17.CAM Unit12_PlumasIRSC.pdf

PDF 4 MB Posted

Attached to
Plumas Stewardship IRSC
Solicitation number
12363N22Q4101
Issued by

About this file

This solicitation is for a stewardship contract to perform fuels management services along roads within areas impacted by recent wildfires on the Plumas National Forest in California. The objective is to treat standing and downed fire killed fuels along and adjacent to roads through mandatory decking and processing of unmerchantable trees and small diameter hazardous fuels for burning or removal by the Forest Service. Optional items include decking and possible removal of merchantable logs, as well as removal of any timber awarded under the contract. It is anticipated that up to three awards will be made, with items 1, 2, and 3 available as separate contracts. The period of performance for mandatory items is through December 31, 2022, and through October 1, 2023 for optional items. Two site visits will be held on September 14th and 20th, 2022 to review project areas. All contractors must be registered in the System for Award Management to be eligible for consideration.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36003800

879 11

24 20

3 2 1

4 6

61234

T.25N R.9E T.25N R.10E

T.24N R.10E

CA89

25N14

CA70

25N73

N1

25N 12Y

25N12

24N21X

PC

PC403

25N33Y

PC420

PC416

25N73B

N9

25N53

25N58

25N73A

26N66

PC205

PC404A

PC415

PC404

25N46

25N12YB

25N48X

25N 14F

25N53Y

N4

25N 12Y

D

N1

2Y A

25N12YC

25N11Y

!(12

!(12

!(12 C6.315# - SALE OPERATIONS SCHEDULE. (8/2006) Unless otherwise agreed in writing, Purchaser’s Operations shall be performed in accordance with the following schedule

Subdivision/Area/Unit

Conditions of Operation

Purpose

Contract Area

Operations may occur when soil is dry; that is, soil moisture in the upper 8 inches is not sufficient to allow a soil sample to be squeezed and hold its shape, or will crumble when the hand is tapped.

Operations may also occur when the ground is frozen to a depth of 5 inches, or snow depth is at least 18 inches or machine compacted to 8 inches.

Soil Protection

Requirements Table ITM Ind ivid ua l Tree M a rk, C2.35# DXDAM Designation by Dam age Cla s s C2.353# TSTA Tim ber Subject To Agreem ent C2.11# DF Directiona l Fa lling, C6.41# TRAC Ground Ba sed Skid d ing, Skid Tra il Layout, C6.42# SUSP Ground Ba sed Skid d ing, O ne End Suspension, C6.42# SPACE Ground ba sed Skid d ing, Skid Tra il Spacing, C6.42# ENDL Ground Ba sed Skid d ing, End lining, C6.42# SEPM Specia l Erosion Prevention M ea sures, C6.6# COVER Sla sh Treatm ent, Cover Piles, C6.7# SCAT 18” Sla sh Treatm ent, Scattering, 18 inch d epth C6.7# SCAT 30” Sla sh Treatm ent, Scattering, 30 inch d epth C6.7# FELL Sla sh Treatm ent, Fell Dam aged Trees, C6.7# MACH Sla sh Treatm ent, M achine Pile La nd ing, C6.7#

O ptiona l Item 2

M a nd a tory Item

O ptiona l Item 3

DF

TRAC

SU SP

SPACE

ENDL

SEPM

Fell Scat 18"

M ACH

DECK

Designation of Tim ber(C2.35#,C2.353#,C2.11#)

Sla s h Treatm ent (C6.7#)

Eros ion Prevention & Control (C6.6#)

Not To Exceed 5 Acre

Sa le Area Felling, Bucking, a nd Lim bing (C6.41#)

M in. stum p height 6 inches Ground Ba sed Skid d ing (C6.42#)

M a nd a tory Item

Roa d s id e Fuels Treatm ent – Cut, Skid , Deck a nd Pile: unit 9,10,15

Sa le Area

Roa d s id e Fuels Treatm ent – Cut, Skid , Deck a nd Pile: unit 12,16,17 Roa d s id e Fuels Treatm ent – Cut, Skid , Deck a nd Pile: unit 21

Roa d s id e Fuels Treatm ent – Cut, Skid , Deck a nd Pile: unit 18,20

All County a nd Nationa l Forest Roa d s to rem a in open Tra ffic Control B6.33

W ithin 50' of each sid e of roa d Sa le Area

Scat 30" Except in roa d s id e d is pos a l strip listed above

La nd ings

Plum a s IRSC Dixie a nd Beckwourth

U nit 12 Contra ct Area Ma p

All lines a re a pproxim a te Reference Scale:

Ma in Ma p - 1:17,500 40 Feet Contour Interva ls

For da ily project a ctivity level (PAL ) inform a tion, Ca ll PAL WEST a t 1-800-847-7766 (C7.22#) Project Activity L evel – Centra l Zone

Wea ther Sta tion - Quincy/Pierce/Ca shm a n= C 7.2#, C 7.22#

Ma p 1 of 2

/ Plum a s N a tiona l Forest Fea ther River Ra nger District

Ma p Crea ted b y: J.Rodriguez 08/30/2022 T:\FS\N FS\Plum a s\Project\SO \ DixieFire_ L a ndsca peAssessm ent\

GIS\PostDisturb a nceHa za rdousT reeMa na gem ent

"T his m a p does not show a ll Contol a rea s under C6.24#"

Ephem era l (200 ft Strea m Buffer) (C6.5) Interm ittent (200 ft Strea m Buffer) (C6.5) Perenia l (200 ft Strea m Buffer) (C6.5)

FS - Forest Service System Roa d P - Priva te Roa d N on-Forest Service O wnership (B1.1) U SDA Forest Service O wnership (B1.1)

Contra ct Area Bounda ry (B1.1)

C - County Roa d

O ptiona l Item 2 (C2.35#), (C2.3.53#) T im b er sub ject to a greem ent (C2.11#)#

File details come from the government source that posted it. Updated .