This is a Scope of Work specification document for Fulton County Schools in Georgia, detailing structural repairs to an existing wood pedestrian bridge at Hopewell Middle School located at 13060 Cogburn Road, Milton, Georgia. The project encompasses selective demolition of existing wood decking, structural framing repairs using pressure-treated Southern Pine No. 2 materials, deck replacement with 2x6 decking, repair of existing 8x8 wood posts using epoxy-based methods with metal column cap installation, replacement of damaged X-bracing at specified locations, installation of new guardrail supports at each post location, and installation of vehicular bollards at bridge ends. The Contractor must verify all existing conditions prior to construction and report any discrepancies to the Engineer of Record, Southern A&E, LLC, located at 7951 Troon Circle, Austell, Georgia. All work must be performed in strict accordance with the Structural Drawings and manufacturer requirements, with no material substitutions permitted without written approval from the Engineer of Record.

The Contractor and all subcontractors must comply with Fulton County Schools' site access, safety, and security requirements, including daily sign-in/sign-out procedures, visitor identification display, and maintenance of safety signage and barricades to isolate work zones from students, staff, and the public. All work must adhere to OSHA standards and applicable federal, state, and local codes and regulations. The Contractor is responsible for furnishing all labor, materials, equipment, supervision, and incidentals necessary for project completion. Personnel must conduct themselves professionally in accordance with the school environment and coordinate activities to minimize disruption to school operations. Non-compliance with FCS safety and site access requirements may result in personnel removal, work suspension, or other contractual remedies.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Fulton County Schools (FCS) is seeking a qualified Contractor to provide structural repairs to an existing wood pedestrian bridge located at Hopewell Middle School. The work includes selective demolition, structural framing repairs, deck replacement, guardrail installation, and related improvements in accordance with approved structural design documents.

SPECIFICATIONS

The Contractor shall complete all work necessary to repair and restore the structural integrity and functionality of the existing wood bridge, including selective demolition, deck and framing replacement, post repairs, bracing, and installation of guardrails and vehicular protection.

Demolition Work:

The Contractor shall remove existing vertically oriented 2x4 wood decking as shown on the Structural Drawings and dispose of demolished materials in accordance with all applicable regulations. Adjacent structures and site features shall be protected.

Structural Framing and Repairs:

The Contractor shall install new pressure-treated Southern Pine No. 2 wood joists and 2x6 decking as shown on the Structural Drawings. Existing 8x8 wood posts shall be repaired using epoxy-based methods, and metal column caps shall be installed. Damaged X-bracing shall be replaced only at locations indicated on the Structural Drawings.

Guardrails and Vehicular Protection:

New guardrail supports shall be installed at each 8x8 post location. Vehicular bollards shall be installed at each end of the bridge in accordance with Structural Detail 5/S001.

Materials, Connections, and Installation:

All materials, connectors, and fasteners shall be installed in strict accordance with the Structural Drawings and manufacturer requirements. Substitutions shall not be permitted without written approval from the Engineer of Record.

Field Conditions and Coordination:

The Contractor shall verify all existing conditions prior to construction. Any discrepancies or unforeseen conditions shall be reported to the Engineer of Record before proceeding.

Site Access, Safety, and Security Requirements (FCS Standard):

The Contractor shall comply with all Fulton County Schools (FCS) site access, safety, and security requirements while performing work on school property.

The Contractor and all subcontractors shall sign in and sign out daily at the school’s designated office or security location and shall obtain and visibly display visitor identification at all times while on campus. Access shall be limited to authorized personnel only.

The Contractor shall provide, install, and maintain proper safety signage, barricades, and caution tape to clearly identify and secure all work areas. Work zones shall be fully isolated to prevent access by students, staff, and the public.

Safety measures shall remain in place at all times and be adjusted as site conditions change.

Contractor personnel shall conduct themselves in a professional manner consistent with a school environment and shall coordinate work activities to minimize disruption to school operations.

Failure to comply with FCS site access and safety requirements may result in removal of personnel from the site, suspension of work, or other remedies available under the Contract.

Safety and Compliance:

All work shall comply with OSHA standards and all applicable federal, state, and local codes and regulations. The Contractor is responsible for maintaining a safe work site at all times.

Limitations of Statement of Work:

The Structural Drawings, specifications, and contract documents are the controlling instruments for quantities, dimensions, materials, and installation requirements.

LOCATION

Hopewell Middle School 13060 Cogburn Road Milton, Georgia 30004

Engineer of Record Southern A&E, LLC 7951 Troon Circle Austell, Georgia 30168

Governing Documents and Scope Hierarchy This Scope Of Work supplements the Structural Drawings and specifications prepared by the Engineer of Record. In the event of a conflict, the Structural Drawings shall govern.

The Contractor shall furnish all labor, materials, equipment, supervision, and incidentals required to complete the work in compliance with the Contract Documents.