This Scope of Work document is an Attachment to Invitation for Bid (IFB) 700637-27 issued by Prince William County, Virginia for the supply, delivery, and dumping of quarry materials to support the County, its Service Districts, and County Facilities. The materials will be ordered on an as-needed basis throughout the contract period, with estimated quantities provided in the Pricing Schedule for bid evaluation purposes only and not constituting a guarantee of actual orders. Bidders may submit bids for one or both of two Groups, which will be evaluated separately; the County reserves the right to award each Group to different contractors. Deliveries must be completed within two (2) business days of order placement to County-designated job sites or other designated locations, with the contractor responsible for sourcing material from the closest available location unless otherwise authorized by the County. The scope accommodates delivery challenges on certain Service District roads by permitting the use of smaller trucks or stockpile locations with County approval, with no adjustment to haul rates or additional charges permitted for such alternative delivery methods.

Pricing shall include all costs for furnishing, delivering, and dumping materials, with no additional delivery, dumping, mobilization, minimum-load, or fuel charges permitted unless specifically listed in the Pricing Schedule or expressly authorized in the solicitation. Haul charges are calculated based on certified scale ticket tonnage and delivery miles, with rates adjusted for distances over five (5) miles using a per-ton-mile calculation. Group I materials must meet or exceed Virginia Department of Transportation (VDOT) Section 200 Road and Bridge Specifications (2020 Edition), with CBR 30 Material verified using VDOT-approved Virginia Test Method-8 and moisture content maintained within two percent (2%) of optimum, while Group II Stream Restoration Materials have specifications identified individually in the Pricing Schedule and are not subject to VDOT Section 200 requirements. The County reserves the right to inspect and test delivered materials for compliance and reject non-conforming materials, requiring the contractor to replace rejected materials at no additional cost. Hauling rate adjustments are governed exclusively by the Hauling Rate Adjustments Provision in the Pricing Schedule using a fixed diesel fuel baseline of $6.08 per gallon and U.S. Energy Information Administration (EIA) published prices for On-Highway UltraLow Sulfur Diesel Fuel for East Coast (PADD 1), with adjustments permitted by either party subject to County approval.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment III.4

IFB 700637-27

SCOPE OF WORK

GENERAL REQUIREMENTS

The Contractor shall supply, deliver, and dump Quarry Materials to support Prince William County, including all Service Districts and County Facilities. Orders shall be placed by the County on an as-needed basis throughout the contract period.

Estimated quantities identified in the Pricing Schedule are provided for bid evaluation purposes only and do not constitute a guarantee of the quantities to be ordered.

The Quarry Materials to be supplied under this solicitation are identified in the Pricing Schedule.

MULTIPLE AWARDS

Bidders may submit bids for one or both Groups. Each Group will be evaluated separately based on the applicable Group Total. The County reserves the right to make awards in accordance with Section II.18, Award of Contract, of the Terms and Conditions. The County may award the two Groups to different Bidders, and a Bidder that bids both Groups may be awarded one or both Groups.

DELIVERY AND HAULING REQUIREMENTS

The Contractor shall deliver materials to the County's designated job site or other County-designated delivery location identified at the time an order is placed. Deliveries shall be completed within two (2) business days of the order being placed, unless otherwise agreed to by the County.

The Contractor shall source and ship material from the closest location at which the Contractor has the material available, unless otherwise authorized by the County. The Contractor shall use large commercial hauling trucks or other equipment appropriate for the safe transportation and delivery of quarry materials, except as provided below.

Certain Service District roads may be narrow, have restricted access, or otherwise present conditions that make the use of standard commercial dump trucks impractical or unsafe. When necessary to safely complete a delivery, the Contractor may use single-axle dump trucks, smaller trucks, or other appropriate equipment.

When road or site conditions within a Service District are unfavorable for standard commercial dump trucks, the Contractor may, with County approval, either (a) use smaller trucks or other appropriate equipment to deliver the materials directly to the designated site, or (b) use standard commercial dump trucks to deliver and stockpile the materials at a County-approved location. The use of smaller trucks, other equipment, or a stockpile location does not change the haul rates or permit any additional charge.

Haul charges shall be based on the distance to the County-approved delivery or stockpile location.

The Contractor shall be responsible for coordinating the delivery method and equipment necessary to safely deliver the materials within the required delivery timeframe and in accordance with the County's delivery instructions.

All material deliveries shall include unloading or dumping at the location designated by the County unless otherwise specified in the Pricing Schedule or purchase order.

At the County's option, the County may pick up materials from the Contractor's quarry. The Contractor shall make the materials available within two (2) days after the County's request. Contract material prices remain unchanged, and no haul charge applies to materials picked up by the County.

Deliveries shall be accompanied by a delivery ticket that reflects, at a minimum: Contract Number, Purchase Order Number and Customer Number; Type of Materials; Quantities Ordered, Quantities Shipped and Back Orders; Net Tons Delivered (from a certified scale ticket); Shipping Point and Delivery Miles; and Destination and Date Delivered.

HAUL CHARGES AND MEASUREMENT

Haul charges shall be calculated from the Contractor's haul rates in the Pricing Schedule, as adjusted under the Hauling Rate Adjustments Provision. For a delivery of five (5) miles or less, the haul charge is the per ton rate within 5 miles multiplied by the net tons delivered. For a delivery of more than five (5) miles, the haul charge is the per ton rate within 5 miles plus the per ton mile rate multiplied by the number of miles beyond five (5), with that total multiplied by the net tons delivered.

Delivery miles are one-way, loaded miles measured from the Contractor's shipping point to the delivery site by the shortest practical route, rounded to the nearest whole mile. Net tons shall be determined from certified scale tickets. The Contractor shall show the delivery miles, net tons, and rates used on each invoice.

ORDERING

The County will place orders for materials on an as-needed basis. Orders may vary in quantity, material type, delivery location, and delivery schedule.

The Contractor shall fulfill orders in accordance with the quantities, materials, delivery locations, and delivery requirements specified by the County, including the two (2) day delivery requirement set forth above.

The Contractor shall not substitute materials without the prior approval of the County.

BID SUBMISSION

Bidders may submit a bid for one or both Groups. To be considered for award of a Group, the Bidder must submit a price for every Item within that Group, including the material unit price and both haul rates for each Item. Partial bids for individual Items within a Group will not be considered for award. A Bidder that submits a bid for both Groups must provide pricing for all Items in both Groups.

The Bidder's submitted prices shall include all costs necessary to furnish, deliver, and dump the specified materials. No additional delivery, dumping, mobilization, minimum-load, fuel, or other charges shall be permitted unless a specific line item for the cost is provided in the Pricing Schedule or the charge is otherwise expressly authorized elsewhere in the solicitation, including adjustments under the Hauling Rate Adjustments Provision.

MATERIAL SPECIFICATIONS

Group I - Quarry Materials Except for Screenings (Stone Dust), all Group I Quarry Materials shall meet or exceed the applicable requirements of Section 200 of the Virginia Department of Transportation (VDOT) Road and Bridge Specifications, 2020 Edition, including revisions in effect on the date of this solicitation, unless otherwise pre-approved by VDOT.

CBR 30 Material shall be verified using VDOT-approved Virginia Test Method-8. The Contractor shall provide VDOT Form TL-127 verifying the aggregate job formula mix as approved by VDOT for the intended application.

Material moisture content shall be within two percent (2%) of the optimum moisture content.

Group II - Stream Restoration Materials Group II Stream Restoration Materials are not required to meet VDOT Section 200 specifications.

Applicable material, gradation, size, and quality requirements are identified under the individual items in the Pricing Schedule.

MATERIAL QUALITY AND COMPLIANCE

The County reserves the right to inspect and test delivered materials for compliance with the applicable specifications. Materials that do not conform may be rejected by the County.

The Contractor shall promptly replace any rejected material at no additional cost to the County.

HAULING RATE ADJUSTMENTS

Hauling rate adjustments shall be governed exclusively by the Hauling Rate Adjustments Provision in the Pricing Schedule. Either the Contractor or the County may request an adjustment under that provision, and all adjustments are subject to final approval by the County.

For purposes of calculating any allowable hauling rate adjustment, the diesel fuel baseline is $6.08 per gallon and shall remain fixed for the entire contract term, including all renewal periods. The baseline shall not reset, be recalculated, or otherwise change at the beginning of any renewal period. Any adjustment to the Contractor's haul rates during the base contract period or any renewal period shall be calculated using the original $6.08 per gallon baseline and the applicable diesel fuel price published by the U.S. Energy Information Administration (EIA) on its Weekly Gasoline and Diesel Prices page for "On-Highway UltraLow Sulfur Diesel Fuel for East Coast (PADD 1)," in accordance with the Hauling Rate Adjustments Provision.

The Contractor and the County may each monitor the referenced EIA publication. Any request for an adjustment shall be submitted in accordance with the procedures and documentation requirements of the Hauling Rate Adjustments Provision.

GENERAL REQUIREMENTS
MULTIPLE AWARDS
Bidders may submit bids for one or both Groups. Each Group will be evaluated separately based on the applicable Group Total. The County reserves the right to make awards in accordance with Section II.18, Award of Contract, of the Terms and Conditions....
DELIVERY AND HAULING REQUIREMENTS
HAUL CHARGES AND MEASUREMENT
ORDERING
BID SUBMISSION
MATERIAL SPECIFICATIONS
Group I - Quarry Materials
Group II - Stream Restoration Materials
MATERIAL QUALITY AND COMPLIANCE
HAULING RATE ADJUSTMENTS