855940weatherOcp.pdf

PDF 618 KB Posted

Attached to
FY27 Weatherization Assistance Program (WAP)
Solicitation number
Doc838097
Issued by
District of Columbia

About this file

This is a Solicitation, Offer, and Award (Form SF 1449) issued by the District of Columbia Office of Contracting and Procurement on behalf of the Department of Energy and Environment (DOEE) for the FY27 Weatherization Assistance Program (WAP). The solicitation seeks a qualified contractor to provide residential weatherization and energy efficiency services to approximately 78 low-income residential properties across the District of Columbia. Services include air sealing, insulation, ductwork sealing, installation of energy-efficient lighting and ventilation systems, heating and mechanical system repairs or replacements, window and door installations, roof repairs or replacements, health and safety improvements, and other energy-saving measures based on energy audits and diagnostic testing, all performed in compliance with DOE Standard Work Specifications and BPI Standards. The contractor must perform in-process and quality control inspections on 100% of units and certify work quality prior to DOEE's final Quality Control Inspection. Sealed bids are due by 2:00 PM local time on November 23, 2026. The contract term is 12 months from the date of award, with three optional one-year renewal periods, for a total potential duration not to exceed five years. The contract is classified as a requirements contract with no limit on the number of task orders that may be issued.

The price schedule consists of 12 line items covering walk-throughs and energy audits (156 hours), weatherization, health and safety measures, attic and roof work, insulation installation, water conservation, doors and windows, structural repairs, permits, change work orders, final inspections, and project management and administration (all at 78 units maximum per line item for the base year). At least 35% of the dollar volume of this contract, which exceeds $250,000, must be subcontracted to qualified small business enterprises or certified business enterprises in accordance with District subcontracting requirements. Additional District-specific requirements include compliance with the First Source Employment Agreement Act (51% District residents new hires for contracts exceeding $300,000), Department of Labor wage determinations, the Protecting Pregnant Workers Fairness Act, the Unemployed Anti-Discrimination Act, Fair Criminal Record Screening requirements, and mandatory insurance coverage including Commercial General Liability ($1,000,000 per occurrence, $2,000,000 aggregate), Automobile Liability ($1,000,000 combined single limit), Workers' Compensation, and Media Liability/Cyber Insurance ($1,000,000 per claim). Contractors must demonstrate experience working with DOEE, the U.S. Department of Energy, and HUD Weatherization, Lead Safety, and Remediation Programs within the last three years and must maintain numerous mandatory certifications including EPA Lead Renovator, Asbestos Awareness, BPI Retrofit Installer Technician, and OSHA Confined Space and HAZWOPER certifications.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER, AND AWARD

1. Caption FY27 Weatherization Assistance Program (WAP) Page of Pages

1 62

2. Contract Number

3. Solicitation Number

Doc838097

4. Type of Solicitation Sealed Bid (IFB) Sealed Proposals (RFP) Sole Source Emergency

5. Date Issued

6. Type of Market Open Set Aside Open Market with Set-Aside

CBE Designated Category

7. Issued By

Office of Contracting and Procurement 441 - 4th Street, N.W., Suite 330 South Washington, D.C. 20001

8. Address Offer to:

Submission should be made via Electronic Sourcing only.

NOTE: In sealed bid solicitations “offer” or “offeror” means “bid or “bidder”

SOLICITATION

9. Sealed offers in original and 1 _ copy for furnishing the supplies or services in the Schedule via electronic format via the on-line solicitation software 2:00 PM local time November 23, 2026 (Hour) (Date)

CAUTION: Late submission, Modifications and Withdrawals: See 27 DCMR chapters 15 & 16 as applicable. All offers are subject to all terms & conditions contained in solicitation.

10. For Information Contact

A. Name B. Telephone C. E-mail Address

Saboor Ghaznavi

(202) 673-6717 (desk) saboor.ghaznavi@dc.gov

11. Table of Contents

(X) Section Description Page

No.

(X) Section Description Page No.

PART I – THE SCHEDULE PART II – CONTRACT CLAUSES

X A Solicitation/Contract Form 1 X I Contract Clauses 38 X B Supplies or Services and Price/Cost 2 PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER

ATTACHMENTS

X C Specifications/Work Statement 7 X J List of Attachments 53 X D Packaging and Marking 20 PART IV – REPRESENTATIONS AND INSTRUCTIONS X E Inspection and Acceptance 21

X

K

Representations, certification, and other statements of offerors 54 X F Deliveries or Performance 22

X G Contract Administration Data 27 X L Instructions, conditions & notices to Offerors 55 X H Special Contract Requirements 32 X M Evaluation factors 59

12. In conjunction with the above, the undersigned agrees, if this offer is accepted within _______120_______ calendar days from the receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified herein.

13. Discount for Prompt Payment

10 Calendar days

20 Calendar days

30 Calendar days % ____ Calendar days %

14. Acknowledgement of Amendments (The offeror acknowledges receipt of amendments to the SOLICITATION):

Amendment Number

Date Amendment Number Date

15A.

Name and Address of Offeror

16. Name and Title of Person Authorized to Sign Offer/Contract

15B. Telephone 15 C. Check if remittance address is different from above – Refer to section G

17. Signature 18. Date (Area Code)

(Number)

(Ext)

AWARD (TO BE COMPLETED BY GOVERNMENT)

19. Accepted as to Items Numbered 20. Amount

21. Accounting and Appropriation

2. Name of contracting Officer (Type or Print)

Tracy Crump

23. Signature of Contracting Officer (district of Columbia)

24. Award Date

Government of the District of Columbia Office of Contracting & Procurement mailto:saboor.ghaznavi@dc.gov

Doc838097 - FY27 Weatherization Assistance Program (WAP)

SECTION B: CONTRACT TYPE, SUPPLIES OR SERVICES AND PRICE/COST

B.1 The District of Columbia (“District”) Office of Contracting and Procurement (“OCP”), on behalf of Department of Energy and Environment (“DOEE”), is seeking a qualified contractor to provide residential weatherization and energy efficiency services to enhance the health and safety of residents in low-income households through DOEE’s Weatherization Assistance Program (WAP). The goal of this procurement is to identify a qualified contractor capable of performing energy efficiency upgrades and delivering comprehensive weatherization improvements focusing on building envelopes for approximately 78 low-income residential properties across the District of Columbia.

Common services may include insulation and air sealing and ductwork; installation of energy saving lighting and ventilation, repair or replace heating and mechanical systems installation of windows, doors, repair of roof leaks or roof replacement, health and safety improvements, installation of energy star appliances and other specific energy-saving measures based on an energy audit and diagnostic testing to identify cost effective solutions as outlined in WAP program guidelines, federal guidance and the District of Columbia Field Guide SWS - Aligned Edition and Building Performance Institute (BPI) Standards.

The contractor will perform in process and quality control inspections on 100% of the units to ensure energy conservation measures are installed correctly and certify the quality of work prior to DOEE’s final Quality Control Inspection (QCI).

B.2 The District contemplates awarding requirements contract in accordance with 27

DCMR Chapter 2416. The Contractor shall be obligated to perform all the work necessary to complete the project in accordance with the deadlines specified, for the contract price stated in Section B.3.

The Contractor is required to have experience working with DOEE, US Department of

Energy (DOE) and HUD Weatherization, Lead Safety and Remediation Programs within the last three years.

B.2.1 This is a requirement contract for the supplies or services specified, and effective for the period of performance stated in Section F.

a. This contract will provide for the completion of all actual purchase requirements of designated services during the specified contract period, with deliveries to be scheduled by placing orders with the contractor as required.

b. There is no limit on the number of task orders that may be issued. The District may issue orders requiring delivery to multiple destinations or performance at multiple locations.

c. Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and District's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period.

B.3 PRICE SCHEDULE – REQUIREMENTS

The Cost Schedule consists of 12-line items covering energy efficiency upgrades, air sealing, insulation, duct air sealing, health and safety readiness, ventilation, water conservation, structural repairs, windows, doors and other electrical modifications, miscellaneous mechanical adjustments and permits.

All pricing shall include labor, materials, equipment, supervision, disposal, startup and commissioning, duct cleaning (if applicable), code-required modifications, QCI compliance.

All work shall comply with Weatherization and DC Mechanical Code, DC Guel Gas

Code, DC Plumbing Code, DC Electrical Code, and Manufacturer Installation Requirements.

Replacement pricing shall include all components required to pass DOEE Quality

Control Inspection (QCI) and District inspection.

B.3.1 BASE YEAR (12 Months from Date of Award)

Contract Line

Item No.

(CLIN)

Item Description Unit of Measure

Maximum Quantity

Unit Price

Maximum Total Price

(NTE)

Walk Thru and Inspection & Energy Audit/Assessment Ref. C.1.1, C.1.2, C.1.3

Hours

156 $ $

Weatherization (air sealing, insulation, shading materials and methods, SWS alignment to reduce air leakage) Ref. C.1.1, C.1.2, C.1.5

Each 78 $ $

Health & Safety (smoke/ C/O detectors, ventilation, reduction of moisture, electrical safety and pollutant controls (if applicable) Ref. C.1.2, C.1.8, C.1.14

Each 78 $ $

Attics, Roofs, Gutters and Chimneys (Repair or replace roof, shingle replacement, repair and install gutters and downspout) Ref. C.1.4, C.1.5

Each 78 $ $

0005 Insulation Installation (Attic, wall or floor insulation) Ref. C.1.5 Each 78 $ $

0006 Water Conservation, Moisture Management Ref. C.1.9 Each 78 $ $

Doors and Windows (repair, replacement of doors and windows, framing, weatherstripping and caulking) Ref. C.1.4, C.1.5, C.1.6

0008 Structural Repairs Ref. C.9.1, C.9.2 Each

78 $ $

0009 Permit Ref. C.1.12, C.1.13 Each 78 $ $

0010 Change Work Order (if applicable) Ref. C.1.11 Each 78 $ $

0011 Final Inspection and QCI Ref. C.1.15

Project Management & Administration (Documentation and Invoice Delivery) Ref. C.1.16

Grand Total for B.3.1 Base Year $

B.3.2 OPTION YEAR 1 (12 Months)

Item No.

(CLIN)

Maximum Total Price

(NTE)

Walk Thru and Inspection & Energy

Weatherization (air sealing, insulation, shading materials and methods, SWS alignment to reduce air leakage) Ref. C.1.1, C.1.2, C.1.5

Each 78 $ $

Health & Safety (smoke/ C/O detectors, ventilation, reduction of moisture, electrical safety and pollutant controls (if applicable) Ref. C.1.2, C.1.8, C.1.14

Each 78 $ $

Attics, Roofs, Gutters and Chimneys (Repair or replace roof, shingle replacement, repair and install gutters and downspout) Ref.

C.1.6, C.12

1005 Insulation Installation (Attic, wall or floor insulation) Ref. C.1.5 Each 78 $ $

1006 Water Conservation, Moisture Management Ref. C.1.9 Each 78 $ $

Doors and Windows (repair, replacement of doors and windows, framing, weatherstripping and, caulking) Ref. C.1.4, C.1.5, C.1.6

1008 Structural Repairs Ref. C.9.1, C.9.2 Each

1009 Permit Ref. C.1.12, C.1.13 Each 78 $ $

1010 Change Work Order (if applicable) Ref. C.1.11 Each 78 $ $

1011 Final Inspection and QCI Ref. C.1.15 Each 78 $ $

Project Management & Administration (Documentation and Invoice Delivery) Ref.

C.1.16

Grand Total for B.3.2 Option Year One $

B.3.3 OPTION YEAR 2 (12 Months)

Item No.

(CLIN)

Maximum Total Price

(NTE)

Walk Thru and Inspection & Energy

Weatherization (air sealing, insulation, shading materials and methods, SWS alignment to reduce air leakage) Ref. C.1.1, C.1.2, C.1.5

Each 78 $ $

Health & Safety (smoke/ C/O detectors, ventilation, reduction of moisture, electrical safety and pollutant controls (if applicable) Ref. C.1.2, C.1.8, C.1.14

Each 78 $ $

Attics, Roofs, Gutters and Chimneys (Repair or replace roof, shingle replacement, repair and install gutters and downspout) Ref.

C.1.4, C.1.5

2005 Insulation Installation (Attic, wall or floor insulation) Ref. C.1.5 Each 78 $ $

2006 Water Conservation, Moisture Management Ref. C.1.9 Each 78 $ $

Doors and Windows (repair, replacement of doors and windows, framing, weatherstripping, and caulking) Ref. C.1.4, C.1.5, C.1.6

Each 78 $ $

2008 Structural Repairs Ref. C.9.1, C.9.2

Each

2009 Permit Ref. C.1.12, C.1.13 Each 78 $ $

2010 Change Work Order (if applicable) Ref. C.1.11 Each 78 $ $

Final Inspection and QCI

Project Management & Administration (Documentation and Invoice Delivery) Ref.

C.1.16

Grand Total for B.3.3 Option Year Two $

B.3.4 OPTION YEAR 3 (12 Months)

Item No.

(CLIN)

Maximum Total Price

(NTE)

Walk Thru and Inspection & Energy

Weatherization (air sealing, insulation, shading materials and methods, SWS alignment to reduce air leakage) Ref. C.1.1, C.1.2, C.1.5

Each 78 $ $

Health & Safety (smoke/ C/O detectors, ventilation, reduction of moisture, electrical safety and pollutant controls (if applicable) Ref. C.1.2, C.1.8, C.1.14

Each 78 $ $

Attics, Roofs, Gutters and Chimneys (Repair or replace roof, shingle replacement, repair and install gutters and downspout) Ref. C.1.4, C.1.5

3005 Insulation Installation (Attic, wall or floor insulation) Ref. C.1.5 Each 78 $ $

3006 Water Conservation, Moisture Management Ref. C.1.9 Each 78 $ $

Doors and Windows (repair, replacement of doors and windows, framing, weatherstripping, and caulking) Ref. C.1.4, C.1.5, C.1.6

Each 78 $ $

3008 Structural Repairs Ref. C.9.1, C.9.2

Each

3009 Permit Ref. C.1.12, C.1.13 Each 78 $ $

3010 Change Work Order (if applicable) Ref. C.1.11 Each 78 $ $

Final Inspection and QCI

Project Management & Administration (Documentation and Invoice Delivery) Ref. C.1.16

Grand Total for B.3.4 Option Year Three $

B.4 A bidder responding to this solicitation that is required to subcontract shall be required to submit with its bid, any subcontracting plan required by law. Bids responding to this IFB shall be deemed nonresponsive and shall be rejected if the bidder fails to submit a subcontracting plan that is required by law.

B.5 For contracts in excess of $250,000, at least 35% of the dollar volume of the contract shall be subcontracted in accordance with section H.9. A Subcontracting Plan form is available at http://ocp.dc.gov , under Quick Links click on “Required Solicitation Documents.”

SECTION C: SPECIFICATIONS/WORK STATEMENT

The District of Columbia (“District”) Office of Contracting and Procurement (“OCP”), on behalf of Department of Energy and Environment (“DOEE”), Residential Services Division (RSD) is seeking a qualified contractor to provide weatherization and energy efficiency to enhance the health and safety of residents of low-income households for DOEE’s Weatherization Assistance Program (WAP). The goal of this procurement is to identify a qualified contractor capable of performing energy efficiency upgrades and delivering weatherization improvements for approximately 78 low-income residential and multifamily properties across the District of Columbia. Common services may include insulation and air sealing and ductwork; installation of energy saving lighting and ventilation, repair or replace heating and mechanical systems installation of windows, doors, repair of roof leaks or roof replacement, health and safety improvements, installation of energy star appliances and other specific energy-saving measures based on an energy audit and diagnostic testing to identify cost effective solutions as outlined in WAP program guidelines, federal guidance and the District of Columbia Field Guide SWS- Aligned Edition and BPI Standards.

The contractor will perform in process and quality control inspections on 100% of the units to ensure energy conservation measures are installed correctly and certify the quality of work prior to DOEE’s final Quality Control Inspection (QCI).

C.1 PROGRAM GOVERNANCE, HEALTH & SAFETY, AND TECHNICAL

REQUIREMENTS

C.1.1 Program Governance and Applicability (DC-Specific)

Contractor shall comply with all District of Columbia codes, applicable regulations, and program standards, including:

1. Standards of Practice All DC Codes; DC Weatherization Field Guide; DOE/NREL Standard Work Specifications (SWS) for single-family and multifamily housing. Minimum acceptable outcomes apply to all installed measures.

2. DC Health & Safety Plan Requirements Contractor shall apply DOEE deferral and referral rules; asbestos handling protocols http://ocp.dc.gov/

(including vermiculite); combustion safety standards; at-risk occupant criteria; and all applicable code compliance requirements.

3. Job Aids and Field Guides Contractor shall use DOE Weatherization job aids for step-by-step installation guidance in attics, rim joists, hatches, lighting penetrations, and related assemblies.

4. Best Practice References Contractor shall follow national best-practice guidance, including prescriptive methods for air sealing, ventilation, recessed fixtures, and attic preparation.

5. Mandatory Yearly Certifications (US DOE Grants) Weatherization and H\&S contractors and subcontractors shall maintain the following:

a. EPA Lead Renovator (1-Day)

b. Asbestos Awareness (2-Hour)

c. Mold Inspection & Assessment (2-Day; every 2 years)

d. OSHA Confined Space (8-Hour)

e. OSHA HAZWOPER Refresher (8-Hour)

f. ASHRAE 62.2 Ventilation (Single Family)

g. BPI Retrofit Installer Technician (IREC-accredited; online acceptable)

h. Envelope and Duct Leakage Certification

i. Ethics Training

j. Fraud, Waste, and Abuse Training

k. HVAC Fundamentals & Duct Sizing (IREC-accredited, where applicable)

C.1.2 Health & Safety (Global Requirements)

1. Combustion Safety & Indoor Air Quality (IAQ) Conduct CAZ testing, worst-case depressurization, spillage, draft, CO, and gas leak testing before and after air sealing or insulation work. Ensure ventilation meets ASHRAE 62.2. Defer work where safety cannot be maintained.

2. Ventilation Protections Air tightening shall not occur without corresponding ventilation measures to prevent pollutant buildup, including CO, VOCs, moisture, and mold.

3. Asbestos, Lead, and Mold Controls Follow DOEE asbestos requirements. Do not operate blower doors where friable

ACM is present. Lead work must comply with EPA RRP. Severe biological contamination requires deferral.

4. Deferral and Documentation Contractor shall complete the DOEE Deferral Form with hazard description, photos, appeal information, and signatures. Completed forms must be uploaded to the system of record.

C.1.3 Pre-Work Assessment and Diagnostics

At every project, Contractor shall perform:

1. Blower Door Test (Pre and Post Work Blower Door Testing is Required).

2. Ventilation Calculation and Exhaust Verification for kitchens and bathrooms.

3. Moisture, Mold, Roof, and Envelope Assessment to ensure measures do not trap moisture or conceal active damage.

4. Combustion Safety and CAZ Testing, pre- and post-work.

C.1.4 Air Sealing Requirements

Objective: Establish a continuous pressure boundary between conditioned and unconditioned spaces per SWS Sections 3.01 and 3.02.

Materials: Caulks, backer rod, low-expansion spray foam, two-part foam, fire-rated sealants, and gaskets.

Procedures (Typical Single-Family):

1. Attic Plane: Seal top plates, soffits, chases, penetrations, and hatches. Protect recessed lighting per code.

2. Rim Joist/Sill Plate: Seal and insulate after air sealing.

3. Foundation/Garage Interfaces: Maintain fire and fume separation.

4. Roof Assemblies: Provide continuous air, thermal, and moisture barriers.

5. Windows/Doors: Weatherstrip operable components and ensure proper operation.

Health & Safety: Maintain safe combustion and verify ventilation before and after air-tightening.

Verification: Post blower door test, photo documentation, and completion of DOE job aids.

C.1.5 Insulation Requirements

Objective: Install insulation to required R-values while preserving ventilation, drainage, and durability.

a) Attics:

1. Prep: Air seal, protect fixtures, maintain ventilation, and dam around hatches/mechanicals.

2. Install: Blow or place insulation to specified depth; maintain clearances.

3. Unvented Attics: Follow code-approved assemblies.

b) Walls & Floors:

1. Dense-Pack Sidewalls: Verify density and full cavity coverage.

2. Floors Over Unconditioned Spaces: Seal penetrations before insulating.

c) Roofs:

1. Prevent heat and moisture damage to roof structures.

2. Provide waterproofing to prevent infiltration.

Health & Safety: No insulation over knob-and-tube wiring; address leaks; follow asbestos protocols.

C.1.6 Window & Door Weatherstripping

1. Assessment: Identify leakage around operable components.

2. Materials: Foam, V-strip, door sweeps, spring bronze.

3. Installation: Clean surfaces, apply continuous seals, verify function.

4. Verification: Spot testing and homeowner education.

C.1.7 Duct Air Sealing

1. Scope: Seal all supply and return ducts, prioritizing those outside the thermal envelope.

2. Materials: Water-based mastic, UL foil tape, and mesh (no cloth tape).

3. Procedures: Clean, seal, mechanically fasten, then insulate.

4. Verification: Visual inspection, diagnostics, and documentation.

C.1.8 Ventilation – Health & Safety

1. Assessment: Determine whole-building airflow needs and verify existing exhaust flows.

2. EPA IAQ Guardrails: Ensure ventilation offsets air sealing impacts.

3. Install/Repair:

a. Bath and kitchen fans vented outdoors.

b. Provide makeup air when CAZ depressurization exceeds limits.

4. Verification: Measure airflow, confirm damper operation, conduct post-work CAZ/CO testing.

C.1.9 Water Conservation

1. Install low-flow fixtures, insulate electric DHW tanks and piping, and verify T\&P discharge compliance.

2. Evaluate gas water heater/tank insulation.

3. Complete flow testing and educate occupants.

C.1.10 System Inspection

A full HVAC system inspection includes:

1. Visual assessment of equipment.

2. Operational testing of heating and cooling functions.

3. Electrical component evaluation.

4. Refrigerant level check.

5. Combustion and venting inspection (gas systems).

6. Airflow measurement.

7. Filter condition assessment.

C.1.11 Work Orders

Contractor shall:

1. Document scope, equipment, and tasks.

2. Record inspection findings and recommended repairs.

3. Provide labor and material estimates.

4. Track assignment and completion.

5. Maintain records for compliance and future planning.

C.1.12 Permits

Contractor shall:

1. Determine required mechanical, electrical, plumbing, or gas permits.

2. Submit applications and supporting documentation.

3. Coordinate inspections with authorities.

4. Maintain permit records.

5. Ensure upgrades meet all local building and energy standards.

C.1.13 DOB Safety & Permit Compliance

Contractor shall comply with all District of Columbia Department of Buildings requirements, including:

1. Use of licensed professionals

2. Proper lockout/tagout procedures

3. Required documentation

4. Compliance with safety standards for combustion, refrigerants, and electrical systems

C.1.14 Health & Safety Protocols

Contractor shall:

1. Use required PPE

2. Follow OSHA-aligned practices

3. Ensure ventilation during combustion or refrigerant work

4. Maintain clean work areas

5. Document hazard mitigation

6. Train personnel in emergency procedures

C.1.15 Post-Work Inspection & Close-Out (QCI)

1. Perform final diagnostics.

2. Complete DOE checklists and photo documentation.

3. Provide client education and required materials.

C.1.16 Documentation & Records

Contractor shall maintain and upload all forms, hazard logs, test results, ventilation calculations, photos, and cost tracking records to the approved system of record (QuickBase).

C.1.17 Training & Quality Assurance

Contractor must maintain training in OSHA, EPA RRP, asbestos protocols, combustion safety, and SWS standards.

Quality assurance includes internal reviews and DOE/DOEE monitoring.

C.1.18 Method of Surveillance

Oversight includes work order tracking, permit verification, site inspections, documentation review, and QCI audit.

C.1.19 CAPACITY REQUIREMENTS

Contractor shall demonstrate the ability to manage multiple simultaneous Task Orders and maintain emergency response capacity during peak periods.

C.2 WARRANTY

Contractor shall provide two (2) year workmanship warranty, responding within:

1. 48 hours for standard issues

2. 24 hours for emergencies

C.3 METHOD OF SURVEILLANCE

Common surveillance methods include work order tracking, permit verification, on-site inspections, review of documentation, and performance metrics related to timeliness, quality, and compliance. Final approval of services will be based on a final QCI audit from a DOEE Inspector.

C.4 NONCONFORMING SERVICES

Industry standard remedies include corrective action plans, rework at no additional cost, payment withholding and contract termination for repeated or unresolved deficiencies.

C.5 APPLICABLE DOCUMENTS

The following documents are applicable to this procurement and are hereby incorporated by this reference:

Item No.

Document Type Title Location Date

01 Reference DOE Weatherization Assistance Program Guidelines (most recent edition) https://doee.dc.gov/service/wap 2025

02 Reference LIHEAP Weatherization Guidelines (most recent edition) https://doee.dc.gov/liheap 2025

03 Reference District of Columbia Energy Conservation Code https://dob.dc.gov/sites/default/file s/dc/sites/dob/publication/attachm ents/2017%20DC%20Energy%20Co de.pdf or https://doee.dc.gov/service/wap https://doee.dc.gov/liheap https://dob.dc.gov/sites/default/files/dc/sites/dob/publication/attachments/2017%20DC%20Energy%20Code.pdf https://dob.dc.gov/sites/default/files/dc/sites/dob/publication/attachments/2017%20DC%20Energy%20Code.pdf https://dob.dc.gov/sites/default/files/dc/sites/dob/publication/attachments/2017%20DC%20Energy%20Code.pdf https://dob.dc.gov/sites/default/files/dc/sites/dob/publication/attachments/2017%20DC%20Energy%20Code.pdf https://www.energycodes.gov/stat us/states/washington-dc

04 Reference District of Columbia Codes (general) https://code.dccouncil.gov/us/dc/c ouncil/code

2/27/20

05 Reference DC Department of Buildings – DC Construction Codes https://dob.dc.gov/page/dc-construction-codes

5/29/2

06 Word /PDF Document DOEE Field Guide https://doee.dc.gov/service/wap 2021

07 Word /PDF Document Owner Contractor Agreement Provided to Contractor upon award

08 Word /PDF Document Notice To Proceed

Provided to Contractor upon award

C.6 DEFINITIONS

These terms when used in this IFB have the following meanings:

Weatherization: The practice of modifying residential buildings to enhance energy efficiency, reduce energy consumption, and improve occupant comfort, health, and safety through cost-effective, energy-saving measures.

Energy Audit: A comprehensive, diagnostic assessment conducted by a certified auditor to identify energy inefficiencies, evaluate building performance, and recommend prioritized energy-saving improvements while addressing health and safety considerations.

Air Sealing: Measures implemented to reduce uncontrolled air leakage between the building's interior and exterior, thereby improving the energy efficiency, indoor air quality, comfort, and durability of the building envelope.

Insulation: Materials and installation techniques applied to walls, attics, floors, and other building components designed to resist heat transfer, maintain optimal indoor temperatures, and significantly improve overall energy efficiency.

Blower Door Test: A diagnostic procedure used to measure air infiltration and leakage rates within residential buildings, utilizing a specialized fan and measuring equipment to quantify building airtightness.

Heating/Cooling System Improvements:

Upgrades, repairs, maintenance, or replacement of existing HVAC systems to improve energy efficiency, functionality, occupant safety, and compliance with relevant guidelines and standards.

Health and Safety Measures:

Necessary corrective actions or protocols required to mitigate health and safety hazards identified during energy audits or weatherization installations, consistent with DOE and LIHEAP guidelines

Owner-Contractor Agreement:

A formal, legally binding contract between the property owner and weatherization contractor defining the scope of work, responsibilities, terms, conditions, warranties, liabilities, and timelines for the completion of weatherization services.

https://www.energycodes.gov/status/states/washington-dc https://www.energycodes.gov/status/states/washington-dc https://code.dccouncil.gov/us/dc/council/code https://code.dccouncil.gov/us/dc/council/code https://dob.dc.gov/page/dc-construction-codes https://dob.dc.gov/page/dc-construction-codes https://doee.dc.gov/service/wap

Readiness Weatherization Readiness refers to the process of repairing and upgrading homes to fix structural, health or safety issues that prevent them from receiving energy efficiency upgrades through WAP. Issues such as mold, roof leaks or outdated wiring may allow previously deferred homes to qualify for energy- saving, cost-reducing retrofits.

QuickBase: The DOEE's designated online project management and data management platform used by contractors and staff for communication, document uploads, project tracking, approvals, inspections, and reporting.

Quality Control Inspection (QCI):

An inspection process conducted by DOEE-certified inspectors upon project completion to ensure that all weatherization improvements adhere to federal, local, and programmatic quality and performance standards.

Standard Work Specifications (SWS):

Detailed guidelines established by the Department of Energy outlining best practices, technical standards, and performance outcomes for weatherization installations to ensure consistency, quality, and effectiveness.

Benefits Efforts to improve indoor air quality, enhance resident comfort and allow for long-term energy savings

Deferral: A formal determination to postpone weatherization services due to the presence of hazardous or unsuitable conditions requiring resolution prior to commencement or continuation of work.

Company Cam: An online visual documentation tool provided by DOEE for contractors to record, track, and share visual evidence of pre-installation conditions, progress updates, and post-installation results for all assigned weatherization projects.

DOE and LIHEAP Guidelines:

Current regulatory frameworks and technical requirements set forth by the U.S.

Department of Energy and the Low-Income Home Energy Assistance Program governing weatherization program implementation, performance standards, health and safety protocols, and allowable energy efficiency measures.

Customer Service and Satisfaction Forms:

DOEE-mandated documents designed to capture resident feedback on contractor performance, project outcomes, and overall satisfaction with weatherization services delivered.

Client Education Forms: Informational materials and documentation provided to homeowners or residents detailing effective usage and maintenance of newly installed energy-saving improvements, safety considerations, and overall best practices for sustaining energy efficiency and home comfort.

Permits and Licensing: Official authorizations obtained from the District's Department of Consumer and Regulatory Affairs (DOB) required legally conducting weatherization-related installations and improvements within the District of Columbia.

Punch List: A detailed, itemized list of deficiencies or corrective actions identified during the Quality Control Inspection (QCI), which the contractor must resolve prior to final approval and payment.

Warranty: The contractor's legally binding commitment to remedy any defects in workmanship or installed materials for a period of two (2) years following DOEE's final payment approval, ensuring the long-term performance and reliability of weatherization improvements.

C.7 BACKGROUND

DOEE administers federal and local weatherization assistance programs aimed at reducing energy costs, improving home comfort and safety, and enhancing the environmental sustainability of residential housing for vulnerable populations in Washington, DC.

Historically, DOEE has partnered with qualified subgrantees to deliver these weatherization services effectively. This procurement addresses recurring needs, aiming to enhance administrative efficiency, increase the pace of home weatherization, and ensure compliance with updated federal DOE WAP and LIHEAP guidelines. Previous procurements revealed opportunities for improved reporting, project timelines, and contractor accountability.

The objective of this procurement is to secure contractors capable of performing weatherization services efficiently, meeting or exceeding federal and local program standards, and achieving measurable energy-saving outcomes for households served.

C.8 REQUIREMENTS

C.8.1 Assess comprehensive home energy audits compliant with DOE and LIHEAP standards provided by DOEE Auditor.

C.8.2 Have ability to review WAP scope (s) of work assigned by DOEE staff:

a) Scopes of work will have details of the WAP work, with projected costs for labor and materials.

b) Funding Source Allocation records will also be provided to the contractors to itemize each task with each respective cost for labor and materials.

C.8.3 DOEE will provide contractors with a date and time of all initial walk-throughs via

DOEE's QuickBase system and via email to all WAP contractors assigned.

C.8.4 The Contractor shall attend a mandatory post-award Kick-Off meeting with DOEE’s

Contract Administrator (CA) and WAP technical team to review contract requirements, clarify responsibilities, review project schedule, discuss administrative procedures (invoicing, progress reporting and quality control) and establish lines of communication.

C.9 REPLACEMENT MEASURE

C.9.1 REPLACEMENT MEASURE REQUIREMENTS

The following apply to all replacement measures within the Cost Schedule:

Replacement pricing shall include:

1. Removal and proper disposal of existing equipment;

2. Replacement measures must be new items, not refurbished items.

3. Venting, flue, or chimney modifications required by DC Code;

4. Gas piping modifications required for compliance;

5. Electrical disconnects, breakers, bonding, and grounding as required;

6. Condensate drainage and neutralization where required;

7. Refrigerant recovery, evacuation, and charging (where applicable);

8. Duct transition and reconnection necessary for airflow compliance;

9. Duct cleaning associated with system replacement;

10. Startup, commissioning, and combustion analysis testing;

11. Cleanup of work area;

12. All incidental materials required to pass QCI.

Failure to pass QCI due to incomplete installation shall not entitle the Contractor to additional compensation.

C.9.2 REPAIR AND TUNE-UP MEASURE REQUIREMENTS

The following apply to all repair and service measures:

Repair pricing shall include:

1. Diagnostic labor;

2. Cleaning of burners, coils, and heat exchangers;

3. Minor mechanical or electrical adjustments;

4. Combustion testing where applicable;

5. Refrigerant verification where applicable;

6. Cleanup of work area.

Repair measures shall not include full system replacement unless authorized through written Change Order.

C.9.3 PERMIT REQUIREMENTS

All measures requiring permits shall comply with District Department of Buildings (DOB) requirements.

Permit-related measures shall include:

1. Permit application submission;

2. Inspection coordination;

3. Re-inspection scheduling if required;

4. Upload of permit approval documentation and final inspection report to DOEE system prior to invoice submission.

Permit costs shall not be billed separately outside the approved permit line item unless official District fee schedules change.

C.9.4 CHANGE ORDERS

A. Any foreseen circumstance that may require a change order shall be communicated as soon as practicable to the Contract Administrator, who will coordinate with the Contracting Officer to determine the appropriate contractual action.

B. Change Orders shall only be used when:

1. Field conditions materially differ from the documented scope; and

2. The required work is not reasonably encompassed within the approved line item.

C. All Change Orders shall:

1. Be documented on official DOEE Change of Work Order forms;

2. Include a complete cost breakdown and justification;

3. Be submitted in writing to the Contract Administrator, who will obtain written approval from DOEE and the Contracting Officer before any work is performed.

C.9.5 Assess comprehensive home energy audits compliant with DOE and LIHEAP standards provided by DOEE WAP Auditor.

C.9.6 Have ability to review WAP scope (s) of work assigned by DOEE staff:

c) Scopes of work will have details of the WAP work, with projected costs for labor and materials.

d) Funding Source Allocation records will also be provided to the contractors to itemize each task with each respective cost for labor and materials.

C.9.7 DOEE will provide contractor with a date and time of all initial walk-throughs via

DOEE's QuickBase system and via email to all WAP contractors assigned.

C.9.8 Once WAP contractor and DOEE successfully conducts the initial walk-through, contractor shall submit an estimated cost to DOEE via QuickBase within 48 business hours of the initial walk-through date.

a. If DOEE does NOT approve estimated cost provided contractor shall wait for

DOEE to provide estimated cost approval/change order approval before installation of any energy efficiency measure.

b. If DOEE approves the estimated cost submitted by contractor, contractor shall provide DOEE:

1. Executed Owner Contractor Agreement

2. A project start date

3. A project completion date

4. Company camera links - DOEE will provide all contractors with access to company camera

5. Any applicable permits

C.9.9 Provide strong deferral/health and safety justification to DOEE for approval. If it is determined that a home has a pre-existing condition that prevents the safe and effective installation of measures, the Contractor must alert DOEE and pause the project until the conditions are fixed.

C.9.10 Ensure ability to obtain applicable permits and licenses at DOB to complete assigned scopes of work.

C.9.11 Ensure start dates provided to DOEE are accurate as DOEE will use those dates provided to conduct in-progress inspections on 100% of WAP jobs assigned to contractors.

i. The purpose of the DOEE WAP in-progress inspection is to ensure all assigned

WAP work abides by the OSHA, SWS, DC Code, and Workers/Crew Professionalism industry standards while performing work.

C.9.12 Perform approved HVAC measures, including but not limited to:

1. Air Sealing

2. Insulation (attic, walls, floors)

3. Window and door weather stripping

4. Duct air sealing. Duct insulation

5. energy-efficient upgrade, window AC, Lighting

6. Ventilation

7. Infiltration Reduction

8. Health and Safety

9. Structural Damage Repair

10. Water Conservation

11. permit

C.9.13 Ensure compliance with health and safety protocols as outlined by DOE guidelines.

C.9.14 Ensure property owners have engaged in an Owner Contractor Agreement that defines scope, establishes legal consent, outlines responsibilities, and protect against liabilities.

C.9.15 Once project is completed, upload all required documents into QuickBase.

C.9.16 Provide DOEE with a notification of completion via QuickBase by clicking on 'please inspect my work' within the respective job record, so that a Final QCI inspection can be conducted.

1. If DOEE QCI Fails, the contractors assigned are notified by DOEE of the full punch list detail, contractor(s) have three (3) business days to address the deficiencies with proof of correction for re-inspection.

2. If DOEE QCI Passes, the contractors assigned are notified by DOEE via

QuickBase to begin the payment request process.

C.9.17 Attend periodic meetings and training courses as required by DOEE.

C.9.18 Demonstrates computer, accounting, and filing systems capable of supporting program delivery.

C.9.19 Abide by DOEE's Residential Services Division's Client Service Policy, Ref. C.5

Applicable Documents, Item No. 01.

C.10 Contractors shall take ownership of any client issues and concerns that arise after final payment is rendered. Industry practice indicates that subpar contractor performance typically results in corrective action requirements, rework at no additional cost, withholding payment, or contract termination for cause. Performance is commonly measured through inspections, permit approvals, system testing, and compliance with work orders and program requirements

SECTION D: PACKAGING AND MARKING

RESERVED

SECTION E: INSPECTION AND ACCEPTANCE

RESERVED

SECTION F: PERIOD OF PERFORMANCE AND DELIVERABLES

F.1 TERM OF CONTRACT

The term of the contract shall be for a period of 12 months from the date of the award specified on the cover page of this contract.

F.2 OPTION TO EXTEND THE TERM OF THE CONTRACT

F.2.1 The District may extend the term of this contract for a period of three (3) one-year option periods, or successive fractions thereof, by written notice to the Contractor before the expiration of the contract; provided that the District will give the Contractor preliminary written notice of its intent to extend at least thirty (30) days before the contract expires. The preliminary notice does not commit the District to an extension.

The exercise of this option is subject to the availability of funds at the time of the exercise of this option. The Contractor may waive the thirty (30) day preliminary notice requirement by providing a written waiver to the Contracting Officer prior to expiration of the contract.

F.2.2 If the District exercises this option, the extended contract shall be considered to include this option provision.

F.2.3 The price for the option period shall be as specified in Section B of the contract.

F.2.4 The total duration of this contract, including the exercise of any options under this clause, shall not exceed five years.

F.3 DELIVERABLES

The Contractor shall perform the activities required to successfully complete the District’s requirements and submit each deliverable to the Contract Administrator (CA) identified in section G.9 in accordance with the following:

F.3.1 BASE YEAR (12 Months from Date of Award)

No. Deliverable Qty Method of Delivery Due Date

Kickoff Meeting (Ref. C.8.4)

Face to Face/Online Meeting 7 days after contract award

Walk Through and Project Scope determined (Ref. C.8.3, C.9.7, C.9.8, C.9.11)

In-person walk-through

DOEE will perform an Energy Audit and task estimate. The Contractor is required to perform a walk through within 48 hours of the Energy Audit and task work order

3 Executed Owner Contractor Agreement to Client

Contractor upload signed PDF form to

1 day before task work begins

(Ref. C.9.11, C.9.14)

DOEE QuickBase system

Submit Documentation for review to obtain permit for

DOB

(Ref. C.9.3, C.9.10, C.1.12)

Contractor to upload to DOEE QuickBase System

1 day before work begins

Weekly Check In Status Meetings with DOEE (Ref. C.8.4, C.9.17)

Weekly Online Meetings

Every Week after task work begins

Change Work Order, If applicable (Ref. C.9.4, C.1.11)

System for review and approval, Submit to OCP for financial approval

24 hours after identification of additional WAP measures

Work Completion (Ref. C.1.2, C.1.3, C.1.4, C.1.5, C.1.6, C.1.7, C.1.8, C.1.9, C.1.10, C.1.13, C.1.14, C.1.15, C.1.19, C.3)

DOEE performs final QCI Audit for Completion Sign Off

WAP work should be completed within 20 days

Provide Applicable Permits to DOEE (Ref. C.1.12)

Prior to payment sign off

Upload final documentation and invoices to QuickBase for review for payment (Ref. C.1.16, C.1.7, C.4)

System, submit to OCP for financial approval

48 hours after work is completed

Honor 2-year workmanship warranty (Ref. C.2)

Written warranty

Begins the day final payment is received

F.3.2 OPTION YEAR ONE (12 Months)

DOEE will perform an Energy Audit and task estimate. The Contractor is required to perform a walk through within 48 hours of the Energy Audit and task work order

Executed Owner Contractor review to obtain permit for

System for review and approval, C.1.5, C.1.6, C.1.7, C.1.8, and invoices to QuickBase

System, submit to

F.3.3 OPTION YEAR TWO (12 Months)

DOEE will perform an Energy Audit and task estimate. The Contractor is required to perform a walk through within 48 hours of the Energy Audit and task work order

Executed Owner Contractor review to obtain permit for

System for review and approval, C.1.5, C.1.6, C.1.7, C.1.8, and invoices to QuickBase

System, submit to

F.3.4 OPTION YEAR THREE (12 Months)

DOEE will perform an Energy Audit and task estimate. The Contractor is required to perform a walk through within 48 hours of the Energy Audit and task work order

Executed Owner Contractor review to obtain permit for

System for review and approval, C.1.5, C.1.6, C.1.7, C.1.8, and invoices to QuickBase

System, submit to

F.3.5 The Contractor shall submit to the District, as deliverable, the report described in section

H.5.5 that is required by the 51% District Residents New Hires Requirements and First Source Employment Agreement. If the Contractor does not submit the report as part of the deliverables, final payment to the Contractor shall not be paid pursuant to section G.3.2.

SECTION G: CONTRACT ADMINISTRATION

G.1 INVOICE PAYMENT

G.1.1 The District will make payments to the Contractor, upon the submission of proper invoices, at the prices stipulated in this contract, for supplies delivered and accepted or services performed and accepted, less any discounts, allowances or adjustments provided for in this contract.

G.1.2 The District will pay the Contractor on or before the 30th day after receiving a proper invoice from the Contractor.

G.2 INVOICE SUBMITTAL

G.2.1 The Contractor shall create and submit payment requests in an electronic format through the DC Vendor Portal, https://vendorportal.dc.gov.

G.2.2 The Contractor shall create and submit proper invoices monthly or as otherwise specified in Section G.4.

https://vendorportal.dc.gov/

G.2.3 To constitute a proper invoice, the Contractor shall enter all required information into the Portal after selecting the applicable purchase order number which is listed on the Contractor’s profile.

G.2.4 Federal Reporting Requirements

RESERVED.

G.3 FIRST SOURCE AGREEMENT REQUEST FOR FINAL PAYMENT

G.3.1 For contracts subject to the 51% District Residents New Hires Requirements and First

Source Employment Agreement requirements, final request for payment must be accompanied by the report or a waiver of compliance discussed in section H.5.5.

G.3.2 The District shall not make final payment to the Contractor until the agency CFO has received the CO’s final determination or approval of waiver of the Contractor’s compliance with 51% District Residents New Hires Requirements and First Source Employment Agreement requirements.

G.4 PAYMENT

Invoices shall be submitted monthly and reflect the percent of work performed toward achieving project deliverables (Section F.3)

G.5 ASSIGNMENT OF CONTRACT PAYMENTS

G.5.1 In accordance with 27 DCMR 3250, the Contractor may assign to a bank, trust company, or other financing institution funds due or to become due because of the performance of this contract.

G.5.2 Any assignment shall cover all unpaid amounts payable under this contract and shall not be made to more than one party.

G.5.3 Notwithstanding an assignment of contract payments, the Contractor, not the assignee, is required to prepare invoices. Where such an assignment has been made, the original copy of the invoice must refer to the assignment and must show that payment of the invoice is to be made directly to the assignee as follows:

“Pursuant to the instrument of assignment dated ___________, make payment of this invoice to (name and address of assignee).”

G.6 THE QUICK PAYMENT ACT

G.6.1 Interest Penalties to Contractors

G.6.1.1 The District will pay interest penalties on amounts due to the Contractor under the

Quick Payment Act, D.C. Official Code § 2-221.01 et seq., as amended, for the period beginning on the day after the required payment date and ending on the date on which payment of the amount is made. Interest shall be calculated at the rate of at least 1.5% per month. No interest penalty shall be paid if payment for the completed delivery of the item of property or service is made on or before the required payment date. The required payment date shall be:

G.6.1.1.1 The date on which payment is due is due under the terms of the contract.

G.6.1.1.2 Not later than 7 calendar days, excluding legal holidays, after the date of delivery of meat or meat food products.

G.6.1.1.3 Not later than 10 calendar days, excluding legal holidays, after the date of delivery of a perishable agricultural commodity; or

G.6.1.1.4 30 calendar days, excluding legal holidays, after receiving a proper invoice for the amount of the payment due.

G.6.1.2 No interest penalty shall be due to the Contractor if payment for the completed delivery of goods or services is made on or after:

G.6.1.2.1 3rd day after the required payment date for meat or a meat food product.

G.6.1.2.2 5th day after the required payment date for an agricultural commodity; or

G.6.1.2.3 15th day after any other required payment date.

G.6.1.3 Any interest penalty which remains unpaid at the end of any 30-day period shall be added to the principal amount of the debt and thereafter interest penalties shall accrue on the added amount.

G.6.2 Payments to Subcontractors

G.6.2.1 The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor under the contract:

G.6.2.1.1 Pay the subcontractor(s) for the proportionate share of the total payment received from the District that is attributable to the subcontractor(s) for work performed under the contract; or

G.6.2.1.2 Notify the CO and the subcontractor(s), in writing, of the Contractor’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment.

G.6.2.2 The Contractor must pay any subcontractor or supplier interest penalties on amounts due to the subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of at least 1.5% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before the:

G.6.2.2.1 3rd day after the required payment date for meat or a meat product.

G.6.2.2.2 5th day after the required payment date for an agricultural commodity; or

G.6.2.2.3 15th day after any other required payment date.

G.6.2.3 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-day period shall be added to the principal amount of the debt to the subcontractor and thereafter interest penalties shall accrue on the added amount.

G.6.2.4 A dispute between the Contractor and subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District is a party. The District may not be interpleaded in any judicial or administrative proceedings involving such a dispute.

G.6.3 Subcontract requirements. The Contractor shall include in each subcontract under this contract a provision requiring the subcontractor to include in its contract with any lower-tier subcontractor or supplier the payment and interest clauses required under paragraphs

(1) and (2) of D.C. Official Code § 2-221.02(d).

G.7 CONTRACTING OFFICER (CO)

Contracts will be entered into and signed on behalf of the District only by contracting officers. The contact information for the Contracting Officer is:

Tracy Crump, Contracting Officer Department of Energy & Environment 1200 1st Street NE, 5th Floor Phone: (202) 724-4051 Email: tracy.crump@dc.gov

Donnetta Butler, Supervisory Contract Specialist Department of Energy & Environment 1200 1st Street NE, 5th Floor Phone: (202) 442-7623 Email: donnetta.butler@dc.gov

G.8 AUTHORIZED CHANGES BY THE CONTRACTING OFFICER

G.8.1 The CO is the only person authorized to approve changes in any of the requirements of this contract.

G.8.2 The Contractor shall not comply with any order, directive or request that changes or modifies the requirements of this contract, unless issued in writing and signed by the

CO.

G.8.3 In the event the Contractor…