About this file

This is a Project Manual and bidding document package for the Rocky Mount WWTP UV Replacement project issued by the Town of Rocky Mount, Virginia, with Thompson & Litton serving as the engineer. The project involves the installation of a new UV Disinfection System including Ultraviolet Modules, System Control Center, Power Distribution Centers, Hydraulic System Center, Level Controller, Water Level Sensor, and Reduction Baffles with all related appurtenances, as well as the demolition and removal of the existing UV Disinfection Equipment. The work is bid on a lump-sum basis with two primary bid items: installation of the new UV system and demolition of existing equipment. Sealed bids were to be received electronically and in person at the Town Administration Building (345 Donald Avenue, Rocky Mount, Virginia 24151) until 2:00 P.M. on January 5, 2026, with public opening and reading of bids at the same location. A non-mandatory pre-bid conference was scheduled for December 1, 2026, at 10:00 A.M. at the Rocky Mount WWTP (1446 Power Dam Road, Rocky Mount, Virginia 24151). The contract requires substantial completion within thirty (30) calendar days and final completion within forty-five (45) calendar days from the Notice to Proceed.

Bidders must submit bid security equal to 5 percent of the maximum bid price in the form of a certified check, cashier's check, or bid bond. All bidders must be licensed as a Class A contractor in the State of Virginia, and subcontractors must be registered as either Class A or Class B contractors. Bidders are required to provide evidence of workers' compensation insurance coverage prior to contract award and complete a certification regarding debarment by any Virginia agency. The contract will be awarded to the lowest responsive and responsible bidder. Liquidated damages are assessed at $600.00 per day for failure to achieve substantial completion on schedule and an additional $600.00 per day for failure to complete final work within the specified timeframe. Progress payments will be made monthly at 95 percent of work completed with 5 percent retainage, with no additional retainage applied once 50 percent of work is complete if progress remains satisfactory. The Town of Rocky Mount does not discriminate against faith-based organizations, and MBE/WBE firms are encouraged to submit bids. Contract documents indicate that all equipment will be provided by the owner.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rocky Mount WWTP UV Replacement Rocky Mount, Virginia

Prepared for

Town of Rocky Mount, Virginia

T&L Project No. 20142 Issued for Bids November 17, 2026

PROJECT MANUAL

00 0101

PROJECT MANUAL

Rocky Mount, Virginia

Prepared For

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of Thompson & Litton and is not to be used in whole or in part for any other project without the written authorization of Thompson & Litton.

103 East Main Street P.O. Box 1307

Wise, Virginia 24293

T&L Project No. 20142 Issued for Bids November 17, 2026

TABLE OF CONTENTS

00 0110/1

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 0101 Project Title Page 00 0110 Table of Contents 00 1113 Advertisement for Bids 00 2113 Instructions to Bidders for Construction Contracts (EJCDC C-200) 00 2515 Pre-Bid Question Form 00 4100 Bid Form for Construction Contracts (EJCDC C-410) 00 4313 Bid Bond (Penal Sum) 2013 (EJCDC C-430) 00 4513 Bidder’s Qualification 00 4546.13 Commonwealth of Virginia Workers' Compensation Certificate of Coverage 00 4546.16 Certification of Bidder Regarding Debarment 00 5100 Notice of Award (EJCDC C-510) 00 5213 Agreement between Owner and Contractor for Construction Contract (Stipulated Price) (EJCDC C-520) 00 5300 Escrow Agreement 00 5433 Request for Electronic Files 00 5500 Notice to Proceed (EJCDC C-550) 00 6113.13 Performance Bond 2013 (EJCDC C-610) 00 6113.16 Payment Bond 2013 (EJCDC C-615) 00 6275 Payment Application Checklist 00 6276 Contractor’s Application for Payment (EJCDC C-620) 00 6276.11 Weather Delay Request Form (Attachment A) 00 6276.13 Statement of Payment of Taxes 00 6313 Request for Information 00 6325 Request for Substitution 00 6336 Field Order (EJCDC C-942) 00 6349 Work Change Directive (EJCDC C-940) 00 6353 Proposal Request 00 6363 Change Order (EJCDC C-941) 00 6513.13 Certificate of Proper Installation 00 6516 Certificate of Substantial Completion (EJCDC C-625) 00 7210 Standard General Conditions of the Construction Contract (EJCDC C-700) 00 7310 Supplementary General Conditions

SPECIFICATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 1000 SUMMARY

01 2000 PRICE AND PAYMENT PROCEDURES

01 3000 ADMINISTRATIVE REQUIREMENTS

01 3216 CONSTRUCTION PROGRESS SCHEDULE

01 4000 QUALITY REQUIREMENTS

01 5000 TEMPORARY FACILITIES AND CONTROLS

01 6000 PRODUCT REQUIREMENTS

TABLE OF CONTENTS - CONTINUED

00 0110/2

01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS

01 7800 CLOSEOUT SUBMITTALS

DIVISION 02 – EXISTING CONDITIONS

02 4100 DEMOLITION

APPENDICES

Appendix A: Project & System Description – TROJAN Systems

(To obtain the complete Project & System Description document, please contact Amanda Bolling at Thompson & Litton, Inc. via email at abolling@T-L.com ) mailto:abolling@T-L.com

00 1113/1

ADVERTISEMENT FOR BIDS

345 Donald Avenue Rocky Mount, Virginia 24151

Separate sealed Bids for the Rocky Mount WWTP UV Replacement Project for the Town of Rocky Mount, Virginia which consists of the installation of a UV Disinfection System and all related appurtenances (all equipment will be provided by Owner), will be received electronically online at https://www.tlplanroom.com and in person at the Town Administration Building, 345 Donald Avenue, Rocky Mount, VA, until 2:00 P.M., local prevailing time, on January 5, 2026, and then publicly opened and read aloud at the same location.

The Contract Documents may be examined at the Town of Rocky Mount WWTP, 1446 Power Dam Road, Rocky Mount, Virginia; at Thompson & Litton, 726 Auburn Avenue, Radford, VA; and online at TRASCO (http://www.trascoplanroom.com).

Copies of the Contract Documents (electronic and/or hard copy) are available for purchase through TRASCO at http://www.trascoplanroom.com.

A non-mandatory Pre-Bid Conference will be held on December 1, 2026, at 10:00 A.M. All interested parties are requested to meet the Engineer at the Rocky Mount WWTP located at 1446 Power Dam Road, Rocky Mount, Virginia 24151, at that time.

Withdrawal of bids shall be according to procedure (i) of the Virginia Public Procurement Act and to the Code of Virginia (§ 2.2-4330).

Bids must be accompanied by Bid security as specified in the Instructions to Bidders.

Each Bidder must be licensed as a Class A contractor in the State of Virginia; Bidders are instructed to review the Code of Virginia, Title 54.1, Chapter 11, prior to bidding.

The Owner does not discriminate against faith-based organizations in accordance with the Code of Virginia, § 2.2-4343.1.

MBE/WBE firms are encouraged to submit Bids.

The Contract(s) shall be awarded to the lowest responsive and responsible Bidder(s).

The Owner reserves the right to reject any and all Bids if it appears in its best interest to do so.

Mark Moore, Assistant Town Manager 11/17/2026 Town of Rocky Mount, Virginia _ Date By https://www.tlplanroom.com/ http://www.trascoplanroom.com/

EJCDC® C-200, Instructions to Bidders for Construction Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113

INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT

TABLE OF CONTENTS

Page

Article 1— Defined Terms

Article 2— Bidding Documents

Article 3— Qualifications of Bidders

Article 4— Pre-Bid Conference

Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;

Other Work at the Site

Article 6— Bidder’s Representations and Certifications

Article 7— Interpretations and Addenda

Article 8— Bid Security

Article 9— Contract Times

Article 10— Substitute and “Or Equal” Items

Article 11— Subcontractors, Suppliers, and Others

Article 12— Preparation of Bid

Article 13— Basis of Bid

Article 14— Submittal of Bid

Article 15— Modification and Withdrawal of Bid

Article 16— Opening of Bids

Article 17— Bids to Remain Subject to Acceptance

Article 18— Evaluation of Bids and Award of Contract

Article 19— Bonds and Insurance

Article 20— Signing of Agreement

Article 21— Sales and Use Taxes

Article 22 – Special Legal Requirements

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113

ARTICLE 1—DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.

ARTICLE 2—BIDDING DOCUMENTS

2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.

2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.

2.03 Bidder may register as a plan holder and obtain complete sets of Bidding Documents, in the number and format stated in the Advertisement or invitation to bid, from TRASCO at http://www.trascoplanroom.com. Bidders may rely that sets of Bidding Documents obtained from the TRASCO are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.

2.04 Plan rooms other than TRASCO (including construction information subscription services, and electronic and virtual plan rooms) may distribute the Bidding Documents, or make them available for examination. Those prospective bidders that obtain an electronic (digital) copy of the Bidding Documents from these plan rooms are encouraged to register as plan holders from the TRASCO Website. Owner is not responsible for omissions in Bidding Documents or other documents obtained from these plan rooms, or for a Bidder’s failure to obtain Addenda from a plan room.

2.05 Any Bidder who has obtained a copy of the Bidding Documents from TRASCO may request an electronic version of the site plan by completing the Request for Electronic Files form provided herein at the end of the Instructions to Bidders and submitting it to the Engineer.

2.06 Electronic Documents

A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.

1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113 transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.

B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.

C. After the Contract is awarded, the Owner will provide or direct the Engineer to provide for the use of the Contractor documents that were developed by Engineer as part of the Project design process, as Electronic Documents in native file formats.

1. Electronic Documents that are available in native file format include:

a. Site Plan

2. Release of such documents will be solely for the convenience of the Contractor. No such document is a Contract Document.

3. Unless the Contract Documents explicitly identify that such information will be available to the Successful Bidder (Contractor), nothing herein will create an obligation on the part of the Owner or Engineer to provide or create such information, and the Contractor is not entitled to rely on the availability of such information in the preparation of its Bid or pricing of the Work. In all cases, the Contractor shall take appropriate measures to verify that any electronic/digital information provided in Electronic Documents is appropriate and adequate for the Contractor’s specific purposes.

4. In no case will the Contractor be entitled to additional compensation or time for completion due to any differences between the actual Contract Documents and any related document in native file format.

ARTICLE 3—QUALIFICATIONS OF BIDDERS

A. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.

B. Bidder’s state or other contractor license number, if applicable.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.

ARTICLE 4—PRE-BID CONFERENCE

4.01 A non-mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference; however, attendance at this conference is not required to submit a Bid.

4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.

ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S

SAFETY PROGRAM; OTHER WORK AT THE SITE

5.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

5.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:

a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.

b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.

c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113 as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.

4. Geotechnical Baseline Report/Geotechnical Data Report: The Bidding Documents contain a Geotechnical Baseline Report (GBR) and Geotechnical Data Report (GDR).

a. As set forth in the Supplementary Conditions, the GBR describes certain select subsurface conditions that are anticipated to be encountered by Contractor during construction in specified locations (“Baseline Conditions”). The GBR is a Contract Document.

b. The Baseline Conditions in the GBR are intended to reduce uncertainty and the degree of contingency in submitted Bids. However, Bidders cannot rely solely on the Baseline Conditions. Bids should be based on a comprehensive approach that includes an independent review and analysis of the GBR, all other Contract Documents, Technical Data, other available information, and observable surface conditions. Not all potential subsurface conditions are baselined.

c. Nothing in the GBR is intended to relieve Bidders of the responsibility to make their own determinations regarding construction costs, bidding strategies, and Bid prices, nor of the responsibility to select and be responsible for the means, methods, techniques, sequences, and procedures of construction, and for safety precautions and programs incident thereto.

d. As set forth in the Supplementary Conditions, the GDR is a Contract Document containing data prepared by or for the Owner in support of the GBR.

B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.

C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.

5.03 Other Site-related Documents

A. No other Site-related documents are available.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113

5.04 Site Visit and Testing by Bidders

A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.

B. A Site visit is scheduled following the pre-bid conference. Maps to the Site will be available at the pre-Bid conference.

C. All access to the Site other than during a regularly scheduled Site visit must be coordinated through the Engineer. Bidder must conduct the required Site visit during normal working hours.

D. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

E. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.

F. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

G. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

6.01 Express Representations and Certifications in Bid Form, Agreement

A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.

B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.

6.02 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;

B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113

C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;

D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;

E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;

F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;

G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;

H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;

I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;

and

J. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

ARTICLE 7—INTERPRETATIONS AND ADDENDA

7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.

7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows:

A. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing using the Pre-Bid Question Form provided herein.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113

7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than ten days prior to the date for opening of Bids may not be answered.

7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.

ARTICLE 8—BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, cashier’s check, or a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.

8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.

8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 91 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.

ARTICLE 9—CONTRACT TIMES

9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.

9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS

10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113 material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.

10.02 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer within 10 days of the issuance of the Advertisement for Bids or invitation to Bidders. Each such request must comply with the requirements of Paragraphs 7.05 and 7.06 of the General Conditions, and the review of the request will be governed by the principles in those paragraphs. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all registered Bidders.

Bidders cannot rely upon approvals made in any other manner.

10.03 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.

ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS

11.01 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.

11.02 Each Bidder, must submit to Owner a list of the Subcontractors or Suppliers proposed for the portions of the Work being bid.

11.03 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

11.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.

Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113

11.05 In accordance with the Code of Virginia, Section 2.2-4332, all Bidders must provide evidence of Workers’ Compensation Insurance prior to award of Contract by completing the Workers’ Compensation Certificate of Coverage.

11.06 In accordance with the Code of Virginia, Title 54.1, Chapter 11, all subcontractors must be registered either as a Class A or Class B contractor with the Virginia Board for Contractors.

ARTICLE 12—PREPARATION OF BID

12.01 The Bid Form is included with the Bidding Documents.

A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”

C. The Bid price of each item on the form must be stated in numerals. The Total Bid Price must be stated in both words and numerals; in case of conflict, words will take precedence.

12.02 Bids shall be submitted electronically in portable document format (pdf) and signatures shall be in accordance with the Code of Virginia § 59.1-479 et seq. The submitted copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.

12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.

12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.

12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.

12.06 A Bid by an individual must show the Bidder’s name and official address.

12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.

12.08 All names must be printed in ink below the signatures.

12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.

12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113

12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.

ARTICLE 13—BASIS OF BID

13.01 Lump Sum

A. Bidders must submit a Bid on a lump sum basis as set forth in the Bid Form.

ARTICLE 14—SUBMITTAL OF BID

14.01 The Bidding Documents include one separate copy of the Bid Form, and, if required, the Bid Bond Form. The copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.

14.02 A Bid must be electronically received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid.

14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.

ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID

15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.

15.03 If, in accordance with Code of Virginia, § 2.2-4330, Procedure (i), within two business days after Bids are opened, any Bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of the Bid, provided the Bid was submitted in good faith, and the mistake was a clerical mistake as opposed to a judgment mistake, and was actually due to an unintentional arithmetic error or an unintentional omission of a quantity of work, labor, or material made directly in the compilation of the Bid, that Bidder may withdraw his Bid and the Bid Security will be returned. Thereafter, the bidder will be disqualified from further bidding on the Work to be provided under the Contract Documents.

15.04 No Bid may be withdrawn due to error when the result would be the awarding of the Contract on another Bid of the same Bidder or of another Bidder in which the ownership of the withdrawing Bidder is more than five percent.

16.05 If a Bid is withdrawn due to error, the lowest remaining Bid shall be deemed to be the low Bid.

15.05 No Bidder who is permitted to withdraw a Bid shall, for compensation, supply any material or labor to or perform any subcontract or other work agreement for the person or firm to whom the

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113

Contract is awarded or otherwise benefit, directly or indirectly, from the performance of the Project for which the withdrawn Bid was submitted.

ARTICLE 16—OPENING OF BIDS

16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE

17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT

18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.

18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.

18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.

18.04 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.

18.05 If the Contract is to be awarded, such award shall be to the responsible Bidder submitting the lowest responsive Bid. Evaluation shall be made on the basis of the Base Bid; Add alternates, if any, will be considered by the Owner following Contract award.

18.06 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

B. Unless cancelled or rejected, the responsive Bid from the lowest responsible Bidder shall be accepted as submitted, except that if the Bid from the lowest responsible Bidder exceeds available funds, the Owner or designated official may negotiate with the apparent low Bidder to obtain a contract within available funds. In the event that the Total Base Bid from the lowest responsible bidder exceeds available funds, the Owner may negotiate the Total Base Bid amount with the apparent low bidder to obtain a contract price within available funds, pursuant to § 2.2-4318 of the Code of Virginia. Such negotiations with the apparent low

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113 bidder may include discussions of reducing the quantity, quality, or other cost saving mechanisms which are part of the Total Base Bid.

C. Negotiation with Lowest Responsible Bidder: If award of a contract to the lowest responsive and responsible Bidder is precluded because of limitations on available funds, under the provisions of § 2.2-4318 of the Virginia Public Procurement Act, the Owner reserves the right to negotiate the Total Base Bid amount with the lowest responsive Bidder to obtain a contract price within the available funds. This may involve changes in either the features or scope of the Work included in the Base Bid. The Owner shall notify the lowest responsive and responsible Bidder that such a situation exists and the Owner and Bidder shall then conduct their negotiations in person, by mail, by telephone or by any means they find convenient. If an acceptable contract cannot be negotiated, the Owner shall terminate negotiations and reject all bids.

D. Tie Bids shall be resolved pursuant to Code of Virginia, § 2.2-4328.

E. No Contractor or subcontractor shall perform any Work on the project unless it has obtained, and continues to maintain for the duration of such Work, such worker's compensation coverage as may be required pursuant to Code of Virginia Section 65.2-800 et seq., and no Contractor will be awarded the Contract unless, prior to the award of Contract, it furnishes evidence of such coverage.

F. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.

18.07 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

18.08 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 19—BONDS AND INSURANCE

19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.

19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.

ARTICLE 20—SIGNING OF AGREEMENT

20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 2113

Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

ARTICLE 21—SALES AND USE TAXES

21.01 State Sales and Use Taxes on materials and equipment to be incorporated in the work shall be included in the contract price.

21.02 If this project, or portion thereof, is declared tax exempt as outlined in the Code of Virginia 58.1- 3660, the Contractor shall request from the Virginia Department of Taxation the applicable sales and use exemption certificate and shall give the Owner a credit for the applicable sales tax.

ARTICLE 22 – SPECIAL LEGAL REQUIREMENTS

22.01 In accordance with § 2.2-4334 of the Code of Virginia, in any contract of $200,000 or more, the Bidder may offer the option to use an escrow account procedure for utilization of the Owner's retainage funds by so indicating in the space provided in the Bid Form.

22.02 Bidders must certify that they do not or will not maintain or provide for their employees any facilities that are segregated on the basis of race, color, creed, or national origin.

00 2515

PRE-BID QUESTION FORM

(Use separate Form for each question submitted.)

Date:

Project Name: Rocky Mount WWTP UV Replacement

T&L Project No.: 20142

The following question concerns Drawing Sheet (number) :

The following question concerns Specification Section (number) , page ______, paragraph

Refer to “Instructions to Bidders”, Article 7 - “Interpretations and Addenda”.

NOTE: QUESTIONS MAY NOT BE CONSIDERED IF RECEIVED WITHIN TEN (10) CALENDAR DAYS OF THE

BID DATE. All responses to questions will be made by Addendum.

Question submitted by:

Name Organization:

Telephone:

Bidders shall submit form to: Thompson & Litton

Email address: prebid@T-L.com or FAX No.: (540) 633-1896

EJCDC® C-410, Bid Form for Construction Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 4100

BID FORM FOR CONSTRUCTION CONTRACT

PROJECT IDENTIFICATION: Rocky Mount WWTP UV Replacement for

CONTRACT IDENTIFICATION AND NUMBER: T&L Project No. 20142

The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.

ARTICLE 1—OWNER AND BIDDER

1.01 This Bid is submitted to:

Town of Rocky Mount, Virginia

Mailing: Physical:

345 Donald Avenue 345 Donald Avenue Rocky Mount, Virginia 24151 Rocky Mount, Virginia 24151

1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2—ATTACHMENTS TO THIS BID

2.01 The following documents are submitted with and made a condition of this Bid:

A. Required Bid security;

B. Evidence of authority to do business in the state of the Project;

C. Required Bidder Qualification Statement with supporting data;

D. Certification of Bidder Regarding Debarment by Agency of the Commonwealth of Virginia;

and

E. Commonwealth of Virginia Workers Compensation Certificate of Coverage.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

00 4100

ARTICLE 3—BASIS OF BID—LUMP SUM BID AND UNIT PRICES

BID SCHEDULE – BASE BID

The undersigned hereby proposes and agrees to furnish all the necessary labor, materials, equipment, tools, and services for the construction required for this Project in accordance with the Plans, Specifications, and other Contract Documents prepared by Thompson & Litton, at the prices stated below.

These prices are to cover all expenses to complete the Work and make it fully operational in accordance with the Contract Documents. Total Bid Amounts shall be stated in both words and figures. In case of a discrepancy, words shall govern. The undersigned agrees that the prices below are the balanced figures used in preparing the Bid and further agrees, if awarded the Contract, to furnish an itemized breakdown of costs for any Bid Item. All line items must be completed, and prices must be totaled on each Bid Schedule and on the Bid Summary, if applicable.

Item No.

Description Unit Estimated Quantity

Bid Unit Price

Bid Price

Installation of new UV Disinfection System to include Ultraviolet Modules, System Control Center, Power Distribution Centers, Hydraulic System…