North Bethesda Metro Station Northern Entrance Progressive Design-Build RFP Summary
This is a Request for Proposals (RFP) issued by Montgomery County Department of Transportation (MCDOT) in Maryland for Progressive Design-Build services for the North Bethesda Metro Station Northern Entrance project located at 5400 McGrath Boulevard, Rockville, Maryland. The County seeks a qualified Design-Builder to deliver comprehensive services including the construction of a new second Metrorail entrance with an at-grade entrance, stairs, elevator, mezzanine, and canopy structure, along with a new transit plaza featuring widened sidewalks, landscape, and hardscape elements. The project aims to shorten walking distances to the Metro station and facilitate access to the Pike & Rose mixed-use development and surrounding community amenities. The RFP was issued November 16, 2026, with a pre-submission conference scheduled for December 9, 2026 at 11:00 AM EST. Questions are due by December 28, 2026 at 5:00 PM EST, and proposals must be submitted electronically through BidNet Direct no later than February 24, 2027 at 3:00 PM EST. Technical presentations and interviews for the top three ranked offerors are anticipated for the week of March 22, 2027, with anticipated contract execution by May 20, 2027 and Notice to Proceed by May 31, 2027. Phase 1A is estimated at 120 calendar days from NTP, Phase 1B targeting Q1 2028, and overall project completion including as-built permits by March 31, 2031.
The contract will be executed in three phases: Phase 1A (Scope Validation), Phase 1B (Design, Engineering, and Pre-Construction Services), and Phase 2 (Final Design and Construction Services). Offerors must submit separate Technical and Price Proposals, with pricing components including a Phase 1A Services Fee (cost-reimbursable with a not-to-exceed cap) and a Phase 2 Margin Percentage for contractor markup. The County anticipates funding through a combination of federal, state, and local sources, including a Federal grant from the U.S. Department of Transportation's Fiscal Year 2025 BUILD Program administered by the Federal Transit Administration (FTA). The Design-Builder must provide performance and payment bonds each in the penal sum of 100 percent of the estimated contract value (assumed at $600 million for bonding purposes). Mandatory insurance requirements apply, including coverage costs calculated into the proposal price. Offerors must comply with the Wage Requirements Law and prevailing wage certifications. The Lead Contractor must have minimum ten years of demonstrated transit, heavy civil, and transportation construction experience with alternative delivery experience, while the Lead Designer must have minimum ten years of demonstrated transit, heavy civil, and transportation design experience. The Design-Builder will partner with Montgomery County, WMATA (the station owner and operator), and stakeholder agencies in a collaborative, potentially co-located environment throughout project delivery.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Page
Montgomery County Government
Request for Proposals (RFP) for
RFP #1197773
North Bethesda Metro Station Northern Entrance North Bethesda, MD
PROGRESSIVE DESIGN-BUILD PROJECT
Montgomery County Department of Transportation
NOTICE OF SOLICITATION
North Bethesda Metro Station Northern Entrance
North Bethesda, MD
RFP SUMMARY Montgomery County, Maryland is soliciting proposals for the provision of services from a qualified Design-Builder for a Progressive Design-Build as outlined in this RFP. The Project proposes a comprehensive suite of investments that facilitate safer, more direct access to the North Bethesda Metro Station, and includes the delivery of a new Metro Entrance and Transit Plaza. Capitalized terms used, but not defined herein, have the meaning assigned to such term in Appendix A to this RFP or the Draft Contract included in Appendix G.
RFP ISSUE DATE 11/16/2026
PROPOSAL DUE
DATE
Proposals are due on 2/24/2027 no later than 3:00 PM EST
RFP TYPE:
Progressive Design Build
Services Contract Construction Contract Goods Contract ☒ Yes ☐ No
☒ Yes ☐ No ☐ Yes ☒ No Professional Services
WAGE LAW
APPLICABILITY
Services Contract (Wage Requirements Law)
Construction Contract (Davis Bacon Act) Goods Contract
☒ Yes ☐ No ☒ Yes ☐ No Not applicable
PRE-SUBMISSION
CONFERENCE
A pre-submission conference will be held on 12/9/2026 at 11:00 AM EST. It is highly recommended that all proposers attend.
https://teams.microsoft.com/meet/2357323879776483?p=37C7OcbCoZs3IO5fFq Meeting ID: 235 732 387 977 648 3 Passcode: Uj6Ns2Qc Dial in by phone +1 443-692-5768, 832169969# United States, Baltimore Find a local number Phone conference ID: 832 169 969#
RFP QUESTIONS Technical Questions Contact Maricela Cordova from the Montgomery County Department of Transportation at 240- 337-2237 or via email at Maricela.Cordova@montgomerycountymd.gov
Procurement Questions Contact Jing Chen at 240-777-9916 or via email at jing.chen@montgomerycountymd.gov
RFP QUESTIONS
DUE DATE
12/28/2026 no later than 5:00 PM EST.
PERFORMANCE
BOND
☒ YES
Refer to Section 8 (8.1 and 8.2) for details.
☐ NO
PROPOSAL
SUBMISSION
PROCESS
Prospective offerors must submit their proposals electronically via BidNet Direct.
https://teams.microsoft.com/meet/2357323879776483?p=37C7OcbCoZs3IO5fFq tel:+14436925768,,832169969 https://dialin.teams.cloud.microsoft/4abe07b2-4f3a-4505-8d90-0757bd461b97?id=832169969 https://www.bidnetdirect.com/maryland/montgomerycounty
TABLE OF CONTENTS
Page
NOTICE OF SOLICITATION
SECTION 1. INTENT
SECTION 2. SCOPE OF WORK
SECTION 3. SUBMISSION INSTRUCTIONS
SECTION 4. EVALUATION CRITERIA AND METHOD OF AWARD
SECTION 5. PERFORMANCE PERIOD
SECTION 6. COMPENSATION AND PRICE ADJUSTMENTS
SECTION 7. CONTRACT ADMINISTRATOR
SECTION 8. SPECIAL TERMS AND CONDITIONS
SECTION 9. ETHICS
SECTION 10. INSTRUCTIONS, CONDITIONS AND NOTICES
ATTACHMENTS:
ATTACHMENT A. MONTGOMERY COUNTY, MARYLAND GENERAL TERMS AND CONDITIONS OF
CONTRACT
ATTACHMENT B. ACKNOWLEDGEMENT PAGE
ATTACHMENT C. REFERENCES
ATTACHMENT D. COST AND PRICE REQUIREMENTS
ATTACHMENT E. FEE SCHEDULE/PRICING SHEET
ATTACHMENT F. MANDATORY INSURANCE REQUIREMENTS
ATTACHMENT G. PERFORMANCE BOND
ATTACHMENT H. SIGNATURE PAGE
ATTACHMENT I. DOCUMENTS AND FORMS
APPENDIX A. DEFINITIONS AND INTERPRETATIONS
APPENDIX B. TECHNICAL PROPOSAL (VOLUME 1) CHECKLIST AND FORMS
APPENDIX C. TECHNICAL PROPOSAL (VOLUME 2) CHECKLIST AND FORMS
APPENDIX D. PRICE PROPOSAL (VOLUME 2) CHECKLIST AND FORMS
APPENDIX E. REQUEST FOR INFORMATION
APPENDIX F. REFERENCE DOCUMENTS
APPENDIX G. DRAFT CONTRACT (PHASE 1A AND PARTS 1, 2 AND 3)
SECTION 1. INTENT
1.1. General Provisions
Montgomery County (the County), through its Office of Procurement and the Department of Transportation (MCDOT), is seeking the services of a qualified Design-Builder for a Progressive Design-Build contract as further described in this Request for Proposal (RFP).
Capitalized terms used, but not defined herein, have the meaning assigned to such term in Appendix A to this RFP or the Draft Contract included in Appendix G.
***IMPORTANT***
The County has included in the Administrative Submittal (Volume 1) the “certifications” and clauses required by Federal regulations, as per Best Practices Procurement Manual, (BPPM) Section 4.3.3.2.and BPPM Appendix A1.
Items or Services purchased from this contract may be funded by the Federal Transit Administration (FTA) and are subject to the FTA terms and conditions included in the Administrative Submittal. These terms and conditions cannot be modified or negotiated. By submitting a proposal, Offerors must agree to abide by the included FTA terms and conditions.
Offerors must submit all required certifications with their proposals and comply with all requirements in the FTA Master Agreement.
Note: This information is based upon the policies and guidance expressed in (a) the FTA Administrator's "Dear Colleague" letter of October 1, 1998, (b) the FTA Best Practices Procurement Manual, (c) FTA Circular 4220.1G and (d) 48 CFR Part 36 Subpart 36.3 (up to date as of 7/31/2024) Two-Phase Design-Build Selection Procedure.
In compliance with Section 4.1.2 Formal Solicitation – Best Value Procurement – Request for Proposals, of the County’s COMCOR 11B.00.01 Procurement - Regulations, the procurement method is a two-step, largely qualifications-based selection process, in which the interested offerors to this RFP (Offerors) will initially submit a Technical Proposal (including qualifications) and a separate Price Proposal, each as more fully described in this RFP. Once the Technical and Price Proposals are evaluated and scored, the top three ranked Offerors will be invited to the second step – an interview with the County’s Qualifications & Selection Committee (the QSC). The County is seeking responses to this RFP from Offerors who are qualified and prepared in all respects to undertake the design and construction of the North Bethesda Metro Station Northern Entrance project (the Project) via the progressive design-build approach.
As the local jurisdiction in which the project is located, the County, will lead the development of the Contract and Contract modification(s); support the Design-Builder in design, constructability, value engineering, quality, risk management; design reviews, development and approval of the baseline schedule and schedule updates; participate in the development of progressive construction cost estimates, bid packages, bidding process and development of the Guaranteed Maximum Price (GMP); lead the development of third party agreements; and lead the coordination with the Federal Transit Administration (FTA) and other agencies as needed. In addition, in collaboration with the County, the Washington Metropolitan Area Transit Authority (WMATA), as the owner and operator of the project site, the North Bethesda Metro station, and the new Entrance to the station, will be a key stakeholder in the coordination and decision-making process for the Project design, approvals, and overall project implementation.
1.2. Background
Located at the corner of Rockville Pike and Marinelli Road in Montgomery County, Maryland, the North Bethesda Metro Station provides local and regional commuters with substantial access to multi-modal transportation options, including Metrorail (Red Line), one
(1) Metrobus route, and seven (7) Montgomery County “Ride On” bus transit routes to reach jobs, services, and amenities. In the future, the Station will also provide access to two planned Montgomery County Bus Rapid Transit services (“MD355 FLASH BRT” and “North Bethesda
FLASH BRT”).
WMATA owns the 14-acre site adjacent to the existing North Bethesda Metro Station where it is planning a new life-science anchored transit-oriented development (TOD) under their Federal Transit Administration authorized Joint Development Program. This new TOD development is expected to yield significant economic competitiveness and opportunity, safety, environmental sustainability, quality of life, community connectivity, and state-of-good-repair benefits for Montgomery County, the region, and the State of Maryland.
To this effect, WMATA recently selected Hines as the developer for the new North Bethesda joint development. The future development is envisioned to include delivery of 1,445 new residential units, 695,000 sq ft of biotech/healthcare space, including a signature building to be the future home of the University of Maryland’s Institute for Health Computing, and 75,000 sq ft of mixed-use retail, with Montgomery County’s North Bethesda Metro Station Northern Entrance project as the gateway to this redevelopment.
To realize the vision and goals for the TOD project, the full range of planned public space amenities and infrastructure must be visually appealing and well-coordinated to encourage human interaction and seamlessly integrate the surrounding mix of uses, transportation, and infrastructure systems into an environment that activates North Bethesda as a place for living, cultural exchange, free expression, working, and creating. This can only be achieved through collaboration among all stakeholders. Hines, as WMATA’s chosen Developer for the joint development project, will lead the initial outreach and master planning for the entire TOD project. The County seeks to partner with a Design-Builder capable of integrating and coordinating with this important initiative.
1.3. RFP Goals
The County’s priorities for the Project are:
Safety: Provide safe transportation and transit solutions of the highest quality, helping to achieve the County’s Vision Zero goals;
Environmental Sustainability: Reduce car dependency and vehicle miles traveled (VMT) and attract new riders by providing improved service options for existing riders as an alternative to congested automobile travel through the area;
Quality of Life: Increase access to housing, jobs, and amenities;
Mobility and Community Connectivity: Enhance transit connectivity and multimodal integration as part of a coordinated regional transit network, and improve transit access to major employment and activity centers;
Economic Competitiveness: Accelerate real estate development, jobs creation, and workforce development;
State of Good Repair: Modernize aging infrastructure; and, Partnership, Collaboration and Innovation: Establish and maintain a project team that can timely deliver a successful, well-coordinated project that all stakeholders can be proud of through innovative processes and strategies, transparency, regional partnering, and positive collaboration with agency and community stakeholders.
The delivery goals for the Project are as follows:
(A) Quality & Safety:
1. Execute a safe project for workers and the public during construction while safely maintaining all traffic on MD 355 and Old Georgetown Road, including pedestrians and cyclists traveling along and across the MD 355 and Old Georgetown Road intersection; minimize disruption to WMATA’s Metrorail Station facilities and bus public boarding locations, and minimize disruption and maintain access to businesses, schools, medical facilities, residences, and neighborhoods around the project area.
2. Achieve environmental and permit commitments through high-quality, innovative design solutions.
3. Provide high-quality, aesthetic, durable, maintainable, sustainable, and resilient facilities, understanding that some elements of the Project may be owned, operated, and maintained by others upon acceptance of the Project. Ensure that elements of the Project that will not be owned or maintained by the County are accepted by their respective entities at project completion.
4. Minimize disruption of other construction work in the vicinity of the Project, other federal, State, and local transportation projects, and work by adjacent property owners.
5. Provide active public outreach and engagement, relations, and communications to gain and maintain public trust and integrity.
6. Provide a final and fully commissioned project that achieves the County’s and WMATA’s stated operational and service level goals.
(B) Time: Time is of the essence. Ensure timely delivery of the Project.
See Procurement and Project Schedule in Section 1.9.
(C) Cost: Finalize the design and maximize the construction of elements of the Project within the available funding, while ensuring that what is constructed results in an innovative and highly functional system, continuous from end to end (i.e., transit performance and build to budget).
SECTION 2. SCOPE OF WORK
2.1. General Requirements
Located at the intersection of Rockville Pike (MD 355) and Old Georgetown Road (MD
187) just north of the existing North Bethesda Metro Station, with an official address at 5400 McGrath Boulevard, Rockville, MD 20852, the Project will add a second Metrorail entrance.
The North Bethesda Metro Station Northern Entrance project’s objective is to shorten the walking distance to the Metro for residents, commuters, and visitors from nearby land uses, including the 4 million-square-foot Pike & Rose mixed-use development, nearby residences, medical facilities, schools, offices, restaurants, grocery stores, and other retail services, and various daily destinations. It is expected that this second entrance to the North Bethesda Metro station will position North Bethesda as a major regional hub for commerce, entertainment, and culture.
The Project proposes a comprehensive suite of investments that facilitate safer, more direct access to Metrorail. The Project involves the delivery of:
• A New North Station Metro Entrance. To reduce the distance transit users need to walk or bike and create a secondary point of access to the station closer to major destinations and several community amenities. The construction of this element of the Project includes a new at-grade entrance with a stair to the existing platform below, a new elevator, service and support areas, an over-platform mezzanine, and a canopy structure that will provide access and weather protection to the new stairs and elevators. The new entrance will be furnished in accordance with current Metrorail station standards.
• A New Transit Plaza at the Station. To provide access in support of the expected increase in pedestrian traffic and to establish the Metro Station as a welcoming, activated, gathering area for the community. The construction of this element of the Project includes a new at-grade plaza directly outside the new station entrance, widened sidewalks, landscape, and hardscape.
In addition, as a separate contract, the County is implementing certain Intersection Safety Improvements at the intersection of Rockville Pike (MD 355) and Old Georgetown Road (MD 187). As part of this project, safety and mobility will be improved through new crosswalks, the addition of no-turn-on-red signage, and the removal of channelized right-turn lanes. These improvements decrease crossing distance and improve pedestrian and cyclist priority and visibility at the intersection. The design is complete, and because this represents a safety priority, the County plans to bid this project separately and start construction as soon as the new Metro Entrance project is underway. The coordination and integration of the Safety Improvements and Metro Entrance projects will be critical to the overall project’s success.
The Project's priorities align with the goals of the County’s Racial Equity and Social Justice Act of 2019, which is intended to help reduce and ultimately eliminate racial and other disparities experienced by residents of color across Montgomery County. Providing alternate means of mobility in disadvantaged communities (typically people of color and other marginalized groups whose poverty and education levels, English proficiency, housing tenure, and per capita income are disproportionately lower than those of other areas of the County) will improve access to jobs, housing, education, medical services, shopping, and county facilities. Reliable travel times, along with the other proposed improvements of the Project, are extremely important for those who rely heavily on pedestrian, bicycle, and transit facilities in the region's congested areas. The Project will expand opportunities for these disadvantaged communities by increasing access, mobility, and reliable travel times; generating redevelopment opportunities around the Metro station; supporting a safer intersection for bicyclists, pedestrians, low- and no-vision residents, and others with disabilities; and benefiting the existing transportation network.
The Project responds to Montgomery County’s White Flint Sector Plan from 2010, which proposed the construction of the new north Metro entrance. The White Flint Sector Plan was developed through a public engagement effort that drew on the collaboration of an advisory committee, a steering committee, and residents. The Montgomery County Planning Board established the White Flint/North Bethesda Implementation Advisory Committee to monitor the Sector Plan’s progress and encourage ongoing public engagement. The County expects its extensive engagement approach to continue throughout the Project and is seeking to partner with a Design-Builder who is sensitive to the needs of the communities that the Project will benefit and impact during and after construction.
Part 3 of the Draft Contract Documents (Project Requirements / Scope of Work) contains a more detailed description of roles and services to be provided by the Design-Builder, WMATA, and the County (see Appendix G). Additional scope, and revisions to this scope, could be identified and incorporated into the contract during the Project’s preconstruction phase.
2.2. Service Requirements
The Project will be delivered through a phased Progressive Design-Build Contract as described below. These phases and the work associated with each phase are further described in Part 3 of the Draft Contract Documents (Project Requirements/Scope of Work;
see Appendix G).
2.2.1 Phase 1A: Scope Validation
Phase 1A includes, but is not limited to, the review of project documents; meetings and workshops with the County, WMATA, Third Parties, and Stakeholders; validation of the scope of work; development of the program of requirements and concept plans necessary to support the program of requirements coordination; development of project management plans and a baseline cost sheet and schedule; development, submission, negotiation, and ultimately, the County’s (and third parties’, as applicable) acceptance of the detailed scope of work and fee for Phase 1B Services. As part of the development of the Scope and Lump Sum Fee for Phase 1B Services, the Design-Builder, in coordination with the County and WMATA, will identify potential allowances and/or contingencies to address risks that cannot be otherwise mitigated.
Value engineering, risk management, and constructability reviews are expected as part of this phase, as applicable, and throughout the entire design development and pre-construction process. This phase and the associated required submittals are more fully described in Part 3 of the Draft Contract (Project Requirements/Scope of Work), contained in Appendix G.
2.2.2 Phase 1B: Design, Engineering, and Pre-Construction Services
During Phase 1B, based on the County-accepted deliverables under Phase 1A and the provisions of the Phase 1B Amendment, the Design-Builder shall develop the design of the Project to a level sufficient for the purposes of establishing its Opinion of Probable Cost (OPC), which will serve as the basis of the project budget, and develop an initial Critical Path Method
Project Schedule (CPM) and Construction Sequencing Plan for Phase 1B and Phase 2 Work.
The initial OPC and CPM schedule may be developed at approximately 30% design. The Design-Builder shall develop 30 % design documents for review and approval, including the OPC and shall then advance the design to 60% and update the OPC, incorporating any approved value engineering and constructability concepts. The Design-Builder shall then advance the design to about 80-90% to serve as the basis for the Design-Builder's GMP for Phase 2 Work. This process is more fully described in Appendix G (Draft Contract). During the latter stages of Phase 1B, the Design-Builder will develop its proposed GMP for Phase 2 Work and a detailed CPM schedule for overall Project delivery. In accordance with Part 1 of the Contract Documents, certain discrete elements of the anticipated Phase 2 Work may be delivered via a Contract Modification for Early Work Package(s) commensurate with the Design-Builder’s performance of the Phase 1B Work. See Section 1.4.4 for more information regarding Early Work Packages. The Design-Builder shall support the County and WMATA with community outreach and engagement activities, including, but not limited to, the development of presentation materials, surveys, public meetings, and workshops.
2.2.3 Phase 2: Final Design and Construction Services
The County will issue a Notice to Proceed for Phase 2 if it accepts the Design-Builder's Phase 2 proposal for the Phase 2 Work and determines that it is in the County's and the general public's best interest to continue working with the Design-Builder. The Contract includes information regarding the County’s and the Design-Builder's rights and obligations in the event that the County does not accept the Design-Builder's Phase 2 Proposal or issues a Notice to Proceed for Phase 2. If the County accepts the Design-Builder's Phase 2 Proposal and issues a Notice to Proceed for Phase 2, the Contract will be amended to incorporate the accepted Phase 2 Proposal. At such time, the Design-Builder will be required to fulfill its obligations regarding performance and payment bonds and insurance coverage in accordance with the Contract Documents.
Phase 2 Work includes final design, construction, and commissioning services for the Project, in whole or in part, depending on the agreed scope of work for the Phase 2 Amendment. This may include several work packages, each of which must have a corresponding GMP. The Design-Builder will be required to perform the Phase 2 Work in accordance with the negotiated scope resulting from the Phase 1A Work, Phase 1B Work, and the Contract Amendment for Phase 2 Work. The Phase 2 Work includes completion of any Design Work not included in Phases 1A and 1B, permitting, construction of the mutually agreed to scope, testing, and commissioning, development/submission of As-Built Plans and record documents, and achieving Final Acceptance of the Project (as prescribed in the Contract Documents). Phase 2 also includes implementing all environmental and mitigation measures identified in the NEPA document.
2.2.4 Early Work Packages
As more fully described in Appendix G (Draft Contract), the Design-Builder may be required to commence performance of certain Early Work Package(s) identified and agreed upon by the County and the Design-Builder during Phase 1B in advance of the full Notice to Proceed for Phase 2. The County may authorize the performance of Early Work Packages during Phase 1B by issuing interim Notices to Proceed for Early Work Packages in advance of the full Notice to Proceed for Phase 2. Following negotiations on Early Work Packages and upon the County's acceptance of the Work, the Design Builder will be required to fulfill its obligations regarding performance bonds, payment bonds, and insurance coverage in accordance with the Contract Documents.
2.3. Performance Metrics and Contract Management
2.3.1 Funding Overview
Funding for the Project is expected to be provided through a combination of federal, state, and local sources. The County was awarded a Federal grant from the United States Department of Transportation’s (USDOT) Fiscal Year 2025 Better Utilizing Investments to Leverage Development (BUILD) Program, administered by the FTA, for which certain process and oversight requirements, as outlined in the FTA Master Agreement, dated May 2, 2024, Circular 4220.1G – Third Party Contracting Guidance, and FTA’s Best Practices Procurement Manual Appendix A.1 and, 48 CFR Part 36 Subpart 36.3, are applicable. The Design-Builder is anticipated to support the County with FTA’s Project Readiness review process as necessary (e.g., Value Engineering and Constructability evaluations) and other FTA requirements as set forth in the Contract.
2.3.2 RFP Documents
This RFP provides instructions for Offerors to follow in their Proposals. Technical Proposals must comply with the provisions of this RFP and must address and/or consider the project goals identified in Section 1.3 (Project Priorities and Goals), above.
The RFP Documents include the following:
(A) RFP including Appendices;
(B) Draft Contract Documents (Appendix G):
1. Part 1 (Progressive Design-Build Contract);
2. Part 2 (General Conditions of Progressive Design-Build Contract);
3. Part 3 (Project Requirements/Scope of Work);
(C) Reference Documents (Appendix F); and
(D) Addenda to the RFP issued by the County.
The Contract Documents will also include the Memoranda of Agreement with Stakeholders (once drafted and executed will become Part 4) and the Design-Builder’s Proposal (which will become Part 5). The RFP, Reference Documents, and any Addenda to the RFP will NOT become part of the Contract Documents.
Each Offeror is solely responsible and liable for all investigations and analyses related to the preparation of its Proposal for the Project, as more fully described in Section 1.7 (Reference Documents and Diligence), including the costs of such preparation, in accordance with Section 2.6 (Offeror's Costs Not Reimbursable), and complying with all requirements of this
RFP.
2.3.3 Reference Documents and Diligence
Certain documents (Reference Documents) are made available to the Offerors for the purpose of providing such information relating to the RFP process or the Project as is in https://www.transit.dot.gov/sites/fta.dot.gov/files/2024-05/FTA-Master-Agreement-v31-05-02-2024.pdf https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/Third%20Party%20Contracting%20Guidance%20%28Circular%204220.1F%29.pdf https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/Third%20Party%20Contracting%20Guidance%20%28Circular%204220.1F%29.pdf https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/funding/procurement/8286/fta-best-practices-procurement-and-lessons-learned-manual-2016.pdf https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/funding/procurement/8286/fta-best-practices-procurement-and-lessons-learned-manual-2016.pdf possession of the County. Links to Reference Documents are provided in Appendix F (Reference Documents).
Except as otherwise clearly stated in the Draft Contract:
• The County makes no representations or warranties with respect to the reliability, relevance, accuracy, completeness, or fitness for any purpose of any of the Reference Documents and will not be responsible or liable to any Offeror for any loss or cause of action whatsoever suffered by an Offeror by reason of any use of information contained in or any action in reliance on, a Reference Document.
• If an Offeror intends to use information contained in any Reference Document, such use will be at Offeror’s own risk. An Offeror is solely responsible for determining which information is sufficiently reliable, relevant, accurate, complete, and fit for Offeror’s use and intended purpose.
• The County will not be liable to any Offeror for any failure to make available any materials, documents, drawings, plans, or other information relating to the Project.
The Reference Documents are subject to revision at any time, but the County is under no obligation to notify an Offeror of any such revisions.
By submission of a Proposal, the Offeror will, subject to the terms of this RFP, be deemed to have satisfied itself as to:
• the nature and extent of the risks to be assumed by the Design-Builder under the Contract; and
• the accuracy and adequacy of any information obtained from the County or otherwise.
The Offeror acknowledges and confirms that it will not submit a Proposal on the basis of, and is not entitled to rely upon, any statement or representation (whether negligent, innocent, or otherwise) or warranty or other provision (whether oral, written, express, or implied) made or agreed to by the County, any of its agents or employees.
2.3.4 Definitions
Refer to Appendix A (Definitions and Interpretations), for the meaning of various abbreviations, acronyms, and terms used herein.
2.3.5 Procurement and Project Schedule
The County currently anticipates conducting this procurement in accordance with the following list of milestones. This schedule is subject to revision, and the County reserves the right to modify it as it deems necessary, in its sole discretion.
Issue RFP ................................................................ November 16, 2026
Pre-Submission Conference .................................... December 9, 2026 11:00 AM EST
Deadline to submit questions ................................... December 28, 2026 5:00 PM EST
County will respond to questions .............................. January 18, 2027
Issue RFP Addendum (if required) ........................... February 5, 2027
Proposal Due Date*** ............................................... February 24, 2027 3:00 PM EST
Technical Presentation/Interviews* ........................... week of March 22, 2027
Anticipated Notice of Intent to Award Date ............... April 22, 2027
Anticipated Contract Execution ................................ May 20, 2027
Anticipated Notice to Proceed (NTP) ........................ May 31, 2027
Phase 1A Duration ................................................... 120 calendar days from NTP
Targeted End of Phase 1B** .................................... Q1 of 2028
Project Completion (including As-Built Permits) ....... March 31, 2031
*Invitations to Interviews to be distributed no less than 10 days prior.
**Subject to change based on negotiated Scope of Work and Schedule for Phase 1B Services.
The Proposal must be submitted no later than February 24, 2027, prior to 3:00 p.m.
(prevailing local time - EST).
***Subject to change, if changed it will be via Solicitation Amendment
SECTION 3. SUBMISSION INSTRUCTIONS
3.1. Proposal Submissions
1. Failure of an offeror to submit all required proposal submissions may render its proposal unacceptable as determined by the Director, Office of Procurement.
2. Offerors must electronically submit their proposal through BidNet Direct in the format detailed below. Proposals will be evaluated only on material that is submitted. The offeror must submit sufficient information to enable the Qualification Selection Committee (QSC) to evaluate the offeror’s capabilities and experience.
The Offeror is responsible for ensuring that the materials uploaded to BidNet Direct are properly formatted and not corrupted. Offerors should carefully check their submissions on BidNet Direct following upload to confirm that all documents were properly uploaded and legible. Offerors will not be allowed to submit or supplement any missing, corrupted, or illegible documents after the solicitation has closed.
Proposals must include the following information (including labeled sections numbered as shown):
3.1.2.1. A cover letter with a brief description of the firm, including the offeror’s name, address, telephone number, and email address.
https://www.bidnetdirect.com/maryland/montgomerycounty
3.1.2.2. The completed Acknowledgment Page of this solicitation, signed by a person authorized to bind the offeror to the proposal (see Attachment B).
3.1.2.3. At least three References that may be contacted to attest to the quality and timeliness of the offeror’s work of similar nature and scope as that required by the County in this solicitation (see Attachment C).
3.1.2.4. This solicitation is subject to the Wage Requirements Law, see NOTICE OF SOLICITATION. The offeror must submit the appropriate Wage Requirements Law Certification forms. Failure to submit and complete the required material information on the form(s) may cause the offeror’s proposal to be unacceptable under County law, and the Award Submissions
Prior to the execution of a contract, the following items must be submitted:
3. Offeror’s Certification of Cost and Price (for contract value greater than $100,000).
4. Certificate of Insurance (see Attachment F).
3.1.4.1. The proposed contract awardee must provide the applicable insurance coverage, and all costs for this coverage must be calculated into offeror’s proposal price.
5. This solicitation is subject to the Wage Requirements Law (see Notice of Solicitation).
Offeror must submit the Certification of Posting the Wage Requirements Notices.
3.2 General Provisions Regarding Proposal Submissions
3.2.1 Commitments in the Proposal
The verbiage used in each Proposal will be interpreted and evaluated based on the level of commitment provided by the Offeror. Tentative commitments will be given no consideration.
For example, phrases such as “we may” or “we are considering” will receive no consideration in the evaluation process, as they do not indicate a firm commitment.
3.2.1.1 Property of the County
All documents submitted by the Offerors in response to this RFP will become the property of the County and will not be returned to the Offerors.
3.2.1.2 RFP Compliance
This RFP provides instructions for Offerors to follow during the procurement process.
Offerors must comply with all requirements established in this RFP. Requirements will generally use the words “shall,” “will,” or “must” (or equivalent terms) to identify a required item that must be submitted with an Offeror’s Proposal. Failure by an Offeror to comply with any of the terms of this RFP may result in the disqualification of the Offeror from the solicitation.
Offerors must comply with all applicable federal, State, and local laws, codes, and standards in all aspects in connection with the procurement process of this RFP, and the successful Design-Builder must do the same in the performance of the Contract as described more fully below and in the Contract. When laws and regulations conflict, the more stringent will apply.
https://www.montgomerycountymd.gov/office-procurement/solicitations-contracts/solicitation-forms https://www.montgomerycountymd.gov/office-procurement/solicitations-contracts/solicitation-forms https://www.montgomerycountymd.gov/office-procurement/solicitations-contracts/solicitation-forms
By submitting a Proposal, the Offeror agrees to the terms, conditions, and requirements contained in this RFP and applicable law.
3.2.1.3 Improper Conduct
3.2.1.3.1 Prohibited Activities
If the Offeror, or anyone representing the Offeror, offers or gives any advantage, gratuity, bonus, discount, bribe, or loan of any sort to the County, including agents or anyone representing the County at any time during this procurement process, the County will immediately disqualify the Offeror, and the County may seek appropriate legal recourse against the Offeror.
The Offerors, including any of their officers, directors, partners, controlling stockholders, or employees, must not have engaged in, been indicted for, or convicted of any prohibited activities listed below, and will confirm this by submitting their Proposal.
Discrimination as defined in §19-103 of the State Finance and Procurement Article of the Annotated Code of Maryland. Discrimination also includes retaliating against any person or other entity for reporting any incident of discrimination.
Bribery, attempted bribery, or conspiracy to bribe in violation of Maryland law, or of the law of any other State or federal law.
Fraud, embezzlement, theft, forgery, falsification, or destruction of records, or receiving stolen property;
Racketeering, Corruption, or Mail Fraud, for acts in connection with the submission of bids or proposals for a public or private contract; and, Violation of any of the following:
• State or federal antitrust statute for acts or omissions in connection with the submission of bids or proposals for a public or private contract;
• State Minority Business Enterprise Law, Section 14-308 of the State Finance and Procurement Article of the Annotated Code of Maryland;
• Section 11-205.1 of the State Finance and Procurement Article of the Annotated Code of Maryland; and,
• One or more of the following provisions of the Internal Revenue Code:
o §7201, Attempt to Evade or Defeat Tax, o §7203, Willful Failure to File Return, Supply Information, or Pay Tax, o §7205, Fraudulent Withholding Exemption Certificate or Failure to Supply Information, o §7206, Fraud and False Statements, or o §7207 Fraudulent Returns, Statements, or Other Documents;
• 18 U.S.C. §286 Conspiracy to Defraud the Government with Respect to Claims, 18 U.S.C. §287, False, Fictitious, or Fraudulent Claims, or 18 U.S.C. §371, Conspiracy to Defraud the United States;
• The Tax-General Article, Title 13, Subtitle 7 or Subtitle 10, Annotated Code of Maryland;
• The State Prevailing Wage Laws as provided in the State Finance and Procurement Article, Title 17, Subtitle 2, Annotated Code of Maryland;
• The State Living Wage Laws as provided in the State Finance and Procurement Article, Title 18, Annotated Code of Maryland;
• The Labor and Employment Article, Title 3, Subtitles 3, 4, or 5, or Title 5, Annotated Code of Maryland.
• Compliance with local laws and ordinances in the prosecution of any previous or current contracts with the County.
3.2.1.3.2 Organizational Conflicts of Interest
The Offeror’s attention is directed to the Common Grant Rule, 49 C.F.R. § 18.36, and FTA Circular C 4220.1G (Third Party Contracting Guidance) regarding organizational conflicts of interest. Chapter VI, Section 2.a.(4).(h).1 defines “organizational conflict of interest” as follows:
“An organizational conflict of interest occurs when any of the following circumstances arise:
(a) Lack of Impartiality or Impaired Objectivity. When the Contractor is unable, or potentially unable, to provide impartial and objective assistance or advice to the recipient due to other activities, relationships, contracts, or circumstances.
(b) Unequal Access to Information. The Contractor has an unfair competitive advantage through obtaining access to nonpublic information during the performance of an earlier contract.
(c) Biased Ground Rules. During the conduct of an earlier procurement, the contractor has established the ground rules for a future procurement by developing specifications, evaluation factors, or similar documents.”
The Offeror is prohibited from receiving any advice or discussing any aspect relating to the Project or the procurement of this RFP with any Person with an organizational conflict of interest, including, but not limited to, the Persons identified herein.
An individual or entity that has received monetary compensation as the lead or prime design consultant under a contract with the County for the North Bethesda Metro Station Northern Entrance project to develop the concept plan, and/or to review the County’s proposed plans for this procurement, and/or have been retained to perform preconstruction and/or construction phase related services on behalf of the County and/or State, or a person or entity that employs such an individual or entity, may not submit a Proposal for this procurement and will not be considered a “responsible Offeror” under Montgomery County Procurement Regulation 11B.00.01.02. Any Proposal received from such an individual or entity will be rejected pursuant to Montgomery County Procurement Regulations 11B.00.01.02 and 11B.00.01.06.
Firms deemed as having an organizational conflict of interest due to their respective participation in the development of conceptual design and/or bridging documents under a contract with the County related to this procurement include the following:
• Hayat Brown LLC
• STV Incorporated
• WSP US
Montgomery County makes no representations regarding the completeness of the list.
In addition, Article XII, Ethics in Public Contracting, Chapter 11B, Contracts and Procurement of the Montgomery County Code, contains various restrictions on participating in County procurements. Any questions regarding eligibility must be appealed to the County. No official or employee of the County, as defined under Article III, Chapter 19A of the Montgomery County Code, whose duties as such official or employee include matters relating to or affecting the subject matter of this contract, will during the pendency and term of this contract and while serving as an official or employee of the County and/or State, become or be an employee of the Consultant or an entity that is a subcontractor on this contract.
No official or employee of the County, during his/her/their tenure or for one year thereafter shall have any interest, direct or indirect, in this Contract or the proceeds thereof, regardless of whether they participated in matters relating to this contract while in employment of the County.
3.2.1.3.3 Restrictions on Participation in Design-Build Contracts and/or on More than One Offeror’s Team
The Montgomery County Ethics Commission (the Commission) administers the provisions of the Montgomery County Public Ethics Law, as found in Chapter 19A of the Montgomery County Code. Section 11B.00.01.16 of Montgomery County Procurement Regulations contains various restrictions on participating in State or County procurements. No firm that is ineligible for State or County contracts thereunder may participate as a member of the Design-Builder’s team. Any questions regarding eligibility should be directed to the Montgomery County, Office of Procurement, See RFP’s page 1 for Jing Chen’s contact information.
Offerors are advised that the Major Participants (i.e., Lead Designer and Lead Contractor), as well as named Key Personnel may not be named parties on more than one Offeror team. The only exception to this requirement is for those participants who are Disadvantaged Business Enterprises, only if their role is not that of a Lead Designer or Lead Contractor.
Only one Technical Proposal and one Price Proposal will be accepted from each Offeror.
3.2.1.4 Equal Employment Opportunity
In connection with this RFP and the Contract, the Design-Builder (and its member firms) must not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, age, marital status, or physical disability. Design-Builder (and its member firms) must take affirmative action to ensure that all applicants are treated equally during employment, without regard to race, color, religion, sex, national origin, age, marital status, or physical challenge. The areas requiring such affirmative action include, but are not limited to, the following: layoff or termination; rates of pay or other forms of compensation; employment, job assignment, upgrading, demotion, transfer, recruitment/ recruitment advertising and selection for training, including apprenticeship, pre-apprenticeship, and/or on-the-job training.
3.3 Proposal Submittal Requirements
The County’s objective through the procurement process is to identify the highest qualified, best-value Offeror with the capability (technical, financial, and management), capacity, and experience necessary to successfully undertake and complete the work. The County is seeking a Design-Builder that has a demonstrated history of working collaboratively with its clients in alternate project delivery methods, operates as a team player and/or partner, is committed to co-locate, collaborate and/or coordinate with the County Project staff as needed, and shares the same priorities as its clients (i.e., is equally dedicated to the successful outcome of the Project).
While the participation of the Design-Builder’s Key Personnel will vary with the phases of the Project, the County’s expectation is that the Design- Builder will accommodate the County’s request for appropriate team members to attend in-person and virtual meetings with the County’s and WMATA’s Project team through the different phases of the Project as necessary to advance the project development. If deemed necessary by the project team, colocation might be considered. The Design-Builder will have primary responsibility for planning, designing, managing, controlling, and constructing the Project within the agreed-upon budget and schedule.
The County has set high standards of responsibility for the Design-Builder; these are reflected in the technical evaluation factors of this RFP and will also be reflected in the Contract.
3.3.1 General Instructions
Parties interested in being considered for award of the Project and entering into the Progressive Design-Build Contract with the County must submit a Technical Proposal and a Price Proposal, alone or with others, as the Design-Build Team. The Offeror may include other parties such as subconsultants, that they are committing as part of the Offeror team in their Technical Proposal submittal.
Offerors must electronically submit their Proposals no later than the time and date specified in Section 1.9 (Procurement and Project Schedule) through the Montgomery County Office of Procurement BidNet website portal (www.bidnetdirect.com/maryland/montgomerycounty). Vendors must register with BidNet Direct to view and respond to this RFP. Visit www.bidnetdirect.com and click on the link to register at no charge. Follow the registration path and select the "Limited Access" option to receive an automatic e-mail notification at no charge. For assistance with registration to BidNet, please call BidNet Direct’s Support Department at 800-835-4603, Option 2. For more detailed information regarding BidNet, registration fee, schedule, and transaction fee, use the website link:
https://www.montgomerycountymd.gov/PRO/Resources/Files/General/BidNetInstructions.pdf
It is the Offeror’s responsibility to follow all steps in BidNet to ensure proper and complete submission of the Proposals. The County will not accept Proposals submitted after the Proposal Due Date and time.
The County will not accept Proposals received via fax, email, mail, or personal delivery.
All faxed, emailed, mailed, or personally delivered Proposals will be returned to the Offeror(s).
The Proposals must be organized to match the order in which the information is requested in this RFP to the maximum extent practicable. Each submittal must clearly reference the RFP section number corresponding to the submittal (e.g., Project Understanding and Project Approach).
Each Offeror must include a separate Technical Proposal and Price Proposal that meet the requirements set out in this RFP. Each proposal submitted in response to this RFP must:
http://www.bidnetdirect.com/maryland/montgomerycounty http://www.bidnetdirect.com/ https://www.montgomerycountymd.gov/PRO/Resources/Files/General/BidNetInstructions.pdf
• Include one (1) Technical Proposal, with full supporting documentation in two cohesive Adobe PDF files, one constituting each of Volumes 1 and 2;
• Include one (1) Price Proposal in a cohesive Adobe PDF file submitted into a separate folder on BidNet.
• The combined size of these three files must not exceed 500GB;
• Be submitted in the format specified by the County in this RFP;
• Be submitted no later than the date specified on the Notice of Solicitation page (Page 1);
• Contain concise written material, enabling a clear understanding and evaluation of the capabilities of the Offeror and the characteristics and benefits of the Proposal against the Evaluation Criteria; and
• Provide enough information about the requested items to allow the County to evaluate the Offerors in accordance with the terms of this RFP.
3.3.2 Signatures
The Offeror’s Authorized Representative must sign all forms and letters requiring signature. All signatures must be original.
3.3.3 Language, Units, and Currency
All submittals must be prepared in English, all design plans must be delivered in Imperial Units of measurement, and all currency must be in U.S. Dollars.
3.3.4 Content, Format, and Organization
The Offeror’s Technical and Price Proposals must be on 8½” x 11” pages (except as noted below), accompanied by the required checklists and dividers to make the submittals easily usable. The Offeror’s Organizational Chart and Reference Project Forms may be prepared on 11” x 17” pages. Each section must be separated by numbered tabs with sections corresponding to the order set forth in subsections within Sections 2.4.1 and 2.4.2 below.
All fonts, except for the front cover of each volume of the Technical Proposal, should be Times New Roman 12-point. Times New Roman 10-point font may be used for filling out information on the Reference Project Forms (Form RPC-1, Form RPD-2, Form RPS-3), the Organizational Chart, and the Key Personnel Resume Form. The format and appearance, including existing text, of the Key Personnel Resume Form and the Reference Project Forms should not be modified. The Key Personnel Resume Forms must not exceed two (2) pages for each Key Personnel. The Reference Project Forms must not exceed one (1) page per project for each of the Lead Contractor and the Lead Designer.
3.3.5 Technical Proposal Instructions - Volume 1
Volume 1 of the Technical Proposal must include the Administrative Submittal (Volume
1) Checklist, all required Forms as listed in Section 2.4.1.2 and provided in Appendix B, the Surety Letter, and Copies of Licenses for the individuals and firms providing professional services. Any failure to provide all information and completed forms in the format specified will result in the County’s rejection of the Proposal. All blank spaces in the Proposal forms must be filled in as noted. No substantive change may be made to the Proposal Forms. All contents in the Offeror’s Volume 1 will be evaluated on a “pass/fail” basis.
3.3.5.1 Administrative Submittal (Volume 1) Checklist
The Administrative Submittal (Volume 1) Checklist provides the list and order of forms, letters, licenses, registrations, etc., to be submitted as part of Volume 1, and will serve as a table of contents for Volume 1.
3.3.5.2 Administrative Forms
The…