9-IFB 2026-13 Addendum 1 4 Apply to Rebid.pdf
PDF 441 KB Posted
- Attached to
- Fire Station Upgrades - Electric Rebid
- Solicitation number
- IFB 2026-13-R City of Harrisburg, Dauphin County
- Issued by
- Dauphin County, Harveys Lake Borough, Pennsylvania
About this file
This document is Addendum 1-4 for Invitation for Bid (IFB) 2026-13 Fire Station Upgrades, issued by the City of Harrisburg, Pennsylvania Bureau of Fire for the interior renovation of two fire stations located at 1820 North 6th Street (Station #1) and 140 North 16th Street (Station #2). The project scope includes demolition and reconstruction of bunk rooms, restroom/showers, and offices at both stations, along with partitions, doors, interior glazed openings, casework, painting, plumbing fixtures, HVAC redistribution, electrical service redistribution, and interior lighting. The original Invitation for Bids was modified through four addenda issued between October 8 and November 3, 2026. The final Request for Information (RFI) deadline was November 5, 2026, with bid submission deadline extended to November 10, 2026 at 11:00 PM. The contract timeline is approximately December 15, 2026 through May 30, 2027. The work will be performed concurrently at both stations with an on-site supervisor required at each location. Owner occupancy will continue during the entire construction period except in areas under construction.
Key modifications include deletion of the original 75% self-performance workforce requirement and addition of Responsible Contractor and Apprenticeship Qualification certifications as mandatory bidder requirements. The City of Harrisburg will waive building permit and inspection fees and will cover existing sewage usage, though contractors must provide and pay for temporary jobsite toilets. The City will not provide Builder's Risk insurance, nor will it waive business privilege or mercantile taxes. Bidders must include all applicable local, state, and federal taxes in pricing. Parking is available on-street (free or metered) with limited owner parking available until full capacity, and the area lacks metered parking. Storage and laydown areas will be located at the south end of each building with use of four adjacent parking spots; additional area requires coordination with the Fire Bureau. The project includes separate prime contracts for general construction, plumbing, HVAC, and electrical work, with electrical as a distinct prime contract. No liquidated damages, liquidated delays, or background checks are applicable. Coordination drawings are required at $25 per drawing payable to the architect.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1
IFB 2026-13 Fire Station Upgrades
Date: October 8, 2026
TO ALL PROSPECTIVE BIDDERS:
This Addendum is issued to modify, clarify, or amend the original posted bidding documents for the project referenced above. This Addendum forms a part of the Contract Documents and modifies the original bidding documents as noted below.
ADDITIONAL DOCUMENTATION
IFB 2026-13 Fire Station Upgrades Solicitation File
Bidders are directed to pay special attention to Exhibit I (Grant Requirements) within the solicitation document. Compliance with all terms, conditions, and reporting metrics outlined in
Exhibit I is a mandatory requirement for bid consideration.
BID PRICING FORM CORRECTION
The bid pricing form has been updated to reflect pricing components for the above referenced bid.
End of Addendum No. 1
All questions an inquiry regarding this Addendum or related project materials shall be submitted through
PennBid.
Addendum No. 2
Date: October 15, 2026
TO ALL PROSPECTIVE BIDDERS:
This Addendum is issued to modify, clarify, or amend the original posted bidding documents for the project referenced above. This Addendum forms a part of the Contract Documents and modifies the original bidding documents as noted below.
BID DEADLINE EXTENSION
The deadline for bid submissions has been extended. Please refer to the bid profile in PennBid for details.
ADDITIONAL BIDDER QUALIFICATION FORMS
- Responsible Contractor Form Instructions
- Responsible Contractor Form & Documentation of Apprenticeship Qualification
Please review the instructions carefully before submitting questions regarding this matter.
AMENDMENT TO THE INVITATION FOR BIDS (IFB)
Amendment to Invitation for Bids IFB 2026-13 Harrisburg Bureau of Fire Station Upgrades Solicitation File
1. DELETION OF REQUIREMENT:
Section Instructions to Bidders Item 7.c " It is a requirement of this Contract that at least 75% of the Work be performed by Bidder’s own work force, not by subcontractor(s).", is hereby deleted in its entirety from the IFB bid solicitation file.
This requirement is completely waived and is no longer applicable to any bidders, proposals, or the subsequently awarded contractor(s).
2. ADDITIONAL REQUIREMENT:
Section Instructions to Bidders Item 7.f " Bidder/Contractor complete and submits Bidder and Subcontractor Responsible Contractor/SubContractor Certification Form and
Documentation of Apprenticeship Qualification in is hereby added in its entirety from the IFB bid solicitation file.
End of Addendum No. 2
All questions and inquiry regarding this Addendum or related project materials shall be submitted through PennBid. Prospective bidders must acknowledge receipt of all issued addenda directly on the official Bid Submission Form at the time of submission. Bidders shall verify and input the total number of addenda issued into the designated Request for Information (RFI) field.
Addendum No. 3
Date: October 20, 2026
TO ALL PROSPECTIVE BIDDERS:
This Addendum is issued to modify, clarify, or amend the original posted bidding documents for the project referenced above. This Addendum forms a part of the Contract Documents and modifies the original bidding documents as noted below.
General Clarifications
Question: Is the owner providing the Builder's Risk Insurance?
Answer: No. The project will entail work covered by the City’s commercial liability policy.
Builder’s Risk insurance is not required for this project.
Question: Will the city waive building permit and inspection fees for their own project?
Answer: Yes.
Question: Does this project include liquidated damages?
Answer: No.
Modifications to the Online Bid Portal Submission Form
• Original Question Text: "List of Owned Equipment"
• Revised Question Text: "List Proposed Owned Equipment” o Instruction: List major owned equipment proposed for this scope (e.g., trucks, heavy machinery).
IFB Notice to Bidders
• Section: Solicitation File, Notice to Bidders, Item # 20.
o Modification: “Attachment B - List Proposed Owned Equipment”
IFB Job Scope and Technical Bid Submittal
• Section: Technical Bid Submittal o Addition: "Attachment B – List Proposed Owned Equipment"
Instruction: Bidders must list major owned equipment proposed for this scope (e.g., trucks, heavy machinery).
o Modification: Contractor Parking
Original Requirement: On street (free or metered) parking available – please price job accordingly. The city’s public safety and public works personnel will not be closing roads or reserving parking for this contract.
Revised To: On street (free or metered) parking available – please price job accordingly. The city’s public safety and public works personnel will not be closing roads or reserving parking for this contract. However, owner parking is available until spots are filled. The area surrounding the facilities do not have metered parking.
IFB Instructions to Bidders
• Section: Instruction to Bidders, Item # 2 o Original: The length of Contract will be approximately November 15, 2026 through April 30, 2027.
o Revised To: The length of Contract will be approximately December 15, 2026 through May 30, 2027.
• Section: Instruction to Bidders, Checklist o Original Item: "List of Owned Equipment – See equipment requirements” o Revised To: “List Proposed Owned Equipment – See Technical Submittal Items"
End of Addendum No. 3
All questions and inquiry regarding this Addendum or related project materials shall be submitted through PennBid. Prospective bidders must acknowledge receipt of all issued addenda directly on the official Bid Submission Form at the time of submission. Bidders shall verify and input the total number of addenda issued into the designated Request for Information (RFI) field.
Addendum No. 4
Date: November 3, 2026
TO ALL PROSPECTIVE BIDDERS:
This Addendum #4 is issued to modify, clarify, or amend the original posted bidding documents for the project referenced above. This Addendum forms a part of the Contract Documents and modifies the original bidding documents as noted below.
Bid Extension and Questions Deadline
• RFI / Bidder Question Deadline: November 5, 2026
• Bid Submission Deadline: November 10, 2026 (Extended)
IFB Public Q&A
Pursuant to the provisions of the request for bids, this Addendum is issued to provide responses to requests for information (RFIs) submitted by prospective bidders. The following questions and answers are formally incorporated into the bidding and contract documents.
#3 - Instructions to Bidders 7.c – Own Work Force Requirement (75%) – Prime Contract No. 1, General Construction
Vendor, Oct 13, 2026 10:55 AM EDT, Not Public - Pending
Instructions to Bidders Section 7.c states that at least 75% of the Work shall be performed by the Bidder’s own work force.
Is this requirement applicable to bids for Prime Contract No. 1 – General Construction? Please answer Yes or No.
If Yes, please clarify the following:
1. Basis of measurement. Is the 75% measured by contract value (cost of Work), by labor hours, or by another method?
2. Denominator. Is the 75% calculated against (a) the Bidder’s total Prime Contract No. 1 bid amount, or (b) the Work of Prime Contract No. 1 excluding allowances, bonds, insurance, and fee?
3. Subcontracted trades. Specialty trades such as glazing, tile, and flooring are typically subcontracted. Does Work performed by subcontractors count toward the 75%, or only Work performed by the Bidder’s direct employees? If subcontractors do not count, is there a list of trades or CSI divisions the Bidder is permitted to subcontract?
4. Materials. Does the cost of materials and equipment furnished by the Bidder count toward the 75% when installed by a subcontractor?
5. Documentation. Is any form, schedule, or certification required with the bid or after award to demonstrate compliance? If so, please identify it.
6. Waiver. Is there a process to request approval for a lower self-performance percentage, and by what deadline?
If No, please confirm which Prime Contract(s), if any, Section 7.c applies to.
Because this requirement affects bid pricing, please issue the response by addendum to all bidders.
Hillary Greene, Oct 14, 2026 5:21 PM EDT, Public - Answered
Is this requirement applicable to bids for Prime Contract No. 1 – General Construction?
Answer: No, it does not apply to Contract No. 1 - General Contracting. This will be corrected in a forthcoming Addendum.
#1 - Bid Due Time
Vendor, Oct 13, 2026 11:23 AM EDT, Not Public - Pending
The current bid due time is 11 PM. Could this be changed to 4 PM? We would also like an additional week if possible. Please keep the bid after 1 PM to allow the time needed to prepare on bid day.
Hillary Greene, Oct 14, 2026 9:40 AM EDT, Public - Answered
The City will not modify the submission deadline (time) for this bid. The 11:00 PM deadline was intentionally established to provide a full business day, ensuring that individuals working evening hours have adequate time to complete and submit their proposals. Moving the deadline to 4:00 PM would reduce this submission window by seven hours, which contradicts our goal of maximizing participation.
Additionally, please remember that per the Q&A guidelines, all inquiries, requests for clarification, accommodations, and individual requests must be submitted as separate, distinct entries.
#2 - Bid Extension
Vendor, Oct 14, 2026 10:48 AM EDT, Not Public - Pending
With the mandatory Pre-bid on the 15th and the project covering two separate locations that gives only nine (9) work days broken up by two (2) weekends to complete. Initial inquiries with vendors has a number of normally bidding vendors declining due to the short bid time and their inability to get pricing in that time frame. Can the bid be extended at least a week?
Hillary Greene, Oct 14, 2026 4:57 PM EDT, Public - Answered
Yes, we will extend the bid deadline.
#4 - Liquidated Damages
Vendor, Oct 15, 2026 2:26 PM EDT, Not Public - Pending
Are there LD’s on this project, and if yes, how much per day per prime?
Hillary Greene, Oct 16, 2026 9:32 AM EDT, Public - Answered
No, not applicable.
#5 - Building permit and Fees
Vendor, Oct 15, 2026 2:26 PM EDT, Not Public - Pending
Is the owner paying for the building permit and inspection fees? Will the city waive these fees for their own project?
Hillary Greene, Oct 16, 2026 9:33 AM EDT, Public - Answered
The City of Harrisburg Bureau of Codes fees will be waived for this project because it's a city owned facility and project. Please coordinate directly with the city's Project Manager during the permitting process.
#10 - worker privilege tax
Vendor, Oct 15, 2026 2:27 PM EDT, Not Public - Pending
Will the city waive the worker privilege tax with this being their own project or do we need to include the Harrisburg Workers Privilege tax in the bid? This would essentially have the owner paying mark-up on their own tax which in turn would go back to them minus the mark-up they paid.
Hillary Greene, Oct 16, 2026 1:02 PM EDT, Public - Answered
We proceed under the assumption that your inquiry refers to the city's Business Privilege Mercantile Tax. No employee, officer, or agent of the City has the authority to waive, reduce, or modify any applicable taxes for the purposes of this solicitation or the resulting contract. All applicable local, state, and federal taxes must be included in the bidder's price proposal.
#21 - Site Logistics
Vendor, Oct 15, 2026 2:27 PM EDT, Not Public - Pending
Please provide a site logistics plan showing us how much of the parking lot we will be provided for use as a laydown area. Will the GC need to fence the entire laydown area for use by all primes? Where will the common use office trailer and each of the primes storage containers be located?
Hillary Greene, Oct 27, 2026 10:36 AM EDT, Public - Answered
Storage and laydown area will be located at the south end of each building between the building and fenced property line. Additionally, we will allow the use of the four parking spots adjacent to this fenced area. Additional area can be used if coordinated with the Fire Bureau.
#20 - Common Use Filed Office
Vendor, Oct 15, 2026 2:28 PM EDT, Not Public - Pending
Specification 011200, 1.4.B.1 requires the GC to provide a common use field office. How large does this office need to be? Will job meeting need to take place in this office or will the owner provide a meeting room? Will we need an office trailer at both stations?
Hillary Greene, Oct 27, 2026 10:35 AM EDT, Public - Answered
The final site logistic plan will be determined during the pre-construction meeting with the selected contractor. We can provide a meeting space inside the fire station.
#14 - Coordination drawings
Vendor, Oct 15, 2026 2:29 PM EDT, Not Public - Pending
Please confirm the mechanical prime will be the lead on the coordination drawings and all primes will need to provide them their information.
Hillary Greene, Oct 21, 2026 4:30 PM EDT, Public - Answered
NO - Each prime contractor will prepare their own coordination drawings for the GC to coordinate
#9 - Apprenticeship Program
Vendor, Oct 16, 2026 9:59 AM EDT, Not Public - Pending
If a prime contractor does not participate in a Class A Apprenticeship Program as required in addendum 2, are there any other options for them to qualify to bid? For example, a number of years in business?
Hillary Greene, Oct 16, 2026 12:57 PM EDT, Public - Answered
For a bid submission to be considered responsible under the City's Responsible Contracting ordinance, a contractor must demonstrate it participates in a Class A apprenticeship training program for each separate trade or classification of craft employees it will employ on the project. However, should none of the bidders qualify under the City's Responsible Contracting ordinance the City reserves the right to proceed with an award to the lowest responsible bidder regardless of participation in a Class A apprenticeship training program.
#6 - Builder's Risk Insurance
Vendor, Oct 16, 2026 10:24 AM EDT, Not Public - Pending
Is the owner providing the Builder's Risk Insurance.
Hillary Greene, Oct 16, 2026 12:42 PM EDT, Public - Answered
Yes, Builder’s Risk is covered under the owner’s Commercial Property policy.
Hillary Greene, Oct 16, 2026 5:02 PM EDT, Public - Answered
Correction Notice: This response serves as a formal correction to the previously submitted answer regarding Builder’s Risk Insurance. Please replace the previous response with the updated statement below.
Original Question: Is the owner providing the Builder's Risk Insurance?
Corrected Answer: No. The project will entail work covered by the City’s commercial liability policy.
Builder’s Risk insurance is not required for this project.
#11 - Background checks
Vendor, Oct 16, 2026 11:37 AM EDT, Not Public - Pending
Please confirm if there are any special background checks required for field personnel.
Hillary Greene, Oct 16, 2026 1:03 PM EDT, Public - Answered
Not applicable. Thank you for clarifying.
#8 - Experience Requirement
Vendor, Oct 16, 2026 11:39 AM EDT, Not Public - Pending
Instructions to Bidders 7.b requires three prior service contracts of similar scope and refers to "(landscaping)". Please confirm the intended requirement for this project (e.g., three prior interior renovation or public building contracts).
Hillary Greene, Oct 16, 2026 12:56 PM EDT, Public - Answered
Yes, confirmed. Please list the contracts that correspond directly to the prime contract you are submitting for. To clarify, "Landscaping" was included solely as an example contract type, so it should be preceded by "e.g."
#7 - Contract Time
Vendor, Oct 16, 2026 11:39 AM EDT, Not Public - Pending
Instructions to Bidders 2 states a contract length of approximately November 15, 2026 through April 30, 2027. Please confirm the Notice to Proceed date.
Hillary Greene, Oct 16, 2026 12:52 PM EDT, Public - Answered
A notice to proceed will be sent to an awarded contractor once the contractor's documents are received, finalized, and a contract is fully executed. The contracting phase varies by project and contractor.
#12 - Equipment List (Attachment B / List of Owned Equipment)
Vendor, Oct 16, 2026 12:09 PM EDT, Not Public - Pending
Notice to Bidders 20 requires 'Attachment B – Equipment' for a bid to be responsive, and the PennBid deliverables list a 'List of Owned Equipment,' but the Equipment Product Requirements section states 'N/A.' Please clarify what is being requested. Is it all equipment the Contractor owns, only equipment to be used on this project, or something else?
IFB Notice to Bidders 20; Equipment Product Requirements ('N/A'); Bid Submission Checklist 'List of Owned Equipment'
Hillary Greene, Oct 19, 2026 3:34 PM EDT, Public - Answered
Please attach a list of "Proposed Owned Equipment" including major owned equipment proposed for this scope (e.g., trucks, heavy machinery). The bid solicitation will be officially modified to clarify this request in Addendum 3.
#15 - Bid Package #2 - Plumbing - Section 221116_Domestic Water Piping_Section 2.2.C
Vendor, Oct 19, 2026 9:01 AM EDT, Not Public - Pending
Is pro press fittings allowed for domestic water?
Hillary Greene, Oct 21, 2026 4:34 PM EDT, Public - Answered
NO - ProPress is not currently allowed under the Contract Documents.
#16 - Bid Package #2 - Plumbing - Drawing 1-P-3.01, 2-P-3.01-Enlarged Plan 3
Vendor, Oct 19, 2026 9:10 AM EDT, Not Public - Pending
Should we include a hot water return line for the lav in the semi-private bath?
Hillary Greene, Oct 21, 2026 4:36 PM EDT, Public - Answered
YES - A 1/2" HWR return line should be included. It should connect to both fixtures in the Semi-Private Bathroom and extend to the 3/4" HWR return main in the adjacent corridor.
#19 - Coordination Drawings
Vendor, Oct 20, 2026 3:24 PM EDT, Not Public - Pending
Please confirm if coordination drawings will be required for this project. If they are required, under PM and Coordination 1.6 C 2 d it states that the "Cost per digital data is $25 per drawing, payable to the Architect prior to release of file". Please confirm if that is correct.
Hillary Greene, Oct 27, 2026 9:58 AM EDT, Public - Answered
Coordination drawings are required for this project. YES - a $25 per drawing will be paid to the architect prior to release of the file.
#17 - Partial Height Wall Supports
Vendor, Oct 20, 2026 3:27 PM EDT, Not Public - Pending
Will in wall supports be required for the Type 02 walls that end below the ACT, or is the bracing provided by the intersecting walls sufficient?
Hillary Greene, Oct 21, 2026 4:38 PM EDT, Public - Answered
Bracing provided by the intersecting walls is sufficient.
#32 - On-site supervisor for each building.
Vendor, Oct 20, 2026 3:29 PM EDT, Not Public - Pending
The question was asked at the pre-bid if a separate on-site supervisor would be needed for each of the buildings. Please clarify if that is going to be a requirement or if the same supervisor can oversee the work at both locations.
Hillary Greene, Oct 28, 2026 4:27 PM EDT, Public - Answered
Yes - projects will be running concurrently so an on site supervisor will be required at both sites.
#18 - Non Collusion Affidav
Vendor, Oct 21, 2026 9:22 AM EDT, Not Public - Pending
Can the Non Collusion Affidavit be updated to have the year 2025 corrected to 2026
Hillary Greene, Oct 21, 2026 4:47 PM EDT, Public - Answered
Yes, uploaded separate to files area.
#13 - HVAC Controls
Vendor, Oct 21, 2026 9:52 AM EDT, Not Public - Pending
Please confirm there is no ATC system in these buildings. There does not appear to be, however in the TAB under 3.3 A 3 it states that "automatic temperature-control systems are operational" as part of the complete system-readiness checks.
Hillary Greene, Oct 21, 2026 4:21 PM EDT, Public - Answered
There is no ATC system in either building.
#45 - HBF WORK
Vendor, Oct 22, 2026 7:53 AM EDT, Not Public - Pending
It references that the low voltage work will be provided and performed by HBF. Just to make sure what will be required by the EC regarding this work?
Hillary Greene, Oct 30, 2026 3:03 PM EDT, Public - Answered
The only responsibility that belongs to the EC for data/telephone is the removal of the existing power outlet(s) for the existing data rack(s) as indicated on the plans.
#33 - CLARIFICATION ON RECEPTACLE SYMBOL
Vendor, Oct 22, 2026 10:12 AM EDT, Not Public - Pending
There are some receptacle devices that have a little box behind them. Is this representing a surfaced mounted device with EMT or wiremold and box application?
Hillary Greene, Oct 28, 2026 4:28 PM EDT, Public - Answered
The symbol with the box at the base does indicate surface mounded box with wiremold.
#25 - Asbestos Report
Vendor, Oct 26, 2026 10:47 AM EDT, Not Public - Pending
Has an asbestos survey been performed for this project?
Hillary Greene, Oct 28, 2026 9:36 AM EDT, Public - Answered
No
#26 - Hazardous Materials: Lead, PCB, Terrazzo Mastic
Vendor, Oct 26, 2026 10:48 AM EDT, Not Public - Pending
In addition to the asbestos survey, previously RFI, please provide any lead-based paint, PCB-caulk, and flooring/terrazzo/tile adhesive (mastic) survey results for existing plaster walls, ceilings, thin-set terrazzo, wall tile and caulks to be disturbed.
Hillary Greene, Oct 28, 2026 9:36 AM EDT, Public - Answered
No environmental investigation / report has been completed on these buildings.
#34 - Full Height Studs: Existing Deck Height
Vendor, Oct 26, 2026 10:48 AM EDT, Not Public - Pending
Please confirm what the existing deck height is for the full height studs.
Hillary Greene, Oct 28, 2026 4:29 PM EDT, Public - Answered
Approximately 13'-6"
#35 - Slab Sawcut, Trench and Concrete Infill at New Sanitary
Vendor, Oct 26, 2026 10:49 AM EDT, Not Public - Pending
Please confirm that the plumbing contract will excavate and backfill for its work and the General Contractor is to remove slab on grade and pour back new concrete slabs. Please confirm.
Hillary Greene, Oct 28, 2026 4:30 PM EDT, Public - Answered
Plumbing General Note #2 on sheet 0-P-0.01 states the PC is responsible for his patching and repairing affected by his demolition. The PC is responsible to remove the slab and replace with new concrete slab to match existing.
#36 - Gypsum Cement Underlayment: Location
Where is the gypsum cement underlayment (Spec 035413) located on the drawings? No plan, finish schedule, keynote or detail calls it out. Please identify the rooms/areas and thickness where it is required, or confirm it is intended only for leveling/patching after the flooring and terrazzo removal.
Hillary Greene, Oct 28, 2026 4:31 PM EDT, Public - Answered
It is for leveling and patching throughout the project.
#37 - Job Trailers
Is a job trailer required at each Fire Station? If so, please identify where each trailer may be located on site. Will the electrical contractor hook up the electric to this?
Hillary Greene, Oct 28, 2026 4:32 PM EDT, Public - Answered
Yes one is required at each site. The Owner will provide a location during the pre-construction meeting. The EC will be responsible for extending power to the trailer.
#23 - Award of Stations 1 and 2
Vendor, Oct 26, 2026 10:50 AM EDT, Not Public - Pending
Will Fire Station 1 and Fire Station 2 be awarded to the same contractor? Is the separate pricing for each station for accounting purposes only, or may the City award only one of the two stations?
Hillary Greene, Oct 27, 2026 11:04 AM EDT, Public - Answered
The City intends to award this to one contractor; when determining the lowest responsible bidder the City will consider the pricing of both the base bid and the add-alternates. However, nothing in this bid or answer should be construed as a limitation on the City’s right to reject any add alternates and re-bid the project in the future.
#38 - Station 1 and 2 Phasing: Concurrent vs. Sequential
Will Station 1 and Station 2 work be performed concurrently or sequentially, and what is the required duration of each phase for each station?
Hillary Greene, Oct 28, 2026 4:33 PM EDT, Public - Answered
The projects will run concurrently. A time frame for the project was provided.
#24 - Schedule of Prices: Station 2 Numbering
The Excel Schedule of Prices lists Station 2 as an alternate, but its numbering does not reflect this.
Please clarify whether Station 2 is an alternate or a base bid item.
Hillary Greene, Oct 27, 2026 11:10 AM EDT, Public - Answered
The add alternate includes lines 2-1 through 2-4. Station 2 is an add alternate.
#39 - Sewer Use Charges
Vendor, Oct 26, 2026 10:51 AM EDT, Not Public - Pending
Spec 015000, 1.3.B states that the General Contractor will pay sewer-service use charges for all entities. Please clarify if this means the General Contractor pays only for to temporary toilet (portable jobsite toilets) service. Or does this mean the General Contractor needs to pay for something else such as temporary bathrooms, showers, etc.
Hillary Greene, Oct 28, 2026 4:34 PM EDT, Public - Answered
The owner will pay for the existing sewage usage. The General Contractor will be responsible to provide and pay for a temporary job site toilet at each site.
#40 - Moisture-Protection and Dust/HVAC-Control Plans
Vendor, Oct 26, 2026 10:51 AM EDT, Not Public - Pending
Which contractor is responsible for preparing and submitting the Moisture-Protection Plan listed in Spec 015000, Para. 1.4.B and 1.4.C?
Hillary Greene, Oct 28, 2026 4:35 PM EDT, Public - Answered
A formal plan is not required.
#41 - Dust and HVAC Control Plan: Responsible Contract
Vendor, Oct 26, 2026 10:52 AM EDT, Not Public - Pending
Which contractor is responsible for preparing and submitting the Dust- and HVAC-Control Plan called out in spec 015000, para. 1.4.C?
Hillary Greene, Oct 28, 2026 4:35 PM EDT, Public - Answered
A formal plan is not required
#31 - HVAC Filters and Cleaning
Vendor, Oct 26, 2026 10:52 AM EDT, Not Public - Pending
Spec 015000, 2.3.B.3 requires MERV 8 filters at each return-air grille and cleaning of the HVAC system when the Owner authorizes use of the permanent HVAC system during construction. Which contractor is responsible for providing the filters and cleaning the system?
Hillary Greene, Oct 28, 2026 10:09 AM EDT, Public - Answered
HVAC Contractor / HVAC Contract
#27 - Temporary Telephone Service
Vendor, Oct 26, 2026 10:53 AM EDT, Not Public - Pending
Spec 015000, 3.2.F requires temporary telephone service. Which contractor is required to provide it, and who pays the monthly usage fees?
Hillary Greene, Oct 28, 2026 10:06 AM EDT, Public - Answered
Telephone is not required.
#28 - Prime Contracts
Vendor, Oct 26, 2026 1:06 PM EDT, Not Public - Pending
Is the electrical portion of this project it's own prime contract?
Hillary Greene, Oct 28, 2026 10:06 AM EDT, Public - Answered
Yes
#22 - #17 Apprenticeship Training
Vendor, Oct 27, 2026 9:38 AM EDT, Not Public - Pending
What is required for the apprenticeship training program?
Hillary Greene, Oct 27, 2026 10:59 AM EDT, Public - Answered
Please refer to program instructions located in the files list "Additional_BIdder_Forms_Addendum_2.zip Description: Responsible Contractor Form Instructions - Responsible Contractor"
#29 - Wall Assemblies Insulation
Vendor, Oct 27, 2026 9:38 AM EDT, Not Public - Pending
Can you verify if wall assemblies 03,04,05,09,12,13, or 14 have any insulation requirements?
Hillary Greene, Oct 28, 2026 10:07 AM EDT, Public - Answered
No insulation is indicated, no insulation is required.
#42 - Roof Deck
Vendor, Oct 27, 2026 9:39 AM EDT, Not Public - Pending
What is the height of the roof deck?
Hillary Greene, Oct 28, 2026 4:40 PM EDT, Public - Answered
Approximately 13'-6"
#30 - CMU Walls Roof Deck
Vendor, Oct 27, 2026 9:39 AM EDT, Not Public - Pending
Do any CMU walls need to go to the roof deck?
Hillary Greene, Oct 28, 2026 10:08 AM EDT, Public - Answered
Masonry walls indicated are for toothing in to existing conditions. There are no new masonry walls.
#43 - List of Government Conracts
Vendor, Oct 28, 2026 3:36 PM EDT, Not Public - Pending
Point 5/List 1 noted on page 8 of Instruction to Bidders and on PennBid Responsibility Section: List of government contracts including client name and scope - List only
1. Please clarify that “government” refers to City of Harrisburg only, or to any public governmental agency.
2. Are you requesting active contract projects, or completed projects, or both?
Hillary Greene, Oct 28, 2026 5:05 PM EDT, Public - Answered
Government refers to any public government agency including federal, state, and local government agencies. Authorities will also satisfy the request. Active and/or completed projects will satisfy the request. Listed projects must have a scope similar in nature (i.e. facility upgrades or renovation projects in the related trade or prime category).
#46 - Extension
Vendor, Oct 29, 2026 3:06 PM EDT, Not Public - Pending
Is it possible to get a 1 week extension on this bid?
Hillary Greene, Nov 02, 2026 12:11 PM EST, Public - Answered
We will extend the deadline through November 10th.
#44 - Fire Alarm
Vendor, Oct 29, 2026 3:17 PM EDT, Not Public - Pending
Can you provide the contact info for the vender that installed the fire alarm systems for these fire stations?
Hillary Greene, Oct 30, 2026 9:34 AM EDT, Public - Answered
Kint Fire Protection Harrisburg
#48 - Bench and ADA Bench
Vendor, Oct 30, 2026 10:32 AM EDT, Not Public - Pending
Who is providing the ADA Bench and Standard Bench. If a GC is to provide, please provide a basis of design for the bench.
Hillary Greene, Nov 03, 2026 8:43 AM EST, Public - Answered
Benches are in the General Contract. Basis of Design is ASI Storage Solutions. 17 1/2" high, bench top 1 1/4" thick by width noted on the drawings, laminated clear hardwood with rounded corners; fixed pedestals, 1 1/2" diameter tubing, powder coated finish, color as selected by the architect.
#47 - Collapsible Water Dam
Vendor, Oct 30, 2026 10:32 AM EDT, Not Public - Pending
Please provide a basis of design for the collapsible water dam with End Caps. If this is required. Please confirm if this is in the General Contractors Scope.
Hillary Greene, Nov 02, 2026 12:13 PM EST, Public - Answered
KR Specialties Water Control Systems, 29 Main Street, Kingston, MA 02364, 781-422-2273 - YES this is in the General Construction scope.
End of Addendum No. 4
All questions and inquiry regarding this Addendum or related project materials shall be submitted through PennBid. Prospective bidders must acknowledge receipt of all issued addenda directly on the official Bid Submission Form at the time of submission. Bidders shall verify and input the total number of addenda issued into the designated Request for Information (RFI) field.