ATTACHMENT A

19WA132168

Parker-Davis Access Rock

Performance Work Statement

U.S. DEPARTMENT OF ENERGY

WESTERN AREA POWER ADMINISTRATION

PERFORMANCE WORK STATEMENT

Parker-Davis Access Rock

1.0 INTRODUCTION/BACKGROUND

1.1 Introduction

The Western Area Power Administration (WAPA), Desert Southwest Region (DSW), requires road repair material across Arizona. The required materials, as described further in this Performance Work Statement (PWS) will be use over the entire Parker-Davis power system to repair access roads on a limited basis.

1.2 Background

WAPA is a Federal power marketing administration that markets and delivers reliable, cost-based hydroelectric power and related services to wholesale customers in 17 states. The Desert Southwest Region is one of four regions of the Western Area Power Administration. Desert Southwest customer service region markets federal hydroelectric power to nearly 70 municipalities, cooperatives, federal and state agencies, and irrigation districts.

Most power sold by the Desert Southwest Region is generated from power plants operated at Hoover, Parker, and Davis dams. Power is also marketed from hydroelectric projects in the Bureau's Upper Colorado Region and the federal portion of power generated at Navajo Generating Station near Page, Arizona.

The Desert Southwest Region also operates and maintains more than 40 substations and 3,400 miles (5,472 kilometers) of transmission lines to keep the system running reliably. Our partnerships with our customers allow us to help them quickly restore service to local residents after storms or other major system disturbances.

1.3 Location/Site Contact

The location for road repair will be anywhere along the Parker-Davis power system, as needed, since a full inventory of access roads currently doesn’t exist.

The Contractor is to contact vegetation program manager Steve Narolski, 602-605-2428 (backup Lineman 3, Terry Kuglar 602-376-7482, or Tim Hibbs 602-377-3305) to verify that the site is ready for the delivery of material to aid in access repair, to confirm the destination directions, and to coordinate arrival time to allow a WAPA representative to meet the contractor at the site.

1.4 Government Personnel

The Contracting Officer is the individual executing this contract on behalf of the Government and is responsible for the overall administration of the contract. He/she is the only person authorized to make any changes in the prices, terms or other conditions of the contract.

The Contracting Officer’s Representative (COR) is responsible for giving the Contractor any special technical instructions or guidance necessary to ensure contract execution. The COR has no authority to alter the terms of conditions of the contract.

1.5 Contractor Personnel

The contractor shall have a competent onsite representative authorized to act on behalf of the contractor, available to the CO or COR to receive instructions or information regarding work under the contract. The on-site representative must be able to fluently speak and understand English. The on-site representative shall provide a phone number where he/she can be contacted 24 hours per day 7 days a week.

The contractor shall furnish adequate supervision at the premises to ensure that work is performed in a satisfactory manner. It is the responsibility of the contractor to maintain close surveillance over personnel employed to perform work on the contract.

No unauthorized personnel are permitted on the premises.

1.6 Contractor Submittals

1.6.1 Safety Plan

A Safety Plan is required to be submitted to the CO and COR within 10 calendar days after contract award. WAPA’s approval of the plan is required prior to the commencement of delivery of materials.

1.6.2 List of Employees

Contractor shall furnish names of all personnel performing work on this contract no later than 10 calendar days after contract award. No unidentified or unauthorized personnel are permitted on the work site.

1.6.3 Work Schedule

Material will be ordered and delivered on an “as needed” basis. The Contractor will ensure that material is delivered as needed and in a timely fashion.

1.6.4 Quality Control Plan

The Contractor shall develop and maintain a Quality Control Plan (QCP) to ensure all materials are performed in accordance with the standards outlined in the Performance Requirements Summary (PRS) section of this PWS. The Contractor shall provide the QCP to the CO within 10 days of contract award.

1.7 Materials

The Contractor shall furnish all materials and supplies required for the performance of work under this contract. This contract calls for the delivery of either rip rap (large angular rocks) or pit run (5-8 inch angular rock) as needed.

1.8 Equipment

The contractor shall furnish all equipment required for the performance of the work under this contract. All equipment shall comply with applicable OSHA guidelines, and shall be in good operating condition. The Contractor shall operate the equipment in accordance with the original manufacturer’s recommendation and applicable laws and regulations.

1.9 Protective Clothing

The Contractor shall determine the necessary personnel protective equipment and ensure contract employees use the personnel protective equipment while performing tasks under this contract.

1.10 Licenses and Permits

The Contractor shall obtain and maintain, at its sole expense, all necessary licenses and permits required to meet the requirements of the contract.

1.11 Damage to Property

The contractor is liable for damage to both Government and private property in performance of this contract. The contractor shall pay for damages where the damage is the fault or negligence of the contractor, as determined by the CO.

1.12 Interference with Business

The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other contractors and Government employees and carefully schedule its own work to such additional work as may be directed by the TR or COR. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by Government employees.

The services under this contract shall be performed in such a way that there will be no interruption to or interference with the normal operation of Government business on the premises. Persons employed by the contractor shall, while on the premises, comply with all applicable regulations.

1.13 Occupational Safety and Health Administration Regulations

The contractor shall perform services under the contract in compliance with the safety requirements defined in all applicable Federal, State and local laws, regulations and ordinances, including the latest effective standards promulgated by the Department of Labor, Occupational Safety and Health Administration, Safety and Health Standards, 29 CFR 1910 and 29 CFR 1925. When questionable, the most stringent shall apply.

The Contractor shall take all reasonable precautions in the performance of the work under this contract to protect the safety and health of employees and of members of the public and shall comply with all applicable safety and health regulations and requirements, including Department of Energy and WAPA requirements.

The Contractor shall maintain an accurate record of, and shall report to the CO and COR, all cases of death, occupational disease, or traumatic injury to employees of the public and any property damage as a result of performance under this contract.

2.0 SCOPE

The Contractor will deliver dump truck loads of rip rap or pit run rock as needed by the Government.

3.0 SAFETY REQUIREMENTS

The contractor shall comply with all Federal, State and local safety regulations.

4.0 ENVIRONMENTAL REQUIREMENTS

The contractor shall comply with all Federal, State and local environmental regulations.

5.0 PRE-PERFORMANCE MEETING

The CO will schedule a meeting with the contractor within one week following the contract award to discuss the requirements of the contract (to include safety prior to start of work).