CMR Services for 208 Bull Street Renovations Project
Solicitation number
RFP C27-12
Issued by
Chatham County, Georgia

About this file

This document is a Sealed Fee Proposal Form (Solicitation Form 8) for RFP #C27-12 (ESPLOST) issued by the Board of Public Education for the City of Savannah and the County of Chatham, Georgia, to procure Construction Management at Risk (CMR) Services for the 208 Bull Street Renovations Project located at 208 Bull Street, Savannah, GA 31401. The project has an estimated initial Stated Cost Limitation of $72,500,000. Offerors are required to submit a lump sum preconstruction fee and a construction fee expressed as a percentage of the Cost of the Work, both of which will be evaluated and scored. Additionally, offerors must provide hourly billable rates for CMR staff engaged on the project, which will not be scored but must be honored throughout the contract term. The proposal must remain valid for 120 days from submission, and the selected firm will enter into an AIA Document A133-2019 Agreement Between Owner and Construction Manager as Constructor, with the basis of payment being Cost of the Work Plus a Fee with a Guaranteed Maximum Price (GMP) to be issued after contract award.

The preconstruction fee shall cover all pre-construction consulting services and be submitted as a lump sum amount. The construction fee shall encompass CMR General Conditions and Overhead Costs and CMR Fee as a percentage of the Cost of the Work, with CMR labor costs, materials, equipment, temporary facilities, and miscellaneous costs defined according to AIA Document A133-2019 specifications. The contracting firm agrees to perform all work in accordance with contract documents and specifications, complete services within the proposed timeframe, and acknowledge that the Savannah/Chatham County Public School System will not be responsible for any costs not specifically set forth in the proposal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP # C27-12 (ESPLOST) - SOLICITATION FORM 8 Page | 1

BOARD OF PUBLIC EDUCATION

FOR THE CITY OF SAVANNAH AND THE COUNTY OF CHATHAM

RFP # C27-12 (ESPLOST) - SOLICITATION FORM 8

Sealed Fee Proposal Form

1. CMR’S FEE:

Basis of Fee. The CMR’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the CMR as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the CMR performs all the requirements of the Contract Documents within the time limits established. (See General Requirements of Specimen Contract.)

A. PRECONSTRUCTION LUMP SUM FEE- Considered in Scoring

Pre-Construction Fee. For the pre-construction consulting services provided by CMR as set forth in the General Requirements of Specimen Contract, Board shall pay to CMR a Preconstruction Fee. Pre-Construction Fee shall be expressed as a lump sum amount to be paid to the CMR for Pre- Construction Services.

TOTAL

Pre-Construction Lump Sum Fee

B. CONSTRUCTION FEE – Considered in Scoring

The Construction Fee is for the CMR General Conditions and Overhead Costs, and the CMR Fee. The Construction Fee shall be expressed a percentage (%) of the Cost of the Work.

Pre-construction service costs are to be included in the Pre-Construction Lump Sum Fee and are not included or a part of the Construction Fee.

CMR General Conditions and Overhead Costs are defined as the following:

• All costs in 7.2 Labor Cost; 7.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items with the exception of 7.5.3; and 7.6 Miscellaneous Costs as listed and specified in the AIA Document A133-2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor.

TOTAL

Construction Fee – CMR General Conditions and Overhead Cost, and CMR Fee for a Not To Exceed percentage amount of the Cost of Work.

C. CMR LABOR BILLABLE RATES – Not Scored

Provide hourly billable rates for CMR staff engaged in the project on a separate sheet of paper.

Rates to be used for billing thorough the duration of the project and may not change except as approved by the Owner in advance. While the hourly rates will not be scored during the evaluation of Sealed Fee Proposals, CMR shall honor the quoted hourly rates if awarded a contract during the life of any resulting contract.

RFP # C27-12 (ESPLOST) - SOLICITATION FORM 8 Page | 2

In submitting this proposal, I agree to the following:

• To hold my proposal and all fees valid for a period of one-hundred twenty (120) days.

• To enter into and execute a contract, if awarded on the basis of this proposal.

• To accomplish the work in accordance with the contract documents and specifications.

• To complete the work by the time as proposed in the RFP.

• I will deliver and complete the services outlined in the solicitation documents.

The undersigned, having read and examined the documents and Attachment “A” specifications, understands the requirements of this proposal and agrees to provide the required services in accordance with this proposal, and all other attachments, exhibits, etc. and further understands that the Savannah/Chatham County Public School

System will not be responsible for any cost not specifically set forth in this proposal.

Individual Name: __________________________________________________________________________

Signature: __________________________________________________________________________

Firm Name: __________________________________________________________________________

Address: __________________________________________________________________________

Telephone: __________________________________________________________________________

Email: _________________________________________________________________________

File details come from the government source that posted it. Updated .