10.CAM Unit2_PlumasIRSC.pdf

PDF 2 MB Posted

Attached to
Plumas Stewardship IRSC
Solicitation number
12363N22Q4101
Issued by

About this file

This document outlines a federal contract opportunity for stewardship services on the Plumas National Forest in California. The solicitation seeks proposals for roadside hazardous fuels reduction treatments along roads impacted by recent wildfires within the forest boundary. Contractors will be required to mechanically remove unmerchantable trees and slash piles along roads and deck them for later burning or chipping off-site. Optional line items include mandatory and optional decking of merchantable logs for potential removal by the contractor. It is anticipated that up to three awards will be made from this solicitation for separate treatment units. The period of performance for mandatory roadside work is through December 2022, while optional log removal may continue into October 2023. Contractors must register in the System for Award Management to be eligible for consideration. A pre-bid site visit will be held on September 14th and 20th to tour representative treatment areas. Proposals are due by the response date specified in the solicitation.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T.20N R.7E T.20N R.8E

T.21N R.7E T.21N R.8E

22N24

20N

20N

20N

22N27

21N

Y

N2

0Y

20N57

20N09B

20N76

!(2

C6.315# - SALE OPERATIONS SCHEDULE. (8/2006) Unless otherwise agreed in writing, Purchaser’s Operations shall be performed in accordance with the following schedule

Subdivision/Area/Unit

Conditions of Operation

Purpose

Contract Area

Operations may occur when soil is dry; that is, soil moisture in the upper 8 inches is not sufficient to allow a soil sample to be squeezed and hold its shape, or will crumble when the hand is tapped.

Operations may also occur when the ground is frozen to a depth of 5 inches, or snow depth is at least 18 inches or machine compacted to 8 inches.

Soil Protection

Requirements Table ITM Individual Tree Mark, C2.35# DXDAM Designation by Damage Class C2.353# TSTA Timber Subject To Agreement C2.11# DF Directional Falling, C6.41# TRAC Ground Based Skidding , Skid Trail Layout, C6.42# SUSP Ground Based Skidding , One End Suspension, C6.42# SPACE Ground based Skidding, Skid T rail Spacing, C6.42# ENDL Ground Based Skidding, Endlining, C6.42# SEPM Special Erosion Prevention Measures, C6.6# COVER Slash Treatment, Cover Piles, C6.7# SCAT 18” Slash Treatment, Scattering , 18 inch depth C6.7# SCAT 30” Slash Treatment, Scattering , 30 inch depth C6.7# FELL Slash Treatment, Fell Damaged Trees, C6.7# MACH Slash Treatment, Machine Pile Landing, C6.7#

Optional Item 1

DF

TRAC

SUSP

SPACE

ENDL

SEPM

Fell Scat 18"

MACH

DECK

Designation of Timber(C2.35#,C2.353#,C2.11#)

Slash Treatment (C6.7#)

Erosion Prevention & Control (C6.6#)

Not To Exceed 5 Acre

Sale Area Felling, Bucking, and Limbing (C6.41#)

Min. stump height 6 inches Ground Based Skidding (C6.42#)

Mandatory Item 1 Roadside Fuels Treatment Cut and Pile: unit 4,5,6,2

Sale Area

Roadside Fuels Treatment Cut and Pile: unit 1,3,19

All County and National Forest Roads to remain open (B6.22)

Traffic Control B6.33

Within 50' of each side of road Sale Area

Scat 30" Except in roadside disposal strip listed above

Landings

Plumas IRSC North Complex

Unit 2 Contract Area Map

All lines are approximate Reference Scale:

Main Map - 1:8,000 40 Feet Contour Intervals

For daily project activity level (PAL) information, Call PAL WEST at 1-800-847-7766 (C7.22#)

Weather Station: Pike County Lookout (C7.22#) Project Activity Level: Westside

Map 1 of 2

/ Plumas National Forest Feather River Ranger District

Map Created by: J.Rodriguez 08/30/2022 T:\FS\NFS\Plumas\Project\SO\

DixieFire_LandscapeAssessment\ GIS\PostDisturbanceHazardousTreeManagement

"This map does no show all Contol areas under C6.24#"

Ephemeral (100 ft Stream Buffer) (C6.5) Intermittent (100 ft Stream Buffer) (C6.5) Perenial (100 ft Stream Buffer) (C6.5)

FS - Forest Service System Road P - Private Road Non-Forest Service Ownership (B1.1) USDA Forest Service Ownership (B1.1)

Contract Area Boundary (B1.1)

C - County Road

Mandatory Item 1 (C2.35#), (C2.3.53#) Timber subject to agreement (C2.11#)

ÑØ Water Hole (C5.35#)

File details come from the government source that posted it. Updated .