19.CAM Unit17_PlumasIRSC.pdf

PDF 7 MB Posted

Attached to
Plumas Stewardship IRSC
Solicitation number
12363N22Q4101
Issued by

About this file

This solicitation is for stewardship and fuels management services on National Forest System lands within the Plumas National Forest in California. Up to three awards will be made to remove unmerchantable trees and hazardous fuels along roadsides, with mandatory decking/processing and optional removal of merchantable logs. The period of performance for mandatory items is from date of award through December 31, 2022, and through October 1, 2023 for optional items. Site visits will be held on September 14 and 20 for interested contractors to view project areas. Contractors must be registered in the System for Award Management to be eligible for award. The objective is to treat fuels from recent fires to ensure safe access and reduce wildfire risk going forward.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ÑØ

ÑØ

ÑØ

ÑØ

ÑØ

T.24N R.11E

T.25N R.12E T.25N R.11E

T.24N R.12E

T.25N R.13E

T.24N R.13E

7800 8000

60005800

40005600

1256 34

7 8

7 9

14 3 2

134 2

26 26

25 29

15 16

23 19 23

56 564 3 12

3 2 145 661 52345

3133 34 35 36 32 3332 34 35 36

PC113

PC111

25N42

25N10

24N09

N3

24N54

25N93

24N10

24N19

25N 05Y

26N08

25N29

24N58

24N 85Y

24N57

25N65

PC508

25N85

24N61

25N98

24N11

25N46Y

24N 75Y

24N 98Y

N3

2Y

25N65A 24N08

25N49

24N 02X

PC112

25N95

24N12

24N60

24N 10B

24N66

25N42D

24N97A

24N08X

24N57A2

25N01Y

N4

2C

24N42X

24N57B

24N79Y

24N 60C

24N67

24N11X

25N35A

N7 5X

24N49

N1

25N39

25N42F

24N55

24N89Y

25N42B

24N75YC

24N19A

25N42A

N0

9A 24N11A

24N09C

24N74Y

24N54B

25N32YA

24N 92Y

N7

6X

24N10C

25N95B

25N97

25N10C

24N43X

24N09B

24N94Y

25N49A

24N85YA

24N93Y

24N97

24N48Y

24N43XA

24N97X25 N4

2G

23N51

N1

2B

N0

8A

N1

0A

25N90

25N42J 24N08B

N8

5G

25N29B

24N91Y

N7

5Y B24 N6

0B

24N84X

24N09D

24N 57D

N5

5Y

24N 57F

25N97X

N0

5Y A

25N42D1

25N44Y

N0

2X C

25N49A1

25N36Y

N6

0A

PC112A

PC111

!(17

!(17

!(17

!(17

!(17

!(17

!(17

!(17

!(17

!(17

!(17

C6.315# - SALE OPERATIONS SCHEDULE. (8/2006) Unless otherwise agreed in writing, Purchaser’s Operations shall be performed in accordance with the following schedule

Subdivision/Area/Unit

Conditions of Operation

Purpose

Contract Area

Operations may occur when soil is dry; that is, soil moisture in the upper 8 inches is not sufficient to allow a soil sample to be squeezed and hold its shape, or will crumble when the hand is tapped.

Operations may also occur when the ground is frozen to a depth of 5 inches, or snow depth is at least 18 inches or machine compacted to 8 inches.

Soil Protection

Requirements Table ITM Ind ivid ua l Tree M a rk, C2.35# DXDAM Designation by Dam age Cla s s C2.353# TSTA Tim ber Subject To Agreem ent C2.11# DF Directiona l Fa lling, C6.41# TRAC Ground Ba sed Skid d ing, Skid Tra il Layout, C6.42# SUSP Ground Ba sed Skid d ing, O ne End Suspension, C6.42# SPACE Ground ba sed Skid d ing, Skid Tra il Spacing, C6.42# ENDL Ground Ba sed Skid d ing, End lining, C6.42# SEPM Specia l Erosion Prevention M ea sures, C6.6# COVER Sla sh Treatm ent, Cover Piles, C6.7# SCAT 18” Sla sh Treatm ent, Scattering, 18 inch d epth C6.7# SCAT 30” Sla sh Treatm ent, Scattering, 30 inch d epth C6.7# FELL Sla sh Treatm ent, Fell Dam aged Trees, C6.7# MACH Sla sh Treatm ent, M achine Pile La nd ing, C6.7#

O ptiona l Item 2

M a nd a tory Item

O ptiona l Item 3

DF

TRAC

SU SP

SPACE

ENDL

SEPM

Fell Scat 18"

M ACH

DECK

Designation of Tim ber(C2.35#,C2.353#,C2.11#)

Sla s h Treatm ent (C6.7#)

Eros ion Prevention & Control (C6.6#)

Not To Exceed 5 Acre

Sa le Area Felling, Bucking, a nd Lim bing (C6.41#)

M in. stum p height 6 inches Ground Ba sed Skid d ing (C6.42#)

M a nd a tory Item

Roa d s id e Fuels Treatm ent – Cut, Skid , Deck a nd Pile: unit 9,10,15

Sa le Area

Roa d s id e Fuels Treatm ent – Cut, Skid , Deck a nd Pile: unit 12,16,17 Roa d s id e Fuels Treatm ent – Cut, Skid , Deck a nd Pile: unit 21

Roa d s id e Fuels Treatm ent – Cut, Skid , Deck a nd Pile: unit 18,20

All County a nd Nationa l Forest Roa d s to rem a in open Tra ffic Control B6.33

W ithin 50' of each sid e of roa d Sa le Area

Scat 30" Except in roa d s id e d is pos a l strip listed above

La nd ings

Plumas IRSC Dixie a n d Bec kwourth

U n it 17 Con tra c t Area M a p

All lin es a re a pproxima te Reference Scale:

M a in M a p - 1:40,000 40 Feet Con tour In terva ls

For da ily projec t a c tivity level (PAL) in forma tion , Ca ll PAL W EST at 1-800-847-7766 (C7.22#) Projec t Activity Level – Cen tra l Zon e

W ea ther Station - Quin c y/Pierc e/Ca shma n = C 7.2#, C 7.22#

M a p 1 of 2

/ Pluma s Nation a l Forest Fea ther River Ra n ger Distric t

M a p Crea ted b y: J.Rodriguez 08/30/2022 T:\FS\NFS\Plumas\Projec t\SO \ DixieFire_ La n dsc a peAssessmen t\

GIS\PostDisturb a n c eHa za rdousTreeM a n a gemen t

"This ma p does n ot show a ll Con tol a rea s un der C6.24#"

Ephemera l (200 ft Strea m Buffer) (C6.5) In termitten t (200 ft Stream Buffer) (C6.5) Peren ia l (200 ft Strea m Buffer) (C6.5)

FS - Forest Servic e System Roa d P - Priva te Roa d Non -Forest Servic e O wn ership (B1.1) U SDA Forest Servic e O wn ership (B1.1)

Con tra c t Area Boun da ry (B1.1) O ption a l Item 2 (C2.35#), (C2.3.53#) Timb er sub jec t to a greemen t (C2.11#)

C - Coun ty Roa d

W a ter Hole (C5.35#)ÑØ

File details come from the government source that posted it. Updated .