9058FJ_AFMC_Form_807_Quality_Production.pdf
PDF 85 KB Posted
- Attached to
- A-10 Panel, Structural Aircraft 3 YR IDIQ Federal contract opportunity
- Solicitation number
- FA8212-22-R-0015
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECOMMENDED QUALITY ASSURANCE PROVISIONS
AND SPECIAL INSPECTION REQUIREMENTS
1. PR / MIPR NUMBER
2. NATIONAL STOCK NUMBER
1560010479058FJ
3. POINT OF INSPECTION
SOURCE DESTINATION
X
SEE DFARS 246.402
4. POINT OF ACCEPTANCE
SOURCE DESTINATION
X
5. ITEM MANAGER / PHONE
Salas, Audrey C / 801-775-4292
6. EQUIPMENT SPEC / PHONE
Flook, Robert G / 801-586-4370
7. CONTRACT QUALITY REQUIREMENTS/SPECIAL INSPECTION REQUIREMENTS
CERTIFICATE OF CONFORMANCE
FAR 52.246-15
CONTRACT RESPONSIBILITY
FOR INSPECTION
FAR 52.246-1
STANDARD INSPECTION
FAR 52.246-2,-3,-4,-5 OR -6
AS APPLICABLE TO CONTRACT
X HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
AS 9100
COMMERCIAL ITEM INSPECTION
FAR 52.212-4
OTHER (Describe in Block 8)
8. REMARKS
Moore, Ryan SNAME: 17 JUN 2021DATE:
Component requires inspection and acceptance at source because the following criteria as required in AFMCI 23-102:
- Significant Technical Requirements to ensure configuration baseline.
- Critical production features to ensure Safety of Flight aspects of this component.
- Contract is awarded to manufacturer of this item.
Defense Contract Management Agency (DCMA) will provide the necessary technical and administrative oversight to ensure the requirements in section 7 and the Technical Data Package (TDP) provided by the contract are complied with. Specific aircraft components perform critical functions and are essential for mission success.
Therefore, the following characteristics should be considered in the evaluation by DCMA:
- Material Certifications.
- Process Certifications.
- Non-destructive inspections to support processing in the manufacture of critical aircraft components and assemblies.
- Dimensional requirements to meet requirements of fit-form-function of critical aircraft components and assemblies.
The TDP provides the specific requirements for 'accept/reject' criteria that support the areas identified above.
8a. OZONE DEPLETING SUBSTANCES (ODS)
X STATEMENT
"I HAVE REVIEWED THE REQUIREMENT, INCLUDING AVAILABLE TECHNICAL DOCUMENTATION, AND BELIEVE THAT IT DOES NOT REQUIRE THE CONTRACTOR USE CLASS I OZONE DEPLETING SUBSTANCES (ODS) IDENTIFIED IN AIR FORCE POLICY, NOR IS IT WRITTEN SO THAT IT CAN
ONLY BE MET BY THE USE OF A CLASS I ODS."
WAIVER (SEE AF FARS 5323)
NOTE: Quality provisions as annotated hereon will not be downgraded without Technical Authority coordination. The Technical Authority must be notified if award selection is made to a new source using Acquisition Method Code (AMC) 3, 4, or 5.
9. QUALITY PRE-AWARD SURVEY
X YES X NEW SOURCE
PREVIOUS SOURCENO
X AFMC PARTICIPATION
RECOMMENDED
10. CODES
A. I&A
B. CQR
G
11. SIGNATURE OF TECHNICAL AUTHORITY
Moore, Ryan S
ORGANIZATION / SYMBOL
416 SCMS / GUMBA
PHONE
801-777-9920 / 777-9920
DATE
17 JUN 2021
Page 1 of 1AFMC FORM 807, 20060111, V1 Version 5Generated by PRPS using Jasper Reports on 17 Dec 2021