87 Foot Torpedo Weapons Retriever Ship Yard Work Requirment.pdf
PDF 136 KB Posted
- Attached to
- Security Craft (TWR6) Ship Yard Work
- Solicitation number
- N0017325RFIMB06
About this file
This is a Performance Work Statement detailing maintenance requirements for an 87-foot Torpedo Weapons Retriever/Security Craft (TWR-6) for the Naval Research Laboratory. The work scope includes comprehensive vessel maintenance involving dry docking, hull maintenance above and below waterline, deck maintenance, superstructure work, and various systems inspections and repairs.
The specific requirements include hull stripping and painting with aluminum-compatible paint, replacing hull zincs, NDT testing, deck non-skid coating replacement, sea chest maintenance, fuel tank repairs and cleaning, hydraulic system maintenance, and inspections of propulsion shafting, steering systems, and bow thruster. The vessel is homeported in Chesapeake Beach, MD, with work to be performed within 50 miles by water, or contractor must provide towing. The contractor must coordinate with Naval Research Laboratory Code 3522 personnel for quality assurance activities, and any additional repair work discovered during inspections requires approval from the Naval Research Laboratory Contracting Officer. Site visits are strongly encouraged, and contractors must reference the Craft Information Book for paint specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00173-25-RFI-MB06.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
87 Foot Torpedo Weapons Retriever/ Security Craft (TWR6) Ship Yard Work
The successful offer shall provide all labor, materials and equipment to haul, block and brace the TWR-6 and complete the following items:
1. Haul/ Dry dock vessel according to docking plan outlined in the Craft Information
Book.
2. Hull Maintenance (below waterline)
a. Strip hull of existing paint and marine growth.
b. Prep and paint hull with aluminum compatible paint.
i. Paint scheme and color to match existing paint and color.
c. Replace all hull zincs (14 ea.) and sea chest zincs (6 ea.)
d. NDT Test hull for any discontinuities or thinning.
i. Provide a written report of the results including the layout and testing results and recommendations.
3. Hull Maintenance (above waterline)
a. Prep and paint hull with aluminum compatible paint.
i. Paint scheme and color to match existing color.
ii. Prep and paint all identification numbers and letters.
b. Repair/ replace all rub-rails.
4. Deck Maintenance
a. Strip main deck of all existing non-skid paint.
b. Prep and paint main deck with aluminum compatible non-skid paint.
i. Non-skid paint to match existing color.
c. Prep and paint all Bits, Chocks, and Stanchions with aluminum compatible paint.
i. Paint to match existing color.
d. Prep and paint all Vent Pipes, Fire Stations, and Outlets with aluminum compatible paint.
i. Paint to match existing color.
e. Prep and paint all Vents, Magazine, Capstan, and Hatches with aluminum compatible paint.
i. Paint to match existing color.
5. Superstructure, Wheelhouse, Mast Maintenance
a. Prep and paint all surfaces of the Wheelhouse, Superstructure, and mast with aluminum compatible paint.
i. Paint to match existing color.
6. Sea Chest Maintenance
a. Remove and replace the Fire Pump sea chest strainer. (Strainer supplied)
b. Inspect, repair, or replace port and starboard MDE sea chest strainers
c. Inspect, repair, or replace port and starboard generator sea chest strainers
d. Inspect, repair, or replace Air Conditioning system sea chest strainer.
7. FO Tanks
a. Open, clean, and inspect all (4) FO tanks.
b. Inspect and repair (2) aft fuel tank cracks. (Pictures attached).
c. Pressure test tanks after repair to ensure quality assurance.
d. Refill FO tanks with specified amount of fuel. (Approx. 1,000 GAL. Refer to customer to confirm amount.)
8. Hydraulic Oil Tanks, Waste Oil Tank, Oil Tank, Black Water Tank, Grey Water
Tank.
a. Drain, open, inspect, and clean all tanks.
b. Refill Hydraulic tanks with new specified hydraulic oil.
9. Repair Stanchion on Starboard Deck
a. Stanchion sixth from the stern on the starboard side is bent.
i. Remove stanchion, straighten, and re-weld.
10. Bilges
a. Clean all bilges and forepeak
11. Main Propulsion Shafting, Struts, and Seals
a. Inspect port and starboard main propulsion shafts, bearing struts, and shaft seals for damage and to determine condition.
deficiencies, recommendations and cost estimate for repair.
12. Steering and Rudders
a. Inspect steering system and rudders for damage and to determine condition.
13. Bow thruster
a. Inspect bow thruster for damage and to determine condition.
Note:
• Standard bid will assume delivery of TWR-6 by the Navy to shipyards within a 50 mile travel distance by water, of Chesapeake Beach, MD – homeport of said TWR-6. Berthing of the TWR-6 is on Fishing Creek which has a 50 foot wide channel, and water depth of <6 feet in several locations. Bids requiring work to be performed outside of the 50 mile travel distance will require bidder to transport the TWR-6 at bidder’s cost via towing.
• For all painted items, refer to Craft Information Book for paint specification.
• Site visit to the vessel for inspection is strongly encouraged.
• All additional repair work discovered during inspection must be approved and authorized by Naval Research Laboratory Contracting Officer before any work is to take place.
• Naval Research Laboratory Code 3522 personnel are to be witness for any and all Quality Assurance activities.
File details come from the government source that posted it. Updated .