855398padot105980.pdf

PDF 1010 KB Posted

Attached to
US 219 - MD line to Meyersdale Bypass
Solicitation number
105980
Issued by
Washington County, Pennsylvania

About this file

US 219 Maryland Line to Meyersdale Bypass - Proposal Report

This is a Pennsylvania Department of Transportation (PennDOT) proposal report for a federally-funded highway construction project involving pavement preservation, bridge rehabilitation, traffic signal replacement, and drainage improvements. The project is located on US Route 219 from the Maryland Line to the end of the Meyersdale Bypass in Somerset County, Pennsylvania, spanning Summit and Elk Lick Township and Salisbury Borough (State Route 0219, Section 041, Segment 0010 Offset 0000 to Segment 0114 Offset 0262). The bid package includes numerous line items for asphalt milling and overlay work, with quantities including 80,914 square yards of 9.5 mm wearing course asphalt, 8,617 square yards of 19.0 mm binder course asphalt, 35,320 square yards of milling operations, guide rail installation and replacement totaling approximately 7,500 linear feet, concrete curb placement of approximately 1,400 linear feet, traffic signal equipment and controls, pavement markings, and various erosion and sediment control measures. The project is scheduled for letting on December 10, 2026, at 11:00 AM, with anticipated notice to proceed on January 25, 2027, and required completion by November 1, 2028. Prequalification is required; no pre-bid meeting is specified in the document.

The project cost range is $5,000,000 to $7,499,999.99, with an estimated structure work component of 5.0 percent. This is a standard federally-funded project with federal project status under PennDOT oversight and NHS (National Highway System) designation. The contract includes wage rate requirements and no Disadvantaged Business Enterprise (DBE) set-aside percentage. The project involves multiple special provisions addressing Buy America and Build America, Buy America Act compliance, Federal Labor Standards, erosion and sediment pollution control with post-construction stormwater management requirements, traffic control during construction, and equal employment opportunity obligations. All addenda will be posted electronically through the ECMS system. The bid opening location is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg, Pennsylvania.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL REPORT

Project: 105980 Bid Package: 1

Current Let: 12/10/2026 11:00:00 AM Version: Current

Addendum Count: 0

District: 09 County: Somerset

SR/SEC/Group ID: 219/041/---

Description US 219 - MD line to Meyersdale Bypass

PROPOSAL Report - Project 105980

Page 1 of 106November 17, 2026 10:27:15 AM

TABLE OF CONTENTS

BID PACKAGE SUMMARY 5

PROJECT ITEMS AND QUANTITIES 6

SPECIAL PROVISIONS 18

G50C - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) 18 G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW 18 C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413 19 C172A - a00172 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876 26 C173B - a00173 CHANGES TO SPECIFICATIONS: SECTION 106 32 C174A - a00174 CHANGES TO SPECIFICATIONS: SECTION 107 and APPENDIX C 35 G810A - a00810 MIXTURE ACCEPTANCE AND DENSITY ACCEPTANCE 36 G901B - a00901 ALTERNATE EROSION AND SEDIMENT POLLUTION CONTROL PLAN 37 G1101B - a01101 CONSTRUCTION PROCEDURES - EROSION AND SEDIMENT POLLUTION

CONTROL 38

G1601A - a01601 E.E.O. COVERED AREA 39 G2302A - a02302 Worker Protection and Investment 39 N13301B - a13301 DELIVERY OF MATERIAL TO DEPARTMENT STOCKPILE 40 D29890C - a29890 SPECIAL BIDDING – DESIGN-BUILD 41 D29899A - a29899 QUALITY PLAN WITH QUALITY ASSURANCE REVIEW BY DEPARTMENT -

LOW BID DESIGN 50

S6012B - b06012 - SECTION 601.3(f) BACKFILLING TRENCH 53 S6092B - b06092-SECTION 609.2(f) MISCELLANEOUS MATERIALS 54 I1F - c0490 ITEM 4490-0001 REMOVAL OF EXISTING ASPHALT SURFACE COURSE, BRIDGE 55 I1B - c0491 ITEM 4491-0115 MILLING OF ASPHALT PAVEMENT SURFACE, (SHOULDER

BACKUP) 2 1/2" DEPTH 55

I515D - c0515 ITEM 4515-0001 SAWING AND SEALING OF ASPHALT OVERLAYS, BRIDGE 56 00 - c0605 ITEM 4605-2630 TYPE E-S ENDWALL TWO PIPE OPENINGS 57 00 - c0605 ITEM 4605-2731 TYPE M CONCRETE TOP UNIT AND BICYCLE SAFE GRATE NON-

STANDARD DIMENSIONS 58

00 - c0605 ITEM 4605-2781 TYPE M FRAME AND BICYCLE SAFE GRATE NON-STANDARD

DIMENSIONS 58

I6091L - c0609 ITEM 0609-0009 EQUIPMENT PACKAGE 59 I610C - c0610 ITEM 4610-7002 6" PAVEMENT BASE DRAIN EXCLUDING GEOTEXTILE 60 00 - c0620 ITEM 4620-1680 TYPE 31-S GUIDE RAIL TO TYPE 31-SCC GUIDE RAIL TRANSITION

WITH 8' EXTRA LENGTH 61

00 - c0620 ITEM 4620-2010 THRIE-BEAM GUIDE RAIL TO CONCRETE BRIDGE BARRIER

TRANSITION WITHOUT CURB WITH 8 61

00 - c0627 ITEM 4627-3019 TEMPORARY BARRIER, TEST LEVEL 3, BARRIER DEFLECTION

DISTANCE < /=1&#039; DELINEATORS 62

00 - c0628 ITEM 4628-3019 RESET TEMPORARY BARRIER, TEST LEVEL 3, BARRIER

DEFLECTION DISTANCE < /=1&#039; DELIN 62

00 - c0630 ITEM 4630-0025 PLAIN CEMENT CONCRETE CURB, 4&#034; HEIGHT, INCLUDING

REMOVAL OF EXISTING CURB EXTRA 63

Page 2 of 106November 17, 2026 10:27:15 AM

I1C - c0660 ITEM 4660-0002 MILLED ASPHALT PAVEMENT CENTERLINE RUMBLE STRIPS, TYPE 2 MODIFIED 64

00 - c0695 ITEM 4695-0004 DETECTABLE WARNING SURFACE, POLYMER COMPOSITE

MAROON COLOR 64

I1A - c0810 ITEM 4810-0052 SELECTIVE TREE REMOVAL, INCLUDING FULL STUMP REMOVAL 65 I1A - c0901 ITEM 0901-0001 MAINTENANCE AND PROTECTION OF TRAFFIC DURING

CONSTRUCTION 65

00 - c0901 ITEM 4901-1000 TEMPORARY REMOVABLE RUMBLE STRIPS 68 I1A - c0952 ITEM 4952-1041 NEMA TS-2, TYPE 2 CONTROLLER ASSEMBLY, TYPE 2

MOUNTING, ATC CONTROLLER 69

I1D - c0955 ITEM 4955-3206 & 4955-3208 VEHICULAR SIGNAL HEAD, INCANDESCENT LOOK 70 I1A - c0956 ITEM 4956-0772 RADAR DETECTION SYSTEM, STOP BAR 71 N1D - c1003 ITEM 5003-0002 & 5003-0004 DOWEL HOLES, ADHESIVE ANCHORS 72 I1A - c1018 ITEM 1018-1048 REMOVAL OF PORTION OF EXISTING BRIDGE 73 I19992A - c1999 ITEM 1999-9999 TRAINEES 74 I1A - c9000 ITEM 9000-0001 WEIGHTED SEDIMENT FILTER TUBE 76 I1D - c9000 ITEM 9000-0006 & 9000-0007 TEMPORARY PIPE 76 I1A - c9000 ITEM 9000-0020 TEMPORARY STREAM DIVERSION DEVICE 77 I1A - c9000 ITEM 9000-0021/0022/0023 TEMPORARY PUMP BYPASS SYSTEM 78 I1A - c9000 ITEM 9000-0027 REPAIR OF TEMPORARY IMPACT ATTENUATING DEVICE 79 I1A - c9000 ITEM 9000-0029 DOCUMENTATION OF AREAS ADJACENT TO EXISTING

DRAINAGE FEATURES 80

I1B - c9000 ITEM 9000-0120 SPECIAL MORTAR REPAIRS 81 I1D - c9000 ITEM 9000-0130 SPECIAL CONCRETE REPAIRS 83 I1D - c9000 ITEM 9000-0135 SCARIFICATION 2 3/4&#034; DEPTH 84 00 - c9000 ITEM 9000-0141 SPECIAL CONCRETE BEAM ENCASEMENT REPAIR 85 00 - c9000 ITEM 9000-0210 UNFORSEEN EXISTING BRIDGE REPAIRS 86 00 - c9000 ITEM 9000-0600 SOLAR POWERED FLASHING WARNING DEVICE 87 00 - c9000 ITEM 9000-0601 RIVER ROCK, 6&#034; DEPTH 88 00 - c9000 ITEM 9000-0602 REMOVE AND RESET VINYL FENCE 88 00 - c9000 ITEM 9000-0603 BRICK SIDEWALK RECONSTRUCTION 89 00 - c9000 ITEM 9000-0604 14&#034; X 23&#034; ELLIPTICAL REINFORCED CONCRETE PIPE

FLARED END SECTION 90

00 - c9000 ITEM 9000-1000 INLET FILTER MAT 91 I1B - c9000 ITEM 9000-1045 TEMPORARY AND PERMANENT MAILBOX RESETTING 91 I9000H - c9000 ITEM 9000-5001 DESIGN OF CEMENT CONCRETE CURB RAMPS 92 I9000H - c9000 ITEM 9000-5002 CONSTRUCTION OF CEMENT CONCRETE CURB RAMPS 95 I68C - c9000 ITEM 9000-5101 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION

AGGREGATE 96

I70C - c9000 ITEM 9000-5103 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION

CONCRETE 97

I2032D - c9000 ITEM 9203-0101 TEMPORARY EXCAVATION SUPPORT AND PROTECTION

SYSTEM 99

N1D - d01 ADVANCE NOTICE TO CHANGE IN TRAFFIC CONTROL 101

Page 3 of 106November 17, 2026 10:27:15 AM

N1B - NOTICE TO CONTRACTOR - WORKING HOURS 102

N1B - PROJECT FIELD OFFICE 102

S1A - SECTION 413(h)1.a PLACING 103

N1C - SECTION 810 - TREE TRIMMING AND SELECTIVE TREE REMOVAL 103

N1A - SPOTTED LANTERNFLY QUARANTINE AREA 104

N1A - TEMPORARY PAVEMENT MARKINGS ON FINISHED WEARING SURFACES 105

N1A - TRAFFIC BARRIER PRE-INSTALLATION FIELD MARK-OUT 105

Page 4 of 106November 17, 2026 10:27:15 AM

BID PACKAGE SUMMARY

Project: 105980 Bid Package: 1

Project Type: Standard Posted:

Federal Project Status: PENNDOT Oversight NHS State Type of Work: RESURFACING/OVERLAYS

Prequalification Required: Yes Pre-Bid Meeting: None

408 Version: 2026-1

Scheduled Let: 12/10/2026 11:00:00 AM Project Cost Range: $5,000,000.00 - $7,499,999.99 Anticipated NTP: 01/25/2027 Structure Work: 5.00%

Required Completion: 11/01/2028 DBE: 0% Wage Rates: Yes

Description:

This project is the Pavement Preservation and Rehabilitation of a bridge over Piney Creek, Traffic Signal Replacement and Drainage Improvements on US 219 from the Maryland Line to the end of the Meyersdale Bypass in Summit and Elk Lick Township and Salisbury Borough, Somerset County as indicated on the approved drawings included in the bid package for STATE ROUTE 0219, SECTION 041 from approximately Segment 0010 Offset 0000 to Segment 0114 Offset 0262.

Additional Information:

This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.

Page 5 of 106November 17, 2026 10:27:15 AM

PROJECT ITEMS AND QUANTITIES

Alt Item Work Class Code Unit Of

Measure Quantity Unit Price PDP Spec

Prov Add Action

0201-0001 A Lump Sum 1.0000 N

CLEARING AND GRUBBING

0203-0001 C Cubic Yard 7,872.0000 N

CLASS 1 EXCAVATION

0203-0003 C1 Cubic Yard 1,153.0000 N

CLASS 1A EXCAVATION

0203-0006 G4 Linear Foot 18,769.0000 N

SAW CUTTING

0204-0010 C1, H Linear Foot 2,131.0000 N

CLEANING EXISTING DITCHES EXCAVATION

0204-0100 C1, S1, T1 Cubic Yard 86.0000 N

CLASS 3 EXCAVATION

0204-0150 C1, H, S Cubic Yard 7.0000 N

CLASS 4 EXCAVATION

0205-0263 C1 Cubic Yard 34.0000 N

SELECTED BORROW EXCAVATION ROCK, CLASS R-3

0205-0264 C1 Cubic Yard 90.0000 N

SELECTED BORROW EXCAVATION ROCK, CLASS R-4

0205-0281 C1 Cubic Yard 1,816.0000 N

SELECTED BORROW EXCAVATION, COARSE AGGREGATE, NO. 1

0205-0292 C1, S4 Cubic Yard 68.0000 N

STRUCTURE BACKFILL

0212-0014 C3, H, M2 Square Yard 1,581.0000 N

GEOTEXTILE, CLASS 4, TYPE A

0212-0016 C3, H, M2 Square Yard 5,144.0000 N

GEOTEXTILE, CLASS 4, TYPE C

0222-0012 C3 Square Yard 391.0000 N

GEOCELL LOAD DISTRIBUTION MAT TYPE A, 6" DEPTH, TEXTURED WALLS/PERFORATED

0313-0530 E Square Yard 8,648.0000 N SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, 3 TO < 10 MILLION ESALs, 25.0 MM MIX, 8" DEPTH

0313-0537 E Ton 436.0000 N SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, 3 TO < 10 MILLION ESALs, 25.0 MM MIX

0350-0106 C, E Square Yard 392.0000 N

SUBBASE 6" DEPTH (NO. 2A)

Page 6 of 106November 17, 2026 10:27:15 AM

0350-0108 C, E Square Yard 8,648.0000 N

SUBBASE 8" DEPTH (NO. 2A)

0350-0121 C, E Ton 124.0000 N

SUBBASE (NO. 2A)

0405-0001 X Dollar 1.0000 $1.00 Y

ASPHALT PAVEMENT LONGITUDINAL JOINT DENSITY INCENTIVE/DISINCENTIVE

0413-0298 F Square Yard 80,914.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64S-22, 3 TO < 10 MILLION ESALS, 9.5 MM MIX, 1 1/2"

DEPTH, SRL-H

0413-0308 F Ton 37.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64S-22, 3 TO < 10 MILLION ESALS, 9.5 MM MIX, SRL-H

0413-2089 F Ton 4,882.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE (LEVELING), PG 64S-22, 3 TO < 10 MILLION ESALS, 9.5

MM MIX, SRL-L

0413-6055 F Square Yard 8,617.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64S-22, 3 TO < 10 MILLION ESALS, 19.0 MM MIX, 2 1/2"

DEPTH

0413-7011 F Ton 108.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE (LEVELING), PG 64S-22, 3 TO < 10 MILLION ESALS, 19.0 MM

MIX

0460-0003 F4 Square Yard 171,444.0000 N

ASPHALT TACK COAT (NTT/CNTT)

0461-0001 F4 Square Yard 13,147.0000 N

ASPHALT PRIME COAT

0467-0006 F2 Linear Foot 1,122.0000 N

HEAVY DUTY MEMBRANES 48" WIDTH

4490-0001 C1, F3 Square Yard 173.0000 N Std

REMOVAL OF EXISTING ASPHALT SURFACE COURSE BRIDGE

0491-0014 F3 Square Yard 35,320.0000 N MILLING OF ASPHALT PAVEMENT SURFACE, 2 1/2" DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR

0491-0033 F3 Square Yard 663.0000 N

MILLING OF ASPHALT PAVEMENT SURFACE, 2" DEPTH, MILLED MATERIAL RETAINED BY DEPARTMENT (DELIVERED

TO STOCKPILE)

0491-0034 F3 Square Yard 14,404.0000 N

MILLING OF ASPHALT PAVEMENT SURFACE, 2 1/2" DEPTH, MILLED MATERIAL RETAINED BY DEPARTMENT

(DELIVERED TO STOCKPILE)

0491-0039 F3 Square Yard 127.0000 N

MILLING OF ASPHALT PAVEMENT SURFACE, VARIABLE DEPTH, MILLED MATERIAL RETAINED BY DEPARTMENT

(DELIVERED TO STOCKPILE)

4491-0115 F3 Square Yard 22,573.0000 N Std

MILLING OF ASPHALT PAVEMENT SURFACE, (SHOULDER BACKUP) 2 1/2" DEPTH

Page 7 of 106November 17, 2026 10:27:15 AM

4515-0001 G1, G4 Linear Foot 102.0000 N Std

SAWING AND SEALING OF ASPHALT OVERLAYS BRIDGE

0601-5901 H1 Linear Foot 1,289.0000 N

CLEANING EXISTING PIPE CULVERTS, DIAMETERS UP TO AND INCLUDING 36"

0601-5902 H1 Linear Foot 66.0000 N

CLEANING EXISTING PIPE CULVERTS, DIAMETERS OVER 36"

0601-6100 H Linear Foot 79.0000 N 14" X 23" ELLIPTICAL REINFORCED CONCRETE PIPE, TYPE A HORIZONTAL, < 1.5' FILL, 100 YEAR DESIGN LIFE

0601-7014 H Linear Foot 2.0000 N

18" REINFORCED CONCRETE PIPE, TYPE A, 15' - 2' FILL, 100 YEAR DESIGN LIFE

0601-7313 H Linear Foot 573.0000 N

18" REINFORCED CONCRETE PIPE, TYPE B, 15' - 1.5' FILL

0601-7326 H Linear Foot 432.0000 N

24" REINFORCED CONCRETE PIPE, TYPE B, 10' - 2' FILL

0601-7362 H Linear Foot 29.0000 N

42" REINFORCED CONCRETE PIPE, TYPE B, 10' - 3' FILL

0605-1300 C1, H1 Each 28.0000 N

CLEANING DRAINAGE STRUCTURES

4605-2630 K Each 1.0000 N Proj

TYPE E-S ENDWALL TWO PIPE OPENINGS

0605-2646 K Each 1.0000 N

TYPE D ENDWALL FOR 36" PIPE

0605-2648 K Each 1.0000 N

TYPE D ENDWALL FOR 42" PIPE

0605-2676 K Each 1.0000 N

TYPE D-W ENDWALL FOR 36" PIPE

0605-2731 K Set 10.0000 N

TYPE M CONCRETE TOP UNIT AND BICYCLE SAFE GRATE

4605-2731 K Set 1.0000 N Proj

TYPE M CONCRETE TOP UNIT AND BICYCLE SAFE GRATE NON-STANDARD DIMENSIONS

0605-2740 K Set 3.0000 N

TYPE S CONCRETE TOP UNIT AND GRATE

0605-2781 K Set 2.0000 N

TYPE M FRAME AND BICYCLE SAFE GRATE

4605-2781 K Set 4.0000 N Proj

TYPE M FRAME AND BICYCLE SAFE GRATE NON-STANDARD DIMENSIONS

0605-2850 K Each 6.0000 N

Page 8 of 106November 17, 2026 10:27:15 AM

STANDARD INLET BOX, HEIGHT < /= 10'

0608-0001 X Lump Sum 1.0000 N

MOBILIZATION

0609-0003 X Lump Sum 1.0000 N

INSPECTOR'S FIELD OFFICE AND INSPECTION FACILITIES, TYPE B

0609-0009 X Lump Sum 1.0000 N Std

EQUIPMENT PACKAGE

0610-0003 H2 Linear Foot 505.0000 N

8" PIPE UNDERDRAIN, TYPE I BACKFILL

4610-7002 H2 Linear Foot 15,584.0000 N Std

6" PAVEMENT BASE DRAIN EXCLUDING GEOTEXTILE

0610-7400 H2 Cubic Yard 7.0000 N

ADDITIONAL COARSE AGGREGATE FOR EXTRA DEPTH PAVEMENT BASE DRAIN

0615-0022 H2 Linear Foot 175.0000 N

6" SUBSURFACE DRAIN OUTLETS

0615-0023 H2 Linear Foot 17.0000 N

8" SUBSURFACE DRAIN OUTLETS

0615-0040 H2 Each 11.0000 N

SUBSURFACE DRAIN OUTLET ENDWALL

0615-0066 C1, H2, R Each 11.0000 N

66" RED SUBSURFACE DRAIN OUTLET MARKER

0618-0022 H Each 1.0000 N

CONCRETE COLLAR FOR 18" PIPE EXTENSION

0619-0459 J1, J3 Each 13.0000 N

PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 3, TANGENT (MASH)

0620-0400 J Each 3.0000 N

TERMINAL SECTION, SINGLE

0620-0500 J Linear Foot 25.0000 N

RESET GUIDE RAIL

0620-0503 C1, J Linear Foot 6,717.0000 N

REMOVE EXISTING GUIDE RAIL (CONTRACTOR'S PROPERTY)

0620-0575 J Linear Foot 525.0000 N

GUIDE RAIL ELEMENT

0620-0872 J Each 3.0000 N

BURIED-IN-BACKSLOPE TERMINAL, SINGLE PANEL

0620-1600 J Linear Foot 3,263.0000 N

TYPE 31-S GUIDE RAIL

Page 9 of 106November 17, 2026 10:27:15 AM

0620-1602 J Linear Foot 1,375.0000 N

TYPE 31-S GUIDE RAIL WITH 8' EXTRA LENGTH POSTS

0620-1625 J Linear Foot 163.0000 N

TYPE 31-SC GUIDE RAIL

0620-1627 J Linear Foot 288.0000 N

TYPE 31-SC GUIDE RAIL WITH 8' EXTRA LENGTH POSTS

0620-1635 J Linear Foot 175.0000 N

TYPE 31-SCC GUIDE RAIL

0620-1638 J Linear Foot 950.0000 N

TYPE 31-SCC GUIDE RAIL WITH 8' EXTRA LENGTH POSTS

0620-1650 J Each 3.0000 N

TYPE 31-STRONG POST END TREATMENT

0620-1670 J Each 3.0000 N

TYPE 31-STRONG POST IN-LINE ANCHOR

0620-1680 J Linear Foot 63.0000 N

TYPE 31-S GUIDE RAIL TO TYPE 31-SCC GUIDE RAIL TRANSITION

4620-1680 J Linear Foot 75.0000 N Proj TYPE 31-S GUIDE RAIL TO TYPE 31-SCC GUIDE RAIL TRANSITION WITH 8' EXTRA LENGTH POSTS

0620-2010 J Each 3.0000 N

THRIE-BEAM GUIDE RAIL TO CONCRETE BRIDGE BARRIER TRANSITION WITHOUT CURB

4620-2010 J Each 1.0000 N Proj

THRIE-BEAM GUIDE RAIL TO CONCRETE BRIDGE BARRIER TRANSITION WITHOUT CURB WITH 8' EXTRA LENGTH

POSTS

4627-3019 J1 Linear Foot 612.0000 N Proj

TEMPORARY BARRIER, TEST LEVEL 3, BARRIER DEFLECTION DISTANCE < /=1' DELINEATORS

4628-3019 J1 Linear Foot 72.0000 N Proj RESET TEMPORARY BARRIER, TEST LEVEL 3, BARRIER DEFLECTION DISTANCE < /=1' DELINEATORS

0630-0025 K Linear Foot 1,363.0000 N

PLAIN CEMENT CONCRETE CURB, 4" HEIGHT, INCLUDING REMOVAL OF EXISTING CURB

4630-0025 K Linear Foot 116.0000 N Proj PLAIN CEMENT CONCRETE CURB, 4" HEIGHT, INCLUDING REMOVAL OF EXISTING CURB EXTRA DEPTH

0630-0041 K Linear Foot 175.0000 N

PLAIN CEMENT CONCRETE CURB, 8" HEIGHT

0643-0010 J1 Linear Foot 48.0000 N

TEMPORARY CONCRETE MEDIAN BARRIER, STRUCTURE MOUNTED, 32" HEIGHT

0644-0010 J1 Linear Foot 48.0000 N

TEMPORARY CONCRETE MEDIAN BARRIER, STRUCTURE MOUNTED, 32" HEIGHT, RESET

0659-0001 F4 Square Yard 3,202.0000 N

HIGH FRICTION SURFACE TREATMENT (HFST)

Page 10 of 106November 17, 2026 10:27:15 AM

4660-0002 F3 Linear Foot 18,128.0000 N Std

MILLED ASPHALT PAVEMENT CENTERLINE RUMBLE STRIPS TYPE 2 MODIFIED

0660-0004 F3 Linear Foot 11,637.0000 N

MILLED ASPHALT PAVEMENT EDGELINE RUMBLE STRIPS

0676-0001 K Square Yard 243.0000 N

CEMENT CONCRETE SIDEWALK

0677-0002 C1, E Ton 157.0000 N

SELECTED MATERIAL SURFACING

0680-0121 K2, S1 Square Yard 60.0000 N

MEMBRANE WATERPROOFING SYSTEM INSTALLED ON OTHER SURFACES

0686-0030 X Lump Sum 1.0000 N

CONSTRUCTION SURVEYING, TYPE B, MODIFIED

0686-0060 X Lump Sum 1.0000 N

CONSTRUCTION SURVEYING, TYPE D, MODIFIED

0689-0003 X Lump Sum 1.0000 N

CPM SCHEDULE

0690-0001 X Dollar 1,000.0000 $1.00 Y

INTERNAL FACILITATION

4695-0004 K Square Foot 80.0000 N Proj

DETECTABLE WARNING SURFACE, POLYMER COMPOSITE MAROON COLOR

0696-0610 J1 Each 6.0000 N

TEMPORARY IMPACT ATTENUATING DEVICE, TYPE V (STANDARD), TEST LEVEL 3

0697-0610 J1 Each 2.0000 N

RESET TEMPORARY IMPACT ATTENUATING DEVICE, TYPE V (STANDARD), TEST LEVEL 3

0703-0025 C1, H Cubic Yard 20.0000 N

NO. 57 COARSE AGGREGATE

0802-0001 C1, M Cubic Yard 64.0000 N

TOPSOIL FURNISHED AND PLACED

0804-0025 M3 Pound 37.0000 N

SEEDING AND SOIL SUPPLEMENTS - FORMULA B RESIDENTIAL MIX, INCLUDING MULCH

0804-0027 M3 Pound 457.0000 N

SEEDING AND SOIL SUPPLEMENTS - FORMULA L CLEAR ZONE MIX, INCLUDING MULCH

0804-0032 M3 Pound 63.0000 N

SEEDING - FORMULA T TEMPORARY GRASS MIX, INCLUDING MULCH

0804-0033 M3 Pound 2.0000 N SEEDING AND SOIL SUPPLEMENTS - FORMULA W WETLAND CONSERVATION MIX, INCLUDING MULCH

0806-0112 M2 Square Yard 2,033.0000 N

Page 11 of 106November 17, 2026 10:27:15 AM

TEMPORARY SHORT-TERM, ROLLED EROSION CONTROL PRODUCT, TYPE 2C

0806-0121 M2 Square Yard 318.0000 N

TEMPORARY EXTENDED-TERM, ROLLED EROSION CONTROL PRODUCT, TYPE 3B

0810-0052 A, M1 Each 67.0000 N

SELECTIVE TREE REMOVAL

4810-0052 A, M1 Each 8.0000 N Std

SELECTIVE TREE REMOVAL INCLUDING FULL STUMP REMOVAL

0811-0003 J2, M Linear Foot 1,624.0000 N

TEMPORARY PROTECTIVE FENCE

0849-0010 C1 Each 2.0000 N

ROCK CONSTRUCTION ENTRANCE

0851-0003 C1 Square Yard 9.0000 N

ROCK APRON

0855-0003 M2 Each 1.0000 N

PUMPED WATER FILTER BAG

0855-0004 M2 Each 1.0000 N

REPLACEMENT PUMPED WATER FILTER BAG

0860-0000 M2 Each 3.0000 N

INLET FILTER BAG FOR TYPE M INLET

0860-0011 M2 Each 3.0000 N

CONCRETE BLOCK/GRAVEL INLET PROTECTION FOR TYPE S INLET

0867-0012 M2 Linear Foot 90.0000 N

COMPOST FILTER SOCK, 12" DIAMETER

0901-0001 Q Lump Sum 1.0000 N Std

MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION

0901-0231 Q Day 200.0000 N

ADDITIONAL WARNING LIGHTS, TYPE B

0901-0232 Q Day 200.0000 N

ADDITIONAL WARNING LIGHTS, TYPE C

0901-0240 Q, R Square Foot 200.0000 N

ADDITIONAL TRAFFIC CONTROL SIGNS

0901-0320 O Linear Foot 22,417.0000 N

4" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, YELLOW

0901-0330 O Linear Foot 14,643.0000 N

4" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, WHITE

0901-0334 O Linear Foot 94.0000 N

24" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, WHITE

Page 12 of 106November 17, 2026 10:27:15 AM

0901-0451 Q Each 8.0000 N

3-LINE CHANGEABLE MESSAGE SIGN WITHOUT TELECOMMUNICATIONS

4901-1000 Q Linear Foot 612.0000 N Proj

TEMPORARY REMOVABLE RUMBLE STRIPS

0931-0003 R Square Foot 727.0000 N

POST MOUNTED SIGNS, TYPE B, STEEL SQUARE POST

0932-0001 R Square Foot 96.0000 N

POST MOUNTED SIGNS, TYPE C

0935-0001 R Square Foot 248.0000 N

POST MOUNTED SIGNS, TYPE F

0936-0200 R Square Foot 74.0000 N

STRUCTURE MOUNTED FLAT SHEET ALUMINUM SIGNS

0937-0105 J, R Each 5.0000 N

GUIDE RAIL MOUNTED DELINEATOR TYPE B, (Y/Y)

0937-0107 J, R Each 154.0000 N

GUIDE RAIL MOUNTED DELINEATOR TYPE B, (W/W)

0937-0112 J, R Each 5.0000 N

GUIDE RAIL MOUNTED DELINEATOR TYPE D, (Y/B)

0937-0114 J, R Each 154.0000 N

GUIDE RAIL MOUNTED DELINEATOR TYPE D, (W/W)

0937-0231 J1, R Each 4.0000 N

BARRIER MOUNTED DELINEATOR, TOP AND SIDE-MOUNT TYPE R, (W/W)

0937-0339 R Each 136.0000 N FLEXIBLE DELINEATOR POST, GROUND-MOUNT TYPE GM-2, RED POST WITH WHITE/BLANK SHEETING

0941-0001 R Each 6.0000 N

RESET POST MOUNTED SIGNS, TYPE B

0945-0001 R Each 7.0000 N

RESET POST MOUNTED SIGNS, TYPE F

0951-0130 P Each 3.0000 N

TRAFFIC SIGNAL SUPPORT, 30' MAST ARM

0951-0135 P Each 1.0000 N

TRAFFIC SIGNAL SUPPORT, 35' MAST ARM

0951-4014 P Each 2.0000 N

TRAFFIC SIGNAL SUPPORT, 14' PEDESTAL

0951-4022 P Each 5.0000 N

PEDESTRIAN STUB POLE, TYPE B

4952-1041 P Each 1.0000 N Std

NEMA TS-2; TYPE 2 CONTROLLER ASSEMBLY, TYPE 2 MOUNTING ATC CONTROLLER

Page 13 of 106November 17, 2026 10:27:15 AM

0954-0012 P8 Linear Foot 130.0000 N

2 INCH CONDUIT

0954-0013 P8 Linear Foot 340.0000 N

3 INCH CONDUIT

0954-0152 C1, P8 Linear Foot 120.0000 N

TRENCH AND BACKFILL, TYPE II

0954-0153 C1, P8 Linear Foot 140.0000 N

TRENCH AND BACKFILL, TYPE III

0954-0201 P8 Linear Foot 875.0000 N

SIGNAL CABLE, 14 AWG, 3 CONDUCTOR

0954-0202 P8 Linear Foot 1,680.0000 N

SIGNAL CABLE, 14 AWG, 5 CONDUCTOR

0954-0302 P8 Each 4.0000 N

JUNCTION BOX, JB-27

0954-0402 P8 Each 1.0000 N

ELECTRICAL SERVICE, TYPE B

4955-3206 P Each 4.0000 N Std

VEHICULAR SIGNAL HEAD, ONE 12" SECTION INCANDESCENT LOOK

4955-3208 P Each 8.0000 N Std

VEHICULAR SIGNAL HEAD, THREE 12" SECTIONS INCANDESCENT LOOK

0955-3722 P Each 8.0000 N

LED COUNTDOWN PEDESTRIAN SIGNAL HEAD, TYPE A

4956-0772 P Each 4.0000 N Std

RADAR DETECTION SYSTEM STOP BAR

0956-0790 P Each 8.0000 N

ACCESSIBLE PEDESTRIAN SIGNALS

0956-0831 P Each 1.0000 N

ACOUSTIC PREEMPTION SYSTEM (1 APPROACH)

0958-0081 P, Q Each 1.0000 N

TEMPORARY TRAFFIC CONTROL SIGNALS, TRAILER-MOUNTED PORTABLE DEVICE (ONE-OVERHEAD SIGNAL, 1

VERTICAL POLE SIGNAL)

0958-0121 P, Q Each 10.0000 N

TEMPORARY TRAFFIC CONTROL SIGNALS, TRAILER-MOUNTED PORTABLE DEVICE (2-OVERHEAD SIGNALS)

0958-0261 P, Q Each 2.0000 N

TEMPORARY TRAFFIC CONTROL SIGNAL, TRAILER-MOUNTED PORTABLE DEVICE, RESET

0958-0460 P, Q Each 11.0000 N

RESIDENTIAL DRIVEWAY TEMPORARY SIGNAL

Page 14 of 106November 17, 2026 10:27:15 AM

0960-0005 O2 Linear Foot 340.0000 N

6" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS

0960-0021 O2 Linear Foot 54.0000 N

24" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS

0962-1000 O Linear Foot 93,039.0000 N

4" WHITE WATERBORNE PAVEMENT MARKINGS

0962-1005 O Linear Foot 90,224.0000 N

4" YELLOW WATERBORNE PAVEMENT MARKINGS

0963-0001 O2, O3 Square Foot 188.0000 N

PAVEMENT MARKING REMOVAL

0963-0004 O2, O3 Linear Foot 27,315.0000 N

4" PAVEMENT MARKING REMOVAL

0965-0160 O3 Each 1.0000 N

WHITE PREFORMED THERMOPLASTIC LEGEND, SLOW CURVE ARROW, LEFT INCLUDES ARROW, THE WORD SLOW

AND 2 TRANSVERSE BANDS)

0965-0161 O3 Each 1.0000 N

WHITE PREFORMED THERMOPLASTIC LEGEND, SLOW CURVE ARROW, RIGHT INCLUDES ARROW, THE WORD SLOW

AND 2 TRANSVERSE BANDS)

0966-0011 O1 Each 288.0000 N

SNOWPLOWABLE RAISED PAVEMENT MARKER TWO WAY HOLDER WITH REFLECTOR (Y/Y)

0971-0001 R Each 3.0000 N

REMOVE POST MOUNTED SIGNS, TYPE B

0972-0001 R Each 1.0000 N

REMOVE POST MOUNTED SIGNS, TYPE C

0975-0001 R Each 4.0000 N

REMOVE POST MOUNTED SIGNS, TYPE F

1001-0611 T7 Linear Foot 124.0000 N

6" STRUCTURE FOUNDATION DRAIN

1001-0980 G4, S9 Square Yard 173.0000 N

MECHANICAL TEXTURING WITH LONGITUDINAL SAWED GROOVES

1001-1001 S9 Cubic Yard 33.0000 N

CLASS AAAP CEMENT CONCRETE

1001-1200 S2 Cubic Yard 19.0000 N

CLASS AA CEMENT CONCRETE, EXCEPT USE NO. 8 COARSE AGGREGATE

1002-0052 S7 Pound 6,486.0000 N

REINFORCEMENT BARS, EPOXY COATED

1002-0140 S7 Each 60.0000 N

MECHANICAL SPLICE SYSTEM FOR NO. 5 REINFORCEMENT BARS, EPOXY COATED

1002-0142 S7 Each 4.0000 N

Page 15 of 106November 17, 2026 10:27:15 AM

MECHANICAL SPLICE SYSTEM FOR NO. 6 REINFORCEMENT BARS, EPOXY COATED

5003-0002 S2 Each 304.0000 N Std

DOWEL HOLES, 6" DEPTH ADHESIVE ANCHORS

5003-0004 S2 Each 136.0000 N Std

DOWEL HOLES, 10" DEPTH ADHESIVE ANCHORS

1018-1048 T1 Lump Sum 1.0000 N Std

REMOVAL OF PORTION OF EXISTING BRIDGE

1019-0050 K2 Square Yard 229.0000 N

PROTECTIVE COATING FOR REINFORCED CONCRETE SURFACES (PENETRATING SEALERS, BRIDGE

SUPERSTRUCTURE)

1039-0010 S9 Square Yard 173.0000 N

CONCRETE BRIDGE DECK SURFACE PREPARATION, HYDRODEMOLITION

1999-9999 Z Hour 1,000.0000 N Std

TRAINEES

9000-0001 M2 Linear Foot 94.0000 N Std

WEIGHTED SEDIMENT FILTER TUBE

9000-0006 H Linear Foot 40.0000 N Std

30" TEMPORARY PIPE

9000-0007 H Linear Foot 120.0000 N Std

36" TEMPORARY PIPE

9000-0020 C1, H, M2 Lump Sum 1.0000 N Std

TEMPORARY STREAM DIVERSION DEVICE

9000-0021 C1, H, M2 Lump Sum 1.0000 N Std

TEMPORARY PUMP BYPASS SYSTEM NO. 1

9000-0022 C1, H, M2 Lump Sum 1.0000 N Std

TEMPORARY PUMP BYPASS SYSTEM NO. 2

9000-0023 C1, H, M2 Lump Sum 1.0000 N Std

TEMPORARY PUMP BYPASS SYSTEM NO. 3

9000-0027 J, J3 Dollar 6,000.0000 $1.00 Y Std

REPAIR OF TEMPORARY IMPACT ATTENUATING DEVICE

9000-0029 X Dollar 5,000.0000 $1.00 Y Std

DOCUMENTATION OF AREAS ADJACENT TO EXISTING DRAINAGE FEATURES

9000-0120 S2 Square Foot 12.0000 N Std

SPECIAL MORTAR REPAIRS

9000-0130 S2 Square Foot 99.0000 N Std

SPECIAL CONCRETE REPAIRS

9000-0135 F3, S2 Square Yard 173.0000 N Std

SCARIFICATION, 2 3/4" DEPTH

Page 16 of 106November 17, 2026 10:27:15 AM

9000-0141 S2 Square Foot 237.0000 N Proj

SPECIAL CONCRETE BEAM ENCASEMENT REPAIR

9000-0210 S2 Dollar 50,000.0000 $1.00 Y Proj

UNFORSEEN EXISTING BRIDGE REPAIRS

9000-0600 R Each 2.0000 N Proj

SOLAR POWERED FLASHING WARNING DEVICE

9000-0601 C1 Square Yard 21.0000 N Proj

RIVER ROCK, 6" DEPTH

9000-0602 J2 Linear Foot 24.0000 N Proj

REMOVE AND RESET VINYL FENCE

9000-0603 K Square Yard 33.0000 N Proj

BRICK SIDEWALK RECONSTRUCTION

9000-0604 H Each 1.0000 N Proj

14" X 23" ELLIPTICAL REINFORCED CONCRETE PIPE FLARED END SECTION

9000-1000 M2 Each 13.0000 N Proj

INLET FILTER MAT

9000-1045 X Each 35.0000 N Std

TEMPORARY AND PERMANENT MAILBOX RESETTING

9000-5001 X Each 4.0000 N Std

DESIGN OF CEMENT CONCRETE CURB RAMPS

9000-5002 K Each 4.0000 N Std

CONSTRUCTION OF CEMENT CONCRETE CURB RAMPS

9000-5101 X Lump Sum 1.0000 N Std

ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION AGGREGRATE

9000-5103 X Lump Sum 1.0000 N Std

ELECTRONIC TICKETING SYSTEM (E-TICKETING) FOR CONSTRUCTION CONCRETE

9203-0101 C1, S5 Lump Sum 1.0000 N Std

TEMPORARY EXCAVATION SUPPORT AND PROTECTION SYSTEM

Page 17 of 106November 17, 2026 10:27:15 AM

SPECIAL PROVISIONS

Special Provision: G50C - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) Addendum:

Action:

Item(s) Associated:

Header:

APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL)

Provision Body:

APPLICABLE DESIGNATED SPECIAL PROVISIONS. The following Designated Special Provisions are found in Appendix C and apply to this bid proposal.

DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects.

DSP8. F.A.R. - Required Contract Provisions Federal-Aid Construction Contracts FHWA-1273 (Revised October 23, 2023). Also attached to the Proposal/Contract.

DSP9. Special Supplement - Anti-Pollution Measures - August 26, 1999.

DSP13. Buy America.

DSP15. Commonwealth Standard Terms and Conditions.

DSP16. Lobbying Certification Form. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).

DSP17. Federal Audit Clause.

DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances.

DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities.

Project Specific Details:

Special Provision: G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW Addendum:

CONTRACT PROVISIONS - RIGHT TO KNOW LAW

Provision Body:

Page 18 of 106November 17, 2026 10:27:15 AM

I. Contract Provisions – Right to Know Law 8-K-1532

a. The Pennsylvania Right-to-Know Law (RTKL), 65 P.S. §§ 67.101-3104, applies to this Contract.

b. If the Department needs assistance in any matter arising out of the RTKL related to this Contract, the Department will notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Department.

c. Upon written notification from the Department that it requires assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor will:

1. Provide the Department, within 10 calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Department reasonably believes is Requested Information and may be a public record under the RTKL; and

2. Provide such other assistance as the Department may reasonably request, in order to comply with the RTKL with respect to this Contract.

d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, notify the Department and provide, within 7 calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.

e. The Department will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Department determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Department determine that the Requested Information is clearly not exempt from disclosure, provide the Requested Information within 7 calendar days of receipt of written notification of the Department’s determination.

f. Failing to provide the Requested Information within the time period required by these provisions, indemnify and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of this failure, including any statutory damages assessed against the Department.

g. The Department will reimburse the Contractor for any costs associated with complying with these provisions only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.

h. The Contractor may file a legal challenge to any Department decision to release a record to the public with the Office of Open Records, or in the Pennsylvania Courts, however, indemnify the Department for any legal expenses incurred by the Department as a result of such a challenge and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of the failure, including any statutory damages assessed against the Department, regardless of the outcome of such legal challenge. As between the parties, agree to waive all rights or remedies that may be available as a result of the Department’s disclosure of Requested information pursuant to the RTKL.

i. The Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Contract and continue as long as the Requested Information remains in the Contractor's possession.

Special Provision: C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413

Addendum:

Page 19 of 106November 17, 2026 10:27:15 AM

CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413

Provision Body:

SECTION 313—SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, BASE COURSE

Section 313.3(m) Tests for Depth. Revise to read as follows:•

(m) Tests for Depth.

(m) Tests for Depth. Replace with the following:

Control the loose depth of each layer to construct the base course to the compacted depth indicated and within the specified tolerance. On the top lift and in the presence of the Inspector, drill full-depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed base course and at other locations the Inspector suspects are deficient. After the Inspector completes depth measurements, backfill, compact, and seal core holes with the mixture used to construct the course.

The Inspector will measure the full-depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. Immediately delineate the limits of pavement deficient in depth from the core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is less than 1/2 inch deficient of the design depth. The defective course will be the full width of the affected lane.

SECTION 314—SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, ASPHALT RICH BASE COURSE

Section 314.3(m) Tests for Depth. Revise to read as follows:•

(m) Tests for Depth.

(m) Tests for Depth. Replace with the following:

Control the loose depth of each layer to construct the ARBC to the compacted depth indicated and within the specified tolerance. In the presence of the Inspector, drill full-depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed ARBC and at other locations the Inspector suspects are deficient. After the Inspector completes depth measurements, backfill, compact, and seal core holes with ARBC.

The Inspector will measure the full-depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. Immediately delineate the limits of pavement deficient in depth from the core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is less than 1/2 inch deficient of the design depth. The defective course will be the full width of the affected lane.

SECTION 360—ASPHALT TREATED PERMEABLE BASE COURSE

Section 360.2(e)3. Production. Revise to read as follows:•

3. Production. During the first day of production, take at least three asphalt content and gradation tests to verify the mixture conforms to the JMF. After the first day, perform tests for asphalt content and aggregate gradation according to the QC Plan and PTM No. 1. Produce ATPBC conforming to the gradation requirements in Table A and with an asphalt content within 0.8% of the JMF (n=1). Ensure the aggregate is uniformly coated with asphalt and no runoff of excess asphalt is observed.

Section 360.3(m). Tests for Depth. Revise to read as follows:•

(m) Tests for Depth: Binder and Wearing Courses. Replace with the following:

Carefully dig or drill one random 6-inch diameter test hole selected by the Representative according to PTM No. 1 to the full depth of the ATPBC for each 3,000 square yards, or less, of completed base course. The Representative may require additional test holes in areas the Representative suspects are deficient in depth. The Representative will measure the depth of the base course. Using material acceptable to the Representative, backfill the test holes and compact the material to fill the test hole flush with the completed base course.

ATPBC deficient in depth by 1/2 inch or more is defective. Immediately delineate the limits of ATPBC deficient in depth from the location by proceeding longitudinally, forward and backward, obtaining additional test holes every 50 feet until the depth is less than

Page 20 of 106November 17, 2026 10:27:15 AM

1/2 inch deficient of the indicated depth. The defective course will be the full width of the affected lane.

SECTION 410—SUPERPAVE MIXTURE DESIGN, STANDARD AND RPS CONSTRUCTION OF PLANT-MIXED ASPHALT FINE-

GRADED COURSES

Section 410.3. CONSTRUCTION. Revise to read as follows:•

410.3 CONSTRUCTION—Section 413.3 using the test procedures, limits, and tolerances for a 9.5 mm nominal maximum aggregate size mixture except where procedures, limits and tolerances are specifically indicated for a 9.5 mm fine-graded nominal maximum aggregate size mixture and as modified as follows:

Revise Table G to include 9.5 mm Fine Grade Wearing Course as follows:

TABLE G

Mixture Minimum Indicated Compacted Depths

Mixture Minimum Depth

9.5 mm Fine Grade Wearing Course 1 inch

SECTION 412—SUPERPAVE MIXTURE DESIGN, CONSTRUCTION OF PLANT-MIXED 6.3 MM ASPHALT OVERLAY COURSES

Section 412.3(a)2. Preplacement Meeting. Revise to read as follows:•

2. Preplacement Meeting. At least 2 weeks before placing asphalt paving mixtures, schedule an asphalt preplacement meeting with the Representative to review at a minimum the specification, paving operation QC Plan, sequence of paving operations, asphalt mixture temperature checks, mixture acceptance, density acceptance and the care and custody of asphalt acceptance samples.

Section 412.3(h)1.a. Placing. Revise to read as follows:•

1.a Placing. Unless otherwise allowed, deliver, place, and compact 6.3 mm paving mixtures during daylight hours. Ensure the mixture does not contain lumps of cold material. Deliver and place 6.3 mm paving mixtures at the laying temperatures specified in Table B.

Material placed outside the temperature limits as specified in Table B is defective.

Utilize a Material Transfer Vehicle (MTV) as specified in Section 108.05(c)5 for 6.3 mm paving mixtures unless otherwise approved by the Representative.

Section 412.4(a)4.b. Dispute Resolution. Revise TABLE H to read as follows:•

TABLE H

Dispute Resolution Retest Cost Table

Test Method

Mixture Acceptance Retest Cost if Retest Results Indicate

100% Pay Factor(s) for Full Lots (n > 3)* or Single Sample (n=1) Requirements in Table B were met for Partial Lots (n < 3)**

Mixture Acceptance Retest Cost if Retest Results Indicate

< 100% Pay Factor(s) for Full Lots (n > 3)* or Single Sample (n=1) Requirements in Table B were not met for Partial Lots (n < 3)**

PTM No.

702/739 $900 $3,500

PTM No. 757 $500 $2,000

* For full lots (n ≥ 3) where the original test results indicated a defective lot, only the pay factor(s) where original test

Page 21 of 106November 17, 2026 10:27:15 AM results indicated a defective lot for asphalt content or percent passing the 75 μm (No. 200) sieve will be utilized to determine the retest cost.

** For partial lots (n < 3) where the original test results indicated a pay parameter (asphalt content, percent passing the 75 µm (No. 200) sieve, or both) did not meet the Single Sample (n = 1) requirements in Table B, only the pay parameter(s) that did not meet the Single Sample (n =1) requirements will be utilized to determine the retest cost.

SECTION 413—SUPERPAVE MIXTURE DESIGN, STANDARD AND RPS CONSTRUCTION OF PLANT-MIXED ASPHALT

COURSES WITH PERCENT WITHIN LIMITS AND LTS TESTING (PWS-LTS)

Section 413.2(e)1. Recycled Asphalt Material. Revise to read as follows:•

1. Virgin Material Mixtures. Size, uniformly grade, and combine aggregate fractions, asphalt binder, and either WMA Technology additive(s) or modifier(s) in proportions to produce a JMF that conforms to the material, gradation, and volumetric Superpave Asphalt Mixture Design requirements according to Bulletin 27, Chapter 2A. Produce an asphalt mixture for the specified nominal maximum aggregate size and design ESALs except as procedurally modified by the WMA Technology Manufacturer Technical Representative (Technical Representative) to address laboratory procedures when preparing, compacting and testing asphalt mixtures to achieve a uniform blend. Special additive(s) or modifier(s) need not be used if mixture temperature, workability, and compaction can be achieved solely through plant mechanical modification to produce foamed asphalt. Do not incorporate the WMA Technology additive, modifier or process during the volumetric asphalt mixture design process, so that the JMF volumetrics and material percentages are based on a mixture with no WMA Technology. Only use the WMA Technology additive, modifier or process to evaluate results from moisture susceptibility testing during the mix design process. Develop an asphalt mixture JMF, then incorporate the WMA Technology additive, modifier, or process into that JMF during production. Create an asphalt JMF cover sheet (Form TR-448A) for approval containing the WMA Technology used, additive dosage rate or percent water added for foaming, material code, and the TSR data from the moisture susceptibility testing.

Submit a copy of each completed JMF, signed by a certified Asphalt Level 2 plant technician, to the DME/DMM at least 3 weeks before the planned start of mixture production. Include a list of all material sources and the asphalt mixture producer in the JMF.

Provide the calibration factors (Cf and 200 Cf) according to PTM No. 757 with the JMF. Do not start mixture production until after the DME/DMM reviews the JMF.

Submit a new JMF with a change in material sources or if a new JMF is necessary to produce a mixture conforming to this specification.

No additional revisions were made to Section 413.2(e)1.•

Section 413.2(e)1.d.5. Volumetric Analysis of Compacted Specimens. Revise TABLE A as follows:•

TABLE A

Job-Mix Formula Composition Tolerance Requirements of the Completed Mix

Single Sample (n=1) Multiple

Samples (n > 3)

Gradation Passing 12.5 mm (1/2 inch) and Larger Sieves +8% +6% Passing 9.5 mm (3/8 inch) to 150 µm (No. 100) Sieves (Inclusive) +6% +4%

Passing 75 µm (No. 200) Sieve +3.0% +2.0% Asphalt Content

19.0 mm Asphalt mixtures and smaller +0.7% +0.4%

25.0 mm Asphalt mixtures and larger +0.8% +0.5%

Temperature of Mixture (F)

Class of Material

Type of Material

Chemical, Organic, Foaming Additives

Minimum*

Mechanical Foaming Equipment/Process

Minimum* Maximum*

Page 22 of 106November 17, 2026 10:27:15 AM

PG 58S-28 Asphalt Binder 215 230 310 PG 64S-22 Asphalt Binder 220 240 320 PG 64E-22 Asphalt Binder 240 260 330

All other Binders Asphalt Binder

The higher of 215 or the minimum temp.

specified in Bulletin 25 minus 45F

The higher of 230 or the minimum temp.

specified in Bulletin 25 minus 30F

As specified in Bulletin

* Outline in the Producer QC Plan and follow more restrictive temperature requirements provided by the WMA technology manufacturer or Technical Representative(s) for production and placement of the mixture. Determine the SGC compaction temperature for the production QC which yields the same target air voids as the designed JMF. Include the SGC compaction temperature in the Producer QC Plan. Compact the completed mixture in the SGC for QC volumetric analysis at the SGC compaction temperature according to the guidelines provided by the Technical Representative.

Section 413.2(i)2. Certification Acceptance. Revise to read as follows:•

2. Certification Acceptance. Acceptance by certification is appropriate for the following mixtures, conditions, or applications:

Scratch courses, leveling courses less than 2-inch depth and driveway adjustments.•

Mixtures used by Department maintenance forces.•

Mixtures purchased by local or municipal governments.•

Mixtures placed in quantities not exceeding 500 tons in a continuous placement operation unless otherwise directed by the Representative.

Mixtures used for parking lots.•

All 4.75 mm NMAS asphalt mixtures.•

Other mixtures, conditions, or applications as approved by the Representative.•

2.a General. Obtain certification from the mixture Producer. Use all QC tests during mixture production as acceptance tests. Certify mixtures using Form CS-4171B. Include, or attach, the QC test results on the form. Provide the form to the Inspector-in-Charge within 1 working day after completing the QC tests. Certify mixtures as specified in Section 106.03(b)3 and the requirements below.

2.b Certification of Mixture. Certify each mixture daily if QC test results conform to the single sample and multiple sample JMF production tolerances of Table A. The acceptance values will be:

Asphalt Content.•

Percent Passing the 2.36 mm (No. 8) sieve (not applicable for 4.75 mm NMAS asphalt mixtures).•

Percent Passing the 75 µm (No. 200) sieve.•

If using printed ticket results in place of laboratory test results for asphalt content, certify that at least 90% of each day’s printed ticket results for asphalt content are within 0.2 percentage points of the JMF.

If the mixture does not conform to the above requirements, do not certify the mixture. Instead, provide all QC test results to the Inspector-in-Charge. If using printed ticket results for asphalt content, provide the percentage of daily printed ticket results within 0.2 percentage points of the JMF to the Inspector-in-Charge. Payment will be determined according to Table H based on the QC test results.

If a day’s production is interrupted by corrective action, material produced after the corrective action may be certified if QC test results conform to production tolerances.

2.c Maintaining Approval to Certify Mixtures. The Department may suspend a plant’s approval to certify mixtures if QC is not performed according to the Producer QC Plan, mixtures are not produced according to Bulletin 27, a mixture cannot be certified on 2 consecutive production days, or as described below.

Page 23 of 106November 17, 2026 10:27:15 AM

The Department may take IA samples of the completed mixture at the plant. In the presence of the Department, test the IA samples for asphalt content and gradation according to the test methods indicated in the Producer QC Plan. Take immediate corrective actions if the mixture does not conform to Table A.

The Department may take QA samples of the completed mixture at the plant or on the roadway directly from the uncompacted mixture placed by the paving equipment specified in Section 413.3(e). The Department will test QA samples according to PTM No. 757 or PTM No. 702, Modified Method D, if previously identified problematic aggregates are used in the mixture, for conformance to Table A. If the results of the QA samples do not comply with Table A, review the Producer QC Plan and the QC test results that followed the QA samples for conformance to Table A. If QC results do not conform to Table A, perform the corrective actions necessary to provide a mixture conforming to Table A.

After completing corrective actions or the sample review, the Department will perform an on-site evaluation of the Producer’s plant operation and QC and then take a sample of the completed mixture at the plant. In the presence of the Representative, test the sample.

If the sample does not comply with Table A, the Department will suspend certification. Immediately suspend shipping mixtures accepted by certification to the project.

After testing verifies that the produced mixture conforms to Tables A and B and with the Representative present, conduct JMF verification according to the Producer QC Plan. After successfully completing JMF verification, resume both certification and shipping mixtures accepted by certification to the project.

Section 413.3(a)2. Preplacement Meeting. Revise to read as follows:•

2. Preplacement Meeting. At least 2 weeks before placing asphalt paving mixtures, schedule an asphalt preplacement meeting with the Representative to review at a minimum the specification, paving operation QC Plan, sequence of paving operations, asphalt mixture temperature checks, mixture acceptance, density acceptance and the care and custody of asphalt acceptance samples.

Section 413.3(d). Hauling Equipment. Revise to read as follows:•

(d) Hauling Equipment. Haul the mixtures in tightly sealed vehicles that do not contain petroleum oils, solvents, or other materials that adversely affect asphalt mixture. Provide covers of sufficient size and quality to protect the entire load under all conditions.

Maintain the proper and uniform placement temperature as specified in Section 413.3(h)1. Provide insulation on all sides of the truck body, a double-walled truck body, or a heated truck body when the air temperature is below 50F from October 1 to April 30. Provide a 3/8-inch diameter hole near the center and approximately two-thirds the distance down from the top of the vehicular box, on both sides, to allow for asphalt mixture temperature checks. If trucks cannot be provided with these holes, provide the Representative with two infrared temperature devices along with documentation that the devices were verified annually through an independent verification service or with a blackbody calibration block before paving for asphalt mixture temperature checks.

Section 413.3(f). Rollers. Revise to read as follows:•

(f) Rollers. Use steel wheel, pneumatic tire, vibratory, or oscillating rollers as specified in Sections 108.05(c)3.a, 3.b, 3.c, 3.e, 3.f, 3.h, or (c)4. Operate rollers according to manufacturer's recommendations. Use vibratory and oscillating rollers with separate controls for frequency and amplitude.

Section 413.3(h)1.a. Placing. Revise to read as follows:•

1.a Placing. Unless otherwise allowed or indicated, deliver, place, and compact asphalt paving mixtures during daylight hours.

Ensure the mixture does not contain lumps of cold material. Deliver and place mixtures at the laying temperatures specified in Table A for the type and class of material used. Do not incorporate any material delivered outside the temperature limits as specified in Table A. Material placed outside the temperature limits as specified in Table A is defective.

Utilize a Material Transfer Vehicle (MTV) as specified in Section 108.05(c)5 for RPS pavements unless otherwise approved by the Representative.

Section 413.3(h)1.e. Safety Edge. Revise to read as follows:•

1.e. Safety Edge. Construct the Safety Edge as the standard edge treatment on the outside edge of asphalt pavements and shoulders. Use the Safety Edge for both wearing and binder courses with a depth of 1.5 inches or greater. Do not place the Safety Edge at total depths greater than 5 inches. The Safety Edge is not required where curb or sidewalk are encountered or where the face of guiderail is directly over the edge of pavements. Do not place the Safety Edge for base, leveling, or scratch courses.

Construct the Safety Edge with the same material used to construct the roadway course being placed or, if specified, the paved shoulders. Attach a device to the paver to confine material at the end gate and extrude the asphalt material in a wedge shape. Use

Page 24 of 106November 17, 2026 10:27:15 AM an adjustable device that allows the operator to vary the slope extruded at the paver to account for the angle becoming steeper during compaction (roll up). Before construction, the Safety Edge device must be approved by the Representative(s).

Compact the roadway or paved shoulder as required by the specifications. Do not delay rolling of the mat adjacent to the Safety Edge. After compaction of the mat is complete, provide a Safety Edge meeting the final shape requirements as shown on the Standard Drawings. The completed angle of the Safety Edge must be 26 degrees to 40 degrees measured from the pavement cross slope extended. At the beginning of each day’s paving, measure the angle of the Safety Edge from the pavement cross slope extended. Perform measurements after final compaction is complete. If the angle of the Safety Edge does not meet the slope requirements, stop paving, and provide corrective action. Do not resume production paving until final shape requirements of Safety Edge are achieved.

Allow automatic transition to intersections, driveways, guiderail sections, and obstructions.

Use the device to constrain the asphalt head, reducing the area and increasing the density of the extruded profile. A single plate strike-off method is not allowed.

This is the start of the file's text. The full file is on GovTribe.