8.VicinityMap_NorthComplex_PlumasIRSC.pdf
PDF 8 MB Posted
- Attached to
- Plumas Stewardship IRSC
- Solicitation number
- 12363N22Q4101
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation is for a stewardship integrated resource service contract to conduct roadside fuels treatments along roads within areas impacted by recent wildfires in California. Up to three contractors may be awarded to mechanically remove unmerchantable trees and hazardous fuels along roads to landings for later burning or chipping, with optional removal of merchantable logs. Mandatory work is to be completed by December 31, 2022, while optional removal work may continue through October 1, 2023. Two pre-bid site visits will be held on September 14th and 20th, 2022 to review treatment units. All contractors must be registered in the System for Award Management to be considered for an award from the U.S. Department of Agriculture Forest Service under this full and open solicitation.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unit 1
Unit 3
Unit 4
Unit 5
Unit 6
Unit 2
Unit 14Unit 19
Unit RX Acres 1 Cut and Pile 174 2 Cut and Pile 128 3 Cut and Pile 164 4 Cut and Pile 2 5 Cut and Pile 3 6 Cut and Pile 2 19 Cut and Pile 191 Total 664
C6.315# - SALE OPERATIONS SCHEDULE. (8/2006) Unless otherwise agreed in writing, Purchaser’s Operations shall be performed in accordance with the following schedule
Subdivision/Area/Unit
Conditions of Operation
Purpose
Contract Area
Operations may occur when soil is dry; that is, soil moisture in the upper 8 inches is not sufficient to allow a soil sample to be squeezed and hold its shape, or will crumble when the hand is tapped.
Operations may also occur when the ground is frozen to a depth of 5 inches, or snow depth is at least 18 inches or machine compacted to 8 inches.
Soil Protection
Requirements Table ITM Individual Tree Mark, C2.35# DXDAM Designation by Damage Class C2.353# TSTA Timber Subject To Agreement C2.11# DF Directional Falling, C6.41# TRAC Ground Based Skidding , Skid Trail Layout, C6.42# SUSP Ground Based Skidding , One End Suspension, C6.42# SPACE Ground based Skidding, Skid T rail Spacing, C6.42# ENDL Ground Based Skidding, Endlining, C6.42# SEPM Special Erosion Prevention Measures, C6.6# COVER Slash Treatment, Cover Piles, C6.7# SCAT 18” Slash Treatment, Scattering , 18 inch depth C6.7# SCAT 30” Slash Treatment, Scattering , 30 inch depth C6.7# FELL Slash Treatment, Fell Damaged Trees, C6.7# MACH Slash Treatment, Machine Pile Landing, C6.7#
Optional Item 1
DF
TRAC
SUSP
SPACE
ENDL
SEPM
Fell Scat 18"
MACH
DECK
Designation of Timber(C2.35#,C2.353#,C2.11#)
Slash Treatment (C6.7#)
Erosion Prevention & Control (C6.6#)
Not To Exceed 5 Acre
Sale Area Felling, Bucking, and Limbing (C6.41#)
Min. stump height 6 inches Ground Based Skidding (C6.42#)
Mandatory Item 1 Roadside Fuels Treatment Cut and Pile: unit 4,5,6,2
Sale Area
Roadside Fuels Treatment Cut and Pile: unit 1,3,19
All County and National Forest Roads to remain open (B6.22)
Traffic Control B6.33
Within 50' of each side of road Sale Area
Scat 30" Except in roadside disposal strip listed above
Landings
Contract Area Boundary (B1.1) Mandatory Item 1 (C2.35#), (C2.3.53#) Optional Item 1 (C2.35#), (C2.3.53#)
Plumas IRSC North Complex Fire
Vicinity Map
All lines are approximate Reference Scale:
Main Map - 1:80,000 40 Feet Contour Intervals
For daily project activity level (PAL) information, Call PAL WEST at 1-800-847-7766 (C7.22#)
Weather Station: Pike County Lookout (C7.22#) Project Activity Level: Westside
Map 1 of 2
/ Plumas National Forest Feather River Ranger District
Map Created by: J.Rodriguez 08/29/2022 T:\FS\NFS\Plumas\Project\SO\
DixieFire_LandscapeAssessment\ GIS\PostDisturbanceHazardousTreeManagement
"This map does no show all Contol areas under C6.24#"
File details come from the government source that posted it. Updated .