9.CAM Units1+19_PlumasIRSC.pdf

PDF 5 MB Posted

Attached to
Plumas Stewardship IRSC
Solicitation number
12363N22Q4101
Issued by

About this file

This solicitation is for a Plumas Stewardship Integrated Resource Service Contract (IRSC) to conduct roadside hazardous fuels treatments along roads impacted by recent wildfires on the Plumas National Forest in California. Under the authority of stewardship contracting, the solicitation will result in up to three awards to remove unmerchantable trees and slash along roads, with optional decking and removal of merchantable logs. Mandatory work must be completed by December 31, 2022, while optional product removal has a completion date of October 1, 2023. Interested parties must register in the System for Award Management and attend an optional site visit on September 14th or 20th, 2022 to view the project areas. The solicitation seeks to reduce wildfire risk and restore forest health through mechanical hazardous fuels removal services along roads in units impacted by the 2020 North Complex Fire and the 2021 Dixie and Beckwourth Fires.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ÑØ

ÑØ

T.23N R.6E

T.22N R.6E

T.23N R.5E

T.22N R.5E

T.24N R.6E

3800 3600

00 5400

7 8

5 3

7 8

31 35

35 36

14 13 18 14

PC

23N28

23N15

23N18

N3

CA

23N27

N6

5X

23N00

22N 66X23

N8

23N23

22N

BC27562

22N40X

23N31

23N95

22N08Y

23N65

23N47X

N7

3Y

22N91

23N80Y

N1

1X

23N01Y

24N36X

23N37Y

23N30C

22N93

22N 76X 23

N0 0C

23N58Y

22N

X

22N99

23N01X

N6

0X

23N46X

23N

Y

23N52

N4

9X

22N10X

23N48X

22N99A

N5

7Y

23N18D

N6

23N12YA

23N50X

23N61Y

23N23A

23N30X

24N25A

22N

YH

22N 67X

N3

5X

24N25H

23N18R

23N33Y

23N72Y

23N29X

N0

8Y A

22N64X

23N01YB

23N31A

23N15B

23N11Y

22N59Y

N3

0X A

23N58YA

23N72

N4

0X B

23N18J

22N14Y

23N30G

23N28X

23N47XA

23N31B 23N

95B 23N95A

23N 07X

N3

5Y

23N 69X

24N25C

N0

9X

23N15K1

23N56X

N3

0B

24N65XC

22N40XA

23N58X

N2

5B

22N99A1

N6

5X B

22N59YB

23N71X

23N23C

23N86A

N2

8J

22N03X

N8

0Y A

23N71XA

23N15

23N49X

23N31

N1

!(19

!(1

!(1

C6.315# - SALE OPERATIONS SCHEDULE. (8/2006) Unless otherwise agreed in writing, Purchaser’s Operations shall be performed in accordance with the following schedule

Subdivision/Area/Unit

Conditions of Operation

Purpose

Contract Area

Operations may occur when soil is dry; that is, soil moisture in the upper 8 inches is not sufficient to allow a soil sample to be squeezed and hold its shape, or will crumble when the hand is tapped.

Operations may also occur when the ground is frozen to a depth of 5 inches, or snow depth is at least 18 inches or machine compacted to 8 inches.

Soil Protection

Requirements Table ITM Individual Tree Mark, C2.35# DXDAM Designation by Damage Class C2.353# TSTA Timber Subject To Agreement C2.11# DF Directional Falling, C6.41# TRAC Ground Based Skidding , Skid Trail Layout, C6.42# SUSP Ground Based Skidding , One End Suspension, C6.42# SPACE Ground based Skidding, Skid T rail Spacing, C6.42# ENDL Ground Based Skidding, Endlining, C6.42# SEPM Special Erosion Prevention Measures, C6.6# COVER Slash Treatment, Cover Piles, C6.7# SCAT 18” Slash Treatment, Scattering , 18 inch depth C6.7# SCAT 30” Slash Treatment, Scattering , 30 inch depth C6.7# FELL Slash Treatment, Fell Damaged Trees, C6.7# MACH Slash Treatment, Machine Pile Landing, C6.7#

Optional Item 1

DF

TRAC

SUSP

SPACE

ENDL

SEPM

Fell Scat 18"

MACH

DECK

Designation of Timber(C2.35#,C2.353#,C2.11#)

Slash Treatment (C6.7#)

Erosion Prevention & Control (C6.6#)

Not To Exceed 5 Acre

Sale Area Felling, Bucking, and Limbing (C6.41#)

Min. stump height 6 inches Ground Based Skidding (C6.42#)

Mandatory Item 1 Roadside Fuels Treatment Cut and Pile: unit 4,5,6,2

Sale Area

Roadside Fuels Treatment Cut and Pile: unit 1,3,19

All County and National Forest Roads to remain open (B6.22)

Traffic Control B6.33

Within 50' of each side of road Sale Area

Scat 30" Except in roadside disposal strip listed above

Landings

Ephemeral (100 ft Stream Buffer) (C6.5) Intermittent (100 ft Stream Buffer) (C6.5) Perenial (100 ft Stream Buffer) (C6.5)

FS - Forest Service System Road P - Private Road Non-Forest Service Ownership (B1.1) USDA Forest Service Ownership (B1.1)

Contract Area Boundary (B1.1)

C - County Road

Optional Item 1 (C2.35#), (C2.3.53#) Timber subject to agreement (C2.11#)#

ÑØ Water Hole (C5.35#)

Plumas IRSC North Complex

Unit 1 and Unit 19 Contract Area Map

All lines are approximate Reference Scale:

Main Map - 1:26,500 40 Feet Contour Intervals

For daily project activity level (PAL) information, Call PAL WEST at 1-800-847-7766 (C7.22#)

Weather Station: Pike County Lookout (C7.22#) Project Activity Level: Westside

Map 1 of 2

/ Plumas National Forest Feather River Ranger District

Map Created by: J.Rodriguez 08/30/2022 T:\FS\NFS\Plumas\Project\SO\

DixieFire_LandscapeAssessment\ GIS\PostDisturbanceHazardousTreeManagement

"This map does no show all Contol areas under C6.24#"

File details come from the government source that posted it. Updated .