6.TrafficControlPlan_PlumasIRSC.pdf

PDF 677 KB Posted

Attached to
Plumas Stewardship IRSC
Solicitation number
12363N22Q4101
Issued by

About this file

This document outlines a federal solicitation for fuels management services on National Forest System lands within the Plumas National Forest in California. The solicitation seeks contractors to mechanically remove unmerchantable trees and hazardous fuels along roadsides, with mandatory decking and optional removal of merchantable logs. Additional optional services include road maintenance if timber removal is awarded. The period of performance for mandatory items is through December 2022, and through October 2023 for optional items. Two pre-bid site visits will be held on September 14th and 20th, 2022. The agency estimates making up to three separate awards from this solicitation. All contractors must be registered in SAM to be eligible for award.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Plumas Stewardship IRSC Page 1 of 3

Revised 2.16.2021

Traffic Control Plan

LOGGING AND MAINTENANCE OPERATIONS SIGNING STANDARDS

All signs must be manufactured & installed as specified in the FHWA "Manual on Uniform Traffic Control

Devices" (MUTCD) & FS publication "Standards for Forest Service Signs & Posters"(EM 7100-15).

SIGN STANDARDS

SHAPE & COLOR: Generally, signs for logging and maintenance operations are either diamond-shaped or rectangular. All signs are reflective orange background with black legend and border unless shown otherwise. Hand painted, homemade signs are not legal. Fluorescent paint is not reflectorized.

SUBSTRATE: Sign substrate material may be High Density Overlay (HDO) Plywood, Aluminum, Fiberglass Reinforced Plastic, Corrugated Plastic or Roll-up Fabrics.

SIGN SIZE: Sign size is a factor of speed and MUTCD & FS standards. Where conditions of speed, volume, or special hazard require greater visibility or emphasis, larger signs should be used. Minimum sizes for the most common signs can be found in Figure 4. Refer to the EM-7100-15 for additional sign sizes.

LEGEND: All lettering shall be Series "C" alphabet, conforming to Standard Alphabets for Highway Signs.

Letter size is also a function of speed - use letter size and word messages as specified in MUTCD and EM-

7100-15.

SIGN PLACEMENT

Signs are to be installed in locations as agreed to in the traffic control plan. All signs are to be removed, covered, or folded when operations are not in progress or the sign message is not applicable. Signs should generally be located on the right-hand side of the roadway. When special emphasis is needed, signs may be placed on both the left and right sides of the road. Sign message shall be clearly visible to road users, mounted on posts or portable sign stands.

Figure 1: Sign Placement Dimensions

HEAVY

TRUCK

TRAFFIC

FEET

6' - 12'

(2' minimum where slope limits to less than 6')

M

IN

' M

IN

E d g e o f t ra v e lw a y

LATERAL CLEARANCE

From the edge of the road - 2 foot minimum, where slope limits to less than 6 feet. 6-12 foot preferred.

HEIGHT

Minimum of 7 feet, measured from the bottom of the sign to the near edge of the travelway. The height to the bottom of a supplemental sign mounted below the primary sign will be 6 feet.

Plumas Stewardship IRSC Page 2 of 3

Figure 2: A Portion of MUTCD TABLE II-1

SIGN SUPPORTS

POSTS: Signs are to be mounted on separate posts. Supplemental signs such as Speed Advisory plates are to be mounted on the same post as the primary sign. Do not mount signs on trees or other signs. Posts may be wood, metal, carsonite or similar material. Where sign supports cannot be sufficiently offset from the road edge, supports will meet breakaway standards. Single wood posts with less than 24 square inches do not require breakaway design.

TEMPORARY/PORTABLE SUPPORTS: Portable supports may be used for short-term, short-duration, and mobile conditions. MUTCD defines this time period as one work shift, 12 hours or less. All portable supports must meet MUTCD standards, including breakaway. These must be a minimum of 1 foot above the road surface or more if visibility requires it.

Figure 3: Examples of Temporary/Portable Supports

SIGNS

The following signs meet the intent of the Safety standard. This is not a complete listing of signs that may be needed.

FG20-1-48* FG20-2-48 FG20-3-42* FG20-3a-42 FW22-3-30

Posted or Decelaration to listed advisory speed

85 percentile MPH speed MPH

10 20 30 40 50

20 NA

25 100

30 150 100

35 200 175

40 275 250 175

45 350 300 250

50 425 400 325 225

55 500 475 400 300

60 575 550 500 400 300

65 650 625 575 500 375

PLACEMENT DISTANCE

Signs must be located 100-500 feet prior to the activity, (both ends if a through road) and maintained at that distance.

This distance is based on speed. Refer to Figure 2 , Table II-1, MUTCD, a portion of which is reproduced here, to determine correct placement distance.

ROAD

CONSTRUCTION

NEXT 5 MILES

END

CONSTRUCTION

LOGGING

OPERATIONS

NEXT 5 MILES

END

LOGGING

OPERATIONS

END

BLASTING

ZONE

ROAD

CONSTRUCTION

500 FEET

BLASTING

ZONE

1000 FT

ROAD

MACHINERY

500 FEET

LOGGING

OPERATIONS

LOG

TRUCKS

Plumas Stewardship IRSC Page 3 of 3

FW20-1-30* W22-1-36* W21-3-30* FW21-4a-30 FW11-7-24

FW8-6-24 W20-7aP-24* FW11-9a-24 W7-3a-24* W13-1-18**

* Specify Distance ** Specify Speed

BM-L-O BM-R-O

Barricade Markers (See MUTCD for length and stripe size)

TRUCK

CROSSING 500

FEET

HEAVY

TRUCK

TRAFFIC

NEXT

7 MILES

M.P.H.