mailed or hand-delivered to the Lafayette Parish Communication District at 1810 West Willow Street, Scott, LA 70583. The exterior of the envelope must clearly indicate the name of the bid.

In the event that the Detailed Specifications, Information for Bidders or Special Conditions differ from the General Conditions, the Special Conditions shall take precedence over the Detailed Specifications. The Detailed Specifi-cations shall take precedence over the Information for Bidders and General Conditions. The Information for Bidders shall take precedence over the General Conditions.

ARTICLE 2 - SIGNATURE AUTHORITY OF BIDDER

In accordance with LRS Title 38§2212(B)5, Corporate resolution or written evidence of authority authorizing the person signing the bid must be submitted with your bid pursuant to La. R.S. 38§2212(B)5. This resolution or written evidence of authority must be signed by an officer or the registered agent of the company who is currently listed with the Secretary of State. The authority of signature of the person submitting the bid shall be deemed sufficient and acceptable if any of the following conditions are met:

(a) The signature on the bid is that of any corporate officer listed on the most current annual report on file with the secretary of state, or the signature on the bid is that of any member of a partnership, limited liability company, limited liability partnership, or other legal entity listed in the most current business records on file with the secretary of state.

(b) The signature on the bid is that of an authorized representative as documented by the legal entity certifying the authority of the person.

(c) The legal entity has filed in the appropriate records of the secretary of state of this state, an affidavit, resolution, or other acknowledged or authentic document indicating the names of all parties authorized to submit bids for public contracts. Such document on file with the secretary of state shall remain in effect and shall be binding upon the principal until specifically rescinded and canceled from the records of the office.

Failure to submit the corporate resolution or written evidence of authority with your bid shall result in rejection of your bid.

NOTE: Secretary of State business listing shall not be accepted as a corporate resolution

ARTICLE 3 - SUBMISSION OF BID

Bids may be submitted by mail or delivered in person to the office. All bids will be opened at the time and location specified in the Bid Notice. Each bidder is responsible for ensuring that their bid is received by the Lafayette Parish Communication District prior to the scheduled bid opening date and time. Bids received after this deadline will be returned unopened. Conditional or qualified bids will not be considered.

ARTICLE 4 - OPENING OF BIDS

Bids will be opened at the date and time set forth in the Notice to Bidders. Bidders who do not submit bid security, when required, shall cause rejection of their bid.

ARTICLE 5 - DETERMINATION OF BID PRICES

In unit price bids, the total amount quoted shall be in the sum of the correct extensions of the unit price bid on each item of work, multiplied by the estimated contract quantity of work shown for the respective item. Each extension shall be carried to one hundredth of a dollar, and the last digit in the extension (or cents place) shall not be rounded off; i.e., any portion of a cent appearing in the extended amount shall be dropped from the amount. The determina-tion of bid for award of a Contract shall be made by the summation of extensions of all unit prices to reach a total amount bid.

When called for on the Bid Form, prices should be shown both in words and in figures. In the event of a discrepancy between the prices quoted in words and those quoted in figures in the bid, the words shall govern. In the event that the Bidder does not show prices in both words and in figures, the bid shall be tabulated in accordance with the form of the price provided. In case of a conflict between unit prices and the extended total price, the unit price shall govern.

The prices are to include the furnishing of all materials, plant, equipment, tools and all other facilities, and the performance of all labor services necessary or proper for the completion of the work except as may be otherwise expressly provided in the Contract Documents.

ARTICLE 6 - ALTERATIONS IN BIDS

The Contractor's Bid Form invites bids on definite plans and specifications. Only the amounts and information asked in the Bid Form furnished herein will be considered as the bid. Each Bidder shall bid upon the work exactly as specified and as provided in the bid.

ARTICLE 7 - ERASURES

Bidders should avoid errors or corrections on bids, as these may hinder Lafayette Parish Communication District's ability to interpret them. If corrections are necessary, they must be clear and allow the District to accurately assess the information. The District reserves the right to reject any bid that is unclear or cannot be reasonably understood.

ARTICLE 8 - REJECTION OF BIDS

The District reserves the right to reject any and all bids for just cause in accordance with LA R.S. 38§2214.B. The District also reserves the right to reject any and all bids should the total bid be in excess of appropriated funds and additional funding cannot be made available. Without limiting the generality of the foregoing, any bid which is incomplete, obscure, or irregular may be rejected; any bid which omits a bid on any one or more items in the Bid Form may be rejected; any bid in which unit prices are omitted or in which unit prices are obviously unbalanced may be rejected; any bid accompanied by an insufficient or irregular bid security may be rejected.

ARTICLE 9 - ACCEPTANCE OF BID

Within forty-five (45) calendar days after the date of opening of the bids, unless mutually extended, Lafayette Parish Communication District will act upon them. The acceptance of the bid will be a Notice of Acceptance in writing signed by a duly authorized representative of the District. The acceptance of the bid shall bind the successful Bidder to execute the Contract and to be responsible for liquidated damages as provided for herein. The rights and obligations provided for in the Contract shall become effective and binding upon the parties only upon its formal execution.

ARTICLE 10 - TIME FOR EXECUTING CONTRACT AND DAMAGES FOR FAILURE

TO EXECUTE

Any Contractor whose bid is accepted shall be required to execute the Contract within ten (10) days (unless an extension of time is granted by Lafayette Parish Communication District) after notice that the Contract has been awarded to him. Failure or neglect to do so shall constitute a breach of the agreement affected by the acceptance of the bid.

The damages to Lafayette Parish Communication District for such breach shall include loss from interference with his construction program and other items, the accurate amount of which will be difficult or impossible to compute.

The amount of bid security accompanying the bid of such Bidder shall be retained or proceeded against as liquidated damages for such breach. In the event any Contractor whose bid is accepted shall fail or refuse to execute the Contract as herein before provided, Lafayette Parish Communication District at its option may determine that such Contractor has abandoned the Contract and thereon the bid and the acceptance therefore shall be null and void and Lafayette Parish Communication District will be entitled to liquidated damages.

ARTICLE 11 - QUALIFICATION OF BIDDER

The District may make such investigation as it deems necessary to determine whether a bidder is “responsible bidder” and qualified to perform the work. Bidder Shall furnish to Lafayette Parish Communication District all such information and data as Lafayette Parish Communication District may reasonably request prior to award. Prior to any disqualification on the basis that a bidder is not responsible, the bidder shall be entitled to an informal hearing in accordance with LA R.S. 38§2212.X.

ARTICLE 12 - BID SECURITY

Each bid shall be accompanied by a certified check, cashier's check, or bid bond payable to the Lafayette Parish Communication District, State of Louisiana, the amount of which shall be five percent (5%) of the base bid plus any additive alternates. Any Bidder not furnishing bid security, when required, may cause rejection of his bid.

The successful Bidder's Bid Security shall be given as a guarantee that the Bidder shall execute the Contract, should it be awarded to him, in conformity with the Contract Documents. Should Lafayette Parish Communication District make an award to a Bidder who refuses to enter into a Contract, the bid security shall be forfeited to Lafayette Parish Communication District as liquidated damages.

The successful Bidder's Bid Security will be retained until he has entered into a satisfactory Contract. Lafayette Parish Communication District reserves the right to hold the Bid Security of the three lowest bidders until the successful Bidder has entered into a Contract and furnished performance and payment bonds, each in the amount of 100% of the Contract Price, with a corporate surety approved by Lafayette Parish Communication District.

If a bid bond is used, it shall be written by a surety or insurance company that is in good standing and currently licensed to write surety bonds in the State of Louisiana by the Louisiana Department of Insurance and also conforms to the requirements of LA. R.S. 38:2218. The bid bond must be equivalent to five percent (5%) of the base bid plus any additive alternates, but does not have to specify the amount in dollars and cents.

It is requested that agents signing bonds, type their name and license number below their respective signature.

ARTICLE 13 - POWER OF ATTORNEY

Attorneys-in-fact who sign bid bonds or Contract bonds must file with each bond a certified and effectively dated copy of their power of attorney.

ARTICLE 14 - WITHDRAWAL OF BID

A bid containing patently obvious unintentional, and substantial mechanical, clerical, or mathematical errors, or errors of unintentional omission of a substantial quantity of work, labor, material, or services made directly in the compilation of the bid, may be withdrawn by the contractor if clear and convincing sworn, written evidence of such errors is furnished to Lafayette Parish Communication District within forty-eight (48) hours of the bid opening excluding Saturdays, Sundays, and legal holidays. Such errors must be clearly shown by objective evidence drawn from inspection of the original work papers, documents, or materials used in the preparation of the bid sought to be withdrawn. If Lafayette Parish Communication District determines that the error is a patently obvious mechanical, clerical, or mathematical error, or unintentional omission of a substantial quantity of work, labor, material, or services, as opposed to a judgment error, and that the bid was submitted in good faith it shall accept the withdrawal and return the bid security to the contractor.

A contractor who attempts to withdraw a bid under the provisions of this Section shall not be allowed to resubmit a bid on the project. If the bid withdrawn is the lowest bid, the next lowest bid may be accepted. If all bids are rejected no withdrawal of the bid which would result in the award of the contract on another bid of same bidder, his partner, or to a corporation or business venture owned by or in which he has an interest shall be permitted. No bidder who is permitted to withdraw a bid shall supply any material or labor to, or perform any subcontract work agreement for, any person to whom a contract or subcontract, is awarded in the performance of the contract for which the withdrawn bid was submitted.

ARTICLE 15 – POSTPONEMENT OF DATE FOR PRESENTING AND OPENING BIDS

Lafayette Parish Communication District reserves the right to postpone the date for receipt and opening of bids and will give written or telegraphic notice of any such postponement to all persons to whom drawings and specifications have been issued, at any time prior to the scheduled closing time for receipt of bids.

ARTICLE 16 - ADDENDA

Bidders desiring further information, or interpretation of the plans or specifications, must make written request for such information to the District at least seven (7) working days before the bid opening. Answers to all such requests will be given in writing to all Bidders, in addendum form, and all addenda will be bound with, and made part of, the Contract Documents. No other explanation or interpretation will be considered official or binding.

Should a Bidder find discrepancies in, or omissions from the plans or specifications or other Contract Documents, or should he be in doubt as to their meaning, he should at once notify the District in order that a written addenda may be sent to all Bidders. Any addenda modifying plans and specifications within a period of seven (7) working days prior to the time for the opening of bids shall be sent to prime bidders who have requested bid documents. The addendum may be delivered by facsimile transmission, e-mail, other electronic means, or by hand and shall also be sent by regular mail.

The bid as submitted by the Contractor will be construed as to include any addenda if such are issued by the District prior to seventy-two (72) hours of the opening of bids. If the necessity arises to issue an addendum modifying plans and specifications within a seventy-two (72) hour period prior to the advertised time for the opening of bids, then, the bid opening shall be extended for at least seven (7) working days, but not more than twenty-one (21) working days, without the requirement of re-advertising.

ARTICLE 17 - LAWS AND REGULATIONS

The Bidder's attention is directed to the fact that all applicable state laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the Contract.

ARTICLE 18 - BRAND NAME SPECIFICATIONS

In accordance with LA R.S. 38§:2295:

1. The name of a certain brand, make, manufacturer, or definite specification is utilized, it is to denote the quality standard of article desired, but does not restrict Bidders to the specific brand, make, manufacturer, or specification named; it is to set forth and convey to prospective Bidders the general style, type, character, and quality of article desired.

2. When in specifications or contract documents a particular brand, make of material, device or equipment is shown or specified, such brand, make of material, device or equipment shall be regarded merely as a standard.

(b) When in specifications or contract documents an architect or engineer specifies a particular brand, make of material, device or equipment, or equal thereto, he shall adequately identify said product by including, minimally, the model or catalog number of the product.

(c) If a potential supplier wishes to submit for prior approval a particular product other than a product specified in the contract documents, he shall do so no later than seven (7) working days prior to the opening of bids. Within three (3) days, exclusive of holidays and weekends, after such submission, the prime design professional shall furnish to both the public entity and the potential supplier written approval or denial of the product submitted.

ARTICLE 19 - CONTRACTOR'S LICENSE

On any bid submitted in the amount of $50,000 or more, the Contractor shall certify that he is licensed under Louisiana's Contractor's Licensing Law R.S. 37§2150-2164 and shall show his license number on the sealed envelope submitting the bid.

ARTICLE 20 - AFFIDAVIT OF NON-COLLUSION

In accordance with Louisiana Law, if the Contract is awarded to the Bidder, he shall, at the time of the signing of the Contract, execute the Affidavit of Non-Collusion included in the Contract Documents.

ARTICLE 21 - AWARD

This bid will be awarded on a basis of the sum of the base bid, and (when applicable) any alternates if alternates are accepted, to the low responsible Bidder who has bid according to the Contract, plans and specifications as advertised. Alternates, if accepted, shall be accepted in the order in which they are listed on the Bid Form. However, Lafayette Parish Communication District reserves the right to accept alternates in any order which does not affect determination of the low Bidder.

ARTICLE 22 - NOTICE TO PROCEED

No work on this Contract shall commence until Lafayette Parish Communication District has issued a written "Notice to Proceed" directing the Contractor to proceed according to the Contract Documents.

The Contractor will be required to commence work under this Contract within ten (10) calendar days from date of receipt of the written Notice to Proceed, and he shall be required to complete all work on the project within the number of days stated on the Contract Form.

ARTICLE 23 - PRE-CONSTRUCTION CONFERENCE

After award of the contact, Lafayette Parish Communication District will schedule a preconstruction conference.

The preconstruction conference will be held prior to performing any work in the project, preferably no later than the issuance of a Notice to Proceed. Lafayette Parish Communication District will schedule the conference sufficiently in advance to permit the attendance of all parties concerned. The contractor is urged to have all subcontractors in attend the preconstruction conference.

ARTICLE 24 - PARTICIPATION BY DISADVANTAGED BUSINESS ENTERPRISES BUSINESS

The Lafayette Parish Communication District strongly encourages the participation of DBEs (Disadvantaged Business Enterprise) in all contracts or procurements let by the District for goods and service and labor and material.

To that end, all contractors and suppliers are encouraged to utilize DBEs business enterprises in the purchase or sub-contracting of materials, supplies, services and labor and material in which disadvantaged businesses are available. Assistance in identifying said businesses may be obtained by calling (337) 291-5060.

ARTICLE 25 – SMOKE-FREE WORKPLACE

The Lafayette Parish Communication District is a smoke-free environment and, as such, prohibits smoking in all facilities for events including, but not limited to, conferences, meetings, seminars, etc. Please abide by this policy when in our facilities.

General Conditions

SECTION II

GENERAL CONDITIONS

INDEX

PAGE

ARTICLE 1 - CONTRACT AND CONTRACT DOCUMENTS 3

ARTICLE 2 - DEFINITIONS 3

ARTICLE 3 - EXECUTION AND INTENT OF CONTRACT DOCUMENTS 4

ARTICLE 4 - BIDDER’S UNDERSTANDING 4

ARTICLE 4A - WITHDRAWAL OF BID 5

ARTICLE 5 - CONSTRUCTION SCHEDULE, COMPLETION AND

STIPULATED DAMAGES 5

ARTICLE 6 - CONTRACT TIME 6

ARTICLE 7 - DELAYS AND EXTENSION OF TIME 8

ARTICLE 8 - ADDITIONAL INSTRUCTIONS AND DETAIL DRAWINGS 8

ARTICLE 9 - SHOP DRAWINGS 8

ARTICLE 10 - MATERIALS, SERVICES, FACILITIES AND EMPLOYEES 8

ARTICLE 11 - INSPECTION AND TESTING OF MATERIALS 9

ARTICLE 12 - PATENTS AND TAXES 10

ARTICLE 13 - SURVEYS, PERMITS, RIGHTS-OF-WAY, EASEMENTS

AND REGULATIONS 10

ARTICLE 14 - PLANS AND WORKING DRAWINGS 11

ARTICLE 15 - CONTRACTOR'S OBLIGATION 12

ARTICLE 16 - PROTECTION OF WORK, PROPERTY AND LIVES 12

ARTICLE 17 - SUPERVISION BY CONTRACTOR 13

ARTICLE 18 - INCREASED OR DECREASED QUANTITIES OF WORK 13

ARTICLE 19 - CHANGE ORDERS, PAYMENT FOR EXTRA OR

DELETED WORK 13

ARTICLE 20 - CLAIMS FOR EXTRA COST 14

ARTICLE 21 - CORRECTION OF WORK 14

ARTICLE 22 - OWNER'S RIGHT TO DO WORK 15

ARTICLE 23 - OWNER'S RIGHT TO TERMINATE CONTRACT FOR

CAUSE OR CONVENIENCE 15

ARTICLE 24 - CONTRACTOR'S RIGHT TO TERMINATE CONTRACT 16

ARTICLE 25 - TEMPORARY SUSPENSION OF WORK 17

ARTICLE 26 - USE OF COMPLETED PORTIONS 17

ARTICLE 27 - ELECTRICAL TRANSMISSION, TELEPHONE, AND

CABLE TELEVISION FACILITIES 17

ARTICLE 28 - UNDERGROUND UTILITIES 17

ARTICLE 29 - WARRANTY AND GUARANTEE 18

ARTICLE 30 - PAYMENT 18

ARTICLE 31 - PAYMENTS WITHHELD 19

ARTICLE 32 - CONTRACTOR'S INSURANCE AND

SUBCONTRACTOR'S INSURANCE 20

ARTICLE 33 - BUILDERS RISK INSURANCE (WHEN REQUIRED) 22

ARTICLE 34 - PAYMENT AND PERFORMANCE BOND 23

ARTICLE 35 - ASSIGNMENT 24

ARTICLE 36 - LIENS 24

ARTICLE 37 - SEPARATE CONTRACTS 25

ARTICLE 38 - SUBCONTRACTS 25

ARTICLE 39 - ENGINEER'S/ARCHITECT’S AUTHORITY 26

ARTICLE 40 - INSPECTION 26

ARTICLE 41 - AUTHORITY AND DUTIES OF INSPECTOR 27

ARTICLE 42 - FINAL CLEANING UP 27

ARTICLE 43 - REMOVAL OF EQUIPMENT 27

ARTICLE 44 - SUBSTANTIAL COMPLETION 27

ARTICLE 45 - FINAL INSPECTION 29

ARTICLE 46 – WARRANTY WORK 29

ARTICLE 47 - NOTICE AND SERVICE THEREOF 29

ARTICLE 48 - PROHIBITED INTERESTS 29

ARTICLE 49 - PUBLIC CONVENIENCE AND SAFETY 30

ARTICLE 50 - COOPERATION WITH PUBLIC UTILITIES 30

ARTICLE 51 - SANITARY ARRANGEMENTS 30

ARTICLE 52 - INDEMNIFICATION 30

ARTICLE 53 - EQUAL EMPLOYMENT OPPORTUNITY 31

ARTICLE 54 - BUDGETED FUNDS 32

ARTICLE 55 – NON-APPROPRIATION OF FUNDS 32

ARTICLE 56 - PARTICIPATION BY DISADVANTAGED

BUSINESS ENTERPRISES 33

ARTICLE 57 – STOCKPILED MATERIALS 33

ARTICLE 58 - HAZARDOUS MATERIALS 33

ARTICLE 59 - DISPUTE RESOLUTION 34

ARTICLE 1 - CONTRACT AND CONTRACT DOCUMENTS

The Contract Documents consist of the Notice to Bidders, Information for Bidders, General Conditions, Special Conditions, Specifications, Drawings, Contractor's Bid Form, Bid Security, Contract Form, Affidavit of Non-Collusion, Performance and Payment Bonds, Insurance Certificate, Addenda, including all properly authorized modifications thereof incorporated in the documents before their execution and all properly authorized modifications made subsequent thereto.

ARTICLE 2 - DEFINITIONS

The following terms as used in this contract are respectively defined as follows:

a) “Bidder” - Any individual, firm or corporation submitting a proposal for the work contemplated acting directly or through a duly authorized representative.

b) “Contractor” - A person, firm or corporation with whom the contract is made by the Owner.

c) “Engineer/Architect” - The Engineer/Architect for the Lafayette Parish Communication District or his authorized representative.

d) “Inspector” - An authorized representative of the Engineer/Architect assigned to make any and all inspections of the work performed and the materials furnished by the Contractor.

e) “Or Equal” - The Engineer/Architect shall be the sole judge of the quality and suitability of any proposed substitution.

f) “Owner” - Lafayette Parish Communication District.

g) “Subcontractor” - A Person, firm or corporation supplying labor for work at the site of the project, for and under separate contract or agreement with the Contractor.

h) “Surety” - Any firm or corporation which is bound with and for the Contractor, who is primarily liable, and which engages to be responsible for his payment of all obligations pertaining to and for his acceptable performance of the work for which he has contracted.

i) “Work” - Work to be performed at the location of the project, including the transportation of materials and supplies to or from the location of the project by employees of the Contractor and Subcontractor.

j) “Written Notice” - Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by certified mail to the last business address known to him who gives the notice.

k) “Satisfactory” - Shall mean satisfactory to the Engineer/Architect and Owner.

ARTICLE 3 - EXECUTION AND INTENT OF CONTRACT DOCUMENTS

The successful bidder will be required to execute the contract and furnish performance and payment bonds satisfactory to the Owner within ten (10) calendar days (unless an extension of time is granted by Owner) after receipt of notice of award.

The intent is to prescribe a complete work or improvement which the Contractor undertakes to do in full compliance with the Contract Documents. The Contractor shall perform all items of work covered and stipulated in the contract and perform extra work and shall furnish, unless otherwise specifically provided in the contract, all materials, implements, machinery, equipment, tools, supplies, transportation, labor, etc. necessary for the prosecution of the work.

Any items omitted from the specifications which, in accordance with good standard construction practices, are necessary for a complete and operative installation shall be included in the work as though such items were set out in the Contract Documents.

The Contractor shall not perform any part of the Work where it knows that the Contract Documents contain an error, inconsistency or omission. If the Contractor violates this requirement, Contractor shall be responsible for the cost of correcting the Work affected by the errors, inconsistencies or omissions.

ARTICLE 4 – BIDDER’S UNDERSTANDING

By submitting a bid, the Bidder stipulates, acknowledges, and agrees that by careful examination, he has satisfied himself as to the nature, location and risks inherent in the work, the conformation of the ground, the character, quality and quantity of the materials to be encountered, the character of the equipment and facility needed preliminary to and during the prosecution of the work, the general and local conditions, and all other matters which can in any way affect the work under this Contract. No verbal agreement or conversation with any officer, agent or employee of the Owner, either before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained.

The Bidder is required to examine carefully the site of the proposed work as well as the proposal, plans, specifications, special provisions and contract and bond form for the work contemplated.

By submitting a bid, the Bidder stipulates and agrees that he has investigated and satisfied himself as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished and as to the requirements of these specifications, special provisions, and the contract. Bidder further agrees that if his bid is accepted, he will provide all necessary machinery, tools, apparatus, and other means of construction and will perform and complete all work and furnish all material specified and required in the contract, in the manner and within the time limits prescribed in the contract, and in accordance with all requirements therein set forth; and agrees to accept as full compensation therefore, the total price bid whether computed on a lump sum basis or a unit price basis

ARTICLE 4A – WITHDRAWAL OF BID

A bid containing patently obvious unintentional, and substantial mechanical, clerical, or mathematical errors, or errors of unintentional omission of a substantial quantity of work, labor, material, or services made directly in the compilation of the bid, may be withdrawn by the contractor if clear and convincing sworn, written evidence of such errors is furnished to Owner within forty-eight (48) hours of the bid opening excluding Saturdays, Sundays, and legal holidays.

Such errors must be clearly shown by objective evidence drawn from inspection of the original work papers, documents, or materials used in the preparation of the bid sought to be withdrawn.

If the Owner determines that the error is a patently obvious mechanical, clerical, or mathematical error, or unintentional omission of a substantial quantity of work, labor, material, or services, as opposed to a judgment error, and that the bid was submitted in good faith it shall accept the withdrawal and return the bid security to the contractor.

A contractor who attempts to withdraw a bid under the provisions of this Section shall not be allowed to resubmit a bid on the project. If the bid withdrawn is the lowest bid, the next lowest bid may be accepted. If all bids are rejected no withdrawal of the bid which would result in the award of the contract on another bid of same bidder, his partner, or to a corporation or business venture owned by or in which he has an interest shall be permitted. No bidder who is permitted to withdraw a bid shall supply any material or labor to, or perform any subcontract work agreement for, any person to whom a contract or subcontract, is awarded in the performance of the contract for which the withdrawn bid was submitted.

ARTICLE 5 - CONSTRUCTION SCHEDULE, COMPLETION AND STIPULATED DAMAGES

The Contractor agrees that said work shall be prosecuted regularly, diligently, and uninterruptedly at such rate of progress as will insure substantial completion thereof in the time specified. It is expressly understood and agreed by and between the Contractor and the Owner that the time stipulated for the completion of the job takes into consideration the potential that adverse weather conditions and industrial conditions may cause delays in prosecution of the work, and the Contractor stipulates and agrees that weather conditions and industrial conditions shall not constitute grounds for extension of the time for substantial completion of the work contemplated under the contract unless authorized by the Owner.

All changes or extensions of the schedule shall be made by written and approved change orders.

The scheduled work may be started after the written Notice to Proceed and contract time will officially begin ten (10) calendar days after the date of the Notice to Proceed. All work shall be completed as per schedule.

For each calendar day or working day, as the case may be, that any work remains incomplete after expiration of the contract time and/or any extensions thereof, the sum specified below will be deducted from payments due the Contractor not as a penalty but as liquidated damages as a result of the delay in substantial completion of the work. In the event that the Owner should choose to permit the Contractor to continue the work after expiration of the contract time, or as such contract time may be extended, such will not operate as a waiver by the Owner of its rights to recover stipulated damages. In the event that the Owner terminates the Contractor under the contract in accordance with the provisions of Article 23, infra, the Owner shall retain the right to assess, collect, and recover stipulated damages from the Contractor and/or the Surety until the work under the contract is satisfactorily completed. The amount of stipulated damages will be deducted from the remaining balance of funds due the Contractor under the contract. In the event that liquidated damages which accrue prior to completion of the work under the contract should exceed the remaining balance of funds due the Contractor under the contract, the Contractor shall forfeit any rights to claim additional payments under the contract and both the Contractor and his Surety shall be liable for accrued stipulated damages in excess of the contract balance. If stipulated damage figures are not set forth in the Special Conditions, the following amounts shall be applicable.

Original Contract Amount Liquidated Damages Per Day

From More Than To and Including Per Calendar Day Per Working Day $0 $25,000 $600 $600 $25,001 $50,000 $800 $800 $50,001 $100,000 $1000 $1000 $100,001 $500,000 $1500 $1500 $500,001 $1,000,000 $2000 $2000 $1,000,001 $2,000,000 $2500 $2500 $2,000,001 $5,000,000 $3000 $3000 $5,000,001 $10,000,000 $4000 $4000 $10,000,001 And over $5000 $5000

If the Owner has accepted a portion of the project as Substantially Complete and assumed partial occupancy of the project, then stipulated damages will be prorated by an amount equal to the percentage of completion.

ARTICLE 6 - CONTRACT TIME

The number of days allowed for substantial completion of the work to be performed by the Contractor in accordance with the terms of the contract shall be the “contract time.” The contract time shall be measured by the working day or calendar day, as stipulated elsewhere herein.

When the contract time is on a calendar day basis, it shall consist of the number of calendar days stated in the contract beginning with the date noted in the written Notice to Proceed, including Saturdays, Sundays, holidays and non-work days.

When the contract time is on a working day basis, a work day shall consist of a calendar day, other than exceptions stated below, on which weather and other conditions not under the control of the Contractor, will permit construction operations to proceed for at least five (5) continuous hours of the day with the normal working force engaged in performing the controlling items of work. The scheduled work may be started after the written Notice to Proceed and contract time will officially begin ten (10) days after the date of the Notice to Proceed.

No working days will be charged for the days listed below on a working day basis:

(a) Saturday - (If no inspector is needed and the work progresses for a period of 5 hours or more).

(b) Sunday - (If no inspector is needed and the work progresses for a period of 5 hours or more).

(c) Owner recognized holidays

(1) New Year's Day - January 1, 2026

(2) New Year’s Day (Governor Proclamation) - January 2, 2026

(3) Martin Luther King Day – January 19, 2026

(4) Washington’s Birthday – February 16, 2026

(5) Mardi Gras Day – February 17, 2026

(6) Good Friday – April 3, 2026

(7) Memorial Day – May 25, 2026

(8) Juneteenth – June 19, 2026

(9) Independence Day - July 3, 2026

(10) Labor Day – September 7, 2026

(11) Election Day – November 3, 2026

(12) Veteran’s Day – November 11, 2026

(13) Thanksgiving Day – November 26, 2026

(14) Acadian Day – November 27, 2026

(15) Christmas Eve – December 24, 2026

(16) Christmas Day - December 25, 2026

(17) New Year’s Eve – December 31, 2026

(18) New Year’s Day – January 1, 2027

Holidays fallings on a Saturday shall be observed on the preceding Friday and holidays falling on a Sunday shall be observed on the following Monday.

(d) Days of which delay, attributable solely to the Owner or other governmental agencies, prevent the Contractor from proceeding with the controlling items of work in effect at time of delay.

(e) Days on which delays are attributable to the direct effect of strike, riots or civil commotions.

The following are considered reasonably anticipated days of adverse weather on a monthly basis for either a working day or calendar base contract:

January 10 days May 5 days September 4 days February 9 days June 6 days October 3 days March 8 days July 6 days November 7 days April 7 days August 5 days December 7 days

The Contractor shall ask for total adverse weather days, the Contractor’s request shall be considered only for days over the allowable number of days stated above.

If adverse weather conditions are the basis for a claim for additional time, the Contractor shall document that weather conditions had an adverse effect on the scheduled construction. An increase in contract time due to weather shall not be cause for an increase in the contract sum.

ARTICLE 7 - DELAYS AND EXTENSION OF TIME

The Owner reserves the right, at its sole option, and for good cause shown, to grant to the Contractor additional time for completion of the contract. Any and all granting of additional time for completion of the work under the contract must be initiated by written request from the Contractor to the Engineer/Architect. For the request to be considered, it must be received by the Engineer/Architect no later than fourteen (14) calendar days following the time that the event which prompted the request occurs. It is the Contractor's responsibility to include in the written request the specific and detailed reasons that he feels he deserves additional contract days in order to complete the contract.

No such extension shall be made for delay occurring more than fourteen (14) calendar days before claim therefore is made in writing to the Engineer/Architect.

ARTICLE 8 - ADDITIONAL INSTRUCTIONS AND DETAIL DRAWINGS

The Contractor will be furnished any additional instructions and detail drawings which may be necessary to carry out the work included in the contract. The additional drawings and instructions supplied to the Contractor shall be deemed to be a part of the Contract Documents and will be so prepared that they can be reasonably interpreted as part thereof. The Contractor shall carry out the work required in accordance with the additional detailed drawings and instructions. If the additional instructions and detail drawings adds work not previously shown and reasonably anticipated, the Contractor will be paid under the contract in accordance with the provisions of Article 19 and 20 of these General Conditions.

ARTICLE 9 - SHOP DRAWINGS

The Contractor shall submit promptly to the Engineer/Architect five (5) copies of each shop drawing prepared if submitted in paper format. However, if submitted in digital format the requirement for the number of copies of paper format submitted is waived. After review of such drawings by the Engineer/Architect and dependent upon the extent of the review comments, the drawings will be stamped as “Note Markings” or “Revise and Resubmit”. If the Engineer/Architect has to review shop drawing submittals more than three (3) times (two rejection and one approval) then the Engineer/Architect will be compensated for any additional review time by the contractor. Copies of the final approved shop drawings with all applicable mark-ups will be considered the “Record” copies of the shop drawings.

ARTICLE 10 - MATERIALS, SERVICES, FACILITIES AND EMPLOYEES

It is understood that except as otherwise specifically stated in the contract documents, the Contractor shall provide and pay for all materials, labor, tools, equipment, water, lights, power, transportation, superintendence, temporary construction of every nature, and all other services and facilities of every nature whatsoever necessary to execute, complete and deliver the work within the specified time.

Unless otherwise specified, all materials shall be new, and both workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish to the Engineer/Architect or the Owner satisfactory evidence as to the kind and quality of materials.

Where materials or equipment are specified by a trade or brand name, it is not the intention of the Owner to discriminate against an equal product; another manufacturer, but rather to set a definite standard of performance.

Whenever a material or article required is specified or shown on the plans by using the name of the…