Performance Work Statement Summary: Issuer Stress Testing Program Services
This is a Performance Work Statement (PWS) issued by the Department of Housing and Urban Development (HUD), Ginnie Mae Office of Enterprise Risk, for Issuer Stress Testing (IST) Program Services with an effective date of October 23, 2026. The contract is structured as a one-year base period plus four optional one-year periods. The Contractor shall provide program management support, stress testing framework updates, issuer stress testing analyses, market intelligence reporting, and optional special projects to support Ginnie Mae's review and enhancement of non-depository and depository stress testing frameworks for approximately 400 issuers within the Mortgage-Backed Securities (MBS) programs.
The PWS specifies eight primary tasks with performance standards and acceptable quality levels (AQL). Task One includes bi-weekly status meetings, minutes, and reports, plus a Project Work Plan due within ten business days of award. Task Two requires stress testing framework updates and artifacts delivered semi-annually with a three business-day AQL. Task Three mandates semi-annual issuer stress testing analyses with draft reports due by the 18th business day of quarter months and final reports due six business days later. Task Four requires monthly Market Intelligence Reports with a three business-day AQL. Task Five covers optional Special Projects compensated on a Firm-Fixed-Price (FFP) or Labor-Hour (LH) basis. Task Six provides optional transition services including 90-day transition-in and 30-day transition-out periods. Tasks Seven and Eight address contractor travel (reimbursable at Federal Travel Regulation rates; local travel within 50 miles of Ginnie Mae's office is non-reimbursable) and other direct costs requiring Government approval. All work involving Ginnie Mae sensitive data must be performed exclusively within Ginnie Mae's authorized cloud environment, and all deliverables must be submitted electronically in Microsoft Office format. The Contractor must demonstrate expertise in mortgage finance, financial modeling, stress testing, and analytics, with acceptable certifications including CMB, CPA, CFA, FRM, PRM, or CFE designations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources-Sought-RFI for Issuer Stress Testing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 September 2024
Performance Work Statement (PWS)
Issuer Stress Testing
October 23, 2026
2 September 2024
Vision Statement
1 General Information
1.1 Scope of Work ............................................................................... Error! Bookmark not defined.
1.2 Background
1.3 Constraints
1.4 Non-Personal Services
1.5 Period of Performance
1.6 Place of Performance
1.7 Hours of Operation
1.8 Special Qualifications
1.9 Post Award/Kickoff Conference
1.10 Status Meetings
1.11 Contractor Travel
1.12 Transition In
1.13 Transition Out
2 Definitions and Acronyms
2.1 Definitions
2.2 Acronyms
3 Government-Furnished Property and Services
3.1 Government Services................................................................... Error! Bookmark not defined.
3.2 Facilities
3.3 Equipment
3.4 Materials and Information
3.5 Quality Assurance (QA)
3 September 2024
4 Contractor-Furnished Items and Services
4.1 Facilities
4.2 Equipment
4.3 Materials
4.4 Contractor Responsibilities
4.5 Contractor Personnel
4.6 Identification of Contractor Employees
5 Specific Tasks
5.1 Operations and Maintenance Support
6 Deliverables
6.1 Quality Control Plan
6.2 Acceptance Criteria
7 Related Documents
8 Performance Requirements Summary………………………………………………………………..…………………19
4 September 2024
Performance Work Statement (PWS)
Issuer Stress Testing Program Services
Vision Statement
To continue the review and enhancement of Ginnie Mae’s non-depository and depository stress testing frameworks, datasets, artifacts and suite of models for nearly 400 Issuers within the
Mortgage-Backed Securities (MBS) programs.
1 General Information
1.1 Scope of Work
The Department of Housing and Urban Development (HUD), Ginnie Mae Office of Enterprise
Risk (OER) has a requirement for Issuer Stress Testing program services. The purpose of this requirement is to obtain contractor support services with expertise to produce comprehensive analyses, insights, reports, white papers, power point presentations and data covering US housing and mortgage finance ecosystems. The successful offeror must provide deep, topical industry and market insights and intelligence that produces thoughtful discussions, analyses and has high relevance for Ginnie Mae. Due to the wide range of priorities, issues and matters that affect program issuers, the successful offeror also must have the expertise to improve continuously the identification and quantification of emerging risks within the nearly 400 non-depository and depository issuers within the MBS program and for Ginnie Mae’s continuous
Issuer Risk Management work. This requires broad and deep institutional capability at the intersection of markets, analytics, and mortgage and housing policy, with a strong practitioner’s approach. This continued support is needed to expand, enhance and further mature the enterprise’s ability to analyze counterparty risks through various economic cycles and to identify those counterparties that may not remain solvent or liquid through such cycles. The scope includes:
- Program Management Support
- Stress testing framework updates
- Issuer Stress Testing Analyses
- Market Intelligence Reporting
- Special Projects (Optional to the Government)
- Transition Services (if needed)
The Contractor shall perform all work under this contract involving Ginnie Mae sensitive data exclusively within Ginnie Mae’s authorized cloud environment and designated business systems. All Ginnie Mae data, including information created, accessed, processed, transmitted, or stored in connection with this contract, shall remain within Ginnie Mae’s accredited environment unless Ginnie Mae provides explicit prior written approval for such data to reside outside of the Ginnie Mae environment. The Contractor shall not transfer, replicate, store, or otherwise permit Ginnie Mae data to reside in any external environment, system, application, or service without such prior written approval.
5 September 2024
Detailed descriptions of specific tasks are provided in Section 5 – Specific Tasks.
1.2 Background
Ginnie Mae’s mission is to bring capital into the American housing mortgage system through the
Mortgage-Backed Securities (MBS) programs and with minimal risk to the American taxpayer.
The Issuers that receive these funds through the sale of MBSs can use the capital to make additional residential and other types of mortgage loans. However, since the 2008 Great
Recession, many of the regulated entities/depositories that had been program participants opted to exit and have chosen not to return. This created an opportunity for non-bank/non-depository entities to enter the market in great quantities but without the same oversight requirements of the traditional financial institutions.
Ginnie Mae seeks to continue to review, enhance, further mature and expand its non-depository and depository stress testing frameworks and suite of models for nearly 400 Issuers; to improve the identification and quantification of emerging risks to complement established corporate credit risk analytic functions; to expand its analytical techniques to further enhance early warning signals that provide insight to potentially disruptive market activity (such as detail into global macroeconomic events that may ultimately contribute to risks to Ginnie Mae’s corporate guaranty portfolio.
1.3 Constraints
The services identified in this PWS will adhere to the rules, regulations, laws, standards, and conventions identified by HUD as well as within the Federal Government. Constraints include the following:
OMB Circular A-136 Revised, Financial Reporting Requirements, (https://www.whitehouse.gov/wp-content/uploads/2023/05/A-136-for-FY-2023.pdf)
National Institute of Standards and Technology (NIST), Cybersecurity Framework (CSF) 2.0, (https://nvlpubs.nist.gov/nistpubs/CSWP/NIST.CSWP.29.pdf)
Federal Information Security Modernization Act (FISMA) of 2014
(https://www.congress.gov/113/statute/STATUTE-128/STATUTE-128-Pg3073.pdf)
Payment Integrity Information Act (PIIA) of 2019
(https://www.congress.gov/116/statute/STATUTE-134/STATUTE-134-Pg113.pdf)
Revolutionary Federal Acquisition Regulation Overhaul (FAR Overhaul)
(https://www.acquisition.gov/sites/default/files/page_file_uploads/RFO.pdf)
1.3.1 Project Planning and Management
All HUD IT projects, including all information systems acquired, developed, enhanced, or maintained shall follow the policy, procedures, standards, and guidelines set forth within the IT https://www.whitehouse.gov/wp-content/uploads/2023/05/A-136-for-FY-2023.pdf) https://nvlpubs.nist.gov/nistpubs/CSWP/NIST.CSWP.29.pdf) https://www.congress.gov/113/statute/STATUTE-128/STATUTE-128-Pg3073.pdf) https://www.congress.gov/116/statute/STATUTE-134/STATUTE-134-Pg113.pdf) https://www.acquisition.gov/sites/default/files/page_file_uploads/RFO.pdf)
6 September 2024
Management Framework using the Project Planning and Management (PPM) Life Cycle located at HUD’s PPM Life Cycle Website:
http://portal.hud.gov/hudportal/HUD?src=/program_offices/cio/ppm/PPMV20HOME
PPM was designed based on the best practices from Capability Maturity Model Integration
(CMMI) for systems development and PMBok for project management. While at the foundation, PPM is designed as a Waterfall methodology, HUD encourages tailoring the PPM to use the many modern solution development methodologies available to enable the planning, development and delivery of useable functionality within 6-9 month increments.
Contractors are encouraged to propose a preferred methodology whether their solution(s) are for custom development, includes prototypes or pilots, Commercial Off the Shelf (COTS)/
Government Off the Shelf (GOTS) configuration, or Software as a Services. Working with the
HUD Project Manager(s), the Contractor will tailor PPM to take advantage of contractor proposed expertise in using other methodologies in a manner that will provide HUD the best value and address all of the work necessary for successful project completion, on time, within budget, and delivering intended functionality.
The decisions of PPM tailoring are captured in the Project Tailoring Agreement (PTA), which documents the specific agreement for creating, combining, referring, or omitting specific artifacts applicable to the project, as well as adjusts project control gate reviews to be consistent with the tailoring. All tailoring of PPM must be approved by HUD’s Deputy Chief Information Officer
(DCIO) for Business & IT Modernization. As a default, any project without an approved project tailoring agreement is required to follow all PPM phases and artifacts as presented.
1.4 Non-Personal Services
The Government will neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual Contractor employees. It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services.
If the Contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor's responsibility to notify the Contracting Officer (CO) immediately. These services shall not be used to perform work of a policy, decision making or management nature, i.e., inherently Government functions. All decisions relative to programs supported by the Contactor shall be the sole responsibility of the Government.
1.5 Period of Performance
The period of performance shall be for one (1) base year and four (4) 12-month option periods.
1.6 Place of Performance
The services to be performed under this contract shall be performed primarily at the
Contractor’s primary facility.
http://portal.hud.gov/hudportal/HUD?src=/program_offices/cio/ppm/PPMV20HOME
7 September 2024
1.7 Hours of Operation
The Contractor is responsible for providing services between the hours of 8:00 a.m. and 5:00 p.m. ET Monday through Friday except for Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closing, or similar Government directed facility closings. Weekly hours must not exceed a forty (40) hour work week, and a typical workday will be 8 hours each day. The Government reserves the right to change hours of operation or restrict contractor access. Government agencies will not be available during scheduled holidays, inclement weather, weekends, and after duty hours.
The Contractor shall always maintain an adequate workforce for the uninterrupted performance of all tasks defined within the contract when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.8 Special Qualifications
The Contractor support must demonstrate expertise in the following specific areas.
1. Mortgage Finance
2. Financial Modeling
3. Stress Testing
4. Analytics
Examples of acceptable and/or accredited certifications include:
MBA’s Certified Mortgage Banker (CMB) Designation – Or an equivalent from an accredited organization Certified Public Accountant (CPA) License
Chartered Financial Analyst (CFA) Credential Financial Risk Management (FRM) Credential Professional Risk Management (PRM) Credential Certified Fraud Examiner (CFE) Credential or an equivalent from an accredited organization
1.9 Post Award/Kickoff Conference
The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5 and HUD Acquisition
Regulation (HUDAR) clause 2452.237-79 - Post Award Conference.
1.10 Status Meetings
The Contracting Officer, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to also review Contractor performance, requirement status, etc. At these meetings, the Contracting Officer will apprise the
Contractor of how the Government views the Contractor's performance or progress of the requirement. The Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government. Post Award Conference and subsequent meetings may be held via teleconference at the Contracting Officer's discretion.
8 September 2024
1.11 Contractor Travel
Prior to travel, the Contractor shall coordinate with and receive Government authorization from the COR for all travel. Reimbursement of travel costs will be in accordance with the Federal
Travel Regulation and in accordance with FAR 31.205-46.
1.12 Transition-In
Upon contract award, the Contractor shall furnish transition-in services in accordance with the contract terms and conditions under Section 5.5. Upon award, the Contracting Officer's
Representative (COR) may begin initiation of the required security processing and onboarding activities to facilitate the transition. However, the Contractor shall not perform contract services until the contract effective date. During the 90-day transition-in period, the Contractor shall have sufficient personnel on board to ensure a smooth transition from the incumbent Contractor, provide an orderly transfer and acceptance of work to minimize any impact to the program, and become fully familiar with the contract requirements in preparation for assuming full performance by the end of the transition-in period. Transition-in is not required if the successor
Contractor is the incumbent Contractor.
1.13 Transition-Out
To minimize any decrease in productivity and to prevent possible negative impacts on additional services, the Contractor shall have sufficient personnel on board during the 30-day transition-out period. The incumbent Contractor shall ensure a smooth transition with the successor contractor during the transition-out period, prior to completion of the period of performance. The incumbent Contractor shall aid the successor by conducting walkthrough of all activities and deliverables in support of this PWS. The Contractor shall provide an orderly transition of work acceptance and accomplishment, such that full control by the successor contractor is achieved by the end of the transition-out period.
2 Definitions and Acronyms
2.1 Definitions
Business Day – Every official day of the week which are days between and including Monday to Friday. This does not include federal holidays and weekends.
Contractor - A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contracting Officer (CO) - A person with authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: the only individual who can legally bind the Government.
Contracting Officer’s Representative (COR) – An employee of the U.S. Government appointed by the Contracting Officer to perform contract administration activities regarding technical issues. This individual has authority to provide technical direction to the Contractor if direction is within the scope of the contract, does not constitute a change, and has no funding
9 September 2024 implications. This individual does NOT have the authority to change the terms and conditions of the contract.
Defective Service - A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable - Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
Government Furnished Property (GFP) - Government-furnished property is property in the possession of, or directly acquired by, the Government and subsequently furnished to the
Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification.
Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Performance Standard - The Contractor’s performance level required by the Government.
Performance Work Statement (PWS) - A statement of work for performance-based acquisitions that describe the required results in clear, specific, and objective terms with measurable outcomes.
Quality Assurance (QA) - Policies and procedures adopted by the Government to ensure that supplies and services acquired under Government contracts conform to the contract’s quality requirements.
Quality Assurance Surveillance Plan (QASP) - A plan describing how the agency will survey, observe, test, sample, evaluate and document the Contractor's performance in meeting critical performance standards identified in the contract.
Quality Control (QC) - All necessary measures taken by the Contractor to ensure that the quality of an end product of service shall meet contract requirements.
Subcontractor - Any person, other than the prime Contractor, who offers to furnish or furnishes any supplies, material, equipment, or services of any kind under a prime contract or a subcontract entered into in connection with such prime contract, and any person who offers to furnish or furnishes general supplies to the prime contractor or a higher tier subcontractor. The
Government does not have privity of contract with a subcontractor.
2.2 Acronyms
AQL - Acceptable Quality Level
CO - Contracting Officer
CONUS – Continental United States
10 September 2024
COR – Contracting Officer’s Representative
HUD - U.S. Department of Housing and Urban Development
HUDAR – Housing and Urban Development Acquisition Regulation
IST – Issuer Stress Testing
MBS – Mortgage-Backed Securities
PM – Program Manager
PMP – Program Management Plan
POC - Point of Contact
QA - Quality Assurance
QASP - Quality Assurance Surveillance Plan
QCP - Quality Control Plan
ROM – Rough Order of Magnitude
SF – Standard Form
SOP – Standard Operating Procedure(s)
3 Government-Furnished Property and Services
The Contractor shall ensure accurate control and accountability of all Government-Furnished
Property in accordance with the terms and conditions of this contract. The Government will furnish, at no cost to the Contractor, the GFP shown below.
3.1 Government Services
After successful completion of the PIV process, the Government will provide the Contractor with appropriate access to HUD’s software development, test, and production environments via Virtual Private Network (VPN) (or Virtual Desktop Infrastructure??) as required to perform the services identified in this PWS. The Government will also provide access to HUD’s support systems and cybersecurity training.
The Government will provide Cybersecurity Training.
3.2 Facilities
Government facilities will not be provided
3.3 Government-furnished Equipment/Property
Government-furnished equipment or property will not be provided.
11 September 2024
3.4 Materials and Information
See HUDAR 2452.227-70, Government Information
The Government will provide IST Program artifacts to the Contractor to facilitate completion of all tasks and deliverables required in this PWS, after the award. The Government also will provide access to the necessary HUD/GNMA systems upon completion of the Personal Identity
Verification (PIV) process. Lastly, the Government will provide access to the following financial subscription services:
- Third-party access to Moody’s Ratings Delivery Service
- Moody’s Analytics
3.5 Quality Assurance (QA)
The Government shall evaluate the Contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the
Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable quality level.
4 Contractor-Furnished Items and Services
The Contractor shall furnish, all facilities, equipment, and supplies required to perform the work under this contract that are not listed under Government-Furnished Property and Services.
4.1 Facilities
The Contractor shall furnish all facilities required to perform services.
4.2 Equipment
The Contractor shall furnish all equipment required to perform services.
4.3 Materials
The Contractor shall furnish all materials required to perform the services.
4.4 Contractor Responsibilities
The Contractor shall only conduct business with designated Government personnel listed as points of contact (POCs). Names of authorized personnel shall be provided to the Contractor by the Government, in writing, and updated as necessary throughout the contract period of performance.
U.S. Government records, copies of original results and reports, verified original data, corrected data, and corrected supporting final reports which are maintained by the Contractor remain the property of the U.S. Government. These files/results must be surrendered to the COR.
12 September 2024
4.5 Contractor Personnel
See HUDAR clause 2452.237-70 - Key Personnel in the Key Personnel section of the contract.
4.6 Identification of Contractor Employees
All Contractor/subcontractor personnel shall wear company picture identification badges to distinguish themselves from Government employees. When conversing with Government personnel during business meetings, over the telephone, or via electronic mail, Contractor/subcontractor personnel shall identify themselves as such to avoid situations arising where sensitive topics might be better discussed solely between Government employees.
Contractors/subcontractors shall identify themselves on any attendance sheet or any coordination documents they may review. Electronic mail signature blocks shall identify their company affiliation. Where practicable, Contractor/subcontractors occupying collocated space with their Government program customer shall identify their workspace area with their name and company affiliation, or at a minimum, "Contractor" after name.
5 Specific Tasks
5.1 Task One – Program Management Support (FFP)
The Contractor shall provide program management support under this requirement. This includes the management and oversight of all activities performed by Contractor personnel, including subcontractors, to satisfy the requirements identified in this PWS.
5.1.1 Bi-Weekly Status Meetings, Minutes, and Reports
a. Bi-Weekly Meetings: The Contractor shall meet no less than bi-weekly with the COR and other Government personnel designated by the COR to review and discuss Contractor performance, contract requirements, engagement status, Project Work Plan, tasks, subtasks, deliverables, etc. The Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action must be taken to resolve outstanding issues.
The Contractor shall e-mail the Bi-Weekly Minutes to the COR within two (2) business days following the meeting. The Bi-Weekly Minutes must include, at minimum, meeting attendance, issues discussed, decisions made, and action items assigned.
b. Bi-Weekly Reports and Minutes: The Contractor shall develop a Weekly Status Report using standard Microsoft Office Suite applications. The Contractor shall provide the Weekly
Status Report to the COR via e-mail, at least one hour before established biweekly status call.
The Weekly Status Report must include, at a minimum:
1. Activities and progress by task (on-going, new, and completed).
2. Problems, risks, issues, corrective actions taken or proposed resolutions to address them, and recommendations for improved efficiency and/or effectiveness.
3. Personnel status (gains, losses, leave, security clearance, etc.).
13 September 2024
4. Actions required by stakeholders.
5. Project Schedule (major tasks, milestones, and deliverables; planned and actual start and completion dates).
Performance Standards
a. Standard: The Bi-Weekly Meetings includes the discussion of all tasks/subtasks and deliverables. Meeting Minutes are emailed to the COR within two (2) business days of the meeting.
AQL: Zero deviation, unless discussed and agreed to in writing by the COR.
b. Standard: The Weekly Reports are delivered to the CO at least one (1) hour before established biweekly status call.
AQL: Zero deviation, unless discussed and agreed to in writing by the COR.
Deliverables A001 Bi-Weekly Status Reports
A002 Bi-Weekly Minutes
5.1.2 Project Work Plan
The Contractor shall submit the Project Work Plan (PWP) to the COR for approval within ten
(10) business days of contract award. The PWP shall detail the steps, workstreams, and processes to be completed for all tasks listed in Section 5 of the PWS. The PWP must be continuously reviewed and updated when circumstances require change.
a. Project Work Plan: The PWP must include a narrative description of the IST Program and a graphic summary of the tasks/subtasks, deliverables, project schedule and financial elements of the contract. The narrative must:
1. Describe the planned deliverables schedule.
2. Identify each step in the work process required for executing the full scope of tasking and deliverables for the period of performance year and the time needed to accomplish each step, expressed in terms of the calendar dates.
3. Identify all key milestones and actions required to achieve Ginnie Mae’s near-term objectives and to satisfy applicable requirements
Performance Standards
a. Standard: The Project Work Plan is submitted within ten (10) business days of contract award.
AQL: Three (3) business days deviation from standard.
14 September 2024
b. Standard: The Project Work Plan graphic summary depicts all tasks/subtasks and deliverables.
AQL: Zero deviation, unless discussed and agreed to, in writing, by the COR.
Deliverables
A003 Project Work Plan
5.2 Task Two – Stress Testing Framework Updates (FFP)
The Contractor shall perform updates to and on-going recalibration of Ginnie
Mae’s Issuer stress testing frameworks (non-depository and depository) and suite of models to continually enhance Ginnie Mae’s ability to manage risk in its MBS programs and to improve the reliability of stress test results. Updates may include, for example, improving data quality, data granularity, and the information systems needed for data aggregation, clarifying the limitations of the current framework, recommending areas for improving the approach, ensuring the application of the framework remains relevant, and coding modifications. Inherent to this is a periodic survey of market trends that can inform potential model enhancements (e.g. growth of non-qualified mortgages volumes, credit availability in the debt markets, etc.). Additionally, the
Contractor will be required to support periodic model validation exercises (e.g. providing model documentation, model code, model procedures, participating in walkthroughs, etc.).
The Contractor shall develop and/or update applicable stress testing framework artifacts in coordination with the Ginnie Mae Program Manager (PM)/Contracting Officer’s Representative
(COR). The artifacts must include:
White papers;
Policy recommendations;
Procedures;
Assessments;
Benchmarking;
Model validation package;
Market trends assessment(s); and
Flowcharts.
Performance Standards
a. Standard: Issuer Stress Testing Framework and Artifacts are completed within each option year period as stated in the approved PWP.
AQL: Three (3) business day deviation from standard.
b. Standard: Updates/changes to Issuer Stress Testing Framework and Artifacts are completed and provided to COR within option year period.
AQL: Zero deviation, unless discussed and agreed to in writing by the COR.
15 September 2024
Deliverables A004 Business Process Flow Diagram
A005 IST Development Documentation
A006 IST Model Standard Operating Procedure (SOP) and Model Validation Package
A007 IST Business Requirements Documentation
A008 New and/or Updated Stress Testing Framework Artifacts
5.3 Task Three – Issuer Stress Testing Analyses (LH/FFP)
The contractor shall prepare and submit required deliverables for Issuer Stress Testing (IST) analysis in accordance with the PWP. The analysis is based on IST Model which is used to generate projections of financial statements and performance metrics. Through the Issuer Stress Testing (“IST”) contractor analyzes Ginnie Mae non-depository and depository Issuers, with reported financial performance within MBFRF, through defined IST projection period. The IST analysis generates projected financial statements and metrics for each issuer under three economic scenarios (e.g., Expected (Baseline”), Stressed scenario, and a Third scenario) with the macroeconomic variables employed sourced from defined credit rating agency (e.g., Moody’s Analytics). The Government has the discretion to select and define each of the scenarios and the Contractor shall use them at the Government’s direction. The IST model consists of an 8-quarter projection.
Output includes a full set of projected financial statements, supplemental items, performance metrics, a recalculated issuer rating for each projection period, and an IST rating. IST Ratings are assigned to each Issuer based on how their projected performance metrics compare to the specified minimum thresholds from Ginnie Mae.
The Contractor must:
Retrieve the data necessary for the IST model including those from industry macroeconomic forecasts, Mortgage Bankers' Financial Reporting Form (MBFRF), and Ginnie Mae’s systems among other sources, on a semi-annual basis. This data must include data associated with single family, multifamily, and HMBS originations and portfolios.
Perform quality control checks on the data received to ensure data integrity. In the event of data anomalies, the Contractor must work with the data provider and Ginnie Mae by providing feedback on the data anomalies (i.e., data not in normal or typical range).
Prepare the data for use in the model by performing “data-scrubbing” and other error-correction techniques, as appropriate.
Prepare and deliver both draft and final semi-annual depository and non-depository Issuer Stress Testing (IST) presentations together with necessary supporting files that reflect projected financial statements and metrics for each issuer under three economic scenarios.
16 September 2024
The supporting files must include Data Quality Report and Review Checklist, Assumption Update Review Document, and Guaranty Asset / Guaranty Obligation Supporting Results Files. The draft supporting files must be delivered to the COR for comment and review by the 18th business day of the quarter month (Mar, Jun, Sept & Dec). COR and EMAD model owner will review the supporting files and provide comments as applicable. The Contractor must address all comments before finalizing the supporting files. The final supporting files must be delivered to the COR 6 business days after submission of the draft report; however, deadlines may vary depending on the production calendar for that quarter.
Provide regular model updates for the IST model.
1) Contractor will provide such updates by incorporating foundational model updates and/or latest modeling techniques annually, plus special updates based on COR and management requests.
2) Once model updates are made, the Contractor must perform Annual Model Testing and Attribution Analysis to ensure the model updates are implemented in the existing model properly without unintended consequences. Annual Model Testing includes benchmarking, back testing, stability testing and sensitivity testing. This list of testing may change based on business needs.
3) the Contractor shall perform Annual Model Review that involves performing a comprehensive assessment of the model usage scope and the status of any previous model findings. The deliverable includes a Word document summarizing the Annual Model review. The deliverable due date is based on the PWP, as established by Contractor with approval by COR.
Ensure the model changes, related internal controls and documentation are accurate.
Contractor shall also prepare up to ten (10) individual issuer presentations at the request of the COR. Presentations should highlight the results based on individual issuer results including any financial insights, potential compliance risk, and other notes.
Contractor shall conduct a forecast of future issuance by Ginnie Mae issuers. The issuance growth rate model measures each issuer’s sensitivity to future purchase and refinance origination forecasts based on established market scenarios over the IST model horizon. Keeping the loan-level characteristics from the most recent quarter, issuer loan counts and volumes are adjusted up and down, specific to the issuer and product betas. Separate file of forecasted issuances shall be provided by Contractor.
Performance Standards
a. Standard: The Applied Stress Testing Activities are completed and delivered to the COR, within the option year and as identified in the approved PWP.
AQL: Zero deviation, unless discussed and agreed to, in writing, by the COR.
AQL: Three (3) business days deviation from standard.
A009 IST Non-Depository Executive Reports (Draft & Final)
17 September 2024
A010 IST Depository Executive Reports (Draft & Final)
A011 Issuer Reports (non-depository and depository)
A012 Issuer Specific IST Presentations (up to 10 per semi-annual run)
A013 Forecasts of Issuer Advancing Requirements (Expected and Stressed)
A014 Five-Year Forecast of Issuance Volume
5.4 Task Four – Market Intelligence Reports (FFP)
The Contractor must develop and produce a Market Intelligence Report monthly. The purpose of this effort is to obtain research, analysis, and production of a recurring Market Intelligence
Report that provides Ginnie Mae with timely, quality information on housing market conditions, trends, and risks. The report is intended to inform program management and risk monitoring activities. Report should include market highlights including:
Key market indicators
Origination Impacts
Capital Market Impacts
Servicing Impacts (e.g., DQ rates)
Regulatory Policy updates
And other key market insights.
Performance Standards
a. Standard: The Monthly Market Intelligence Reports are completed and delivered monthly to the COR, within the established deadline as identified in the approved PWP.
AQL: Three (3) business days deviation from standard.
Deliverables
A015 IST Monthly Market Intelligence Report
5.5 Task Five – Special Projects (Optional to the Government)
Special Projects are potential future requirements that may be ordered by the Government on an as-needed basis during the applicable period of performance. Special Projects are optional to the Government and are not guaranteed work. The Government may elect to issue Special Project taskings when operational, regulatory, financial, risk management, or other mission requirements arise.
18 September 2024
Special Projects may be performed on either a Firm-Fixed-Price (FFP) or Labor-Hour
(LH) basis, as determined by the Government based on the nature, complexity, and ability to reasonably establish the scope and level of effort of the specific project.
5.5.1 Government Tasking and Authorization
When a Special Project is required, the Contracting Officer’s Representative (COR) will provide the Contractor with a written tasking describing, to the extent practicable, the objectives, scope of services, anticipated deliverables, schedule, and other applicable requirements.
For Special Projects that are within the scope of the task order and within the awarded funding, labor-hour, and other applicable limitations, the COR is authorized to approve the
Contractor’s project plan, level of effort, and commencement of work. A contract modification is not required for each individual Special Project unless otherwise required by the terms of the task order or applicable acquisition regulations.
If a proposed Special Project is outside the scope of the task order, exceeds an established contract limitation or ceiling, requires a change to the contract terms or awarded labor categories/rates, or otherwise requires contracting officer action, the Contractor shall not commence such work until the CO has provided the required written authorization and, when applicable, executed a contract modification.
COR approval does not constitute authority to make changes to the task order that are reserved to the CO.
5.5.2 Project Planning and Proposal
The Government may request a Rough Order of Magnitude (ROM), technical approach, project plan, or price proposal before authorizing a Special Project. The Contractor shall provide the requested information within five (5) business days, unless otherwise specified by the COR.
The Contractor’s response shall identify, as applicable:
Proposed technical approach and methodology;
Project objectives and deliverables;
Staffing plan and proposed labor categories;
Qualifications of proposed personnel;
Estimated labor hours and level of effort;
Schedule and milestones;
FFP price or LH labor rates and estimated hours; and
Other applicable direct costs or materials.
The Government may require additional information necessary to evaluate the proposed approach, price, level of effort, or schedule.
19 September 2024
5.5.3 Contract Type
Each Special Project may be authorized on either an FFP or LH basis, depending on the
Government's ability to adequately define the scope, deliverables, schedule, and level of effort.
For FFP Special Projects, the Contractor shall perform the approved requirements for the agreed-upon fixed price.
For LH Special Projects, the Contractor shall be compensated for authorized labor hours at the labor rates established in the task order, subject to the applicable labor-hour limitation, funding limitation, and contract ceiling.
5.5.4 Labor-Hour Limitation
For LH Special Projects, the Contractor shall not exceed the number of labor hours awarded or otherwise authorized for the applicable period of performance without prior written approval from the COR and, when required by the task order or applicable regulations, the CO.
Labor hours shall be managed within the labor categories and rates established under the task order. The Contractor shall promptly notify the COR when actual or projected labor-hour consumption indicates that the authorized level of effort may be insufficient to complete the approved requirements.
No additional labor hours, funding, or other contract consideration shall be authorized solely by
Contractor action.
5.5.5 Deviation Controls
The Contractor shall perform each Special Project in accordance with the approved scope, project plan, level of effort, schedule, deliverables, and applicable contract limitations.
The Contractor shall not materially deviate from the approved Special Project without prior written approval from the COR.
Any proposed change that:
1. Is outside the scope of the task order;
2. Requires a change to the terms and conditions of the task order;
3. Exceeds an established contract ceiling, funding limitation, or other contractual limitation;
4. Requires additional labor hours beyond those awarded or authorized for the applicable period of performance; or
5. Requires contracting officer authority under applicable acquisition regulations, shall be referred to the CO for appropriate action before the Contractor performs the changed work.
20 September 2024
The Contractor shall not perform unauthorized out-of-scope work with the expectation of subsequent Government approval or payment.
5.5.6 Invoicing and Supporting Documentation
The Contractor shall submit invoices and supporting documentation in accordance with the applicable payment provisions of the task order and HUDAR 2452.232-71, Voucher
Submission (Cost-Reimbursement, Time-and-Materials, and Labor-Hour), as applicable to
LH Special Projects. HUDAR 2452.232-71 requires supporting documentation demonstrating that claimed costs were incurred, allocable to the contract tasks, and compliant with applicable cost principles; LH costs must also be aggregated and identified by individual task.
For LH Special Projects, invoices shall clearly identify the applicable Special Project and include sufficient supporting documentation to permit the Government to verify the labor hours performed, labor categories utilized, applicable rates, work performed, and costs claimed.
For FFP Special Projects, invoices shall be submitted in accordance with HUDAR 2452.232-70, Alt I Payment Schedule and Invoice Submission (Fixed–Price).
5.5.7 Government Property and Work Product
All deliverables, documents, analyses, reports, data, and other work products developed by the
Contractor under an authorized Special Project shall be delivered to and become the property of the Government to the extent provided by the task order and applicable law and contract clauses. The Contractor shall provide all final work products and associated supporting documentation at the completion of the Special Project and upon completion or expiration of the task order, as applicable. FAR 52.227-14, Rights in Data—General, shall apply as incorporated into the task order.
Performance Standards
a. Standard: Each Rough Order of Magnitude indicates the level of effort, including the staffing plan and the qualifications of each resource, for each task.
AQL: Zero deviation, unless discussed and agreed to in writing by Ginnie Mae and the
Contractor.
b. Standard: All Special Projects are in accordance with the written request, and compliance with applicable laws, regulations, and policies.
AQL: Zero deviation, unless discussed and agreed to in writing by Ginnie Mae and the
Contractor.
c. Standard: All Special Projects written quotations are provided to the Government within fifteen (15) business days of request.
AQL: Two (2) business days deviation from standard.
21 September 2024
d. Standard: Issuer Stress Testing Special Projects Deliverables, and associated activities, are completed in accordance with the technical guidance memorandum with minimal revisions for spelling and grammatical errors.
AQL: Zero deviation, unless discussed and agreed to in writing by Ginnie Mae and the
Contractor.
Deliverables
A016 Rough Order of Magnitude
A017 Special Projects Deliverables
5.6 Task Six – Transition Services (T&M/LH) (Optional)
5.6.1 Transition-In
The Contractor shall provide transition-in services for a period of ninety (90) days after award.
The Contractor shall complete the transition of all work and be ready to perform all services under the contract within the 90 days transition-in period. Transition-in services ensure a smooth transition of work to the Contractor from the Government and the incumbent Contractor.
Transition-in is not required if the successor Contractor is the incumbent contractor.
During the 90-day transition-in, the Contractor shall:
Provide support and expertise to enable a successful transition of all Issuer Stress Test (IST) activities from the incumbent contractor to the Contractor.
Complete and submit all HUD onboarding forms/documents for each team member within three (3) business days of award to the COR for processing.
Be available to collaborate with the incumbent contractor and the Government for walkthroughs of:
o Ginnie Mae, including its offices, divisions, senior leadership, and management;
o IST and associated points of contact, dependencies and/or interdependencies, and timing of cross-program activities;
o IST activities, tasks/subtask, and deliverables; and o Ginnie Mae’s risk environment.
Identify, document, and communicate risks, issues, gaps, and response recommendations, for each task/subtask and deliverables, Provide the Transition-Out Plan.
The transition-in activities must:
Encompass all tasks/subtasks and deliverables within this PWS.
22 September 2024
Timely and effectively inform, escalate, and address risks, issues, and gaps to ensure a successful transition-in.
Inform and enable the planning and development of tasks/subtasks and deliverables.
5.6.2 Transition-Out
To minimize any decrease in productivity and to prevent possible negative impacts on the IST Program, the Contractor shall have sufficient personnel on board during the 30 days transition-out period. The Contractor shall perform all services necessary to transition the work performed under this contract to the Government or another contractor at the conclusion of this contract. Transition-out ensure a comprehensive and effective transition of all IST activities from the Contractor to the incoming contractor.
The Contractor shall provide transition-out services for the 30-days before the end of the contract period of performance, when required by the Government. The Contractor shall perform transition-out services including, but not limited to:
Provide support and expertise to enable a successful transition of all tasks/subtasks and deliverables to the incoming contractor, without compromising existing support and expertise.
Execute the approved Transition-Out Plan.
Conduct walkthroughs with the incoming contractor to support the understanding and awareness of:
o Ginnie Mae, including its offices, divisions, senior leadership, and management;
o IST and associated points of contact, dependencies and/or interdependencies, and timing of cross-program activities;
o IST activities, tasks/subtask, and deliverables;
o Ginnie Mae’s risk environment; and o All work in progress.
Continue supporting tasks/subtasks and deliverables without affecting the transition-out services.
The Transition-out must:
Not impact or interrupt the full performance of the incumbent Contractor during the transition-out period.
Ensure that there is no interruption of services during the transition-out period.
Timely and effectively inform, escalate, and address risks, issues, and gaps to ensure a successful transition-out.
Transition-Out Plan: The Contractor shall provide a draft Transition-Out Plan to the COR via email, for approval, within ninety (90) days of contract award. The Contractor must provide the final Transition Plan within ten (10) business days of receiving Ginnie Mae’s comments on the
23 September 2024 draft plan. At a minimum, the Contractor shall review and update the Transition-Out Plan annually and ninety (90) days prior to the contract expiration date, or more frequently, as needed. The Transition-Out Plan must include comprehensive information related to the planning, execution and delivery of all contract activities and deliverables. The Transition-Out Plan must identify how the Contractor will coordinate with the incoming contractor and/or Ginnie Mae to transfer knowledge and documentation related to the IST Program. The Transition-Out Plan must:
Program and project management processes;
Points of contact;
Location of technical and project management documentation;
Status of ongoing technical initiatives;
Appropriate contractor-to-contractor coordination to ensure a seamless transition;
Transition of key positions;
Schedules and milestone; and
Actions required by the Government.
Performance Standards
a. Standard: The Transition-Out Plan is completed and submitted within thirty (30) days of contract award.
AQL: Three (3) business days deviation from standard.
b. Standard: The Transition-Out Plan is updated and provided to the COR for approval thirty (30) days prior to the contract expiration date.
AQL: Three (3) business days deviation from standard.
A018 Transition Plans
5.7 Task Seven – Travel
The Contractor may be required to travel to support various activities described in Section 5 or other engagements requiring an on-site presence as directed by Ginnie Mae. For example, the
Contractor was a subject matter expert (s) to attend the annual report presentation, semi-annual executive presentation, semi-annual issuer presentation, or the training session/workshop to assist with the presentation.
The Contractor shall:
24 September 2024
Coordinate with, and receive Government authorization from the COR prior to travel, for all long-distance travel. Travel within a 50-mile radius of Ginnie Mae’s office is considered local travel. Expenses associated with local travel are not reimbursable. All other travel will be reimbursed on a cost reimbursable basis, but no profit or fee will be paid.
Justify the purpose, duration, location, and any other information necessary to obtain authorization for travel. Reimbursement of travel costs will be in accordance with the
Federal Travel Regulation and in accordance with RFO FAR 31.205-46 (verify this).
Travel using the lower cost mode of transportation commensurate with the mission requirements.
When necessary to use air travel, use the tourist class, economy class or similar lodging accommodations to the extent they are available and commensurate with the mission requirements. Any travel would be limited to the continental United States (CONUS) or its territories.
5.8 Task Eight – Other Direct Costs
When approved by the Government and incurred by the Contractor in performance of tasks associated with this contract, Other Direct Costs (ODCs) will be reimbursed by the Government.
ODCs include, but are not limited to, materials, supplies, printing/binding/shipping of training materials, etc. Only actual costs for ODCs that are supported with sufficient detail for the
Government to verify that costs are reasonable and in performance of tasks will be reimbursed.
6 Deliverables
The Contractor shall complete all work and submit all deliverables to the COR as specified herein. Unless directed otherwise by the COR, the Contractor shall submit deliverables in accordance with the following:
All deliverables must be sent via e-mail and include all data and/or information to re-create and/or modify deliverables without Contractor assistance.
All deliverables must have gone through the Contractor’s internal quality control check to ensure deliverable consistency and the deliverables are free of spelling and formatting errors.
All deliverables must be completed and submitted in accordance with the contract terms and conditions and in the approved Project…