This Invitation to Bid (ITB) #2027-017 is issued by the City of Salem, Virginia Purchasing Department for the Carey Avenue Drainage Improvements project. The scope of work encompasses installation of approximately 1,001 linear feet of Class III reinforced concrete pipe (RCP) storm sewer in three sizes (900 linear feet of 30-inch, 60 linear feet of 24-inch, and 41 linear feet of 15-inch), or alternatively high-performance polypropylene (PP) pipe under Bid Alternate No. 1; eleven drainage structures consisting of VDOT Standard DI-7 drop inlets and VDOT Standard MH-1 manholes; connection to an existing curb inlet; asphalt pavement replacement; erosion and sediment control; traffic control; construction surveying; and as-built documentation. The project disturbs approximately 0.25 acres within the public right-of-way of Carey Avenue and adjacent drainage easements. Construction Plans were prepared by Westwood Professional Services, Inc., dated June 22, 2026, and consist of ten sheets. The questions deadline is December 2, 2026, at 5:00 p.m. local time, with sealed bids due on December 17, 2026, at 2:00 p.m. local time. Public bid opening will occur on December 17, 2026, at 2:05 p.m. in City Hall Council Chambers. Bidders are strongly encouraged to visit the project site prior to submission. The contract term requires commencement within ten days of the Notice to Proceed, with Substantial Completion required within 120 consecutive calendar days and Final Completion within 150 consecutive calendar days. Liquidated damages are assessed at $500 per day for delays beyond Substantial Completion and $250 per day for delays beyond Final Completion.

Bidders must hold a valid Virginia contractor license of appropriate class (A, B, or C) at the time of bid submission and must be authorized to transact business in Virginia. A bid bond equal to five percent of the greater of the Total Base Bid or Total Bid with Alternate No. 1 is required, payable to the City of Salem and issued by a surety company authorized to do business in Virginia. The successful bidder must furnish performance and payment bonds each in the amount of 100 percent of the contract amount within ten days of Notice of Award. Award will be made to the lowest responsive and responsible bidder based on either the Total Base Bid or Total Bid with Alternate No. 1, whichever the City elects to accept based on available funding and best interest. The City reserves the right to cancel the ITB, reject any or all bids, waive informalities, award in whole or in part, and negotiate with the apparent low bidder if the bid exceeds available funds. Unit prices shall remain firm for 60 days following bid opening and for the duration of the contract with no price escalation allowed. Contract price increases are limited to 25 percent of the original contract amount or $50,000, whichever is greater, and require advance written approval of Salem City Council. The required insurance coverage includes Workers' Compensation with statutory limits, Commercial General Liability with $1,000,000 per occurrence and $3,000,000 general aggregate, and Automobile Liability with $1,000,000 per accident. The City of Salem must be named as an additional insured on all policies.

View the file

Other files

File Type Posted
839443waterLburg.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Salem, Virginia • ITB #2027-017 • Carey Avenue Drainage Improvements

City of Salem Purchasing Department Page 1

ITB #2027-017

Carey Avenue Drainage Improvements

City of Salem, Virginia

Purchasing Department 114 North Broad Street Salem, Virginia 24153 Phone: (540) 375-3063

ITB Number: ITB #2027-017

Title: Carey Avenue Drainage Improvements

Issue Date: Tuesday, November 17, 2026

Questions Deadline: Wednesday, December 2, 2026, 5:00 P.M. (Local Time)

Bids Due: Thursday, December 17, 2026, 2:00 P.M. (Local Time)

Public Bid Opening Thursday, December 17, 2026, 2:05 P.M. (Local Time)

Bid Opening Location: Council Chambers: 114 North Broad Street, Salem, Virginia 24153

Procurement Contact: Benjamin Denton, Procurement Manager Email: bkdenton@salemva.gov

This public body does not discriminate against faith-based organizations in accordance with the Code of Virginia, §2.2-4343.1, or against a bidder or offeror because of race, religion, color, sex, national origin, age, disability, sexual orientation, gender identity, political affiliation, or veteran status, or any other basis prohibited by state law.

mailto:bkdenton@salemva.gov

City of Salem Purchasing Department Page 2

The City of Salem is soliciting sealed bids from qualified, Virginia-licensed contractors to furnish all labor, materials, equipment, and supervision necessary to construct the Carey Avenue Drainage Improvements project, in accordance with the requirements set forth in this Invitation to Bid (ITB). All work must conform to the Construction Plans, Scope of Work, and Bid Form, which are attached hereto and incorporated herein.

The Bid Form includes one (1) bid alternate, Bid Alternate No. 1, for high-performance polypropylene (PP) storm sewer pipe in lieu of reinforced concrete pipe (RCP). A bid bond is required with each bid, and the successful Bidder must furnish performance and payment bonds as set forth herein.

The City of Salem, Virginia, and its officers, employees, and agents shall not be responsible for the premature opening of any bid envelope or package that is not properly sealed and clearly marked in accordance with the requirements set forth herein.

The City of Salem reserves the right to cancel this solicitation, reject any or all bids, waive minor informalities or irregularities, award in whole or in part, and make award to the bidder whose bid is determined, in the sole discretion of the City, to be in the best interest of the City.

During an active solicitation, all communications (email, phone, text, letter) must be conducted through the Purchasing Department. Vendors who violate this protocol may be disqualified at the discretion of the Procurement Manager.

The “Offeror Data/Signature Sheet” found below must be completed by the Bidder and returned with the bid.

By signing, the Bidder agrees that all pricing and terms shall remain firm for sixty (60) days following the bid opening date.

Any notice of bid withdrawal must be submitted in writing to the Purchasing Department prior to the bid opening.

OFFEROR DATA/SIGNATURE SHEET

Legal Name and Address:

Signature (ink): Date:

Printed Name: Title:

Phone: Fax:

Email: Business

License #:

Federal Tax ID #: VA SCC ID

City of Salem Purchasing Department Page 3

TABLE OF CONTENTS

OFFEROR DATA/SIGNATURE SHEET

TABLE OF CONTENTS

I. PURPOSE

II. BACKGROUND

III. SCOPE OF WORK

A. General B. Storm Sewer Construction C. Standards and Specifications D. Existing Utilities E. Erosion and Sediment Control F. Traffic Control and Site Access G. Pavement Restoration and Clean-Up H. Surveying, Testing, and As-Built Documentation I. Work Performance J. Measurement and Payment K. Bid Alternate No. 1 – PP Storm Pipe

IV. BID PREPARATION AND SUBMISSION REQUIREMENTS

A. General Requirements B. Bid Security C. Specific Bid Requirements

V. CONTRACT AWARD

VI. CONTRACT TIME AND LIQUIDATED DAMAGES

VII. PERFORMANCE AND PAYMENT BONDS

VIII. CONTRACT ADMINISTRATOR

IX. COOPERATIVE PROCUREMENT

X. INVOICING AND PAYMENT

XI. PROTESTS

XII. RELEASE OF INFORMATION AND AWARD ANNOUNCEMENT

XIII. REJECTION AND AWARD OF BID

XIV. INSURANCE

XV. GENERAL TERMS AND CONDITIONS

XVI. SPECIAL TERMS AND CONDITIONS

Attachment A – Proprietary Information Form Attachment B – Bidder Qualification Statement and References Attachment C – List of Proposed Subcontractors Attachment D – Construction Plans

BID FORM

City of Salem Purchasing Department Page 4

I. PURPOSE

The City of Salem, Virginia, is soliciting sealed bids from qualified Bidders holding the appropriate Virginia contractor license to furnish all labor, supervision, materials, tools, and equipment necessary to construct the Carey Avenue Drainage Improvements. This Invitation to Bid (ITB) is issued to establish a contract through competitive sealed bidding for the installation of new storm sewer pipe and drainage structures, connection to the existing storm drainage system, pavement restoration, and all associated work shown on the Construction Plans and described in the Scope of Work.

The purpose of this ITB is to obtain the best value for the City through competitive unit pricing from qualified contractors for the construction of the improvements described herein.

II. BACKGROUND

The City of Salem is an independent city encompassing approximately fourteen (14) square miles, nestled in the heart of Virginia’s Blue Ridge Mountains within the Roanoke Region. Conveniently located along Interstate 81, Salem is home to approximately 25,346 residents and is part of the larger Roanoke Metropolitan Area.

The Carey Avenue Drainage Improvements project will improve stormwater conveyance along Carey Avenue by installing a new storm sewer system, constructed of reinforced concrete pipe under the Base Bid or high-performance polypropylene (PP) pipe under Bid Alternate No. 1, with new drop inlets and manholes within the public right-of-way of Carey Avenue and adjacent public drainage easements, discharging to an existing curb inlet at the downstream end of the system.

The limits of disturbance for the project are approximately 0.25 acres.

The Construction Plans were prepared by Westwood Professional Services, Inc., 1208 Corporate Circle, Roanoke, Virginia 24018 (Westwood Project No. R0069009.00), dated June 22, 2026, and consist of ten (10) sheets (C1 through C5.4). The Construction Plans are issued with this ITB as Attachment D and are incorporated herein by reference.

III. SCOPE OF WORK

The successful Bidder (hereinafter the “Contractor”) shall furnish all labor, supervision, tools, equipment, materials, and incidentals necessary to complete the Work in accordance with the Construction Plans (Attachment D), this ITB, and all applicable standards and specifications referenced herein.

A. General

1. The Work generally consists of the installation of approximately 1,001 linear feet of Class III reinforced concrete pipe (RCP) storm sewer (approximately 900 LF of 30-inch, 60 LF of 24-inch, and 41 LF of 15-inch), or, if the City accepts Bid Alternate No. 1, high-performance polypropylene (PP) storm sewer pipe of the same sizes and lengths; eleven (11) drainage structures consisting of VDOT Standard DI-7 drop inlets and VDOT Standard MH-1 manholes; connection to an existing curb inlet; asphalt pavement replacement over the storm sewer trench; erosion and sediment control; traffic control; construction surveying;

testing; and storm sewer as-built documentation.

2. Quantities shown on the Bid Form are estimates provided for bidding and comparison purposes only. Unit price items will be paid based on the actual quantities installed and accepted by the City. The City reserves the right to increase or decrease quantities as necessary to complete the project, and such changes shall not be cause for adjustment of the unit prices bid.

City of Salem Purchasing Department Page 5

3. Bidders are strongly encouraged to visit the project site prior to submitting a bid to become familiar with existing conditions. The site is located on a public street and may be viewed at any time; Bidders shall not disturb residents or enter private property. No additional compensation will be allowed for conditions that could reasonably have been discovered by a site visit and review of the Construction Plans.

4. The Contractor shall be responsible for any damage to public or private property resulting from the performance of the Work, including but not limited to existing utilities, pavement, driveways, curb and gutter, sidewalks, landscaping, mailboxes, and fences, and shall restore such property to a condition equal to or better than its pre-construction condition at no additional cost to the City.

5. The Contractor shall obtain all permits, licenses, and inspections required for the performance of the Work, except those obtained by the City, and shall comply with all conditions thereof.

B. Storm Sewer Construction

1. Under the Base Bid, all storm sewer pipe shall be Class III reinforced concrete pipe (RCP) of the sizes, lengths, and slopes shown on the Construction Plans. If the City accepts Bid Alternate No. 1, storm sewer pipe shall instead be high-performance polypropylene (PP) pipe as specified in Section III.K. Regardless of pipe material, storm sewer located within the public right-of-way of Carey Avenue shall have watertight, gasketed joints.

2. Drainage structures shall be VDOT Standard DI-7 drop inlets and VDOT Standard MH-1 manholes as shown on the Storm Structure Schedule (Sheets C4.1 and C4.2), complete with frames, grates, and covers. VDOT Standard IS-1 inlet shaping shall be provided in all structures.

3. Non-shrink grout shall be used for all storm sewer pipe connections.

4. Trenches shall be excavated to a uniform width conforming to the VDOT Standard PB-1 detail for storm drainage piping. The Contractor shall provide all sheeting, shoring, trench boxes, and dewatering necessary to perform the Work safely and in accordance with OSHA/VOSH requirements.

5. The Contractor shall confirm the location, size, and invert elevations of all existing pipes connecting to proposed and existing structures, including the existing curb inlet at the downstream end of the system, prior to construction and prior to ordering storm structures, and shall notify the Engineer immediately of any discrepancies.

6. Where the vertical separation between the proposed storm sewer and an existing utility is less than eighteen (18) inches, the Contractor shall provide a concrete pier in accordance with Detail C-8 on the Construction Plans. The Contractor shall notify the Engineer immediately if less than six (6) inches of vertical separation is found.

7. Prior to ordering, the Contractor shall submit product data and shop drawings for pipe, precast structures, frames, grates, and covers to the City for review. Materials ordered prior to City review are at the Contractor’s risk.

8. Backfill and compaction of the trench: Class I backfill material in accordance with Section 302 of the VDOT Road and Bridge Specifications shall be used for twelve (12) inches above the pipe per Sheet C5.4. The road profile shall have a minimum of six (6) inches of compacted base stone, such as VDOT 21A aggregate, and a minimum of two (2) inches of VDOT 9.5A Surface Mix Asphalt. The remainder of the trench fill material may be earthen backfill from the site if the material is found to be acceptable. Lifts shall be no more than six

(6) inches and compacted to ninety-five percent (95%).

City of Salem Purchasing Department Page 6

C. Standards and Specifications

1. All construction and materials shall be in accordance with the current Virginia Department of

Transportation (VDOT) Road and Bridge Specifications, the VDOT Road and Bridge Standards, and City of Salem standards and specifications, where applicable. All work within the public right-of-way shall adhere to the City of Salem Right of Way Excavation and Restoration Standards.

2. In the event of a conflict between the Construction Plans, this ITB, and the referenced standards, the more stringent requirement shall govern unless otherwise directed in writing by the City. Bidders shall report any discrepancies or omissions to the Procurement Contact prior to the question deadline.

D. Existing Utilities

1. The locations of existing utilities shown on the Construction Plans are approximate. The

Contractor shall notify Miss Utility (811 or 1-800-552-7001) prior to beginning any excavation and shall have existing utility lines marked prior to and as necessary throughout construction.

2. The Contractor shall pot-hole (test pit) existing utilities at critical crossing locations prior to the start of construction and provide the Engineer with line and grade information. The Construction Plans identify approximate crossings of existing water lines, water laterals, sanitary sewer, sanitary laterals, and gas lines; the Contractor shall confirm the exact location and elevation of each prior to construction and prior to ordering storm structures.

3. Existing water service laterals shall be rerouted as necessary to accommodate the proposed storm sewer, as noted on the Construction Plans. Such work shall be considered incidental to the storm pipe bid items. Relocation of other existing utilities, if required, will be coordinated by the City and is not included in this contract unless authorized by written Change Order.

4. The Contractor shall maintain service on all existing utilities throughout construction. Any planned interruption of service requires prior approval of the City and the utility owner and a minimum of forty-eight (48) hours’ notice to affected customers.

5. Any utility damaged by the Contractor shall be repaired immediately at the Contractor’s expense, in coordination with the utility owner.

E. Erosion and Sediment Control

1. The Contractor shall install, inspect, and maintain all erosion and sediment control measures shown on Sheets C5.1 through C5.4 in accordance with the Virginia Erosion and Sediment Control Handbook and the Virginia Erosion and Stormwater Management Regulations.

2. The Contractor shall designate a person holding a valid Responsible Land Disturber (RLD) certification issued by the Virginia Department of Environmental Quality, who shall be responsible for erosion and sediment control on the project. The RLD’s name and certification number shall be provided to the City prior to any land-disturbing activity.

3. The Contractor shall prevent the tracking of sediment onto public streets and shall sweep or clean paved surfaces as needed, and at the end of each workday.

4. Temporary erosion and sediment control measures shall be removed upon final stabilization of disturbed areas and with the approval of the City.

City of Salem Purchasing Department Page 7

F. Traffic Control and Site Access

1. All work zone traffic control shall conform to the current Virginia Work Area Protection

Manual (WAPM) and the Manual on Uniform Traffic Control Devices (MUTCD). All flaggers shall hold a current VDOT flagger certification.

2. The Contractor shall submit a traffic control plan for City approval prior to beginning work.

Full road closures or detours require prior written approval from the City and a minimum of five (5) business days’ notice.

3. The Contractor shall maintain access to all residences and driveways at all times, except for brief periods coordinated in advance with the affected residents with a minimum of twenty-four (24) hours’ notice. Access for emergency vehicles shall be maintained at all times.

4. At the end of each workday, all trenches within the traveled way shall be backfilled or securely plated, and the roadway shall be open to traffic.

5. The Contractor shall be responsible for securing and maintaining any temporary staging and material storage areas needed for the Work. Staging within the City right-of-way requires prior City approval. All staging areas shall be restored to their pre-construction condition upon completion of the Work.

G. Pavement Restoration and Clean-Up

1. Asphalt pavement shall be replaced over the storm sewer trench and within the limits shown on the Construction Plans. The Contractor shall match the existing pavement section of Carey Avenue and ensure a smooth transition between new and existing pavement, in accordance with the City of Salem Right of Way Excavation and Restoration Standards.

2. Existing pavement shall be saw-cut in neat, straight lines prior to removal. Temporary patching shall be maintained in a safe, smooth condition until permanent pavement is placed.

3. All other areas disturbed by construction, including driveways, curb and gutter, lawns, and landscaped areas, shall be restored to their pre-construction condition. Disturbed grass areas shall be permanently stabilized with seed and mulch.

4. The Contractor shall keep the site clean and orderly at all times and shall remove all debris, excess excavated material, and waste from the site and dispose of it legally at the Contractor’s expense.

H. Surveying, Testing, and As-Built Documentation

1. The Contractor shall provide all construction surveying and staking necessary to construct the Work to the lines and grades shown on the Construction Plans. Construction surveying shall be performed by or under the supervision of a Land Surveyor or Professional Engineer licensed in the Commonwealth of Virginia.

2. The Contractor shall provide quality control testing by an independent testing firm acceptable to the City, including compaction testing of trench backfill and pavement subgrade testing of asphalt materials, and, if Bid Alternate No. 1 is accepted, the post-installation inspection and deflection testing described in Section III.K, at the frequencies required by the VDOT Road and Bridge Specifications. Copies of all test reports shall be provided to the City promptly. The City reserves the right to perform its own quality assurance testing.

3. Upon completion, the Contractor shall submit storm sewer as-built drawings prepared by a Land Surveyor licensed in the Commonwealth of Virginia, showing the horizontal location, top and invert elevations of all structures, and the size, material, length, and slope of all

City of Salem Purchasing Department Page 8 pipes. As-built drawings shall be submitted in PDF and AutoCAD (.dwg) formats. Final payment will not be made until as-built drawings are received and accepted by the City.

I. Work Performance

1. A preconstruction meeting will be held prior to issuance of the Notice to Proceed. The

Contractor shall submit a construction schedule, traffic control plan, list of emergency contacts, and required submittals at or before the preconstruction meeting.

2. Normal working hours are 7:00 a.m. to 6:00 p.m., Monday through Friday, excluding City holidays. Work outside of normal working hours requires prior written approval from the City.

3. The Contractor shall have a competent superintendent on site at all times while work is in progress who is authorized to act on behalf of the Contractor and is able to communicate effectively with City staff and residents.

4. The Contractor shall notify affected residents and businesses in writing (e.g., door hangers) at least forty-eight (48) hours before beginning work in front of their property.

5. The Contractor shall perform all work in compliance with all applicable Federal, State, and Municipal safety laws, including OSHA/VOSH standards and 29 CFR 1926 Subpart P (Excavations).

6. The City reserves the right, for any reason, to refuse to accept services from any personnel deemed by the City to be unqualified, disorderly, or otherwise unable to perform to the standards of the City. Upon notice from a City representative, the Contractor shall promptly remove such personnel from all City work sites and furnish a qualified replacement meeting the requirements of this solicitation, at no additional cost to the City and with no interruption to the work schedule.

7. All work shall be performed to the complete satisfaction of the City and in accordance with all applicable laws, ordinances, and regulations.

J. Measurement and Payment Payment for each bid item shall constitute full compensation for all labor, materials, equipment, and incidentals necessary to complete the item. Work not specifically listed as a bid item shall be considered incidental to the bid items and will not be paid for separately.

• Item 1 – Mobilization (LS): Includes mobilization and demobilization of personnel and equipment, bonds, insurance, field office, and all preparatory work. Payment shall not exceed five percent (5%) of the total contract amount; fifty percent (50%) will be paid with the first Application for Payment and the balance upon Substantial Completion.

• Item 2 – Erosion & Sediment Control (LS): Includes installation, inspection, maintenance, and removal of all erosion and sediment control measures shown on the Construction Plans, street sweeping, and final stabilization.

• Item 3 – Asphalt Pavement Replacement / Repair (SY): Measured by the square yard of pavement replaced in place and accepted. Includes saw-cutting, removal and disposal of existing pavement, base stone, asphalt base and surface courses matching the existing pavement section, tack coat, and temporary patching.

• Item 4 – Storm Inlet / Manhole (EA): Measured per each structure installed complete.

Includes the structure, frame, grate or cover, IS-1 inlet shaping, excavation, bedding, backfill, pipe connections, non-shrink grout, and connection to the existing curb inlet.

• Items 5–7 – Storm Pipe, 15", 24", and 30" RCP (LF): Measured by the linear foot along the centerline of pipe from center of structure to center of structure. Includes excavation, trench protection, dewatering, bedding, backfill, gaskets, concrete piers per Detail C-8, test pits, rerouting of water service laterals, and disposal of excess material.

City of Salem Purchasing Department Page 9

• Items 5A–7A – Storm Pipe, 15", 24", and 30" PP (Bid Alternate No. 1) (LF): Paid only if the City accepts Bid Alternate No. 1, in lieu of Items 5–7. Measured in the same manner as Items 5–7 and includes all work listed for those items, plus manufacturer-required bedding and backfill, structure connection fittings or waterstops, and post-installation inspection and deflection testing as described in Section III.K.

• Item 8 – Construction Surveying (LS): Includes all construction layout, staking, and grade control.

• Item 9 – Traffic Control (LS): Includes all signs, devices, flaggers, traffic control plans, and maintenance of traffic for the duration of the Work.

If rock is encountered, the Contractor shall notify the City immediately and before removal. Rock excavation, if required, will be addressed by written Change Order.

K. Bid Alternate No. 1 – PP Storm Pipe

1. Alternate Description: The Base Bid is based on Class III RCP storm sewer (Items 5–7).

Bid Alternate No. 1 substitutes high-performance polypropylene (PP) storm sewer pipe of the same sizes and quantities (Items 5A–7A) in lieu of the RCP. All other bid items, the pipe alignment, inverts, slopes, and drainage structures shown on the Construction Plans remain unchanged. Bidders shall submit prices for both the Base Bid and Bid Alternate No. 1.

2. Acceptable Pipe: Pipe furnished under Bid Alternate No. 1 shall be dual- or triple-wall corrugated high-performance polypropylene (PP) pipe with a smooth interior wall, meeting AASHTO M 330 / ASTM F2881 (ADS HP Storm or approved equal). High-density polyethylene (HDPE) pipe will not be accepted. Pipe shall conform to the VDOT Road and Bridge Specifications. Single-wall corrugated pipe will not be accepted. A single pipe manufacturer shall be used for the entire project unless otherwise approved in writing by the City.

3. Joints: Joints shall be watertight bell-and-spigot joints with elastomeric gaskets meeting ASTM F477, and the joint system shall meet the watertight requirements of ASTM D3212.

4. Installation: Pipe shall be installed in accordance with the manufacturer’s written installation guidelines, ASTM D2321, and the VDOT Road and Bridge Specifications, using bedding and backfill material and compaction acceptable to the manufacturer and the City. The Contractor shall maintain the minimum cover required by the manufacturer for construction equipment and traffic loads and shall be responsible for any pipe damaged by loads applied before adequate cover is in place.

5. Structure Connections: Connections to drainage structures shall be made with a manufacturer-approved waterstop gasket or grouting collar and non-shrink grout. Before ordering precast structures, the Contractor shall confirm that structure openings and dimensions accommodate the outside diameter of the selected pipe. Concrete piers per Detail C-8 shall be provided where required, as for RCP.

6. Post-Installation Inspection: Not sooner than thirty (30) days after completion of final backfill, the Contractor shall perform post-installation inspection of all PP pipe, including CCTV inspection and mandrel or laser-profile deflection testing, in accordance with the VDOT Road and Bridge Specifications. Pipe with deflection exceeding five percent (5%) of the base inside diameter, or with cracks, joint separation, or other defects, shall be repaired or removed and replaced at no additional cost to the City. Inspection reports and video shall be provided to the City.

7. Submittals: In addition to the submittals required by Section III.B, the Contractor shall submit the manufacturer’s product data, installation guidelines, and certification of compliance with the applicable AASHTO/ASTM standard prior to ordering pipe.

City of Salem Purchasing Department Page 10

8. Construction Plan References: If Bid Alternate No. 1 is accepted, references to RCP on the Construction Plans shall be read as referring to the PP pipe.

IV. BID PREPARATION AND SUBMISSION REQUIREMENTS

A. General Requirements

1. Bids must be received by hand delivery, mail, or electronic submission through eVA at www.eva.virginia.gov no later than 2:00 p.m. (Local Time) on Thursday, December 17, 2026. Electronic submission through eVA is preferred.

2. All Bids received will be publicly opened and read aloud for the information of Bidders and other interested parties at 2:05 p.m. (Local Time) on Thursday, December 17, 2026, in City Hall Council Chambers, 114 North Broad Street, Salem, Virginia 24153. Interested parties may attend in person or virtually. A link to view the bid opening online may be requested by emailing bkdenton@salemva.gov.

3. Bidders submitting paper bids shall provide one (1) original and one (1) copy in a sealed envelope clearly marked: “Attn: Purchasing Dept. – ITB #2027-017 – Carey Avenue Drainage Improvements.” The Bidder’s Virginia contractor license number and class shall also be shown on the outside of the envelope. Paper bids must be mailed or hand-delivered to: City of Salem Purchasing Department, 114 North Broad Street, Salem, VA 24153.

4. Bidders submitting electronically must be registered vendors in eVA (Business Opportunities > Virginia Business Opportunities). Registration is free. For eVA assistance contact 1-866- 289-7367 or eVACustomerCare@dgs.virginia.gov. Bidders submitting electronically must upload a scanned copy of the bid bond with the bid and deliver the original bid bond to the Purchasing Department prior to the bid due date and time.

5. The City is not responsible for delays caused by the eVA platform, vendor registration issues, or internet outages. Timely submission is the Bidder’s sole responsibility.

6. Bids submitted via facsimile or email will not be accepted.

7. If submitting a paper response, bids must be signed in ink by an authorized officer. Any erasures or corrections must be initialed in ink.

8. Late bids will not be considered and will be marked “Late” and retained unopened.

9. Failure to comply with any requirement of this ITB may result in rejection of the bid.

10. All questions and clarifications must be submitted in writing prior to 5:00 p.m. on

Wednesday, December 2, 2026 to: Benjamin Denton, bkdenton@salemva.gov. Oral instructions carry no weight; only written addenda are binding. Any addenda will be posted on eVA and the City of Salem website, and Bidders shall acknowledge receipt of all addenda on the Bid Form.

11. Pursuant to Title 54.1, Chapter 11 of the Code of Virginia, each Bidder must hold a valid Virginia contractor license of the appropriate class (A, B, or C) for the value of its bid, with the appropriate specialty classification (e.g., Highway/Heavy), at the time the bid is submitted. Bids from unlicensed or improperly licensed Bidders will be rejected.

12. Bidders organized as corporations, LLCs, business trusts, limited partnerships, or registered LLPs must be authorized to transact business in Virginia as required by Title 13.1 or Title 50 of the Code of Virginia.

13. A Bidder may request withdrawal of its bid due to an error in the bid in accordance with §2.2-4330 of the Code of Virginia.

14. The City is not responsible for any costs incurred in the development or delivery of the bid.

mailto:bkdenton@salemva.gov

City of Salem Purchasing Department Page 11

B. Bid Security

1. Each bid must be accompanied by a bid bond in an amount equal to five percent (5%) of the greater of the Total Base Bid or the Total Bid with Alternate No. 1, payable to the City of Salem, Virginia, and issued by a surety company legally authorized to do business in the Commonwealth of Virginia, in accordance with §2.2-4336 of the Code of Virginia. In lieu of a bid bond, a Bidder may furnish a certified check or cash escrow in the same amount, as permitted by §2.2-4338 of the Code of Virginia.

2. Bids submitted without the required bid security will be deemed non-responsive and will be rejected.

3. If the successful Bidder fails to execute the contract and furnish the required performance and payment bonds within ten (10) days after the Notice of Award, the bid security shall be forfeited to the City as liquidated damages in accordance with §2.2-4336 of the Code of Virginia, in an amount equal to the difference between the Bidder’s bid and the next low bid, not to exceed the amount of the bid security.

4. The bid security of all Bidders, except the three (3) lowest responsive Bidders, will be returned after the bid opening. The bid security of the remaining Bidders will be returned after the contract has been executed and the required bonds have been furnished.

C. Specific Bid Requirements The following information must be furnished by the Bidder:

1. Completed Offeror Data/Signature Sheet (included herein).

2. Completed Bid Form with unit prices and extended totals for all Base Bid and Bid Alternate

No. 1 items, the Total Base Bid, the Total Bid with Alternate No. 1, acknowledgment of all addenda, and the Bidder’s Virginia contractor license number and class.

3. Bid bond (or certified check or cash escrow) in the amount of five percent (5%) of the greater of the Total Base Bid or the Total Bid with Alternate No. 1.

4. Evidence of authority to transact business in Virginia (State Corporation Commission ID number on the Offeror Data/Signature Sheet).

5. Completed Attachment B – Bidder Qualification Statement and References.

6. Completed Attachment C – List of Proposed Subcontractors.

7. Completed Attachment A – Proprietary Information Form, if applicable.

The Bidder’s bid shall remain valid for not less than sixty (60) days from the bid opening date.

V. CONTRACT AWARD

Award: This is a competitive sealed bid procurement. Award will be made to the lowest responsive and responsible Bidder, provided the bid meets all requirements of this ITB. The City will determine the low Bidder on the basis of either the Total Base Bid (RCP) or the Total Bid with Alternate No. 1 (PP), whichever the City elects to accept based on available funding and the best interest of the City. The option selected will be applied equally to all Bidders. Bids that do not include prices for Bid Alternate No. 1 may be deemed non-responsive. A single contract will be awarded for the entire project.

Responsibility: In determining whether a Bidder is responsible, the City may consider the Bidder’s experience on projects of similar scope, references, past performance, licensure, available personnel and equipment, and financial capacity, as provided in the Virginia Public Procurement Act. The City may request additional information from any Bidder to support this determination.

City of Salem Purchasing Department Page 12

Bid Errors: In the event of a discrepancy between a unit price and its extended total, the unit price shall govern. In the event of a discrepancy between the sum of the extended totals and the Total Base Bid or the Total Bid with Alternate No. 1, the correct sum shall govern.

Negotiation: If the bid from the lowest responsive and responsible Bidder exceeds available funds, the City may negotiate with the apparent low Bidder to obtain a contract price within available funds, in accordance with §2.2-4318 of the Code of Virginia.

Contract: The successful Bidder will be required to execute the City of Salem’s standard construction agreement.

VI. CONTRACT TIME AND LIQUIDATED DAMAGES

The Contractor shall commence the Work within ten (10) days of the date specified in the Notice to Proceed and shall achieve Substantial Completion within one hundred twenty (120) consecutive calendar days, and Final Completion within one hundred fifty (150) consecutive calendar days, after the date specified in the Notice to Proceed.

Time is of the essence. If the Contractor fails to achieve Substantial Completion or Final Completion within the time specified, the Contractor shall pay the City, as liquidated damages and not as a penalty, $500.00 per calendar day for each day beyond the Substantial Completion date and $250.00 per calendar day for each day beyond the Final Completion date. The City may deduct liquidated damages from any amounts due the Contractor.

Extensions of contract time will be granted only by written Change Order for delays beyond the Contractor’s control, including abnormal weather conditions, that are documented and requested in writing within seven (7) days of the start of the delay.

VII. PERFORMANCE AND PAYMENT BONDS

In accordance with §2.2-4337 of the Code of Virginia, the successful Bidder shall deliver to the City, within ten (10) days after the Notice of Award and prior to execution of the contract, the following bonds, each in the amount of one hundred percent (100%) of the contract amount:

• Performance Bond – conditioned upon the faithful performance of the Work in strict conformity with the contract documents, including the warranty period.

• Labor and Material Payment Bond – for the protection of claimants who have and fulfill contracts to supply labor or materials to the Contractor or its subcontractors in the furtherance of the Work.

Bonds shall be payable to the City of Salem, Virginia, and shall be issued by a surety company legally authorized to do business in the Commonwealth of Virginia and listed on the U.S.

Department of the Treasury Circular 570. Each bond shall be accompanied by a valid power of attorney for the surety’s attorney-in-fact. Bond premiums shall be included in the Bidder’s prices. No Notice to Proceed will be issued until acceptable bonds have been received by the City.

VIII. CONTRACT ADMINISTRATOR

Any resulting contract will be issued by the City of Salem Purchasing Office. The Procurement Manager is authorized to act on behalf of the City to administer this contract. The City’s Community Development Department will designate a Project Manager to serve as the City’s representative for day-to-day administration of the Work, including inspection, review of submittals and Applications for Payment, and coordination with the Engineer.

City of Salem Purchasing Department Page 13

IX. COOPERATIVE PROCUREMENT

This solicitation is for a specific construction project. The resulting contract will not be made available for cooperative use by other public bodies.

X. INVOICING AND PAYMENT

The Contractor shall submit one (1) Application for Payment per month for Work completed and accepted during the preceding period. Each Application for Payment must include:

• Company name and contract/purchase order number

• Application number, date, and period covered

• Quantity and value of Work completed for each bid item (previous, this period, and to date)

• Retainage withheld and net amount due

• Updated construction schedule, if requested by the City

In accordance with §2.2-4333 of the Code of Virginia, the City will retain five percent (5%) of each progress payment. Retainage will be released with final payment upon Final Completion and acceptance of the Work, receipt of the as-built drawings, and receipt of the surety’s consent to final payment. Payment will be made in accordance with the prompt payment provisions of §2.2-4352 of the Code of Virginia.

All Applications for Payment must be submitted to:

City of Salem, Virginia Attn: Community Development

21 South Bruffey Street Salem, Virginia 24153

XI. PROTESTS

Any Bidder wishing to protest an award or other decision pursuant to this ITB may do so only in accordance with §§2.2-4357 through 2.2-4364 of the Code of Virginia. Any protest must be in writing, signed by an authorized representative, and delivered to the City Procurement Manager within the required timeframe.

XII. RELEASE OF INFORMATION AND AWARD ANNOUNCEMENT

Upon award, the City will notify all Bidders in writing. A notice of award will be posted on the City of Salem Purchasing website at https://www.salemva.gov/Bids.aspx. All materials submitted become the property of the City and are subject to public inspection under the Virginia Freedom of Information Act. If your bid contains proprietary information, note it on Attachment A – Proprietary Information Form.

XIII. REJECTION AND AWARD OF BID

The City of Salem reserves the right to cancel this ITB, reject any or all bids, waive any informality or irregularity, and award to the Bidder whose bid is, in the City’s opinion, in its best interest.

City of Salem Purchasing Department Page 14

XIV. INSURANCE

By signing and submitting a bid, the Bidder certifies that if awarded the contract, it will have the following coverage in place at the time work commences, maintain it throughout the contract term, and that all coverage will be provided by insurers authorized in the Commonwealth of Virginia. The City of Salem must be named as an additional insured. Certificates of Insurance are required prior to commencement of the Work. A thirty (30) day written notice of cancellation or non-renewal is required.

Workers' Compensation Statutory Employer's Liability Each Accident: $100,000 | Disease, Policy Limit: $500,000 |

Disease, Each Employee: $100,000 Commercial General Liability Each Occurrence: $1,000,000 | General Aggregate: $3,000,000 Automobile Liability Bodily Injury & Property Damage, Each Accident: $1,000,000

XV. GENERAL TERMS AND CONDITIONS

Acceptance: The City’s Notice of Award and execution of the construction agreement constitute acceptance of the successful Bidder’s bid and create a binding contract.

Entire Agreement: The construction agreement, together with this ITB, all addenda, the Construction Plans, and the Contractor’s bid, constitutes the complete agreement and supersedes all previous written or oral communications.

Changes, Additions, Deletions: No changes will be permitted without a written Change Order approved by the City of Salem.

Contractual Disputes: All claims shall be resolved through the City of Salem’s Purchasing Policy and Procedures Manual Section 4007 and §2.2-4363 of the Code of Virginia.

Tax Exemption: The City of Salem is exempt from State Sales Tax and Federal Excise Tax (Federal Tax ID: 54-6001593). This exemption does not transfer to the Contractor; the Contractor is responsible for any sales and use tax on materials incorporated into the Work.

Antitrust: By entering into a contract, the Bidder assigns to the City all rights and causes of action under federal and Virginia antitrust laws relating to the goods and services purchased.

Indemnification: The Contractor agrees to indemnify, defend, and hold harmless the City, its officers, agents, and employees from all claims arising out of performance of this contract.

License Requirements: Firms with a business location in the City of Salem must be licensed under the City’s BPOL Tax Ordinance. Contact the Commissioner of the Revenue at (540) 375- 3019 with questions.

Anti-Discrimination: All Bidders certify conformance with the Federal Civil Rights Act of 1964, the Virginia Fair Employment Act of 1975, and §2.2-4311 of the Code of Virginia.

Drug-Free Workplace: Bidders must comply with §2.2-4312 of the Virginia Public Procurement Act.

Ethics in Public Contracting: By submitting a bid, Bidders certify their bids are made without collusion or fraud and that no kickbacks or inducements have been offered or received.

Applicable Law and Courts: This contract shall be governed by the laws of the Commonwealth of Virginia. Litigation shall be brought in the courts of the Commonwealth.

Independent Contractor: The Contractor is an independent contractor in all respects and is not an agent, servant, or employee of the City.

City of Salem Purchasing Department Page 15

Subcontracting: Subcontracting requires prior written City approval. No subcontract relieves the Contractor of its obligations. Subcontractors must be paid within seven (7) days of the Contractor’s receipt of payment, per §2.2-4354 of the Code of Virginia.

Assignment: Neither party shall assign this contract without the prior written consent of the other party, nor to any party debarred from doing business with the Commonwealth of Virginia.

Debarment Status: By submitting a bid, Bidders certify they are not currently barred from submitting bids by any agency of the Commonwealth of Virginia.

Federal Immigration Law Compliance: The Contractor shall not knowingly employ an unauthorized alien during performance of this contract.

Gifts: No Bidder, Contractor, or subcontractor shall confer anything of more than nominal value on any public employee having official responsibility for this procurement.

XVI. SPECIAL TERMS AND CONDITIONS

Change Orders: Changes in the Work, contract price, or contract time shall be made only by written Change Order. In accordance with §2.2-4309 of the Code of Virginia, the contract price may not be increased by more than twenty-five percent (25%) of the original contract amount or $50,000, whichever is greater, without the advance written approval of Salem City Council.

Differing Site Conditions: If the Contractor encounters subsurface or concealed conditions differing materially from those indicated on the Construction Plans, the Contractor shall notify the City in writing immediately and before disturbing such conditions. Any adjustment will be made only by written Change Order.

Warranty: The Contractor warrants all Work and materials to be free of defects for a period of one

(1) year from the date of Final Completion and acceptance by the City. The Contractor shall promptly correct any defective Work discovered during the warranty period at no cost to the City.

Inspection and Acceptance: All Work is subject to inspection by the City and the Engineer. Work that does not conform to the contract documents shall be removed and replaced by the Contractor at no additional cost to the City. Inspection does not relieve the Contractor of its obligation to perform the Work in accordance with the contract documents.

Default; Right to Cure; Setoff: Upon the Contractor’s failure to perform, the City shall provide written notice and may require corrective action within a specified period. If uncured, the City may perform or procure the Work and deduct costs from amounts owed to the Contractor, and may make demand on the Contractor’s performance bond.

Termination for Convenience: The City may terminate the contract, in whole or in part, for its convenience upon written notice to the Contractor. In such event, the Contractor will be paid for Work satisfactorily performed through the date of termination.

Price: Unit prices shall remain firm for the duration of the contract. No price escalation will be allowed.

Records: The Contractor shall retain all records related to this contract for a period of five (5) years after final payment and shall make them available to the City upon request.

City of Salem Purchasing Department Page 16

Attachment A – Proprietary Information Form Identify data or materials to be protected and state the reasons below. Indicate the specific sections, figures, or paragraphs that constitute trade secrets or proprietary materials.

The classification of an entire bid document, line-item prices, and/or total bid prices as proprietary is not acceptable and will result in rejection of the bid.

Provide one (1) redacted copy of the bid with proprietary portions removed or blacked out, clearly marked “Redacted Copy” on the cover. Confidentiality protection per Code of Virginia, §2.2-4342.

Section / Title or Description Page(s)

Reason for Withholding:

If additional space is needed, attach a separate sheet and include it in your sealed bid.

City of Salem Purchasing Department Page 17

Attachment B – Bidder Qualification Statement and References Each Bidder shall complete this form and submit it with its bid. The City may use this information, and may contact the references listed, in determining whether the Bidder is responsible. Attach additional sheets if needed.

BIDDER INFORMATION

Years in Business Under Current Name:

Proposed Project Superintendent / Years of Experience:

Responsible Land Disturber (Name / Cert. #):

Has the Bidder failed to complete any contract in the last five (5) years?

(Yes/No – if yes, explain):

References: List at least three (3) storm sewer, drainage, or utility construction projects of similar scope completed within the last five (5) years.

REFERENCE 1

Project Name / Location:

Owner & Contact (Name, Phone, Email):

Contract Amount / Completion Date:

Description of Work:

REFERENCE 2

Project Name / Location:

Owner & Contact (Name, Phone, Email):

Contract Amount / Completion Date:

Description of Work:

REFERENCE 3

Project Name / Location:

Owner & Contact (Name, Phone, Email):

Contract Amount / Completion Date:

Description of Work:

City of Salem Purchasing Department Page 18

Attachment C – List of Proposed Subcontractors List all subcontractors proposed to perform any portion of the Work. Attach additional sheets if needed.

SUBCONTRACTOR NAME &

ADDRESS WORK TO BE PERFORMED VA LICENSE # /

CLASS

EST. % OF

WORK

☐ The Bidder does not propose to use any subcontractors on this project.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

City of Salem Purchasing Department Page 19

Attachment D – Construction Plans The Construction Plans for the Carey Avenue Drainage Improvements, prepared by Westwood Professional Services, Inc. (Project No. R0069009.00) and dated June 22, 2026, are issued with this ITB as a separate document and are incorporated herein by reference. The plan set consists of the following sheets:

SHEET TITLE

C1 Cover C2 Notes

C3.1 Existing Conditions & Demolition Plan 1 C3.2 Existing Conditions & Demolition Plan 2 C4.1 Layout & Utility Plan 1 C4.2 Layout & Utility Plan 2 C5.1 E.S.C. Plan 1 C5.2 E.S.C. Plan 2 C5.3 E.S.C. Notes C5.4 E.S.C. Details

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

City of Salem Purchasing Department Page 20

BID FORM

BID FORM — CAREY AVENUE DRAINAGE IMPROVEMENTS

The undersigned Bidder, having examined this ITB, the Construction Plans, all addenda, and the project site, proposes to furnish all labor, materials, equipment, and incidentals necessary to complete the Work in accordance with the contract documents for the following unit prices.

ITEM DESCRIPTION EST.

QTY UNIT UNIT PRICE EXTENDED

TOTAL

Earthwork

1 Mobilization 1 LS $ $ 2 Erosion & Sediment Control 1 LS $ $

Pavement 3 Asphalt Pavement Replacement / Repair 600 SY $ $

Stormwater Improvements 4 Storm Inlet / Manhole (VDOT DI-7 / MH-1) 11 EA $ $ 5 Storm Pipe – 15" RCP, Class III 41 LF $ $ 6 Storm Pipe – 24" RCP, Class III 60 LF $ $ 7 Storm Pipe – 30" RCP, Class III 900 LF $ $

Miscellaneous 8 Construction Surveying 1 LS $ $ 9 Traffic Control 1 LS $ $

TOTAL BASE BID (Sum of Items 1 through 9) $

Bid Alternate No. 1 – PP Storm Pipe (in lieu of Items 5–7) Bidders must price both the Base Bid and Alternate No. 1. Pipe per Section III.K: high-performance polypropylene (AASHTO M 330 / ASTM F2881, ADS HP Storm or approved equal).

5A Storm Pipe – 15" PP 41 LF $ $ 6A Storm Pipe – 24" PP 60 LF $ $ 7A Storm Pipe – 30" PP 900 LF $ $

TOTAL BID WITH ALTERNATE NO. 1 (Items 1–4, 5A–7A, and 8–9) $

END OF ITB #2027-017

OFFEROR DATA/SIGNATURE SHEET
TABLE OF CONTENTS
I. PURPOSE
II. BACKGROUND
III. SCOPE OF WORK
A. General
B. Storm Sewer Construction
C. Standards and Specifications
D. Existing Utilities
E. Erosion and Sediment Control
F. Traffic Control and Site Access
G. Pavement Restoration and Clean-Up
H. Surveying, Testing, and As-Built Documentation
I. Work Performance
J. Measurement and Payment
K. Bid Alternate No. 1 – PP Storm Pipe
IV. BID PREPARATION AND SUBMISSION REQUIREMENTS
A. General Requirements
B. Bid Security
C. Specific Bid Requirements
V. CONTRACT AWARD
VI. CONTRACT TIME AND LIQUIDATED DAMAGES
VII. PERFORMANCE AND PAYMENT BONDS
VIII. CONTRACT ADMINISTRATOR
IX. COOPERATIVE PROCUREMENT
X. INVOICING AND PAYMENT
XI. PROTESTS
XII. RELEASE OF INFORMATION AND AWARD ANNOUNCEMENT
XIII. REJECTION AND AWARD OF BID
XIV. INSURANCE
XV. GENERAL TERMS AND CONDITIONS
XVI. SPECIAL TERMS AND CONDITIONS
Attachment A – Proprietary Information Form
Attachment B – Bidder Qualification Statement and References
Attachment C – List of Proposed Subcontractors
Attachment D – Construction Plans
BID FORM

File details come from the government source that posted it. Updated .