H St Bridge NE Repair and Rehabilitation/or Replacement Design Services from North Capitol St to 3rd St NE
Solicitation number
DCKA-2027-Q-0018
Issued by
District of Columbia

About this file

This Request for Qualifications (RFQ) is issued by the District of Columbia Office of Contracting and Procurement on behalf of the District of Columbia Department of Transportation (DDOT) to solicit Statements of Qualifications from engineering firms to provide design engineering services for the repair, rehabilitation, or replacement of H Street Bridge NE from North Capitol Street to 3rd Street NE. The bridge spans over the Amtrak corridor north of Union Station and carries six lanes of traffic over railroad infrastructure. The solicitation (DCKA-2027-Q-0018) was published on November 23, 2026, with a virtual pre-bid conference and site visit scheduled for December 1, 2026, and questions due by December 8, 2026. Statements of Qualifications are due by 2:00 p.m. local time on January 8, 2027. The contract term will be eighteen months for rehabilitation design or twenty-four months for replacement design from the date of award. This is a fixed-price contract with prospective price redetermination compensated using specific rates of compensation.

The scope of work encompasses project management, surveys, geotechnical engineering review, structural and civil design, stakeholder coordination, utility coordination, two public meetings, environmental support (up to 400 hours), value engineering, and production of final plans, specifications, and estimates. Key personnel requirements include a Design Project Manager with a Bachelor of Science in Civil Engineering and ten years of experience, a Lead Bridge Engineer with a Bachelor of Science in Structural Engineering, ten years of experience, and a Professional Engineer license in the District of Columbia, a Lead Civil Engineer with similar qualifications, and a Lead Stakeholder Coordinator with ten years of relevant experience. DDOT will provide existing inspection reports, as-built drawings, geotechnical investigation results, utility surveys, and environmental assessments. The design must comply with current DDOT standards and AASHTO specifications. Compensation is based on direct salary expense, approved final indirect cost rates, and profit not to exceed ten percent, with annual price redetermination authorized based on certified payroll and indirect cost rate changes limited to a maximum of five percent Direct Salary Expense adjustment.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GOVERNMENT OF THE DISTRICT OF COLUMBIA

DISTRICT DEPARTMENT OF TRANSPORTATION

INFRASTRUCTURE PROJECT MANAGEMENT ADMINSTRATION

ROADWAY CONSTRUCTION BRANCH

SOLICITATION

REQUEST FOR QUALIFICATIONS (RFQ)

FFEDERAL-AID HIGHWAY PROGRAM (FAHP)

H St Bridge NE Repair and Rehabilitation/or Replacement Design Services from North Capitol St to 3rd St NE

DCKA-2027-Q-0018

Solicitation Published Date: November 23, 2026

Virtual Pre-Bid Conference: December 1, 2026

Site Visit: December 1, 2026

Questions Due Date: December 8, 2026

Response Date: January 8, 2027

Contracting officer: Carol Hessler, Carol.Hessler@dc.gov

Contracting Specialist: Paul Tucker, Paul.Tucker@dc.gov

PROJECT: 1116033

H St Bridge NE, & H St from North Capitol to 3rd St NE Repair and Rehabilitation Design Services

A. SOLICITATION, OFFER, AND AWARD

1. Caption

H St Bridge NE, and H St from North Capitol to 3rd St NE Repair and Rehabilitation Design Services

Page of Pages

1 of 78 (plus attachments)

2. Contract Number

3. Solicitation Number

DCKA-2027-Q-0018

4. Type of Solicitation

5. Date Issued 6. Type of Market

Sealed Bid (IFB)

X Open Sealed Proposals (RFP) Set Aside Sole Source

Open with Sub- Contracting Set Aside X

Request for Qualifications

(RFQ)

Emergency

7. Issued By:

District Department of Transportation Office of Contracting and Procurement 250 M Street, SE – 7th Floor Washington, DC 20003

8. Address Offer to:

Department of Transportation Office of Contracting and Procurement 55 M Street, SE Suite 700 Washington, DC 20003

NOTE: In sealed bid solicitations "offer" and offeror" means "bid" and "bidder"

SOLICITATION

9. Statement of Qualification (SOQs) for furnishing the supplies or services in the Schedule will be received at address in 8 above until 2:00 pm local time on __01/08/2027 For electronic submission refer to Section L of the Solicitation.

CAUTION: Late Submissions, Modifications and Withdrawals: See 27 DCMR chapters 15 & 16 as applicable. All offers are subject to all terms & conditions contained in this solicitation.

10. For Information Contact:

A. Name

Paul Tucker, Contract Specialist

B. Telephone C. E-mail Address

(Area Code) (Number) (Ext) Paul.Tucker@dc.gov Email Only Email Only

11. Table of Contents

(X) Section Description Page No.

(X) Section Description Page No.

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

X A SOLICITATION/CONTRACT FORM 2 X I CONTRACT CLAUSES 49

X B

CONTRACT TYPE, SUPPLIES OR

SERVICES AND PRICE/COST

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER

ATTACHMENTS

X C SPECIFICATIONS/WORK STATEMENT 4 X J List of Attachments 66 x D PACKAGING AND MARKING 19 PART IV - REPRESENTATIONS AND INSTRUCTIONS

X E INSPECTION AND ACCEPTANCE 20

X K

REPRESENTATIONS,

CERTIFICATIONS, AND OTHER

STATEMENTS OF OFFERORS

X F

PERIOD OF PERFORMANCE AND

DELIVERABLES

X G CONTRACT ADMINISTRATION 22 X L

INSTRUCTIONS, CONDITIONS, AND

NOTICES TO OFFERORS

X H SPECIAL CONTRACT REQUIREMENTS 42 X M EVALUATION FACTORS FOR AWARD 75

OFFER

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ____ calendar days from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified herein.

13Not Applicable

14. Acknowledgement of Amendments (The offeror acknowledges receipt of amendments to the SOLICITATION) [In case there is more than three amendments attach separate sheet with acknowledgements):

Amendment Number Date Amendment

Number Date

15A. Name and Address of Offeror

16. Name and Title of Person Authorized to Sign Offer/Contract

15B. Telephone 15 C. Check if remittance address is different from above

- Refer to Section G

17. Signature

18. Offer Date

(Area Code) (Number)

(Ext)

AWARD (TO BE COMPLETED BY GOVERNMENT)

19. Accepted as to Items Numbered

20. Amount 21. Accounting and Appropriation

22. Name of Contracting Officer (Type or Print)

23. Signature of Contracting Officer (District of Columbia)

24. Award Date

Government of the District of Columbia Office of Contracting & Procurement

Carol Hessler

SECTION B: SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 INTRODUCTION

B.1.1 The District of Columbia Office of Contracting and Procurement (“OCP”), for and on behalf of The District of Columbia Department of Transportation (“DDOT”) (the “District”), pursuant to the Procurement Practices Reform Act of 2010 (“PPRA”), and 27 DCMR Chapter 26, is issuing this Request for Qualifications (“RFQ”) to solicit Statements of Qualifications (“SOQ”s) from engineering firms (“Offeror” or “Consultant” or “Consultant”) interested in providing design engineering services for Repair and Rehabilitation/or Replacement of H St Bridge NE, from North Capitol St to 3rd St NE (the “Project”).

B.2 TYPE OF CONTRACT

B.2.1 This is a fixed-price contract with prospective price redetermination (See also § G.7) pursuant to 27 DCMR § 2404 and 23 CFR 172.9(3) compensated using specific rates of compensation.

B.3 RESERVED

SECTION C: DESCRIPTION/SPECIFICATION/WORK

STATEMENT

C.1 BACKGROUND AND GOALS

C.1.1 BACKGROUND

Based on DDOT final decision before the Notice to Proceed (NTP), this project involves the development of plans, specifications and estimates (PS&E) for the Rehabilitation or Replacement of H Street Bridge NE and its approaches from North Capitol to 3rd Street NE.

The H Street Bridge spans over the Amtrak corridor north of Union Station in the downtown area of the District of Columbia. The bridge carries 3 lanes of H-Street traffic in each direction over 1st Street and 2nd Street NE and over the Union Station rail yard (which includes both Amtrak and WMATA tracks).

C.1.2 SCOPE SUMMARY

C.1.2.1 BASIC ELEMENTS OF SCOPE

The scope of work will include the following:

a. Project Management,

b. Additional inspections (Rehabilitation option only) and surveys as needed,

c. Bridge Structural Rehabilitation or Replacement Design,

d. Civil Design,

e. Key Stakeholder Coordination,

f. Utility Coordination,

g. Public Meetings,

h. Updating the Environmental for Rehabilitation option,

i. Value Engineering,

j. Updating Amtrak Design and Construction Agreements,

k. Elimination of Streetcar Track/OCS/platform from within the project limits.

l. Traffic Management Plan

C.1.2.2 ASSUMPTIONS AND EXCLUSIONS FOR SCOPE

The scope and design fee estimate should be based on the assumptions below.

a. No Right-of-Way acquisition.

b. DDOT will provide the Quality Level A/B utility designation for the project from North Capitol Street to 3rd Street, not including the rail yard.

C.1.2.3 BACKGROUND INFORMATION

Items to be provided by DDOT at the selection phase are noted below.

a. For the existing H Street Bridge:

i. Inspection report for the existing bridge,

ii. Existing bridge load rating,

iii. As-built drawings of the existing bridge,

iv. Existing bridge pile driving records, and

v. Existing bridge test results from pile installation

b. Data prepared as part of the bridge design-build efforts:

i. Topographic survey

ii. 3D survey of the Union Station rail yard

iii. Geotechnical investigation results and geotechnical report

iv. QL A/B utility survey results

v. Bridge Replacement Environmental Assessment and Finding of No Significant Impact

vi. Phase I Environmental Site Assessment

vii. Phase II Underpass Environmental Site Assessment and limited Hazmat Survey

c. For the existing tunnel below H Street Bridge:

i. 1906 Construction drawings (limited records),

ii. Details of the USRC Parking garage sprinkler pump and meter rooms

d. For adjacent projects (such as improvements for the WMATA Metro Station and Union Station from Union Station Redevelopment Corporation):

i. Construction drawings for the Union Station parking garage ramps (where available)

ii. Progress drawings, construction drawings, and other such items,

iii. Field survey (electronic files), and

iv. Geotechnical reports.

C.1.2.4 STANDARDS

The final design for the Rehabilitation or Replacement work shall be completed in accordance with current DDOT’s design practices and requirements at the date of the proposal, inclusive of the following:

DDOT Standard Drawings, DDOT Standard Specifications for Highways and Structures, A Policy on Geometric Design of Highways and Streets, AASHTO, DDOT Construction Management Manual, DDOT Design & Engineering Manual, DDOT Public Realm Design Handbook, DDOT ROW Manual, DDOT Work Zone Safety and Mobility Policy, DDOT Standard CAD Manual and DDOT Workspace Installation, DDOT MicroStation® CAD Standards Manual; and DDOT Environmental Policy and Process Manual, The bridge design codes to be used shall be as follows:

Superstructure shall satisfy AASHTO LRFD Bridge Design Specifications; and Substructure shall satisfy:

o AASHTO Standard Specifications “HS25 live loading”, if there are no changes to the foundations (e.g. additional deep foundations), or o AASHTO LRFD Bridge Design Specifications, if strengthening of the foundations is required – such as adding piles, etc., C.1.2.5 SCHEDULE

The duration of the project will be Eighteen (18) months for Bridge Rehabilitation design or Twenty-four (24) months for Bridge Replacement design. A detailed project schedule will be submitted two weeks after the project kick-off meeting.

C.2 RESPONSIBILITIES OF CONSULTANT

C.2.1 Consultant shall perform its services consistent with the skill and care ordinarily provided by consultants in consultant's profession practicing on projects of a similar type, cost, and size. The Consultant shall perform its services as expeditiously as is consistent with such skill, care and the orderly progress of the Project. Nothing herein shall be construed to limit or diminish the applicability of 27 DCMR §§ 2630, 2632.

C.2.2 Consultant shall identify a representative authorized to act on behalf of the Consultant with respect to the Contract between Consultant and the District.

C.2.3 Consultant shall not engage in any activity, or accept any employment, interest or compensation that would reasonably appear to compromise the Consultant's judgment with respect to this Project, except with DDOT's prior knowledge and prior written consent.

C.2.4 In the conduct of all activities required for or otherwise related to the performance of the Contract, Consultant shall conform to and uphold all established ethical principles and professional standards of practice governing the consultant's profession in the District of Columbia, and in any jurisdiction where the Consultant may be licensed or registered.

C.2.5 Consultant shall provide all necessary expertise and services and have and maintain appropriate licenses that meet District of Columbia requirements to professionally and diligently prosecute the work authorized.

C.2.6 Consultants shall contract for or employ at Consultant's expense, subconsultants to the extent deemed necessary for the work, with the prior written consent of DDOT.

C.2.7 Consultants shall consult with normal and customary employees, agencies, and/or representatives of the District of Columbia regarding the work.

C.2.8 Consultants shall work effectively with other District of Columbia and federal agencies.

C.2.9 Consultants shall abide by all regulations imposed by funding sources, such as auditing requirements and payroll affidavits.

C.2.10 Consultants shall perform its services in accordance with all applicable District and federal laws, codes, regulations, standards, guidelines, and orders.

C.2.11 When reviewing, evaluating, monitoring, coordinating, and reporting with respect to the services of other consultants and Consultants, Consultants shall apply all applicable District and federal, laws, codes, regulations, standards, guidelines, and orders, including, without limitation, the then-current version of the District of Columbia Department of Transportation (DDOT) Standard Specifications for Highways and Structures.

C.2.12 Neither the District's review, approval or acceptance of, nor payment for, any of the services required under the Contract shall be construed to operate as a waiver of any rights under the Contract or of any cause of action arising out of the performance of this contract, and the Consultant shall be and remain liable to the District in accordance with applicable law for all damages to the District caused by the Consultant's negligent performance of any of the services furnished under the Contract.

C.3 SCOPE OF WORK

C.3.1 PROJECT MANAGEMENT

C.3.1.1 PROGRESS REPORTS AND INVOICES

Consultant will prepare monthly progress reports and invoices in DDOT format.

C.3.1.2 MEETINGS

Project management meetings will include those noted below.

a. Chartering Meeting: The Consultant Team members and DDOT staff will have a kickoff and chartering meeting to review critical success factors for the project.

b. Bi-Weekly Progress Meetings with DDOT: Key Consultant Team members and DDOT will participate in bi-weekly progress meetings. Meetings will typically be a Teams meeting. When necessary, the meetings will be held in person.

Consultant will record and distribute minutes.

C.3.1.3 PROJECT DIGITAL DOCUMENT DEPOSITORY

The Consultant Team will use DDOT Project BOX for all project’s digital documents depository. BOX will be used to store and share all documents including technical deliverables in draft and final form, CAD files, design calculation and ratings, PS&E, meeting agendas/minutes, project schedules, presentations, bi-weekly status reports and invoices.

Consultant will provide bi-weekly status reports to document hours spent / remaining for this support.

C.3.1.4 PROJECT WORKPLAN AND INSTRUCTIONS

Consultant will prepare and submit for DDOT approval Project Instructions that include project management requirements specifically tailored to the H Street Bridge project.

C.3.1.5 QUALITY MANAGEMENT PLAN

Consultant will prepare and submit for DDOT approval a project specific Quality Management Plan that will describe the QA/QC procedures to be followed for the Project.

C.3.2 SURVEY

C.3.2.1 GENERAL

The Consultant Team will be provided with the topographic survey completed in 2018 for the project from North Capitol Street to 3rd Street and the 3d survey for the Union Station rail yard completed prior to 2016 by Amtrak.

All survey work shall be completed under the direction of a Professional Land Surveyor licensed in the District of Columbia. It is the responsibility of the supervising Land Surveyor to ensure that all work under this agreement complies with all District of Columbia regulations. The surveyor shall research, recover, and confirm the existing horizontal and vertical control networks found on or near the site and provide a report which includes definition of the Monumentation to be used as a basis of survey. The surveyor shall confirm that the horizontal and vertical coordinate system and datums are consistent with the coordinate system and datums currently in use on the project site. If variations are found between the datums listed, the surveyor shall report dual values when determined that the current values differ from the value based on the specified datums.

C.3.2.2 RESEARCH RIGHT OF WAY AND SURVEY CONTROL

The Consultant Team will be provided with the following data:

a. The District of Columbia land records of existing right of way and Property Boundaries information; and

b. The right of way mosaic.

C.3.2.3 HORIZONTAL CONTROL SURVEY

The Consultant Team will complete the items noted below.

a. Research, recover, and confirm existing available horizontal and vertical control in the area. The horizontal control will be based on the Maryland Coordinate System NAD 83 datum with current adjustment.

b. Horizontal control stations will be set as needed throughout the project by static GPS survey in compliance with DDOT specifications. A conventional total station traverse will be run between the GPS stations to form a closed line or loop traverse meeting or exceeding Second Order Class II (1 in 20,000) closure. The traverse will be adjusted by Least Square method.

c. Recovery sketches will be made for each traverse point giving a minimum of three distance ties to distinct points, coordinates, elevation and a description of the point.

C.3.2.4 VERTICAL CONTROL

The Consultant Team will complete the items below.

a. All data are reported as North American Vertical Datum of 1988 (NAVD 88) with current adjustment. (DDOT to specify if base-specific datum is different)

b. Research, recover, and confirm existing available vertical control.

c. Three permanent vertical benchmarks are set on the project. The locations and descriptions are provided in the survey drawings.

C.3.2.5 SURVEY UPDATES

A new full survey is not required as part of this project. Consultant shall provide survey updates as necessary to complete the scope of work of the project, including extending the survey limits at North Capitol Street and 3RD Street and selecting survey updates to confirm and update existing data provided.

C.3.2.6 ACCURACY

Horizontal control work shall comply with Second Order Class 2 (1:20,000) or better, as outlined in the FGDC Geospatial Positioning Accuracy Standards, Part 4: Standards for Architecture, Engineering, Construction (A/E/C), and Facility Management. If GPS is used, the relative horizontal accuracy shall conform to the FGDC Geospatial Positioning Accuracy Standards, Part 2: National Standard for Spatial Data Accuracy.

Vertical Control work shall be Second Order Class II (0.035√m) or better, as outlined in the FGDC Geospatial Positioning Accuracy Standards, Part 4: Standards for Architecture, Engineering, Construction (A/E/C) and Facility Management.

All other surveys (other than control surveys if required), shall comply with FGDC Geospatial Positioning Accuracy Standards, Part 4: Standards for Architecture, Engineering, Construction (A/E/C), and Facility Management with accuracy tolerances of +/-0.10-foot for the horizontal and +/-0.03-foot for the vertical (if applicable) on all other hard surfaces and +/-0.10-foot for the vertical on soft or natural ground surfaces (if applicable).

The Surveyor reports all coordinates of all points X, Y & Z to the nearest 0.01 foot. When +/- 0.01-foot vertical/elevation accuracy tolerance.

C.3.2.7 CADD FORMAT

All electronic drawing symbology shall conform to the DDOT CADD standards. The CADD files will be in MicroStation (dgn) format and will include a surface model with 3D graphic triangles, 3D contour lines and features and an InRoads (dtm) file as per DDOT CADD Standards.

C.3.3 GEOTECHNICAL ENGINEERING

Existing data will be reviewed to determine the foundation configuration and to determine the pile lengths and capacities. Historic subsurface investigations of H Street bridge will also be reviewed to aid in developing an opinion of probable existing bridge foundation capacity/resistance for Bridge Rehabilitation and substructure and foundation design for Bridge Replacement.

The historical construction plans and geotechnical data will be reviewed to develop subsurface profiles along the length of the bridge. Available data will be summarized and used to establish design parameters for each of the subsurface layers. These design parameters will be used for Bridge Rehabilitation or Replacement design.

For Bridge Rehabilitation, the length of the existing piles will be assumed to be installed as shown on the existing construction plans. The estimated pile capacity of the existing piles will be assumed to be that shown on the plans of the existing bridge. This capacity will be used to determine if these piles can support the loading of the proposed bridge modifications.

Assumptions for the development of the scope and fee are as follows:

1. Bridge Rehabilitation

a. It will be based on the data presented in the existing soil boring logs,

b. Lengths and allowable capacity of existing piles are assumed to be as shown on existing bridge drawings,

c. Where there are data gaps on the drawings, length and capacity of existing piles will be assumed to be the same or an average of adjacent piers

2. Bridge Replacement

a. Study of the data presented in the existing soil boring logs,

b. Design based on DDOT geotechnical investigation results and geotechnical report

C.3.4 STRUCTURAL ENGINEERING FOR BRIDGE AND RETAINING

WALLS

C.3.4.1 ASSUMPTIONS

1. For Bridge Rehabilitation the following criteria assumptions will be incorporated into Bridge Rehabilitation Design.

a. The proposed H Street Bridge deck width will be approximately the same as existing.

b. A 30-year service life will be used for Rehabilitation design.

c. Existing horizontal and vertical railroad and roadway clearances will be maintained.

d. Concepts for the sequence of construction and maintenance of traffic (MOT) will be provided by DDOT. Consultant shall develop/revise the MOT plans based upon the selected approach for rehabilitation.

e. The scope does not include any traffic analysis or modeling. DDOT will provide traffic analysis, and consultants will review and adopt the report for environmental studies if needed.

f. The condition of the existing bridge will be based on the latest inspection reports provided by DDOT. Additional inspections or condition surveys will be performed to verify the findings in the DDOT’s inspection reports.

Consultant will be required to sign a permit to enter with Amtrak for access to any part of the Washington Union Station rail yard for the purpose of inspecting the bridge.

2. For Bridge Replacement the following criteria assumptions will be incorporated into the Bridge Replacement Design.

a. The proposed H Street Bridge deck width will be approximately the same as existing.

b. A 75-year service life will be used for Bridge Replacement design.

c. A modified vertical alignment should be studied and designed while maintaining or improving the exiting railroad and roadway clearances.

d. Concepts for the sequence of construction and maintenance of traffic (MOT) will be provided by DDOT.

e. The scope does not include any traffic analysis or modeling. DDOT will provide traffic analysis, and consultants will review and adopt the report.

f. Consultants will be required to sign a permit to enter Amtrak for access to any part of the Washington Union Station rail yard for the purpose of bridge design.

C.3.4.2 BRIDGE AESTHETICS

Separate drawings addressing aesthetics, including architectural drawings and renderings, will not be developed.

C.3.4.3 ALTERNATIVES TO BE CONSIDERED

The consultant shall develop innovative solutions, including approaches that utilize accelerated bridge construction, that minimize impacts to users of the bridge and railroad/WMATA tracks below.

The basic scope of Bridge Rehabilitation shall be to replace the concrete deck, repair structural steelwork, rehabilitate/replace bearings, replace bridge expansion joints, replace the pin and hanger components with new components and rehabilitate substructure.

Consultant will also assess feasibility of innovative solutions that would eliminate the pin and hangers and/or the non-redundant substructure elements (straddle bents).

The basic scope of the Bridge Replacement shall be to replace the whole bridge superstructure & substructure.

C.3.4.4 CONCEPTUAL BRIDGE REHABILITATION PLANS

The minimum number of sheets for Bridge Rehabilitation conceptual details shall be as shown on the table below.

Bridge Element Total Sheets Count

Existing conditions plan 5

Existing utility plans 5

Bridge Existing Plan & Elevation 2

Existing Typical Sections 3

Proposed Bridge Plan & Elevation 2

Deck Section 2

Proposed roadway plan 5

Roadway typical sections 3

Construction sequence/MOT Plans 6

Streetlight/signal/ITS plans 6

Drainage plans 4

Railing and fencing plans 2

Deck replacement details 5

Pin and hanger replacement details 3

Bearing details 3

Steelwork repair details 4

Abutment repair details 4

Joint replacement details 3

Approach pier rehabilitation details 3

Underpass pier rehabilitation details 2

Consultant will prepare and submit a sheet list for intermediate / final design as defined in the DDOT’s Design and Engineering Manual and submit it to DDOT for review and approval.

The minimum number of sheets for Bridge Replacement conceptual details shall be as shown on the table below.

Bridge Element Total Sheets Count

Proposed Bridge Plan & Elevation 3

Deck Section 2

Proposed Roadway Plan 5

Roadway Typical Sections 3

Proposed Bridge Superstructure 6

Proposed Bridge Foundation 4

Proposed Bridge Substructure Details 4

Proposed Bridge Details 4

Construction Sequence/MOT Plans 3

Streetlight/Signal/ITS Plans 8

Drainage Plans 6

Railing And Fencing Plans 4

Deck Details 2

Pin And Hanger Replacement Details 5

Bearing Details 3

Approach Pier Rehabilitation Details 4

Underpass Pier Rehabilitation Details 3

Consultant will prepare and submit a sheet list for intermediate / final design as defined in the DDOT’s Design and Engineering Manual and submit it to DDOT for review and approval.

C.3.4.5 COST ESTIMATE

The Consultant Team will develop the project cost estimate at 60% and PS&E. This will be a Class 4 estimate as defined by AACEI and ANSI Z94.2-1989. The cost estimate will include the following:

a. Construction Cost Estimate (based on quantities for all items and a percentage for structural incidentals);

b. Maintenance of Traffic

c. Mobilization

d. Third party costs

e. Utility costs

f. Construction Engineering and

g. Contingency

h. 10.5% DC IDCR

C.3.4.6 DELIVERABLES

The Consultant Team will prepare the final rehabilitation or replacement PS&E documents as defined in the DDOT’s Design and Engineering Manual.

C.3.5 CIVIL

C.3.5.1 NON-STRUCTURAL ALTERNATIVES UNDER CONSIDERATION

a. Design of H Street Intersections at North Capitol Street and 3rd Street to facilitate turning movements and improve traffic flow and eliminate streetcar tracks.

b. Construction sequencing and maintenance of traffic impacts.

c. Design of roadway lighting foundations on the bridge to maximize sidewalk widths.

d. Layout of drainage structures and pipes. Hydrologic, inlet and pipe sizing calculations will be performed as part of this scope.

e. Provision of pedestrian and bicycle access.

f. Conformation of the assumption that there will be no right-of-way impacts. If there are scope impacts, a change order to the proposed scope of work will be required.

g. Identification of existing utilities and conceptual layout of utility relocations required for Bridge Rehabilitation and or Bridge Replacement

h. Design of accommodating and supporting the third-party utilities by the bridge

C.3.5.2 CONSTRUCTABILITY

Review the sequence of construction provided by DDOT and revise to reflect the sequence of operations necessary for Bridge Rehabilitation or Bridge Replacement to be included in the final PS&E package. Consultant also will also assess what level of access is required to Amtrak and WMATA property, potential staging areas, and accelerated construction techniques.

Consultant will include resources that are specialized in coordination with Amtrak and WMATA for work within and adjacent to their respective rights of way. The consultant team will coordinate with Amtrak for review and approval of the rehabilitation design at each stage of design development as required by Amtrak address any comments received by Amtrak on the design. Consultant will coordinate closely with Amtrak in preparing the sequence of construction, means and methods and schedule for the Bridge Rehabilitation or Bridge Replacement to integrate track and / or OCS outages that are acceptable to Amtrak for each stage of construction and that will be included in the PS&E.

C.3.6 KEY STAKEHOLDER COORDINATION

C.3.6.1 MEETINGS

To facilitate the development of the project, the Consultant Team will have the Project Manager and one other key discipline team members attend the meetings noted below.

Stakeholder at Meeting Number of Meetings Duration of Meeting

All Key Stakeholders / Group Meeting

Four (4) meetings 4-hours per meeting

Amtrak Eight (24) meetings 2-hours per meeting

WMATA Four (4) meetings 2-hours per meeting

Akridge Four (8) meetings 2-hours per meeting

Union Station Redevelopment Corporation

Four (4) meetings 2-hours per meeting

Union Station Parking Garage & Bus Operators

Two (2) meetings 2-hours per meeting

C.3.6.2 DELIVERABLES

Deliverables will include the following:

1. Circulate meeting minutes within two working days.

a. Submit Bridge Rehabilitation or Bridge Replacement Plans to stakeholders for review and input; and

b. The Consultant Team will provide progress technical information for meetings. The various MOUs will be reviewed to be finalized by DDOT’s Legal Counsel.

C.3.7 UTILITY COORDINATION

DDOT will provide the Consultant Team with Quality Level A/B utility designation information on the approaches to the bridge and beyond.

The Consultant Team will meet with affected utility companies to understand their facilities in the project area and to coordinate relocation or protection of any impacted utility.

The Consultant Team will coordinate with the utility companies and incorporate the DDOT-approved proposed utility infrastructure supported by the bridge structure into the bridge design.

C.3.8 PUBLIC INFORMATION

C.3.8.1 STAKEHOLDER LIST

DDOT will provide the consultant with an initial stakeholder list for the project. Consultant will maintain/update the list throughout the duration of the project.

C.3.8.2 PUBLIC MEETINGS

The Consultant team will hold two public meetings. The work associated with the public meeting will include the following:

a. Selection and reservation of a meeting venue.

b. Prepare notifications for the meeting and distribute to the stakeholder communication list and website

c. Prepare an agenda and appropriate meeting materials.

d. Preparation for and attendance at both Public Meetings.

e. After the meeting consultant will prepare a meeting summary or meeting minutes; and

f. Prepare and maintain a database of project contacts including the names, addresses, phone numbers and email addresses of all meeting attendees.

C.3.8.3 PROJECT WEBSITE

The project website will be hosted on the DDOT HUB. Consultant will be responsible for monthly updating the site, adding material and notifications as necessary.

C.3.9 ENVIRONMENTAL

Consultants will provide up to 400 hours of technical support to DDOT for their updating of the EA as directed by DDOT. It is assumed DDOT will be responsible for conducting all agency coordination.

C.3.10 VALUE ENGINEERING WORKSHOP

For the Bridge Replacement, the Consultant Team will complete value engineering workshop to identify potential value engineering opportunities. A brief memorandum summarizing the findings of the workshop will be provided.

The workshop will include the key members of the design team and the value engineering reviewers as noted below.

The workshop will include the following members of the design team:

Project Manager.

Structural Design Lead.

Civil Design Lead.

Traffic Engineer.

C.4 APPLICABLE DOCUMENTS INCORPORATED BY REFERENCE

The following documents are applicable to this procurement and are hereby incorporated by reference:

Documents Links

DDOT Standard Drawings, 2020 or latest version https://ddotwiki.atlassian.net/wiki/spaces/COM /pages/2069271070/Standards+and+Manuals# Standard-Drawings

DDOT Standard Specifications for Highways and Structures, 2020 or latest version https://ddotwiki.atlassian.net/wiki/spaces/COM /pages/2069271070/Standards+and+Manuals# Standard-Specifications-for-Highways-and- Structures

A Policy on Geometric Design of Highways and Streets, AASHTO

DDOT Construction Management Manual https://ddotwiki.atlassian.net/wiki/spaces/COM /pages/2069271070/Standards+and+Manuals# Construction-Management-Manual

DDOT Design and Engineering Manual, 2023 or latest version https://ddotwiki.atlassian.net/wiki/spaces/COM /pages/2069271070/Standards+and+Manuals# Design-and-Engineering-Manual

DDOT Public Realm Design Handbook https://ddotwiki.atlassian.net/wiki/spaces/COM /pages/2069271070/Standards+and+Manuals# Public-Realm-Design-Manual

DDOT ROW Manual https://ddotwiki.atlassian.net/wiki/spaces/COM /pages/2069271070/Standards+and+Manuals# Right-of-Way-Manual

DDOT Work Zone Safety and Mobility Policy https://ddot.dc.gov/sites/default/files/dc/sites/d dot/publication/attachments/ddot_work_zone_t emporary_traffic_control_manual_2006.pdf

DDOT Standard CAD Manual and DDOT Workspace Installation https://ddot.dc.gov/sites/default/files/dc/sites/d dot/publication/attachments/ddot_microstation _v8_standard_cad_manual_and_workspace_in stallation_read_me.pdf

DDOT MicroStation® CAD Standards Manual https://ddotwiki.atlassian.net/wiki/spaces/COM /pages/2069271070/Standards+and+Manuals# MicroStation-V8-CAD-Standards-Manual

DDOT Environmental Policy and Process Manual https://ddotsites.com/documents/environment/ DDOT_EnvironmentalManual_2012.pdf

SECTION D: RESERVED

SECTION E: INSPECTION AND ACCEPTANCE

E.1 The inspection and acceptance requirements for this contract shall be governed by General Provisions (Federally Funded Agreements) dated February 19, 1981, revised March 2, 2001, including the Supplement to General Provisions (Federally Funded Agreements), revised 03/02/2001 (Attachment J.1)

E.2 Performance monitoring by DDOT will take place daily, monthly, and annually as required. Performance monitoring will be conducted by the DDOT Contract Administrator (CA). The CA will manage each project in accordance with the terms of the order and as delegated by the Contracting Officer in the CA Delegation Letter.

SECTION F: DELIVERIES OR PERFORMANCE

F.1 TERM OF CONTRACT

F.1.1 The term of the Contract shall be for a period of Eighteen (18) months for Rehabilitation design or for Twenty-four (24) months for Replacement design from date of award specified in block 24 on the Contract Form signature page.

F.1.2 RESERVED

F.2 DELIVERABLES

F.2.1 The Consultant shall be responsible for the professional quality, technical accuracy, and the coordination of all studies, reports, recommendations, and other deliverables it furnishes under this Contract. The Consultant shall, without additional compensation, correct or revise any non-conforming deliverables if the non-conformance is a result of errors in the Consultant’s studies, reports, recommendations, and other deliverables.

F.2.2 All studies, reports, recommendations, and other deliverables are subject to the review and approval of DDOT. DDOT shall coordinate reviews with any other involved agencies and serve as the one point of contact for all review and approval.

The Consultant shall prepare, modify, and correct all such non-conforming deliverables in sufficient detail to secure such approval.

The Consultant shall be responsible for the professional quality, technical accuracy, and the coordination of all reports, recommendations, and other deliverables it furnishes under the Contract. The Consultant shall, without additional compensation, correct or revise any non-conforming deliverables, if the non-conformance is a result of errors in the Consultant’s reports, recommendations, and/or other deliverables.

The Consultant shall perform the activities required to successfully complete the District’s requirements and submit each deliverable to the Contract Administrator (CA) as identified in section C.3.4.6 and C.3.6.2.

SECTION G: CONTRACT ADMINISTRATION DATA

G.1 INVOICE PAYMENT

G.1.1 The District will make payments to the Consultant, upon the submission of proper invoices at the prices stipulated in this contract, for supplies delivered and accepted or services performed and accepted, less any discounts, allowances or adjustments provided for in this contract.

G.1.2 The District will pay the Consultant on or before the 30th day after receiving a proper invoice from the Consultant.

G.2 INVOICE SUBMITTAL

a) The Consultant shall create and submit applications for payment in an electronic format through the DC Vendor Portal, https://vendorportal.dc.gov.

b) Unless otherwise specified in the Contract, the Consultant shall submit proper invoices on a monthly basis by 15th of the following month.

c) To constitute a proper invoice, the Consultant shall enter all required information into the Portal after selecting the applicable purchase order number, which is listed on the Consultant’s profile.

G.3 PAYMENT

G.3.1 The compensation method for this Contract is specific rates of compensation.

G.3.2 When compensation is based on labor hours, the consultant’s compensation shall be based upon a loaded hourly rate which includes the total of Direct Salary Expense (DSE), the approved final indirect cost rate, and, under certain circumstances as defined below, profit. When the compensation method is specific rates of compensation or cost per unit of work, profit shall also be included in the negotiated fully loaded rates. Loaded hourly rates must be included for each of the key personnel positions identified in Attachment J.7 as well as for all personnel in other work classifications which may be necessary to fulfil the requirement.

G.3.3 Profit: Profit will be negotiated based on the unique complexities and performance risks of each project. The negotiated profit rate shall not exceed ten percent (10%) except in extraordinary circumstances as determined by the Contracting Officer.

Profit shall be included in the negotiated fully loaded rates.

G.3.4 Direct Salary Expense (DSE)

G.3.4.1 DSE is defined as the actual salaries, expressed on an hourly wage basis, prior to deductions for employment taxes (such as FICA, Medicare, income tax withholding) and employee-paid benefits, of all personnel, including Consultant's employees directly engaged on the Project (and performing consultations or research or preparing documents for the Project). DSE shall exclude mandatory and customary fringe benefits, overhead expense, and profit relating to the Project. Any multiplier applied to such DSE shall be for the purpose of covering such fringe benefits, expense, and profit. All personnel shall mean anyone employed by the Consultant and its subconsultants including, but not limited to, Key Personnel as defined in this contract, engineers, architects, officers, principals, associates, CADD technicians, designers, job captains, draftspersons, and writers, who are performing consultation, research or design, or who are producing documents pertaining to the Project, or who are performing program management services during planning, design, or construction of the Project or any component thereof that are directly attributable to, and necessary for, program management related to such planning, design, or construction.

G.3.4.2 In the event a DSE is misrepresented by the Consultant, the District reserves the right to adjust the compensation paid to the Consultant to reflect the difference between the reimbursed and actual allowable DSE.

G.3.4.3 The use of overtime may be authorized under this Contract if the overtime premium does not exceed an amount approved by the Contracting Officer for work:

G.3.4.3.1 Necessary to cope with emergencies such as those resulting from accidents, natural disasters, breakdowns of production equipment, or occasional production bottlenecks of a sporadic nature;

G.3.4.3.2 By indirect labor employees such as those performing duties in connection with administration, protection, transportation, maintenance, standby plant protection, operation of utilities, or accounting;

G.3.4.3.3 To perform tests, industrial processes, laboratory procedures, loading or unloading of transportation conveyances, and operations in flight or afloat that are continuous in nature and cannot reasonably be interrupted or completed otherwise; or

G.3.4.3.4 That will result in lower overall costs to the District.

G.3.4.3.5 All requests for estimated overtime premiums shall include all estimated overtime for Contract completion and shall:

1) Identify the work unit; e.g., department or section in which the requested overtime will be used, together with present workload, staffing, and other data of the affected unit sufficient to permit the Contracting Officer to evaluate the necessity for the overtime;

2) Demonstrate the effect that denial of the request will have on the contract delivery or performance schedule;

3) Identify the extent to which approval of overtime would affect the performance or payments in connection with other District contracts, together with identification of each affected contract; and

4) Provide reasons why the required work cannot be performed by using multishift operations or by employing additional personnel.

G.3.5 Other Direct Costs ("ODC"): Consultant is authorized to reimbursement of ODCs subject to the following provisions.

G.3.5.1 Types, rates, and amounts of allowable ODCs, if any, shall be negotiated. ODCs, if allowed, shall be subject to a maximum not-to-exceed amount.

G.3.5.2 Non-salary direct costs shall include purchase and rental of all materials, supplies, and equipment necessary for the performance of the services on each assignment and cost of outside professional consulting or contracting services, all at invoiced cost to the Consultant, plus the cost of communications and reproductions directly chargeable to the project, plus necessary travel and per diem expenses. The purchase of outside professional consulting or contracting services is allowable when the employment type is an individual (Sole Proprietor) acting as an independent Consultant (i.e., 1099) or when the service customarily includes a cost per unit of work (e.g., Drill Rig & Crew, Test Pits for Utility Locating, etc.). Independent Consultants shall be invoiced at the Consultant’s established fixed hourly rate with the independent consultant without indirect costs. The purchase cost of all materials, supplies and equipment, which are not for the exclusive use in providing the services included in this Agreement, are not allowed as non-salary direct costs and shall be included in the Consultant's overhead. These items include, but are not limited to, copiers, computers, software, refrigerators, coffee makers, microwave ovens, cellular phones, pagers, helmets, tape measures, fire extinguishers, and professional books and references.

G.3.6 Equipment rental shall be billed at cost.

G.3.6.1 The cost of motor vehicle rentals and the cost of common carriers shall be the actual cost incurred. The cost of motor vehicle leases and rentals shall be the actual cost incurred, subject to audit. Leases must be supported by bona fide documentation from the leasing company and will only be allowed from established companies in the business of leasing vehicles.

G.3.6.2 For use of personal or company owned vehicles, the reimbursement rate per mile stipulated in the cost proposal shall be the General Services Administration ("GSA") Privately Owned Vehicle mileage reimbursement rate published at the time the cost is incurred.

G.3.6.2.1 The Consultant shall maintain a mileage log for each project. The Consultant shall submit the project mileage log to the District with each invoice and upon request from the Contracting Officer.

G.3.6.3 For personnel in travel status, reimbursement of actual expenses up to the maximum amount per day will be allowed for meals and hotel. The allowable amount shall be

GSA's per diem rates published for the performance location at the time the cost is incurred. Travel must be approved in advance and in writing by the District.

G.3.6.4 Costs of time applied and charged directly to each assignment of the services of special outside consultants, Consultants, or drafting services shall be included in nonsalary direct costs at rates stipulated in the proposal.

G.3.6.5 Invoiced cost to the Consultant of all technical computations for each assignment performed by outside commercial electronic computation services shall be included in non-salary direct costs.

G.3.7 Facilities Capital Cost of Money (FCCM): FCCM is an allowable expense subject to the following provisions.

G.3.7.1 If reimbursement of FCCM is proposed, it shall be separately stated in the cost proposal.

G.4 INDIRECT COST RATES (ICR)

The Consultant shall maintain a current approved indirect cost rate throughout the term of this Contract. To the maximum extent practicable, the District intends to negotiate contract costs based on the Consultant’s approved final indirect cost rate(s) from the Consultant’s most recently completed fiscal year. Consultants providing services under the Contract shall develop indirect cost rates on an annual basis in accordance with the Federal Cost Principles at 48 CFR Part 31 (Federal Acquisition Regulation). Notwithstanding the foregoing definition of DSE, Consultant's indirect cost rate shall comply with 48 CFR Part 31, 2 CFR Part 200, and 23 CFR § 172.

Subconsultants’ indirect cost rates are subject to the same requirements. The Consultant shall provide separate indirect cost rates for home office and co-location when required. A Consultant's indirect cost rate(s) and business systems (e.g., Accounting System) are subject to audit throughout the life of the Contract. An indirect cost rate or business system that is cognizant-approved, or otherwise acceptable under current laws and regulations, shall be used.

G.4.1 For Consultants with a field and home office indirect cost rate, the Consultant shall state which rate applies based on the preponderance of the work location.

G.4.2 For Consultants with a unitary rate, the District reserves the right to require project specific rates that reflect the causal-beneficial relationship between the Consultant's activities in the field and the pool of costs being reimbursed, and in accordance with 27 DCMR § 3313. Such rates will take precedence over the same audit rate for the period. Such rates may be documented using an advance agreement.

G.4.3 A Consultant may voluntarily propose the use of an indirect cost rate that is lower than its current approved rate, and the Contracting Officer may accept such a rate via the execution of an advance agreement if a project specific rate or an indirect cost rate agreement.

G.4.4 The Consultant and subconsultant's indirect cost rates will be subject to review and audit by the OCP Assurance and Compliance Team (see Section G.6.1) and FHWA for the life of the Contract. A subconsultant is an independent Consultant providing services to and under direct contract to the Consultant for a portion of the Consultant's negotiated services for individual orders placed under the Contract.

G.4.4.1 The District shall reimburse the Consultant for such indirect costs that are allowable, allocable, and reasonable under generally accepted accounting principles and as allowed in the Federal Acquisition Regulation Part 31 and not prohibited by the laws of the District of Columbia.

G.4.4.2 Such indirect costs designated as overhead in the Consultant's Cost Summary (Attachment J.6), shall be applied to an allocation base such as direct labor. The allocation base shall represent a logical grouping based on a causal-beneficial relationship of the allocation base to the final cost objectives.

G.4.4.3 Final indirect cost rate submissions shall be proposed utilizing one of the following types: (In order of preference)

1) An Indirect Cost Rate Schedule approved by a cognizant state or federal entity;

2) An arms-length auditing firm possessing the necessary credentials to perform such an audit in accordance with FAR Part 31 and a CO approved Certification of Final Indirect Costs; or

3) Self-Certification of Indirect Cost Rates (See G.4.4.3.4 for more information).

G.4.4.3.1 If a Consultant receives an annual approval of its Indirect Cost Rates from a cognizant state of federal entity, it shall utilize G.4.4.3(1) as its final incurred cost submission type.

G.4.4.3.2 A fiscal year's rate determination, using one of the above, shall be used in establishing the current approved indirect cost rate except as permitted in § G.4.6 Use of District Safe Harbor Indirect Cost Rates.

G.4.4.3.3 An incurred cost submission provided under G.4.4.3 must be performed in accordance with Generally Accepted Government Auditing Standards (GAGAS), 48 Code of Federal Regulations (CFR) Part 31, 23 CFR 172, and the AASHTO Uniform Audit & Accounting Guide for Architectural & Engineering Consulting Firms (Attachment J.12).

G.4.4.3.4 A Consultant with greater than or equal to $1,000,000 in sales in two of the last three years is prohibited from utilizing § G.4.4.3(3) Self-Certification of Indirect Cost Rates. If requested by a Consultant, the Contracting Officer may grant a waiver to this requirement on a case-by-case basis.

G.4.4.4 Annual Indirect Cost Rate Package

The annual incurred cost package shall be submitted to OCP (See § G.7) within six months of the Consultant's annual fiscal year end. Reasonable extensions, for exceptional circumstances only, may be requested in writing by the Consultant and granted in writing by the Contracting Officer.

The Consultant shall submit a complete and adequate incurred cost package in an electronic format using the DDOT Consultant Submission Portal at the following link:

https://caci.jotform.com/team/ocpddot-ac/ICR. Please note, when using this link, Consultants will receive automated e-mail correspondence from: noreply@formresponse.com. If you have any questions or issues using this link, please e-mail the OCP Assurance and Compliance Team at ocp.ddot-ac@dc.gov. The Consultant’s annual incurred cost package shall include:

G.4.4.4.1 Incurred Cost Submission (G.4.4.3)

G.4.4.4.2 Cost Summary- applicable only to work performed under cost type contracts for the fiscal year of the ICR submission. (Attachment J.6) A cost summary is not applicable for fixed-price contracts negotiated based on an approved final indirect cost rate.

G.4.4.4.3 Internal Control Questionnaire for Consulting Engineers (Attachment J.10)

G.4.4.4.4 Certification of Final Indirect Costs (Attachment J.8)

G.4.4.4.5 Executive Compensation Analysis Matrix (Attachment J.11)

G.4.4.4.6 If requested, additional supporting documentation. All documents required for complete and adequate submission can be accessed from the DDOT Consultant Submission Portal’s information page link: Checklist for ICR Submissions.

G.4.4.5 The Consultant shall submit certified payroll for all staff working on the Contract including certified payrolls for all subconsultants (or when subconsultants are determined).