86614820R00003 REAC-TAC QASP.pdf
PDF 224 KB Posted
- Attached to
- HUD REAC/TAC Call Center Federal contract opportunity
- Solicitation number
- 86614820R00003
About this file
This document contains a Quality Assurance Surveillance Plan (QASP) for the Real Estate Assessment Center, Technical Assistance Center Support Services contract. The QASP defines performance standards for responding to service requests, resolving issues, and managing knowledge base content in a cloud-based contact center system. Key performance metrics include logging 100% of service requests, resolving 90% of tier 1 requests at first contact within one business day, and resolving or escalating 100% of tier 2 requests within three business days. The contractor must also maintain less than a 10% call drop rate. Performance will be monitored through the contact relationship management system and phone records on a monthly basis. Deductions may be assessed against monthly invoices if the contractor fails to meet the acceptable quality levels defined in the QASP.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| REAC-TAC Solicitation - Questions.xlsx | XLSX spreadsheet | |
| 86614820R00003 REAC TAC PWS Amend A0001.pdf | ||
| 86614820R00003 REAC-TAC New Solicitation Amend A0001.pdf | ||
| PAST PERFORMANCE REAC TAC.docx | DOCX document | |
| 86614820R00003 REAC TAC PWS.doc | DOC document | |
| 86614820R00003 REAC-TAC Pricing Format.docx | DOCX document | |
| 86614820R00003 WD No. 2015-4281 Rev 16 dtd 4-23-2020.pdf | ||
| Nondisclosure-Agreement-between-HUD-and-Potential-Offeror.docx | DOCX document | |
| 86614820R00003 REAC-TAC Call Center Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
(QASP)
Real Estate Assessment Center, Technical Assistance Center Support Services
03/06/2020
Version 1.0
1 Vision
1 INTRODUCTION
1.1 Purpose
1.2 Performance Management Approach
1.3 Performance Management Strategy
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
2.2 The Contacting Officer'sRepresentative
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY
LEVELS
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
4.2 Customer Feedback
4.3 Acceptable Quality Levels
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
5.2 Monitoring Forms
6 ANALYSIS OF QUALITY ASSURANCE ASSESSEMENT
6.1 Determining Performance
6.2 Reporting
6.3 Reviews and Resolution
6.4 Surveillance Matrix
Appendix 1 - Surveillance Matrix
Appendix 2 - Corrective Action Report (CAR)
Appendix 3 - Customer Complaint Record
Appendix 4 - Performance Assessment Report (PAR)
Quality Assurance Surveillance Plan (QASP)
Real Estate Assessment Center, Technical Assistance Center Support Services
1 Vision
Improve HUD-related housing quality by performing accurate, credible, and reliable assessments of HUD’s real estate portfolio to ensure safe, healthy, decent affordable housing and promote sound property management practices.
1 INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) entitled Real Estate Assessment Center, Technical Assistance Center Support Services. This plan sets forth the procedures and guidelines the Real Estate Assessment Center (REAC), Technical Assistance Center (TAC) will use in ensuring the required performance standards or service levels are achieved by the Contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards/quality levels identified in the PWS and the Contractor's Quality Control Plan (QCP), and to ensure that the Government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the Integrated Project Team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the Contractor's performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around "what service or quality level is required", as opposed to "how the Contractor should perform the work" (i.e., results, not compliance). This QASP will define the performance management approach taken by REAC TAC to monitor and manage the Contractor's performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved.
Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the Contractor.
1.2.2 Performance management represents a significant shift from the more traditional Quality Assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the Contractor to play a large role in how the work is performed, if the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A "results focus" provides the Contractor flexibility to continuously improve and innovate over the course of the contract if the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the Contractor's own Quality Control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by Contractor employees or by subcontractors. The Contractor's QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The Contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. This QASP enables the Government to take advantage of the Contractor's QC program.
1.3.2 The Government representative(s) will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
2.1 The Contracting Officer
The Contracting Officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officer’s Representative (COR) and the Contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the Contractor's performance, and must be identified and designated by the CO.
2.2 The Contracting Officer’s Representative (COR)
The COR is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the Contractor's performance.
The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government's behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions, shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the Contractor's work performance.
Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY
LEVELS
The required performance standards and/or quality levels are included in the PWS and in Appendix 1, "Surveillance Matrix". If the Contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
To minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate Contractor performance when appropriate.
The primary methods of surveillance are:
• Random Sampling - CRM system random generated selection.
• 100% Inspection - Each month, the COR, shall review the generated documentation.
• Periodic Inspection - The COR shall perform the periodic inspection on a monthly basis.
4.2 Customer Feedback
The Contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the Contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems. The customer always has the option to communicate complaints to the CO and/or COR as opposed to the Contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.3 Acceptable Quality Levels
The Acceptable Quality Levels (AQLs) included in Appendix 1, "Surveillance Matrix", for Contractor performance are structured to allow the Contractor to manage how the work is performed. For certain critical activities such as those involving logging of service requests and escalated service requests, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Appendix 1.
5.2 Monitoring Forms
The Government's QA surveillance, accomplished by the COR, may be reported using the following monitoring forms: Appendix 2 - "Corrective Action Report (CAR)", Appendix 3 - "Customer Complaint Record", and Appendix 4 "Performance Assessment Report" (PAR). The forms, when completed, will document the Government's assessment of the Contractor's performance under the contract to ensure that the required results are being achieved. The COR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
The Government will use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the Contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
6.2 Reporting
At the end of each month, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the Contractor's performance. This written report, which includes the Contractor's submitted monthly report and the completed quality assurance monitoring forms, will become part of the QA documentation. It will enable the Government to demonstrate whether the Contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The COR may require the Contractor's project manager, or a designated alternate, to meet with the CO, PM and/or other Government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the Contractor, including appropriate self-assessments by the Contractor;
however, if the need arises, the Contractor will meet with the COR as often as required or per the Contractor's request. The agenda of the reviews may include:
• Monthly performance assessment data and trend analysis,
• Issues and concerns of both parties,
• Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis,
• Recommendations for improved efficiency and/or effectiveness,
• Other items that may arise in the course of TAC contact center operations.
6.3.2 The CO and COR must coordinate and communicate with the Contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR and Contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the discretion of the CO.
6.4 Surveillance Matrix
The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the Contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the Contractor's performance as it relates to the performance element standards. The PRS should be used to form the foundation of the COR's inspection checklist.
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance Rating
Criteria
Excellent /
Outstanding
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal
Performance does not meet some contractual requirements.
The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Appendix 1 - Surveillance Matrix
Statements Standards/AQLs Inspections Ratings
5.2.1 Respond to Service Requests:
answer questions, resolve problems and process fulfillment requests
a) 100 % of Service Requests are logged into CRM.
AQL: 0%. Deviation
b) 90% of Service Requests (Tier 1) resolved at first contact.
AQL: 0% Deviation.
What: System Generated Records How: Cross check ACD phone records to CRM logs. Total number of logged inquires divided by the total number of inquiries received from all channel sources:
telephone, email, web, facsimile, correspondence and walkup.
Frequency: Monthly Who: COR/SME Incentive: 1% deduction from the associated monthly invoice price for performance between 98% and 99%.
2% deduction from the associated monthly invoice price for performance at or below 97%.
What: System generated records.
How: Review of CRM generated records. Divide number of closed Tier 1 tickets over total received.
Frequency: Monthly Who: COR/SME Incentive: 1% deduction from the associated monthly invoice price for performance between 86% and 89%.
2% deduction from the associated
c) 100% of escalated Service Requests (Tier 2) are resolved or escalated to Tier 3 within three business days.
AQL: Two business day deviation from standard.
d) 90% of Service Request calls are answered (i.e., = ≤ 10% Call Drop Rate).
AQL: 0% Deviation.
monthly invoice price for performance at or below 85%.
What: System Generated Records How: Review of CRM generated records. Divide number of closed Tier 2 tickets over total received.
Frequency: Monthly Who: COR/SME Incentive: 1% deduction from the associated monthly invoice price for performance between 98% and 99%.
2% deduction from the associated monthly invoice price for performance at or below 97%.
What: System Generated Records How: Cross check ACD phone records to CRM logs. Total number of logged inquires divided by the total number of inquiries received from all channel sources:
telephone, email, web, facsimile, correspondence and walkup.
Frequency: Monthly Who: COR/SME Incentive: 1% deduction from the associated monthly invoice price for performance between 86% and 89%.
2% deduction from the associated monthly invoice price for performance at or below 85%.
5.3.3 CRM KnowledgeBase Management Tasks
a) KnowledgeBase Content published in the CRM no later than ten business days after creation and submission of KnowledgeBase candidate.
What: KnowledgeBase Content How: Check publish minus submission date.
Frequency: Monthly Who: COR/SME Incentive: A deduction from the associated monthly invoice price shall be assessed as follows:
1 to 10 business day deviation from the minimum performance standard: 0.5% deduction;
11 business days and beyond: 1% deduction.
5.4.3 CRM Management
a) Deployed changes in Salesforce org shall be published in the [CRM] Set Up Audit Trail Log no later than one business day after deployed change.
AQL: One business day deviation
b) CRM Set Up Audit Trail Log saved to SF Files no later than five
What: Audit Trail Log How: Review of Audit Trail Log within CRM.
Frequency: Upon each deployment.
Who: COR/SME Incentive: A deduction from the associated monthly invoice price shall be assessed as follows:
1 to 10 business day deviation from the minimum performance standard: 0.5% deduction;
11 business days and beyond: 1% deduction.
What: SalesForce Files How: Review of SalesForce Files business days after the end of each fiscal quarter.
within CRM Frequency: Quarterly Who: COR/SME Incentive: A deduction from the associated monthly invoice price shall be assessed as follows:
1 to 10 business day deviation from the minimum performance standard: 0.5% deduction;
11 business days and beyond: 1% deduction.
Appendix 2 - Corrective Action Report (CAR)
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE
Appendix 3 - Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 4 - Performance Assessment Report (PAR)
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER NUMBER 2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
5. COR PHONE 6. SUSPENSE DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS
CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE CONCUR NON-
CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-
CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
File details come from the government source that posted it. Updated .