ATTACHMENT_3_-_Distribution_Plan.pdf

PDF 45 KB Posted

Attached to
STRATEGIC PETROLEUM RESERVE REFINED PRODUCT RESERVE
Solicitation number
89243518RFE000008
Issued by

About this file

Attachment 3

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

DISTRIBUTION PLAN

A. Introduction B. Storage Facilities:

1. Terminal Address

2. Total product storage capacity

C. Distribution Facilities:

1. Marine (Barge docks, Tanker docks)

2. Truck Racks

3. Pipeline Connections

4. Other Terminals

5. Terminal Data Sheet (see attached) D. Distribution Procedures

1. DOE responsibilities. (To be added by DOE at contract award)

2. QAR responsibilities. (To be added by DOE at contract award)

3. Storage Contractor responsibilities:

a. Sale Preparation

b. Scheduling of Deliveries

c. Inspection and Issue of Product

d. Quantity Measurement Procedures

E. Purchaser Responsibilities (To be added by DOE)

1. Scheduling of Deliveries

2. Inspections and Receipt

Attachment: Terminal Data Sheet

Terminal Data Sheet

Name: Terminal Contractor:

Location: Terminal Manager:

Waterfront Loc: Tel. No:

Owner: Fax No:

Operator: E-mail: Hours of Operation:

Delivery Modes:

Ship Docks

Dock # Max Loading Rate (bbls/hr)

Max LOA (ft)

Max Beam (ft)

Max Draft (ft)

Max DWT

Barge Docks

Dock # Max Loading Rate (bbls/hr)

Max LOA (ft)

Max Beam (ft)

Max Draft (ft)

Max DWT

Pipelines

Name Size BBLs/hr Receipt BBLS/hr Issue

Truck Loading Racks

Top Loading Positions Bottom Loading Positions Max Loading Rate

Remarks/ Restrictions:

File details come from the government source that posted it.