9092000.pdf

PDF 9 MB Posted

Attached to
Roof Replacement Debose Hall & Annex Southern University
Solicitation number
Project # 19-671-22-01
Issued by
East Baton Rouge Parish, Baton Rouge City, Louisiana

About this file

Summary of Roof Replacement Project - DeBose Hall & Annex, Southern University

This document is a project specification for a roof replacement initiative at Southern University in Louisiana. The project encompasses the removal of approximately 31,052 square feet of existing built-up roof membrane down to the existing deck at DeBose Hall and its annex. The scope of work includes installation of new tapered and/or non-tapered polyisocyanurate insulation and cover board, replacement of flashings and edge metal as specified in the contract documents, and replacement of existing ventilation covers. Additionally, the project requires installation of new gutters, downspouts, and cast-iron boots in accordance with the project specifications.

No specific pricing information, bid due dates, site visit schedules, pre-bid meetings, award dates, contract terms, set-asides, or renewal options are detailed in the provided specification. The document serves as a technical scope of work outlining the material and labor requirements for the roofing installation project but does not include procurement timeline, financial terms, or contractual conditions necessary for bid submission.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roof Replacement Debose Hall & Annex

Southern University Baton Rouge, Louisiana

STATE PROJECT NO. 19-671-22-01

F.019002620

SITE CODE: 217038

STATE BUILDING ID: S02143

STATE OF LOUISIANA

GOVERNOR: JEFF LANDRY

DIVISION OF ADMINISTRATION: TAYLOR F. BARRAS, COMMISSIONER

OFFICE OF FACILITY PLANNING AND CONTROL: MATTHEW H. BAKER, DIRECTOR

Bidding Documents

-1

/2

/2

19-671-22-01, F.19002620 25-112

Roof Replacement Debose Hall & Annex, Southern University

TABLE OF CONTENTS

Advertisement for Bids 1

Instructions to Bidders IB-1 thru IB-7

Bid Form & Bid Bond 1-3

General Conditions of the Contract for Construction AIA A-201 – 2017 1-42

Supplementary Conditions SC-1 thru SC-25

Contract Between Owner and Contractor

And Performance and Payment Bond C-1 thru C-4

Affidavit 1-2

Pre-Construction Conference Agenda 1-4

Schedule of Values V-1 thru V-6

Change Order CO-1 thru CO-7

Recommendation of Acceptance RA-1 thru RA-3

Partial Occupancy PO-1

FP&C Recommended Agenda for Roofing Conferences 5 Pages

FP&C Roofing Guarantee R1 (2-Yr Contractor Warranty, Roofer is NOT Prime Contractor) 3 Pages

FP&C Roofing Guarantee R2 (2-Yr Contractor Warranty, Roofer IS Prime Contractor) 3 Pages

FP&C Watertightness Membrane Roofing System Warranty 4 Pages

00 22 13 – SUPPLEMENTARY INSTRUCTIONS TO BIDDERS 1

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01 11 00 - SUMMARY OF WORK 1

01 12 13 – SUMMARY OF CONTRACTS 1

01 12 16 – WORK SEQUENCE 1

01 14 16 – CORRDINATION WITH OCCUPANTS 1

01 14 19 – JOB SITE ADMINISTRATION 1-2

01 22 00 – UNIT PRICES 1

01 23 00 – ALTERNATES 1

01 26 49 – MODIFICATION PROCEDURES 1

01 29 73 – SCHEDULE OF VALUES 1

01 29 76 – APPLICATION FOR PAYMENT

AND MATERIAL INVOICES 1-2

01 31 13 – COORDINATION 1

01 31 19 – PROJECT MEETINGS 1-2

01 32 16 – CONSTRUCTION PROGRESS SCHEDULE 1

01 33 23 – SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 1-3

01 41 00 – REGULATORY REQUIREMENTS 1

01 45 23 – TESTING AND INSPECTION SERVICES 1

01 50 00 – TEMPORARY FACILITIES AND CONTROLS 1-2

01 62 00 – PRODUCT OPTIONS AND SUBSTITUTIONS 1

01 66 00 – PRODUCT HANDLING 1

01 71 23 – FIELD ENGINEERING 1

01 73 29 – CUTTING AND PATCHING 1

01 74 13 – CLEANING UP 1

01 77 19 – CONTRACT CLOSEOUT 1-2

DIVISION 2 - SITE WORK

02 41 00 – DEMOLITION 1-2

DIVISION 5 - METALS

05 51 11 – FIXED ALUMINUM LADDERS 1-3

DIVISION 6 - WOOD AND PLASTICS

06 10 00 – ROUGH CARPENTRY 1-4

19-671-22-01, F.19002620 25-112

Roof Replacement Debose Hall & Annex, Southern University

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

07 52 00 – MODIFIED BITUMEN MEMBRANE ROOFING SYSTEM 1-17

07 62 00 – FLASHING AND SHEET METAL 1-3

07 71 00 – ROOF SPECIALTIES 1-2

07 71 23 – GUTTERS, DOWNSPOUTS, AND CAST-IRON BOOTS 1-2

07 92 00 – SEALANTS AND CAULKING 1-3

DIVISION 9 – FINISHES

09 91 00 – PAINTING 1-4

ADVERTISEMENT

REQUEST FOR BID

BID #50016-10374

ROOF REPLACEMENT

LOCATION: DEBOSE HALL & ANNEX

SOUTHERN UNUVERSITY AND A&M COLLEGE

BATON ROUGE CAMPUS

STATE BUILDING ID # S02143

Project # 19-671-22-01, WBS # F.19002620

DIDIER PROJECT NUMBER 25-112

DECEMBER 14, 2026 @ 10:30 AM

Sealed bids will be received by Southern University, Baton Rouge, Louisiana, in the Purchasing

Department, 8100 James L. Prestage Drive, PO Box 9543, J. S. Clark Administration Building

Annex, South Entrance, First Floor East, Baton Rouge, LA 70813. Bids will be opened and read aloud in a public meeting in the Southern University Purchasing Department.

Use link to submit bid/upload online: http://www.sus.edu/bidcertification

MAIL, HAND-DELIVER OR UPLOAD BID TO PURCHASING DEPARTMENT

NO LATER THAN 10:30 AM-on DECEMBER 8, 2026

Bidders are solely responsible for ensuring timely delivery of their bids. The Southern University

Purchasing Department is not responsible for any delays caused by bidders’ chosen means of delivery. Failure to meet the bid deadline submittal date and time shall result in rejection of bid.

Architecture Firm: Didier Architecture

Derryl Didier, AIA,NCARB,CPP

17531 Old Jefferson Highway, Suite C, Prairieville, LA70769

Ph. 225-744-0008

ALL BID SPECIFICATIONS AND ADDENDA CAN BE OBTAINED BY ACCESSING

THE LA STATE PROCUREMENT WEBSITE

https://wwwcfprd.doa.louisiana.gov/osp/lapac/pubMain.cfm.

(Search by bid # 50016-10371)

We highly recommend registering your company with Louisiana State

Procurement/LAPAC.

Mandatory Pre-Bid Conference & Site Visit DECEMBER 1, 2026 @ 10:30 AM

Conference & Site Visit Location: Physical Plant Department

(Southern University Campus)

Benjamin H. Kraft Building, 515 James L. Hunt Street

Baton Rouge, La 70813

Site Visit Location Telephone Number: 225-771-4741 or 225-771-6241

Participants shall be in attendance by 10:30 a.m. and sign sheet provided by the

Purchasing Department.

http://www.sus.edu/bidcertification https://wwwcfprd.doa.louisiana.gov/osp/lapac/pubMain.cfm

Bidders shall visit the site and be familiarized with the local conditions under which the work is to be performed. No additional compensation will be granted because of unusual difficulties, which may be encountered in the execution of any portion of the work.

Inquiries will be accepted until December 4, 2026 by 5:00 p.m. Inquiries shall be submitted to Linda Antoine at linda_antoine@subr.edu

Responses to inquiries will be posted on LAPAC-LA State Procurement website by

December 9, 2026 by 5:00 PM

Any person requiring special accommodation should notify the Purchasing Office of the type(s) of accommodation required not less than seven (7) days before the bid opening date. Additional contact is Henry Thurman, Southern University Safety Department henry_thurman@subr.edu or

225-771-4741.

5% Security

All bids must be accompanied by bid security equal to five (5%) percent of the sum of the base bid and all alternates, if applicable and must be in the form of a certified/official check, cashier’s check or bid bond, made payable to Southern University and A & M College. Surety represents that it is listed on the current U.S. Department of the Treasury Financial Management Service list of approved bonding companies and that is listed thereon as approved for amount equal to or greater than the amount for which it obligates itself in this instrument. No bid bond indicating an obligation of less than five percent (5%) by any method is acceptable.

Performance & Payment Bond

Successful Proposer shall be required to furnish a performance (surety) bond. The amount will be determined during contract negotiations for the period the contract is in effect. The Bond should be made payable to Southern University. Any performance bond furnished shall be written by a surety or insurance company currently on the U.S.

Department of the Treasury Financial Management Service list of approved bonding companies which is published annually in the Federal Register, or by a Louisiana domiciled insurance company with at least an A-:VI rating or higher in the latest printing of the A.M. Best's Key Rating Guide or by an insurance company that is either domiciled in Louisiana or owned by Louisiana residents and is licensed to write surety bonds.

No surety or insurance company shall write a performance bond which is in excess of the amount indicated as approved by the U.S. Department of the Treasury Financial

Management Service list or by a Louisiana domiciled insurance company with an A-:VI rating by A.M. Best up to a limit of 10 percent of policyholders' surplus as shown by

A.M. Best; companies authorized by this Paragraph who are not on the treasury list shall not write a performance bond when the penalty exceeds 15 percent of its capital and surplus, such capital and surplus being the amount by which the company's assets exceed its liabilities as reflected by the most recent financial statements filed by the company with the Department of Insurance.

In addition, any performance bond furnished shall be written by a surety or insurance company that is currently licensed or authorized to do business in the State of

Louisiana. The bond must be received within twelve (12) working days from the date of notification.

Bidders shall include the following on envelopes of choice: company’s name, address, Louisiana contractor’s license number, bid number, name of bid, bid opening date and time.

Bids may be withdrawn by written, telegraphic fax notice or email and received at the address or email address designated in the Invitation to Bid prior to the time set for bid opening, as recorded by date stamp at the Purchasing Office. Bids received after closing time will be returned unopened. Evidence of authority to submit the bid shall be required in accordance with R.S. 38:2212(a)(1)(c) and/or R.S. 39:1594(c)(2)(d).

The Southern University System is a participant in the Louisiana for the Small Entrepreneurships

Program (the Hudson Initiative) and the Louisiana Initiative for Veterans and Service-Connected

Disabled Veterans-Owned Business Small Entrepreneurships. Bidders are encouraged to consider participation. A list of certified vendors and additional information can be obtained from website http://www.ledsmallbiz.com. Potential participants may also register at this website.

Any questions concerning bid documents, please contact Mary Jane Spruel, Assistant

Director of Purchasing at (225) 771-2800 or email to maryjane_spruel@subr.edu

No bid may be withdrawn for a period of forty-five (45) days after receipt of bids, except under the provisions of LA. R.S. 38:2214. Bidder is required to comply with provisions and requirements of LA R.S. 38:2212(B)(5).

The University reserves the right to reject all bids and to waive any informalities incidental thereto.

Bids shall be accepted from Contractors who are licensed under LA. R.S. 37:2150-2192 for the classification of 72000000 Building and Construction Maintenance Services;

72130000 General Building Construction; 72131600 Commercial or Industrial

Construction.

SOUTHERN UNIVERSITY & A&M COLLEGE

AN EQUAL OPPORTUNITY EMPLOYER

Linda A. Antoine, Director of Purchasing

DATES ADVERTISED

NOVEMBER 16, 23, & 30, 2026

http://www.ledsmallbiz.com/

Document will be included with the successful vendor’s contact.

SOUTHERN UNIVERSITY AND A&M COLLEGE

BATON ROUGE CAMPUS

REQUEST FOR BID

GENERAL CONDITIONS

PROJECT: ROOF REPLACEMENT

LOCATION: DEBOSE HALL & ANNEX

Project #19-671-22-01, WBS # F.19002620

Didier Architecture Project # 25-112

BID DUE DATE AND TIME: DECEMBER 14, 2026 @ 10:30 AM

BID # 50016-10374

Bids submitted are subject to provisions of but not limited to La.R.S.38:2212 Purchasing Rules and Regulations;

Executive Orders; and the General Terms and Conditions, listed in this Invitation for Bid. Southern University reserves the right to award items separately, grouped or on an all or none basis and to reject any or all bids and waive any informalities.

BIDS MAY BE SENT BY MAIL, HAND-DELIVERED or UPLOADED TO:

As an alternative, bids may be hand delivered to:

Bids should be mailed to: Southern University

Southern University Purchasing Department

Purchasing Department 1st Floor East-James L. Prestage Drive

Post Office Box 9534 J. S. Clark Administration Building

Baton Rouge, LA 70813 Baton Rouge, LA 70813

As an alternative:

Use link to submit bid online:

The Southern University Purchasing Department is not responsible for any delays caused by bidders’ chosen means of delivery. Failure to meet the bid deadline submittal date and time shall result in rejection of bid.

Architect Firm: Didier Architecture

Derryl Didier, AIA, NACRB, CPP

17531 Old Jefferson Highway, Suite C

Prairieville, LA 70769

225-744-0008 derryl@didierarch.com

MANDATORY PRE-BID CONFERENCE & SITE VISIT: DECEMBER 1, 2026 @ 10:30 AM

LOCATION: Physical Plant Department

Benjamin H. Kraft Building

515 James L. Hunt Street

Southern University SUBR Campus

Site Telephone No. 225-771-4741

Deadline to submit inquiries: December 4, 2026 by 5:00 PM

Deadline to respond to inquiries: December 9. 2026 by 5:00 PM

INQUIRIES:

No negotiations, decisions, or actions will be executed by any bidder as a result or any oral discussion with any University employee or State

Consultant. Only those transactions which are in writing, sent to Linda A. Antoine, Director of Purchasing, will be considered as valid.

Send inquiries to linda_antoine@subr.edu

INSTRUCTIONS TO BIDDERS

1. Bid Forms

All written bids, unless otherwise provided for, must be submitted on, and in accordance with forms provided and properly signed in ink. Bids submitted in the following manner will not be accepted:

Bid containing no signature indicating intent to be bound

(1) Bid filled out in pencil

(2) Bid not submitted on university standard forms

Bids must be received at the address specified in the Invitation for Bid or uploaded prior to bid opening time to be considered.

2. Envelope (if mailed) Bidders are requested to submit bid package in a sealed envelope of your choice that is clearly marked identifying the company’s name, complete address, bid number, time and date of bid opening, and license number, if applicable.

Bidder is responsible for means of delivery of bid.

Louisiana Contractors License Number shall be placed on the outside of the envelope.

3. Standards of Quality Any product or service bid shall conform to all applicable federal, state and local laws, regulations and the specifications contained in the IFB. Unless otherwise specified in the IFB, any manufacturer’s name, trade name, brand name, or catalog numbers used in the specifications is for the purpose of describing the quality level, performance and characteristics required. Bidder must specify the brand and model number of the product offered in his/her bid. Bids not specifying brand and model numbers will be considered as offering the exact product(s) specified in the IFB.

4. Descriptive Information

Bidders proposing an equivalent brand or model should submit information with bid (such as illustrations, descriptive literature, technical data) sufficient for the University to evaluate quality, suitability and compliance with the specifications in the IFB. Failure to submit descriptive information may cause bid to be rejected. Any change made to a manufacturer’s published specification submitted for a product should be verifiable by the manufacturer. If item(s) bid do not fully comply with specifications (including brand and/or product number), bidder must state in what respect the item(s) deviate. Failure to note exceptions on the bid form will not relieve the successful bidder(s) from supplying the actual products requested.

5. INSURANCE:

A current insurance certificate with Southern University as the certificate holder shall be sent to the Purchasing Department before starting project. Contractor shall maintain insurance coverage until project is completed.

6. Prices Unless otherwise specified by the Purchasing Department, bid prices must be complete, including transportation, prepaid by bidder to destination. In the event of extension errors, the unit price shall prevail.

7. Payment Terms Payment is to be made within thirty (30) days after receipt of properly executed invoice, or delivery and acceptance, whichever is later. Delinquent payment penalties are governed by L.R.S. 39:1695.

8. Deliveries Bids may be rejected if the delivery or completion time indicated is longer than that specified in the bid.

9. Vendor Invoices Invoices or AIA payment form shall reference the Southern University purchase/release order number, vendor’s packing list/delivery ticket, ticket number, shipping/delivery date, etc. Invoices are to be itemized and billed in accordance with the order and should show the amount of any prompt payment discount and submitted on the vendor’s own invoice form. Invoices submitted by the vendor’s supplier will not be accepted. Terms are net 30.

10. Tax Information/State of Louisiana Vendor is responsible for including all applicable taxes in the bid prices. Southern University is exempt from all Louisiana state and local sales and use taxes. By accepting an award, resident and non-resident firms acknowledge their responsibility for the payment of all taxes duly accessed by the State of Louisiana and its political subdivisions for which they are liable, including but not limited to: franchise taxes, privilege taxes, sales taxes, use taxes, ad valorem taxes, etc. In accordance with Act Number 1029 of the 1991 Regular

Session, effective September 1, 1991 state agencies will no longer be required to pay state sales tax.

11. New Products Unless specifically called for, all products for purchases must be new (never previously used) and the current model and/or packaging. The manufacturer’s standard warranty will apply unless otherwise specified in the IFB.

12. Contract Cancellation Southern University has the right to cancel any contract, in accordance with Purchasing Rules and

Regulations, for cause, including but not limited to, the following: (1) failure to deliver within time specified in the contract; (2) failure of the product or service to meet specifications, conform to sample quality or to be delivered in good condition;( 3) misrepresentations by the contractor;(4) fraud, collusion, conspiracy or other unlawful means of obtaining any contract with the state; (5) conflict of contract provisions with constitutional or statutory provision of state or federal law; (6) any other breach of contract.

13. AWARD AND EXECUTION OF CONTRACT:

The owner shall incur no obligation to the contractor until the contract between the owner and contractor is duly executed. If the contractor is notified of the acceptance of the bid within thirty (30) days of the opening bid date, contractor agrees to execute and deliver to owner, Performance and Payment Bond and Certificate of Insurance, a copy of which is attached to the Contract

Documents, within ten (10) working days after notice from the Owner that the instrument is ready for signature.

14. Fiscal Funding Clause (Renewal Contracts Only) In accordance with LA R.S.39:1615 (c) and (e), any contract entered into by the State of Louisiana and Southern University shall include the following Fiscal Funding Clause:

C. Termination due to unavailability of funds in succeeding years. When funds are not appropriated to support continuation of performance in a subsequent year of a multiyear contract, the contract for such subsequent year shall be terminated. When a contract is terminated under these conditions, no additional funds shall be paid to the contractor as a result of such action. E. With respect to all multiyear contracts, there shall be no provisions for a penalty to the state for the cancellation or early payment of the contract. The continuation of this contract is contingent upon the appropriation of funds to fulfill the requirements of the contract by the legislature.

All proposers should be aware that our legislative process is such that it is often impossible to give prior notice of the non-appropriation of funds.

15. Default of Contactor Failure to deliver within the time specified in the bid will constitute a default and may cause cancellation of the contract. Where the state had determined the contractor to be in default, the state reserves the right to purchase any or all products or services covered by the contract on the open market and to charge the contractor with cost in excess of the contract price. Until such assessed charges have been paid, no subsequent bid from the defaulting contractor will be considered.

16. Order of Priority

In the event there is a conflict between the Instructions to Bidders the General Terms and Conditions will govern.

17. Applicable Law All contracts will be construed in accordance with and governed by the laws of State of Louisiana. Vendors shall be in compliance with applicable laws of the State of Louisiana and Federal Laws where applicable, to include licenses, fees and permits. Vendors are responsible for the cost of licenses, fees and permits.

18. Certification of No Suspension or Debarment ($25,000 or more) By signing and submitting this bid, bidder certifies that its company, any subcontractors, or principals thereof, are not suspended or debarred under federal or state laws or regulations. A list of parties who have been suspended or debarred by federal agencies is maintained by the General Services Administration and can be viewed on the internet at www.sam.gov.

Federal Funded XXNon-Federal Funded

19. E-VERIFY (verification of employees)

Contractor acknowledges and agrees to comply with the provisions of La R.S. 38:2212.10 and federal law pertaining to E-Verify in the performance of services under this contract.

20. Prohibited Contractual Arrangements Per Louisiana R.S. 42:1113.a, no public servant, or member of such public servant’s immediate family, or legal entity in which he is a controlling interest shall bid on or enter into any contract, subcontract, or other transaction that is under the supervision or jurisdiction of the agency of such public servant. See statute for complete law, exclusions and provisions.

21. Discriminatory Boycotts of Israel This section applies to procurements with a value of $100,000 or more and for vendors with five (5) or more employees

Prohibition of Discriminatory Boycotts of Israel

In accordance with R.S. 39:1602.1, for any contract for $100,000 or more and for any contractor with five or more employees, the Contractor certifies that neither it nor its subcontractors are engaged in a boycott of Israel, and that the http://www.sam.gov/

Contractor and any subcontractors shall, for the duration of this contract, refrain from a boycott of Israel. The State reserves the right to terminate this contract if the Contractor, or any Subcontractor, engages in a boycott of Israel during the term of this contract.

22. Prohibition of Companies That Discriminate Against Firearm and Ammunition Industries

In accordance with La. R.S. 39:1602.2, the following applies to any competitive sealed bids, competitive sealed proposals, or contract(s) with a value of $100,000 or more involving a for-profit company with at least fifty full-time employees:

Unless otherwise exempted by law, by submitting a response to this solicitation or entering into this contract, the Bidder, Proposer or Contractor certifies the following:

The company does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association based solely on the entity’s or association’s status as a firearm entity or firearm trade association;

The company will not discriminate against a firearm entity or firearm trade association during the term of the contract based solely on the entity’s or association’s status as a firearm entity or firearm trade association

23. Mutual Indemnification Each party hereto agrees to indemnify, defend and hold the other, its officers, directors, agents and employees harmless from and against any and all losses, liabilities and claims, including reasonable attorney’s fees arising out of or resulting from the willful act, fault, omission, or negligence of the indemnifying party or of its employees, contractors, or agents in performing its obligations under this agreement, provided however, that neither party hereto shall be liable to the other for any consequential damages arising out of its willful act, fault, omission, or negligence.

24. Fair Labor Standards Act Contractor shall be in compliance with the Fair Labor Standards Act 29 USC 201-6; Establishes minimum wage, overtime pay, equal pay, recordkeeping, and child labor standards for employees or in the production of goods for interstate commerce. By signing and submitting this bid, bidder certifies that its company, any subcontractors, or principals thereof is in accordance with said compliance. United States Department of Labor website: www.dol.gov/esa

25. Davis-Bacon Act ($2,000 or more) Contractor shall be in compliance with the Davis-Bacon Act, 40 USC 276A-7; ensures that laborers and mechanics employed pursuant to federally funded construction contracts, subcontracts and construction under Federal grants, will be paid wages as determined by the U.S. Secretary of Labor. By signing and submitting this bid, bidder certifies that its company, any subcontractors, or principals thereof is in accordance with said compliance. United States Department of Labor website:

www.dol.gov/esa

Federal Funded ___XX Non-Federal Funded

26. Small Business Entrepreneurship Programs

The Southern University System is a participant in the Louisiana for the Small Entrepreneurships Program (the Hudson Initiative) and the Louisiana Initiative for Veterans and Service-Connected Disabled Veterans-Owned Business Small Entrepreneurships. Bidders are encouraged to consider participation. A list of certified vendors and additional information can be obtained from website http://www.ledsmallbiz.com. Potential participants may also register at this website. Businesses include minority and women.

27. Public Works Projects (R.S. 38:2227) In accordance with the provisions of R.S. 38:2227; in awarding public works projects, any public entity is authorized to reject a proposal or bid, or not award the contract, to a business in which any individual with an ownership interest of ten percent (10%) or more, has been convicted, or has entered a plea of guilty or nolo contenere to any state felony or equivalent federal felony crime.

28. Tobacco-Free Policy The use of tobacco products on any Southern University campus is prohibited by students, staff, faculty or visitors in all campus buildings, facilities, or property owned or leased by Southern University System and outside areas of the campus where non-smokers cannot avoid exposure to smoke; on campus grounds, facilities, or vehicles that are the property of the University; and at lectures, conferences, meetings, and social and cultural events held on school property or school grounds. The sale or free distribution of tobacco products, including merchandise on campus or at school events is prohibited.

29. Equal Opportunity Employer

Southern University and A&M College Systems of the State of Louisiana is an equal opportunity employer and looks to its contractors, sub-contractors, vendors, and suppliers to take affirmative action to effect this commitment in its operations. By submitting and signing this bid, the bidder certifies that he agrees to adhere to the mandates dictated by Title VI and VII of the Civil

Rights Act of 1964, as amended; the Vietnam Era Veterans’ Readjustment Assistance Act of 1974; Section 303 of the Rehabilitation

Act of 1973; Section 202 of Executive Orderll24b,as amended; and the Americans with Disabilities Act of 1990. Bidder agrees that he will not discriminate in the rendering of services to and/or employment of individuals because of race, color, religion, sex, age, http://www.dol.gov/esa http://www.dol.gov/esa http://www.ledsmallbiz.com/ national origin, handicap, disability, veteran status, or any other non-merit factor. Bidder further agrees to keep informed of and comply with all Federal, State, and local laws, ordinances, and regulations which affect his employees or prospective employees. Any person who is a “Qualified Individual with a Disability” as defined by 42 USC 12131 of the American with Disabilities Act who has submitted a bid on this procurement and who desires to attend the bid opening, must notify this office in writing no later than seven

(7) working days prior to the bid opening date of their need for special accommodations. If the requested accommodations cannot be reasonably provided, the individual will be so informed prior to the bid opening.

30. Code of Ethics

The contractor acknowledges that Chapter 15 of Title 42 of the Louisiana Revised Statutes (R.S. 42:1101 et. seq., Code of

Governmental Ethics) applies to the Contracting Party in the performance of services called for in this contract. The contractor agrees to immediately notify the state if potential violations of the Code of Governmental Ethics arise at any time during the term of this contract.

31. Vendor Forms/SU Signature Authority The terms and conditions of the SU solicitation and purchase order/contract shall solely govern the purchase agreement, and shall not be amended by any vendor contract, form, etc. The University’s chief procurement officer, or designee, is delegated sole authority to execute any vendor contracts, forms, etc. Departments are prohibited from signing any vendor forms.

32. Prosecution of Work

The work is to be done when Southern University is in operation. The contractor shall, therefore, plan the repairs and installation in specifications so as not to interfere with normal operations of the facility and shall exert effort to expedite completion of the work once it has started. It is intended that the work shall be done during normal working hours, however, should work require overtime

(Saturday, Sunday and/or night working hours), the cost must be borne by the contractor at no extra compensation from the Owner

(Southern University).

33. On-Campus Attendance Requirements (COVID-19)

The Center for Disease and Control (CDC) recommends social distancing and wearing of masks to prevent the spread of the

Coronavirus (COVID19). Persons visiting Southern University are required to wear a mask/face covering and stay at least 6 feet between yourself and others, even when you wear a face covering.

34. Termination of the Contract for Convenience The State/University may terminate the contract at any time by giving thirty (30) days written notice to the Contractor of such termination or negotiating an effective date with the Contractor. The Contractor shall be entitled to payment for deliverables in progress, to the extent work has been performed satisfactorily.

35. Termination for Cause The State may terminate this Contract for cause based upon the failure of the Contractor to comply with the terms and/or conditions of the Contract; provided that the State shall give the Contractor written notice specifying the Contractor’s failure. If within thirty (30) days after receipt of such notice, the Contractor shall not have either corrected such failure or thereafter proceeded diligently to complete such correction, then the State may, at its option, place the Contractor in default and the Contract shall terminate on the date specified in such notice. The Contractor may exercise any rights available to it under Louisiana law to terminate for cause upon the failure of the Owner to comply with the terms and conditions of this contract; provided that the Contractor shall give the State, written notice specifying the State’s failure and a reasonable opportunity for the Owner to cure the defect.

36. Auditors It is hereby agreed that the Legislative Auditor of the State of Louisiana and/or the Office of the Governor, Division of Administration auditors shall have the option of auditing all accounts of contractor which relate to this contract.

37. Awarded Products/Unauthorized Substitutions Only those awarded brands and numbers stated in the SU contract are approved for delivery, acceptance, and payment purposes. Any substitution requires prior approval of the Purchasing Office. Unauthorized product substitutions are subject to rejection at time of delivery, post-return at vendor’s expense, and non-payment.

38. Acceptance Upon written notice by the Owner, a Notice by Owner of Acceptance of Work will be executed and forwarded to the Contractor for recording with the Clerk of Court in the parish in which the work has been performed and shall furnish a clear Lien Certificate from the Clerk of Court (to the owner along with final invoice) forty-five (45) days after recordation of acceptance. Final payment of ten percent (10%) will be made at this time.

39. Guarantee

It is the intention of the specifications to secure a first-class permanent material and construction and to this end, Contractor will be held responsible for and must correct defects discovered in the work within one (1) year from acceptance. Should any materials or methods be called for, of such nature to render this guarantee impossible, written notice to this effect should be given Owner

(Southern University) before signing contract and/or beginning of work; failure to do this will be construed as agreement to the strictest terms of the guarantee.

40. Clean-Up

The Contractor will be directed during the progress of work to remove and properly dispose of the resultant and debris. Upon completion, Contractor shall remove all equipment, unused materials and debris and will leave the premises in a clean and first-class condition.

41. Examination of Site

Each bidder will visit the site of the proposed project and will fully acquaint himself with conditions relating to construction and labor so that he may fully understand the facilities, difficulties and restrictions attending the execution of work under this contract. No consideration or allowance will be granted the Contractor for failure to visit the site or for any alleged misunderstanding of the materials to be furnished or the work to be done.

42. Anti-Kickback Clause

The Contractor hereby agrees to adhere to the mandate dictated by The Copeland "Anti-Kickback" ACT which provides that each

Contractor or Subgrantee shall be prohibited from inducing, by any means, any person employed in the completion of work, to give up any part of the compensation to which he is otherwise entitled.

43. Clean Air Act The Contractor hereby agrees to adhere to the provisions which require compliance with all applicable standards, orders or requirements issued under Section 306 of the CLEAN AIR ACT which prohibits the use under non-exempt contracts, grants or loans of facilities included on the EPA list of Violating Facilities.

44. Clean Water Act The Contractor hereby agrees to adhere to the provisions which require compliance with all applicable standards, orders or requirements issued under Section 508 of the Clean Water Act which prohibits the use under non-exempt federal contracts, grants or loans of facilities included on the EPA list of Violating Facilities.

45. Energy Policy and Conservation Act The Contractor hereby recognizes the mandatory standards and policies relating to energy efficiency which are contained in the State energy conservation plan issued in compliance with the Energy Policy and Conservation Act (P.L. 94-163).

46. Anti-Lobbying and Debarment Act The Contractor will be expected to comply with federal statutes in the Anti-Lobbying Act and The Debarment Act.

47. Signature Authority

A CORPORATE RESOLUTION OR WRITTEN EVIDENCE OF THE AUTHORITY OF THE PERSON SIGNING

THE BID FOR THE PUBLIC WORK AS PRESCRIBED BY LOUISIANA REVISED STATUTE 38:2212 (B)(5)

A copy of the applicable signature authority document/Board Resolution or LA Secretary of State

Registration must be submitted with bid.

48. ADITIONAL REQUIREMENTS

1. ALL WORK SHALL BE IN ACCORDANCE WITH THE PLANS; THE PROJECT SPECIFICATIONS, AND HALL COMPLY

WITH APPLICALBE LOCAL AND STATE BUILDING CODES AS WELL AS ANY AND ALL REGULATORY AGENCY

REQUIREMENTS AND LAWS, INCLUDING BUT NOT LIMIOTED TO OSHA, ETC. GENERAL NOTES SHALL APPLY TO

ALL DRAWINGS.

2. CONTRACTOR SHALL NOTIFY THE ENGINEER/ARCHITECT, IF APPLICABLE, OF ALL CONFLICTS OR

DISCRENPENSIES PRESENTED IN THESE PLANS PRIOR TO THE START OF WORK.

3. ALL WORK, WHETHER SHOWN OR IMPLIED, UNLESS SPECIFICALLY QUESTIONED SHALL BE CONSIDERED

UNDERSTOOD IN ALL RESPECTS BY THE GENERAL CONTRATOR AND WHO WILL BE RESPOSIBLE FOR ANY

MISINTERPRETATIONS AND CONSEQUENCES THEREOF.

4. ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.

5. ENGINEER/ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ALL IDENTIFIED EXISTING UTILITIES NOT

INDENTIFIED IN THE PLANS.

6. OWNER SHALL PROVIDE WATER FOR CLEANING OPERATIONS FROM ANY FIRE HYDRANT AT NO COST TO THE

CONSULTANT.

49. PUBLIC AWARENESS – 192.616

Southern University Baton Rouge owns and operates a master meter natural gas distribution system on the school campus. The gas system consists of an underground network of pipelines. The purpose of the gas system is to provide a reliable and safe economical source of energy for heating purposes. The pipeline system has the capacity to reliably deliver natural gas.

The hazards of natural gas are odorless, colorless, tasteless, lighter than air and can ignite and/or explode with tremendous force when mixed with the right amount of air.

Measures taken include:

• Adding odorant to the gas to give it that distinctive smell, like rotten eggs, to warn us of its presence.

• Testing the odorant level each calendar quarter,

• Performing annual gas leakage surveys, and

• Conducting periodic pipeline patrols.

The following are signs that may indicate a gas leak:

• A hissing or roaring sound (caused by escaping gas)

• A patch of dead or discolored vegetation in an otherwise green setting along a pipeline route

• Blowing dirt, grass or leaves near a pipeline,

• Continuous bubbling in wet, flooded areas,

• A “gas small” like rotten eggs.

Anyone who may smell this odor or notice any unusual conditions on or near gas mains, vents, service lines, meter sets, or especially inside of a building should call the maintenance office immediately. If you smell a strong gas odor inside a building, notify everyone in the building to leave. Do not operate any switches or use the phone. Go a safe distance away upwind of the smell of the gas and call the maintenance office. With any gas leak protect life first, then property, then notify the maintenance office.

State and federal laws require excavators to notify LA One-Call 2 days before digging. If any excavation is planned, you must notify LA One-Call which will notify the Southern University to locate the gas lines.

To obtain additional information or report a gas related issue call Southern University Baton Rouge Maintenance Office.

The Southern University Maintenance Office phone number is 225-771-4741. The LA One-Call Center phone number is 811.

EXHIBIT D

INSURANCE REQUIREMENTS

FOR NEW CONSTRUCTION, ADDITIONS AND LARGE RENOVATIONS

The Contractor shall purchase and maintain without interruption for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, its agents, representatives, employees or subcontractors, or anyone employed directly or indirectly by any of them. The duration of the contract shall be from the inception of the contract until the date of final payment.

A. MINIMUM SCOPE AND LIMITS OF INSURANCE

1. Workers Compensation

Workers Compensation insurance shall be in compliance with the Workers Compensation law of the State of the Contractor’s headquarters. Employers Liability is included with a minimum limit of $1,000,000 per accident/per disease/per employee. If work is to be performed over water and involves maritime exposure, applicable LHWCA, Jones Act, or other maritime law coverage shall be included. A.M. Best's insurance company rating requirement may be waived for workers compensation coverage only.

2. Commercial General Liability

a. Commercial General Liability insurance, including Personal and Advertising Injury Liability and Products and Completed Operations Liability, shall have a minimum limit per occurrence based on the project value. The Insurance Services Office (ISO) Commercial General Liability occurrence coverage form CG 00 01 (current form approved for use in Louisiana), or equivalent, is to be used in the policy. Claims-made form is unacceptable.

b. The aggregate loss limit must apply to each project. ISO form CG 25 03 (current form approved for use in Louisiana), or equivalent, shall also be submitted. The State project number, including part number, and project name shall be included on this endorsement.

c. COMBINED SINGLE LIMIT (CSL) PER OCCURRENCE

Type of Construction

Projects up to $1,000,000

Projects over $1,000,000 up to

$10,000,000

Projects over $10,000,000

New Buildings:

Each Occurrence Minimum Limit $1,000,000 $2,000,000 $4,000,000

Per Project Aggregate $2,000,000 $4,000,000 $8,000,000

Each Occurrence

Minimum Limit $1,000,000 ** $2,000,000 ** $4,000,000 **

Per Project Aggregate 2 times per occur limit ** 2 times per occur limit ** 2 times per occur limit **

** While the minimum Combined Single Limit of $1,000,000 is required for any renovation, the limit is calculated by taking 10% of the building value and rounding it to the nearest $1,000,000 to get the insurance limit. Example: Renovation on a $33,000,000 building would have a calculated $3,000,000 combined single limit of coverage (33,000,000 times .10 = 3,300,000 and then rounding down to $3,000,000). If the calculated limit is less than the minimum limit listed in the above chart, then the amount needed is the minimum listed in the chart. Maximum per occurrence limit required is $10,000,000 regardless of building value. The per project aggregate limit is then calculated as twice the per occurrence limit.

3. Automobile Liability

Automobile Liability Insurance shall have a minimum combined single limit per accident of $1,000,000. ISO form number CA 00 01 (current form approved for use in Louisiana), or equivalent, is to be used in the policy. This insurance shall include third-party bodily injury and property damage liability for owned, hired and non-owned automobiles.

4. Excess Umbrella Excess Umbrella insurance may be used to meet the minimum requirements for Commercial General Liability and Automobile Liability only.

5. Builder’s Risk

a. Builder’s Risk Insurance shall be in an amount equal to the amount of the construction contract including any amendments and shall be upon the entire work included in the contract. The policy shall provide coverage equivalent to the ISO form number CP 10 20, Broad Form Causes of Loss (extended, if necessary, to include the perils of wind, earthquake, collapse, vandalism/malicious mischief, and theft, including theft of materials whether or not attached to any structure). The policy must include architects’ and engineers’ fees necessary to provide plans, specifications and supervision of work for the repair and/or replacement of property damage caused by a covered peril, not to exceed 10% of the cost of the repair and/or replacement.

b. Flood coverage shall be provided by the Contractor on the first floor and below for all projects, except as otherwise noted. The builder’s risk insurance policy, sub-limit for flood coverage shall not be less than ten percent (10%) of the total contract cost per occurrence. If flood is purchased as a separate policy, the limit shall be ten percent (10%) of the total contract cost per occurrence (with a max of $500,000 if NFIP). Coverage for roofing projects shall not require flood coverage.

c. A Specialty Contractor may provide an installation floater in lieu of a Builders Risk policy, with the similar coverage as the Builder’s Risk policy, upon the system to be installed in an amount equal to the amount of the contract including any amendments. Flood coverage is not required.

d. The policy must include coverage for the Owner, Contractor and any subcontractors as their interests may appear.

6. Pollution Liability (required when asbestos or other hazardous material abatement is included in the contract)

Pollution Liability insurance, including gradual release as well as sudden and accidental, shall have a minimum limit of not less than $1,000,000 per claim. A claims-made form will be acceptable.

A policy period inception date of no later than the first day of anticipated work under this contract and an expiration date of no earlier than 30 days after anticipated completion of all work under the contract shall be provided. There shall be an extended reporting period of at least 24 months, with full reinstatement of limits, from the expiration date of the policy if policy is not renewed. The policy shall not be cancelled for any reason, except non-payment of premium.

B. DEDUCTIBLES AND SELF-INSURED RETENTIONS

Any deductibles or self-insured retentions must be declared to and accepted by the Agency. The Contractor shall be responsible for all deductibles and self-insured retentions.

C. OTHER INSURANCE PROVISIONS

The policies are to contain, or be endorsed to contain, the following provisions:

1. Workers Compensation and Employers Liability Coverage

To the fullest extent allowed by law, the insurer shall agree to waive all rights of subrogation against the Agency, its officers, agents, employees and volunteers for losses arising from work performed by the Contractor for the Agency.

2. Commercial General Liability Coverage

a. The Owner, its officers, agents, employees and volunteers are to be added as additional insureds as respects liability arising out of activities performed by or on behalf of the Contractor;

products and completed operations of the Contractor, premises owned, occupied or used by the Contractor. ISO Forms CG 20 10 (for ongoing work) AND CG 20 37 (for completed work) (current forms approved for use in Louisiana), or equivalent, are to be used.

b. The Contractor’s insurance shall be primary as respects the Agency, its officers, agents, employees and volunteers for any and all losses that occur under the contract. The coverage shall contain no special limitations on the scope of protection afforded to the Agency, its officers, officials, employees or volunteers. Any insurance or self-insurance maintained by the Agency shall be excess and non-contributory of the Contractor’s insurance.

3. Builder’s Risk

The policy must include an endorsement providing the following:

In the event of a disagreement regarding a loss covered by this policy which may also be covered by a State of Louisiana self-insurance or commercial property policy through the Office of Risk Management (ORM), Contractor and its insurer agree to follow the following procedure to establish coverage and/or the amount of loss:

Any party to a loss may make written demand for an appraisal of the matter in disagreement. Within 20 days of receipt of written demand, the Contractor’s insurer and either ORM or its commercial insurance company shall each select a competent and impartial appraiser and notify the other of the appraiser selected. The two appraisers will select a competent and impartial umpire. The appraisers will then identify the policy or policies under which the loss is insured and, if necessary, state separately the value of the property and the amount of the loss that must be borne by each policy. If the two appraisers fail to agree, they shall submit their differences to the umpire. A written decision by any two shall determine the policy or policies and the amount of the loss. Each insurance company agree that the decision of the appraisers and the umpire if involved will be binding and final and that neither party will resort to litigation. Each of the two parties shall pay its chosen appraiser and bear the cost of the umpire equally.

4. All Coverages

a. All policies must be endorsed to require 30 days written notice of cancellation to the Agency.

Ten-day written notice of cancellation is acceptable for non-payment of premium. Notifications shall comply with the standard cancellation provisions in the Contractor’s policy. In addition, Contractor is required to notify Agency of policy cancellations or reductions in limits.

b. Neither the acceptance of the completed work nor the payment thereof shall release the Contractor from the obligations of the insurance requirements or indemnification agreement.

c. The insurance companies issuing the policies shall have no recourse against the Agency for payment of premiums or for assessments under any form of the policies.

d. Any failure of the Contractor to comply with reporting provisions of the policy shall not affect coverage provided to the Agency, its officers, agents, employees and volunteers.

D. ACCEPTABILITY OF INSURERS

1. All required insurance shall be provided by a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located. Insurance shall be placed with insurers with an A.M. Best's rating of A-:VI or higher. This rating requirement may be waived for workers compensation coverage only.

2. If at any time an insurer issuing any such policy does not meet the minimum A.M. Best rating, the

Contractor shall obtain a policy with an insurer that meets the A.M. Best rating and shall submit another Certificate of Insurance within 30 days.

E. VERIFICATION OF COVERAGE

1. Contractor shall furnish the Agency with Certificates of Insurance reflecting proof of required coverage. The Certificates for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The Certificates are to be received and approved by the Agency before work commences and upon any contract renewal or insurance policy renewal thereafter.

2. The Certificate Holder Shall be listed as follows:

State of Louisiana Agency Name, Its Officers, Agents, Employees and Volunteers Address, City, State, Zip Project or Contract #:

3. In addition to the Certificates, Contractor shall submit the declarations page and the cancellation provision for each insurance policy. The Agency reserves the right to request complete certified copies of all required insurance policies at any time.

4. If the Contractor does not meet the insurance requirements at policy renewal, at the option of the

Agency, payment to the Contractor may be withheld until the requirements have been met, OR the Agency may pay the renewal premium and withhold such payment from any monies due the Contractor, OR the contract may be suspended or terminated for cause. Failure of the Contractor to purchase and/or maintain any required insurance shall not relieve the Contractor from any liability or indemnification under the contract.

F. SUBCONTRACTORS

1. Contractor shall include all subcontractors as insureds under its policies OR shall be responsible for verifying and maintaining the Certificates provided by each subcontractor. Subcontractors shall be subject to all of the requirements stated herein. The Agency reserves the right to request copies of subcontractor’s Certificates at any time.

2. If Contractor does not verify subcontractors’ insurance as described above, Agency…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .