This is a Statement of Need (SON) for the replacement of a generator Human Machine Interface (HMI) screen system at Building 23265 at Beale Air Force Base, CA. The requirement is for the 548th Intelligence, Surveillance and Reconnaissance Group, which operates $2 billion worth of Distributed Common Ground System equipment.

The contractor must replace the existing non-operational Wonderware Master Operator Interface Terminal (MOIT) and install a new HMI system for ASCO manufactured generator switchgear equipment. Key requirements include removing existing hardware/software, installing a new MOIT system compatible with onsite generators, configuring the HMI for real-time data visualization and control, performing system integration and testing, and ensuring compliance with industry standards and cybersecurity protocols. The work must be performed during standard base hours (Monday-Friday 7:30AM-6PM) and includes a five-year warranty requirement. Contractors must obtain proper base access through the Wheatland Gate and comply with all base regulations. Photos show the existing 24-inch diagonal screen system with 2-inch black border mounted in gray equipment cabinets.

View the file

Other files

File Type Posted
RFI Fa468625HMIRFI - QA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF NEED

FOR

9 CES G E N E R A T O R H U M A N M A C H I N E I N T E R F A C E ( H M I ) S C R E E N

R E P L A C E M E N T

BACKGROUND:

The 548th Intelligence, Surveillance and Reconnaissance Group located with B23265 consists of more than 1,400 officer, enlisted, Guard, Reserve, civilian, and contract personnel spanning more than 40 Air Force Specialties responsible for operation and maintenance of more than $2 billion dollars’ worth of Distributed Common Ground System (DCGS) equipment. The 548th is needing the existing synchronization system for the generators located in the utility room at B23265 replaced. The existing Wonderware Master Operator Interface Terminal (MOIT) is non-operational and offline. Synchronization of the generators allows the generators to match the demand parameters from the facility so that the system operates efficiently and effectively.

SCOPE:

The contractor shall be responsible for replacing the existing Wonderware Master Operator Interface Terminal (MOIT) and installing the associated human machine interface (HMI) equipment. The contractor shall perform all associated integration and startup procedures. The contractor shall also retain all required certifications to work on the MOIT IAW all federal and state regulations.

REQUIREMENTS:

The contractor shall be responsible for replacing the existing Wonderware Master Operator Interface Terminal and installing the associated human machine interface (HMI) on ASCO manufactured generator switchgear equipment in use at Building 23265 (Reference Attachment 1 – HMI Screen Photos). The contractor shall ensure that the system supports and integrates with the existing on-site manufactured generators, maintaining their operational performance and compliance with mission requirements, and include five (5) year warranty.

The contractor shall be responsible for the following:

1. Replacement of existing MOIT:

• Remove the existing Wonderware MOIT hardware and software

• Replace the MOIT with a system compatible with the onsite manufactured generators and other facility control systems

• Ensure the new MOIT is configured to communicate effectively with generator control systems to support monitoring and control functionalities

2. Installation of HIM system:

• Install new HMI system designed to interface with the replacement MOIT and the manufactured generators

• Configure the HMI to provide real-time data visualization, control options, and operational feedback for the generators and other connected systems

• Ensure the HMI includes intuitive user interface features and graphical displays for seamless generator management

3. System Integration & Testing:

• Integrate the replacement MOIT and HMI with the manufactured generators and the facilities overall control system

• Perform system-wide testing to validate interoperability, real-time communication, and operational accuracy, particularly focusing on generator performance

• Provide a detailed report of testing results and resolve any identified issues before final acceptance

4. Compliance and Standards:

• Ensure all equipment and software installations comply with relevant industry standards, cybersecurity protocols, and generator manufacturer specifications

• Verify that the MOIT and HMI upgrades maintain the reliability and operational readiness of the manufactured generators

LOCATION AND HOURS OF WORK:

Beale AFB standard operating hours are Monday –Friday 7:30 AM-6PM. The location of operations will be Bldg. 23265, Beale AFB, CA 95903. The following Federal holidays are observed:

New Year's Day 1 January Martin Luther King’s Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

Access. Contractor Manager or alternate shall complete an entry authorization list (EAL) for access to Beale Air Force Base. The request shall be submitted within two (2) weeks of delivery to Pass and Registration via the Government Point of Contact (POC) identified in the inspect and accept information section of the contract. All contractor vehicles must enter the base via the Wheatland Gate and shall be subject to inspection. All contractor personnel must obtain base passes or be listed on the Entry Access List (EAL) throughout duration of work performance. Any persons in the EAL are required to bring two (2) forms of identification or REAL ID to access the base.

Traffic Laws. The contractor and their employees shall comply with all installation traffic regulations.

Cellular Phone Operation Policy. The contractor shall comply with local base policies regarding cellular phone operation.

Attachment 1 - HMI Screen Photos

24'' Screen, Diagonal Measurement

2'' black border

BACKGROUND:
The 548th Intelligence, Surveillance and Reconnaissance Group located with B23265 consists of more than 1,400 officer, enlisted, Guard, Reserve, civilian, and contract personnel spanning more than 40 Air Force Specialties responsible for operation and...
SCOPE:
REQUIREMENTS:
The contractor shall be responsible for replacing the existing Wonderware Master Operator Interface Terminal and installing the associated human machine interface (HMI) on ASCO manufactured generator switchgear equipment in use at Building 23265 (Refe...
1. Replacement of existing MOIT:
2. Installation of HIM system:
LOCATION AND HOURS OF WORK:
HMI- SON 11-26-24.pdf
BACKGROUND:
The 548th Intelligence, Surveillance and Reconnaissance Group located with B23265 consists of more than 1,400 officer, enlisted, Guard, Reserve, civilian, and contract personnel spanning more than 40 Air Force Specialties responsible for operation and...
SCOPE:
REQUIREMENTS :
The contractor shall be responsible for replacing the existing Wonderware Master Operator Interface Terminal and installing the associated human machine interface (HMI) on ASCO manufactured generator switchgear equipment in use at Building 23265 (Refe...
1. Replacement of existing MOIT:
2. Installation of HIM system:

LOCATION AND HOURS OF WORK:

File details come from the government source that posted it. Updated .