BNJ.pdf

PDF 2 MB Posted

Attached to
First Rate Generator, Transmission Atlas Federal contract opportunity
Solicitation number
89603018Q0060
Issued by
Department of Energy Federal Energy Regulatory Commission

About this file

89603018Q0060 BNJ.pdf

View the file

Other files for this federal contract opportunity

Other files attached to First Rate Generator, Transmission Atlas, newest first.
File Type Posted
89603018Q0060_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRAND NAME JUSTIFICATION

Please complete and return immediately to:

Agency/Office Name: FERC\DCIO\IT Operations

1. "Brand name" of product: TRANSMISSION ATLASTm and FirstRate®

2. Description of "brand name" product: Cloud based Data Base for PowerWorld Software

3. Name of manufacturer of "brand name" product: Energy Visuals

4. The "braid name" provided is to identify the standard of quality necessary. Equivalents will be considered. Yes X No (If no, please complete Nos. 5 and 6.)

5. If the armwer to No. 4 is "no," please complete the following.

Only the "brand name" item specified will meet the Government's needs:

A. Because patent rights, copyrights, proprietary secret processes, control of certain materials or components providing a superior utility or capability that cannot be obtained from similar products.

X B. Because program requirements cannot be modified so that competitive products or services may be used.

C Because the product or service is unique and easily established as one-of-a kind.

Please explain:

FERC currently owns PowerWorld Software. TRANSMISSION ATLASTm and FirstRate® are the data bases that are needed for the software to access. FERC currently owns the PowerWorld Software and it only works with this data base.

6. If the answer to No. 4 is "no," please indicate other reasons for restricting competition:

This product is el unique data base not sold by other competitors and joined to unique software that gives access to the data.

I certify to the best of my knowledge that the above statements are correct.

PAUL

Okill Ray signed by PAUL VANASSE

.115. on US. Government.

oual Weal Elwrgy Regulatory

1 Vont rank. crvirPAUL VANASSE E 003 14/19200303.1001.1.119901000

VA N A$S: Re. trcI pproving thh document Date 3018-01.16 1904.13 0590

1/16/18 Date

*See Attached Applicable FAR References 11.104, 11.105, 6.302-1, 6.303-1 & 6.303-2

*11.104 Use of brand name or equal purchase descriptions.

(a) While the use of performance specifications is preferred to encourage offerors to propose innovative solutions, the use of brand name or equal purchase descriptions miy be advantageous under certain circumstances.

IT Specialist Name/Signature Title

(b) Brand name or equal purchase descriptions must include, in addition to the brand name, a general description of those salient physical, functional, or performance characteristics of the brand name item that an "equal item must meet to be acceptable for award. Use brand name or equal descriptions when the salient characteristics are firm requirements.

*11.105 Items peculiar to one manufacturer.

Agency requirements shal not be written so as to require a particular brand name, product, or a feature of a product, peculiar to one manufacturer, thereby precluding consideration of a product manufactured by another company, unless-

(a) The particular brand name, product, or feature is essential to the Government's requirements, and market research indicates other companies' similar products, or products lacking the particular feature, do not meet, or cannot be modified to meet, the agency's needs;

(b) The authority to coitract without providing for full and open competition is supported by the required justifications and approvals (see 6.302-1); and

(c) The basis for not pinviding for maximum practicable competition is documented in the file when the acquisition is awarded using simplified acquisition procedures.

*6.302-1 Only one re4;ponsible source and no other supplies or services will satisfy agency requirements.

(a) Authority.

(1) Citations: 10 U.S.C. 2304(c) (1) or 41 U.S.C. 253(c) (1).

(2) When the supplies or services required by the agency are available from only one responsible source, or, for DOD, NASA, and the Coast Guard, from only one or a limited number of responsible sources, and no other type of supplies or services will satisfy agency requirements, full and open competition need not be provided for.

(i) Supplies or service.; may be considered to be available from only one source if the source has submitted an unsolicited research proposal that-

(A) Demonstrates a unique and innovative concept (see definition at 2.101). or, demonstrates a unique capability of the source to provide the particular research services proposed;

(B) Offers a concept or services not otherwise available to the Government, and

(C) Does not resemble the substance of a pending competitive acquisition. (See 10 U.S.C. 2304(d)(1)(A) and 41 U.S.C. 253(d)(1)(A).)

(ii) Supplies may be doemed to be available only from the original source in the case of a follow-on contract for the continued development or production of a major system or tighly specialized equipment, Including major components thereof, when it is likely that award to any other source would result in-

(A) Substantial duplicsition of cost to the Government that is not expected to be recovered through competition; or

(B) Unacceptable delays in fulfilling the agency's requirements. (See 10 U.S.C. 2304(d)(1)(B) or 41 U.S.C. 253 (d)(1)(B).)

(iii) For DOD, NASA, ;Ind the Coast Guard, services may be deemed to be available only from the original source in the case of follow-on contracts for the continued provision of highly specialized services when it is likely that award to any other source would result in-

(A) Substantial duplicution of cost to the Government that is not expected to be recovered through competition; or

(B) Unacceptable delays in fulfilling the agency's requirements. (See 10 U.S.C. 2304(d)(1)(B).)

(b) Application. This a vthority shall be used, if appropriate, in preference to the authority in 6.302-7; it shall not be used when any of the other circumstances is applicable. Use of this authority may be appropriate in situations such as the following (these examples are not intended to be all inclusive and do not cristitute authority in and of themselves):

(1) When there is a reasonable basis to conclude that the agency's minimum needs can only be satisfied by-

(i) Unique supplies or services available from only one source or only one supplier with unique capabilities; or

(ii) For DOD, NASA, and the Coast Guard, unique supplies or services available from only one or a limited number of sources or from only one or a limited number of sup,iliers with unique capabilities.

(2) The existence of linited rights in data, patent rights, copyrights, or secret processes; the control of basic raw material; or similar circumstances, make the supplies and services available from only one source (however, the mere existence of such rights or circumstances does not in and of itself justify the use of these authorities) (see Part 27).

(3) When acquiring utlity services (see 41.101), circumstances may dictate that only one supplier can furnish the service (see 41.202); or when the contemplated contrac is for construction of a part of a utility system and the utility company itself is the only source available to work on the system.

(4) When the agency'iead has determined in accordance with the agency's standardization program that only specified makes and models of technical equipment and parts VIII satisfy the agency's needs for additional units or replacement items, and only one source is available.

(c) Application for braid name descriptions. An acquisition that uses a brand name description or other purchase description to specify a particular brand name, product, or fea .ure of a product, peculiar to one manufacturer does not provide for full and open competition regardless of the number of sources solicited. It shall be jugified and approved in accordance with FAR 6.303 and 6.304. The justification should indicate that the use of such descriptions in the acquisition is esse ntial to the Government's requirements, thereby precluding consideration of a product manufactured by another company. (Brand-name or equal descnptions, and other purchase descriptions that permit prospective contractors to offer products other than those specifically referenced by brand tame, provide for full and open competition and do not require justifications and approvals to support their use.)

(d) Limitations.

(1) Contracts awarded using this authority shall be supported by the written justifications and approvals described in 6.303 and 6.304.

(2) For contracts awatied using this authority, the notices required by 5.201 shall have been published and any bids and proposals must have been considered.

*6.303 Justifications.

6.303-1 Requiremen s.

(a) A contracting offic?.r shall not commence negotiations for a sole source contract, commence negotiations for a contract resulting from an unsolicited proposal, or award ar y other contract without providing for full and open competition unless the contracting officer-

(1) Justifies, ff required in 6.302, the use of such actions in writing;

(2) Certifies the 8CCUlacy and completeness of the justification; and

(3) Obtains the appro /al required by 6.304.

(b) Technical and req Jirements personnel are responsible for providing and certifying as accurate and complete necessary data to support their recommendation for other than full and open competition.

(c) Justifications requ'red by paragraph (a) of this section may be made on an individual or class basis. Any justification for contracts awarded under the authority of 6.302-7 s ball only be made on an individual basis. Whenever a justification is made and approved on a class basis, the contracting officer must ensure that Erni, contract action taken pursuant to the authority of the class justification and approval is within the scope of the class justification and approval and shall document the contract file for each contract action accordingly.

(d) If the authority of ii.302-3(a)(2)(i) or 6.302-7 is being cited as a basis for not providing for full and open competition in an acquisition that would otherwise be subject to the Trade Agreements Act (see Subpart 25.4), the contracting officer must forward a copy of the justification, in accordance with agency procedures, b the agency's point of contact with the Office of the United States Trade Representative.

(e) The justifications kr contracts awarded under the authority cited in 6.302-2 may be prepared and approved within a reasonable time after contract award when preparation and approval prior to award would unreasonably delay the acquisitions.

• 6.303-2 Content.

(a) Each justification shall contain sufficient facts and rationale to justify the use of the specific authority cited. As a minimum, each justification shall include the following information:

(1) Identification of the agency and the contracting activity, and specific identification of the document as a "Justification for other than full and open competition."

(2) Nature and/or description of the action being approved.

(3) A description of thn supplies or services required to meet the agency's needs (including the estimated value).

(4) An identification of the statutory authority permitting other than full and open competition.

(5) A demonstration that the proposed contractor's unique qualifications or the nature of the acquisition requires use of the authority cited.

(6) A description of efiods made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized as required by Subpart 5.2 and, if not, which exception under 5.202 applies.

(7) A determination by the contracting officer that the anticipated cost to the Government will be fair and reasonable.

(8) A description of tho market research conducted (see Part 10) and the results or a statement of the reason market research was not conducted.

(9) Any other facts supporting the use of other than full and open competition, such as:

(i) Explanation of why technical data packages, specifications, engineering descriptions, statements of work, or purchase descriptions suitable for full and open competition have not been developed or are not available.

(ii) When 6.302-1 is ciad for follow-on acquisitions as described in 6.302-1(a)(2)(ii), an estimate of the cost to the Government that would be duplicated and how the estimate was derived.

(iii) When 6.302-2 is cted, data, estimated cost, or other rationale as to the extent and nature of the harm to the Government.

(10) A listing of the sooces, if any, that expressed, in writing, an interest in the acquisition.

(11) A statement of th e actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or service's required.

(12) Contracting officer certification that the justification is accurate and complete to the best of the contracting officer's knowledge and belief.

(b) Each justification shall include evidence that any supporting data that is the responsibility of technical or requirements personnel (e.g., verifying the Government's minimum needs or schedule requirements or other rationale for other than full and open competition) and which form a basis for the justification have beer certified as complete and accurate by the technical or requirements personnel.

6.304 Approval of thl justification.

(a) Except for paragraoh (b) of this section, the justification for other than full and open competition shall be approved in writing-

(1) Fora proposed co Itract not exceeding $500,000, the contracting officer's certification required by 6.303-2(a)(12) will serve as approval unless a higher approving leve, is established In agency procedures.

(2) For a proposed coltract over $500,000 but not exceeding $10,000,000, by the competition advocate for the procuring activity designated pursuant to

6.501 or an official deacnbed in paragraph (a)(3) or (a)(4) of this section. This authority is not delegable.

(3) For a proposed coltract over $10,000,000 but not exceeding $50,000,000, by the head of the procuring activity, or a designee who-

(i) If a member of the armed forces, is a general or flag officer; or

(ii) If a civilian, is serving in a position in grade GS 16 or above under the General Schedule (or in a comparable or higher position under another schedule).

(4) For a proposed coltract over $50,000,000, by the senior procurement executive of the agency designated pursuant to the OFPP Act (41 U.S.C.

414(3)) in accordance with agency procedures. This authority is not delegable except in the case of the Under Secretary of Defense for Acquisition.

Technology, and Logistics, acting as the senior procurement executive for the Department of Defense.

(b) Any justification fo,- a contract awarded under the authority of 6.302-7, regardless of dollar amount, shall be considered approved when the determination required by 6.302-7(c)(1) is made.

(c) A class justification for other than full and open competition shall be approved in writing in accordance with agency procedures. The approval level shall be determined A, the estimated total value of the class.

(d) The estimated dollar value of all options shall be included in determining the approval level of a justification.