89MVA86301_00_A01.pdf

PDF 1 MB Posted

Attached to
Docking or Hauling Out YON-286; accomplish
Solicitation number
N6264926Q0475
Issued by

About this file

This document is a Job Specification for a federal shipyard maintenance contract at Naval Base Sasebo, Japan. The work involves docking or hauling out Barge YON-286 (hull identification number 89MVA86301) to accomplish underwater hull repair, preservation, and SHIPALT work. The barge has principal dimensions of 165 feet length overall, 40 feet maximum breadth, 11 feet 6 inches depth amidship, and a full load displacement of 368.9 long tons (374.8 metric tons).

The anticipated award date is September 1, 2026, with the period of performance starting September 28, 2026, and ending May 30, 2027. Production completion is scheduled for April 2, 2027. The contractor must hoist and set the barge on blocks in either a dry dock (excluding Dry Dock #2) or on a barge/marine railway, transfer it to and from Sasebo Bay, provide access ways, establish grounding connections for lightning protection using minimum 500,000 circular MIL cable, and accomplish the necessary hull repairs and preservation work. The contractor is responsible for all waste disposal in accordance with Japanese Environmental Governing Standards (JEGS), and must clean and preserve all new and disturbed surfaces to match surrounding areas. No government-furnished material is provided. The preparing activity is Sasebo, with the work prepared by T. Baba and approved by S. Murakami and S. Morooka on January 22, 2028.

View the file

Other files

File Type Posted
Solicitation - N6264926Q0475.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ship/HULL NO. ShlDIHULL NAME ICN: Rev: Key Op:

YON-286 BARGE

JON:

89MVA86301 A01

TITLE:

Docking or Hauling Out YON-286; accompllah

JOB SPECIFICATION

Antlclpatad Award Data: PREPARING ACTIVITY:

POP Start Data:

Production Completion Data:

04/02/2027

POP End Data: SASEBO 9/28/2026

PREPARED BY: CODE DATE

T.BABA H BA 1/22/2028

APPROVED BY:

_Q,fa'\

CODE

S.MURAKAMI S226

CONCURRED BY:

&,?Iv

CODE

S.MOROOKA S231

ASSIST PLANNER'S NAME:

CODE

ASSIST PLANNER'S NAME: CODE

ASSIST PLANNER'S NAME: CODE

DESCRIPTION:

JINHH: f!llA CMBEl?I

S/F CONTACT; CWI'# CCNS# I

T. ESCRITOR-YAMADA

Ala; 1,,bf 'l(lyy

Approved by S300IS900 AV\,; :::ff4:::

I.WC;

Work Completed

S/Force: Rate; Date; •

Ship Supt: Dm; SRF CONTROL NO.:

WORK CERTIFICATION llgH�TYR�

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

Tasuku.Nagano.ja Typewritten Text 1301392671

Tasuku.Nagano.ja Typewritten Text 05/30/2027

Tasuku.Nagano.ja Typewritten Text 9/1/2026

FY26

File details come from the government source that posted it. Updated .