This is a Proposal Report for Pennsylvania Department of Transportation (PennDOT) Project 120692, a state-funded traffic signal modernization project in Philadelphia County. The project involves the modernization and replacement of existing traffic signal infrastructure along Ridge Avenue (S.R. 3009) from Pep Boys Driveway to Ramp F/J, including installation of new traffic signal equipment, signal supports, controller assemblies, foundations, conduit, wiring, pedestrian accommodations, and ADA-compliant curb ramps. Additional work includes fiber-optic cable installation, ITS cameras on traffic signal supports, a Type A changeable message sign, and design-build ADA curb ramps. The project is classified as non-federal (100% state-funded) with a cost range of $10,000,000.00 to $12,499,999.99. The scheduled bid letting is December 10, 2026, at 11:00 AM, with an anticipated Notice to Proceed of January 25, 2027, and required completion by August 24, 2029. The project includes numerous line items for traffic signal components, pavement markings, lighting, detection systems, and professional services. Prequalification is required, and prevailing wage rates apply to this contract.
The proposal includes extensive special provisions addressing traffic control procedures, erosion and sediment pollution control, prevailing wage compliance, equal employment opportunity requirements, worker protection and investment certifications, and quality assurance procedures. Contractors must comply with Pennsylvania's Right-to-Know Law, Buy America provisions (as applicable), and obtain approval for alternate erosion and sediment control plans from appropriate regulatory agencies. The contract requires compliance with the Reciprocal Limitations Act, with specified preferences against nonresident bidders from Arizona (5%), Montana (3%), and Wyoming (5%). Contractors and all subcontractors must submit Worker Protection and Investment Certification Forms (BOP-2201) within seven calendar days after bid opening. The project does not involve federal funding, though comprehensive design-build specifications and quality control procedures are mandated. Design activities include ADA ramp improvements with specific design and construction requirements, coordination with PennDOT's traffic unit and fiber optic contractors, and comprehensive ITS device integration and testing.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL REPORT
Project: 120692 Bid Package: 1
Current Let: 12/10/2026 11:00:00 AM Version: Current
Addendum Count: 0
District: 06 County: Philadelphia
SR/SEC/Group ID: 3009/76G/GLG
Description Ridge Avenue Signals: Northwestern Avenue - Ramp F/J: (Design Activities: ADA Ramps)
PROPOSAL Report - Project 120692
Page 1 of 107November 6, 2026 15:42:09 PM
TABLE OF CONTENTS
BID PACKAGE SUMMARY 4
PROJECT ITEMS AND QUANTITIES 5
SPECIAL PROVISIONS 12
G51A - a00051 APPLICABLE DESIGNATED SPECIAL PROVISIONS (STATE) 12 G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW 12 C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413 13 C172A - a00172 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876 20 C173B - a00173 CHANGES TO SPECIFICATIONS: SECTION 106 25 G401A - a00401 ADVANCE NOTICE OF TRAFFIC RESTRICTIONS 29 G901B - a00901 ALTERNATE EROSION AND SEDIMENT POLLUTION CONTROL PLAN 29 G1101B - a01101 CONSTRUCTION PROCEDURES - EROSION AND SEDIMENT POLLUTION
CONTROL 30
G1401A - a01401 EQUAL EMPLOYMENT OPPORTUNITY WITH PREQUALIFICATION 31 G2302A - a02302 Worker Protection and Investment 32 G3401A - a03401 PREVAILING WAGE ACT 33 G3501B - a03501 RECIPROCAL LIMITATIONS ACT REQUIREMENTS FOR CONSTRUCTION 33 D29899A - a29899 QUALITY PLAN WITH QUALITY ASSURANCE REVIEW BY DEPARTMENT -
LOW BID DESIGN 34
00 - a300282 COOPERATION AND COORDINATION BETWEEN CONTRACTORS 38 G60000A - a60000 PENNDOT TRAFFIC UNIT AND FIBER OPTIC CONTRACTOR
COORDINATION 38
P60100A - a60100 ITS PROJECT DESCRIPTION AND CONTRACTOR REQUIREMENTS 39 P60101A - a60101 ITS PROJECT MILESTONE DATES 39 S60102A - a60102 SECTION 1201 – ITS DEVICES – GENERAL 40 S6012B - b06012 - SECTION 601.3(f) BACKFILLING TRENCH 41 I68C - c00068 ITEM 9000-5101 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION
AGGREGATE 42
I70C - c00070 ITEM 9000-5103 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION
CONCRETE 43
I6091L - c06091 ITEM 0609-0009 EQUIPMENT PACKAGE 44 I60107A - c60107 ITEM 5201-[1XXXX] ITS DEVICE FIELD ENCLOSURE, [X] MOUNT, WITH
LABEL 45
I60108A - c60108 ITEM 5201-3000 ITS DEVICE TESTING, COMPLETE, DURATION 46 I60110A - c60110 ITEM 5202-0001 ATMS ITS DEVICE INTEGRATION, COORDINATION 47 I60111A - c60111 ITEM 9000-0015 STANDARD FIBER OPTIC CABLE, 24 STRAND 49 I60113A - c60113 ITEM 5210-0100 – ITS CLOSED CIRCUIT TELEVISION, CAMERA
SUBSYSTEM, STRUCTURE MOUNT, BOSCH 51
I60115A - c60115 ITEM 5230-2650 ITS DYNAMIC MESSAGE SIGN, 12” TEXT, FRONT-ACCESS, 30-DEG, CHARACTERS 51
I60121A - c60121 ITEM 9000-0013 35 FOOT WOODEN UTILITY POLE 52 I60124A - c60124 ITEM 9000-0017 CATEGORY 6 CABLE – OUTDOOR RATED 53 I60125A - c60125 ITEM 9000-0014 FIBER OPTIC CABLE SPLICE ENCLOSURE, 24-STRAND 54
Page 2 of 107November 6, 2026 15:42:09 PM
I60129A - c60129 ITEM 9000-[XXXX] SYSTEM SUPPORT EQUIPMENT 55 I60133A - c60133 ITEM 9000-0011 SELECTIVE TREE TRIMMING AND REMOVAL FOR ITS 56 D65010A - c65010 SPECIAL BIDDING – DESIGN-BUILD – ADA RAMPS – PHL 57 G69100A - c69100 PHILADELPHIA STREET LIGHTING GENERAL SPECIFICATIONS 66 I69213A - c69213 ITEM 9001-094X METRO STREET NAME SIGNS 67 I69303A - c69303 ITEM 4956-0790 ACCESSIBLE PEDESTRIAN SIGNALS TOUCHLESS PHL 69 I69306A - c69306 ITEM 9001-097X JUNCTION BOXES TRAFFIC SIGNAL PHL 70
00 - COORDINATION WITH DISTRICT 6-0 ABOVE-GROUND CULTURAL RESOURCES
PROFESSIONAL 71
00 - ITEM 0901-0001 MAINTENANCE AND PROTECTION OF TRAFFIC DURING
CONSTRUCTION 72
00 - ITEM 4954-0153 TRENCH AND BACKFILL, TYPE III, PHL 76
00 - ITEM 9000-0001 STREET LIGHTING LUMINAIRE, LED 76
00 - ITEM 9000-0002 WHITE HOT THERMOPLASTIC LEGEND, "DOUBLE RIGHT
ARROW", 21'-0" X 3'-0" 77
00 - ITEM 9000-0010 CMS NUMBER SIGN 78
00 - ITEM 9000-0016 ADVANCED TRANSPORTATION CONTROLLER, TYPE 1 MOUNTING, 352
CABINET 78
00 - ITEM 9000-0018 ADVANCED TRANSPORTATION CONTROLLER UNIT 84
00 - ITEM 9000-0020 LED COUNTDOWN PEDESTRIAN SIGNAL HEAD, TYPE A (REMOVE AND
INSTALL) 87
00 - ITEM 9000-0021 OPTICAL PREEMPTION SYSTEM (3 APPROACHES) (REMOVE AND RE-
INSTALL) 88
00 - ITEM 9000-0022 TRAFFIC C-POST, 20' 88
00 - ITEM 9000-0023 COMPOST SOCK INLET PROTECTION FOR PWD OPEN MOUTH INLET 90
00 - ITEM 9000-0976 DETECTION SYSTEM, 3 APPROACHES 91
00 - ITEM 9000-0977 DETECTION SYSTEM, 4 APPROACHES 93
00 - ITEM 9000-1104 PROFESSIONAL SERVICES (AS-BUILTS), PER INTERSECTION 94
00 - ITEM 9001-0651 CONSTRUCTION OF ADA RAMPS (BY QUADRANT), CONCRETE PHL 97
00 - ITEM 9001-0672 DESIGN OF ADA RAMPS (BY QUADRANT) PHL 101
Page 3 of 107November 6, 2026 15:42:09 PM
BID PACKAGE SUMMARY
Project: 120692 Bid Package: 1
Project Type: Standard Posted:
Federal Project Status: Non - Federal (100% State) State Type of Work: NEW AND REVISED MAJOR TRAFFIC SIGNALS
Prequalification Required: Yes Pre-Bid Meeting: None
408 Version: 2026-1
Scheduled Let: 12/10/2026 11:00:00 AM Project Cost Range: $10,000,000.00 - $12,499,999.99 Anticipated NTP: 01/25/2027 Structure Work: 0.00%
Required Completion: 08/24/2029 Wage Rates: Yes
Description:
This project is for modernization and replacement of existing traffic signal infrastructure along Ridge Avenue (S.R. 3009) in Philadelphia County from Pep Boys Driveway to Ramp F/J, within the project limits. Work includes the installation of new traffic signal equipment, signal supports, controller assemblies, controller units, foundations, conduit, wiring, pedestrian accommodations, accessible curb ramp improvements and other miscellaneous construction for a complete and operational traffic signal system.
Additional work includes the installation of Fiber-Optic Cable for connection to controller assemblies, ITS Cameras mounted on Traffic Signal Supports, Type A Mounted Changeable Message Sign, Design Build ADA Curb Ramps.
Additional Information:
This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to contact Contract Awards and be escorted to the 7th Floor Contract Awards Room. Contract Awards can be reached at 717-395-9754.
Due to recent changes in the Keystone Building, there is no longer a reception on the 5th Floor to greet and check-in visitors.
Page 4 of 107November 6, 2026 15:42:09 PM
PROJECT ITEMS AND QUANTITIES
Alt Item Work Class Code Unit Of
Measure Quantity Unit Price PDP Spec
Prov Add Action
0203-0001 C Cubic Yard 13.0000 N
CLASS 1 EXCAVATION
0608-0001 X Lump Sum 1.0000 N
MOBILIZATION
0609-0002 X Lump Sum 1.0000 N
INSPECTOR'S FIELD OFFICE AND INSPECTION FACILITIES, TYPE A
0609-0009 X Lump Sum 1.0000 N Std
EQUIPMENT PACKAGE
0676-0001 K Square Yard 54.0000 N
CEMENT CONCRETE SIDEWALK
0686-0020 X Lump Sum 1.0000 N
CONSTRUCTION SURVEYING, TYPE B
0689-0001 X Lump Sum 1.0000 N
NARRATIVE SCHEDULE
0690-0001 X Dollar 1,000.0000 $1.00 Y
INTERNAL FACILITATION
0695-0002 K Square Foot 24.0000 N
DETECTABLE WARNING SURFACE, CAST IRON
0802-0001 C1, M Cubic Yard 9.0000 N
TOPSOIL FURNISHED AND PLACED
0804-0025 M3 Pound 10.0000 N
SEEDING AND SOIL SUPPLEMENTS - FORMULA B RESIDENTIAL MIX, INCLUDING MULCH
0860-0000 M2 Each 1.0000 N
INLET FILTER BAG FOR TYPE M INLET
0867-0012 M2 Linear Foot 145.0000 N
COMPOST FILTER SOCK, 12" DIAMETER
0901-0001 Q Lump Sum 1.0000 N Proj
MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION
0910-0001 C1, P8 Each 1.0000 N
JUNCTION BOXES J.B.-1
0910-4116 P8 Linear Foot 14,920.0000 N
AWG 8 UNDERGROUND CABLE, COPPER, 1 CONDUCTOR
0910-5055 C1, P8 Linear Foot 90.0000 N
2" DIRECT BURIAL CONDUIT
Page 5 of 107November 6, 2026 15:42:09 PM
0930-0110 R Each 1.0000 N
BREAKAWAY SYSTEM REPLACEMENT
0931-0001 R Square Foot 255.0000 N
POST MOUNTED SIGNS, TYPE B
0935-0001 R Square Foot 230.0000 N
POST MOUNTED SIGNS, TYPE F
0935-0360 P8 Each 2.0000 N
LED BORDER LIT SIGN
0936-0200 R Square Foot 2,542.0000 N
STRUCTURE MOUNTED FLAT SHEET ALUMINUM SIGNS
0945-0001 R Each 2.0000 N
RESET POST MOUNTED SIGNS, TYPE F
0951-0215 P Each 4.0000 N
TRAFFIC SIGNAL SUPPORT, 15' MAST ARM, POWDER COATED
0951-0220 P Each 16.0000 N
TRAFFIC SIGNAL SUPPORT, 20' MAST ARM, POWDER COATED
0951-0225 P Each 6.0000 N
TRAFFIC SIGNAL SUPPORT, 25' MAST ARM, POWDER COATED
0951-0230 P Each 4.0000 N
TRAFFIC SIGNAL SUPPORT, 30' MAST ARM, POWDER COATED
0951-0235 P Each 4.0000 N
TRAFFIC SIGNAL SUPPORT, 35' MAST ARM, POWDER COATED
0951-0240 P Each 3.0000 N
TRAFFIC SIGNAL SUPPORT, 40' MAST ARM, POWDER COATED
0951-0250 P Each 5.0000 N
TRAFFIC SIGNAL SUPPORT, 50' MAST ARM, POWDER COATED
0951-2220 P Each 14.0000 N TRAFFIC SIGNAL SUPPORT, 20' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0951-2225 P Each 11.0000 N TRAFFIC SIGNAL SUPPORT, 25' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0951-2230 P Each 5.0000 N TRAFFIC SIGNAL SUPPORT, 30' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0951-2235 P Each 3.0000 N TRAFFIC SIGNAL SUPPORT, 35' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0951-2240 P Each 4.0000 N TRAFFIC SIGNAL SUPPORT, 40' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0951-2245 P Each 2.0000 N TRAFFIC SIGNAL SUPPORT, 45' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
Page 6 of 107November 6, 2026 15:42:09 PM
0951-2250 P Each 1.0000 N
TRAFFIC SIGNAL SUPPORT, 50' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0951-2260 P Each 1.0000 N TRAFFIC SIGNAL SUPPORT, 60' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0952-3002 P Each 1.0000 N
CONTROLLER MODIFICATION
0953-0601 P Each 24.0000 N
MANAGED NETWORK SWITCH, FIELD SWITCH TYPE B
0953-0802 P Lump Sum 1.0000 N
UNIFIED COMMAND AND CONTROL INTEGRATION
0954-0012 P8 Linear Foot 2,969.0000 N
2 INCH CONDUIT
0954-0013 P8 Linear Foot 7,314.0000 N
3 INCH CONDUIT
0954-0151 C1, P8 Linear Foot 794.0000 N
TRENCH AND BACKFILL, TYPE I
0954-0152 C1, P8 Linear Foot 3,338.0000 N
TRENCH AND BACKFILL, TYPE II
4954-0153 C1, P8 Linear Foot 2,142.0000 N Proj
TRENCH AND BACKFILL, TYPE III PHL
0954-0201 P8 Linear Foot 22,985.0000 N
SIGNAL CABLE, 14 AWG, 3 CONDUCTOR
0954-0202 P8 Linear Foot 50,062.0000 N
SIGNAL CABLE, 14 AWG, 5 CONDUCTOR
0954-0203 P8 Linear Foot 2,847.0000 N
SIGNAL CABLE, 14 AWG, 7 CONDUCTOR
0954-0401 P8 Each 1.0000 N
ELECTRICAL SERVICE, TYPE A
0954-0402 P8 Each 29.0000 N
ELECTRICAL SERVICE, TYPE B
0954-0600 P8 Each 22.0000 N
UNINTERRUPTIBLE POWER SUPPLY (UPS)
0955-3208 P Each 197.0000 N
VEHICULAR SIGNAL HEAD, THREE 12" SECTIONS
0955-3209 P Each 7.0000 N
VEHICULAR SIGNAL HEAD, FOUR 12" SECTIONS
0955-3210 P Each 1.0000 N
Page 7 of 107November 6, 2026 15:42:09 PM
VEHICULAR SIGNAL HEAD, FIVE 12" SECTIONS
0955-3722 P Each 166.0000 N
LED COUNTDOWN PEDESTRIAN SIGNAL HEAD, TYPE A
4956-0790 P Each 170.0000 N Std
ACCESSIBLE PEDESTRIAN SIGNALS TOUCHLESS PHL
0956-0823 P Each 6.0000 N
OPTICAL PREEMPTION SYSTEM (3 APPROACHES)
0956-0824 P Each 16.0000 N
OPTICAL PREEMPTION SYSTEM (4 APPROACHES)
0960-0001 O2 Linear Foot 697.0000 N
4" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS
0960-0002 O2 Linear Foot 11,349.0000 N
4" YELLOW HOT THERMOPLASTIC PAVEMENT MARKINGS
0960-0005 O2 Linear Foot 11,546.0000 N
6" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS
0960-0021 O2 Linear Foot 17,410.0000 N
24" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS
0960-0022 O2 Linear Foot 64.0000 N
24" YELLOW HOT THERMOPLASTIC PAVEMENT MARKINGS
0960-0101 O2 Each 21.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "ONLY", 8' - 0"
0960-0220 O2 Each 3.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "STRAIGHT ARROW", 12' - 0" X 1' - 8"
0960-0222 O2 Each 3.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "RIGHT ARROW", 12' - 0" X 3' - 0"
0960-0224 O2 Each 19.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "LEFT ARROW", 12' - 0" X 3' - 0"
0960-0226 O2 Each 1.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "THRU AND RIGHT ARROW", 20' - 0" X 3' - 7"
0960-0228 O2 Each 1.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "THRU AND LEFT ARROW", 20' - 0" X 3' - 7"
0960-0230 O2 Each 3.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "WRONG WAY ARROW", 23' - 0"
0960-0255 O2 Linear Foot 19.0000 N WHITE HOT THERMOPLASTIC LEGEND, "YIELD LINE", 12" X 18" TRIANGLE, (MIN 6 TRIANGLES PER LINE)
0960-0401 O2 Each 5.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "A", 8' - 0"
Page 8 of 107November 6, 2026 15:42:09 PM
0960-0402 O2 Each 11.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "B", 8' - 0"
0960-0404 O2 Each 2.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "D", 8' - 0"
0960-0405 O2 Each 10.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "E", 8' - 0"
0960-0407 O2 Each 2.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "G", 8' - 0"
0960-0408 O2 Each 3.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "H", 8' - 0"
0960-0409 O2 Each 2.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "I", 8' - 0"
0960-0414 O2 Each 3.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "N", 8' - 0"
0960-0415 O2 Each 5.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "O", 8' - 0"
0960-0418 O2 Each 5.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "R", 8' - 0"
0960-0419 O2 Each 11.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "S", 8' - 0"
0960-0420 O2 Each 5.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "T", 8' - 0"
0960-0421 O2 Each 11.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "U", 8' - 0"
0960-0422 O2 Each 5.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "V", 8' - 0"
0960-0425 O2 Each 3.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "Y", 8' - 0"
0960-0433 O2 Each 14.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "BICYCLE SYMBOL", 6' - 0" X 3' -4"
0960-1121 O2 Each 14.0000 N
WHITE HOT THERMOPLASTIC LEGEND, SHARED LANE MARKING
0963-0001 O2, O3 Square Foot 3,001.0000 N
PAVEMENT MARKING REMOVAL
0963-0010 O2, O3 Each 1.0000 N
PAVEMENT MARKING REMOVAL (LEGENDS AND SYMBOLS)
5201-1000 P1, P2, P4, P5 Each 1.0000 N Std
ITS DEVICE FIELD ENCLOSURE, GROUND MOUNT WITH LABEL
Page 9 of 107November 6, 2026 15:42:09 PM
5201-1600 P1, P2, P4, P5 Each 7.0000 N Std
ITS DEVICE FIELD ENCLOSURE, STRUCTURE MOUNT WITH LABEL
5201-3000 P1, P2, P3, P4, P5 Lump Sum 1.0000 N Std
ITS DEVICE TESTING, COMPLETE , DURATION
5202-0001 P5 Lump Sum 1.0000 N Std
ATMS ITS DEVICE INTEGRATION COORDINATION
5210-0100 P1 Each 7.0000 N Std
ITS CLOSED CIRCUIT TELEVISION, CAMERA SUBSYSTEM, STRUCTURE MOUNT BOSCH
5230-2650 P3 Each 1.0000 N Std
ITS CHANGEABLE MESSAGE SIGN, 12" TEXT, FRONT-ACCESS, 30-DEG CHARACTERS
9000-0001 P8 Each 42.0000 N Proj
STREET LIGHTING LUMINAIRE, LED
9000-0002 O Each 1.0000 N Proj
WHITE HOT THERMOPLASTIC LEGEND, "DOUBLE RIGHT ARROW", 21'-0" X 3'X 0"
9000-0010 P3 Square Foot 84.0000 N Proj
CMS NUMBER SIGN
9000-0011 M1 Dollar 20,000.0000 $1.00 Y Std
SELECTIVE TREE TRIMMING AND REMOVAL FOR ITS
9000-0013 P3 Each 1.0000 N Std
35 FOOT WOODEN UTILITY POLE
9000-0014 P, P4 Each 3.0000 N Std
FIBER OPTIC CABLE SPLICE ENCLOSURE, 24-STRAND
9000-0015 P, P4 Linear Foot 2,080.0000 N Std
STANDARD FIBER OPTIC CABLE, 24 STRAND
9000-0016 P Each 23.0000 N Proj
ADVANCED TRANSPORTATION CONTROLLER, TYPE 1 MOUNTING, 352 CABINET
9000-0017 P3 Linear Foot 40.0000 N Std
CATEGORY 6 CABLE - OUTDOOR RATED
9000-0018 P Each 1.0000 N Proj
ADVANCED TRANSPORTATION CONTROLLER UNIT
9000-0019 P4 Lump Sum 1.0000 N Std
SYSTEM SUPPORT EQUIPMENT
9000-0020 P Each 4.0000 N Proj
LED COUNTDOWN PEDESTRIAN HEAD, TYPE A (REMOVE AND INSTALL)
9000-0021 P Each 1.0000 N Proj
OPTICAL PREEMPTION SYSTEM (3 APPROACHES) (REMOVE AND INSTALL)
9000-0022 P Each 123.0000 N Proj
Page 10 of 107November 6, 2026 15:42:09 PM
TRAFFIC C-POST, 20'
9000-0023 M2 Each 2.0000 N Proj
COMPOST SOCK INLET PROTECTION FOR PWD OPEN MOUTH INLET
9000-0976 P Each 7.0000 N Proj
DETECTION SYSTEM, 3 APPROACHES
9000-0977 P Each 16.0000 N Proj
DETECTION SYSTEM, 4 APPROACHES
9000-1104 X Each 25.0000 N Proj
PROFESSIONAL SERVICES (AS-BUILTS), PER INTERSECTION
9000-5101 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION AGGREGRATE
9000-5103 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION CONCRETE
9001-0651 K Each 2.0000 N Proj
CONSTRUCTION OF ADA RAMPS (BY QUADRANT) CONCRETE PHL
9001-0672 X Each 2.0000 N Proj
DESIGN OF ADA RAMPS (BY QUADRANT) PHL
9001-0944 R Each 8.0000 N Std
METRO STREET NAME SIGN 12"X36"
9001-0945 R Each 96.0000 N Std
METRO STREET NAME SIGN 18"X36"
9001-0947 R Each 70.0000 N Std
METRO STREET NAME SIGN 12"X48"
9001-0949 R Each 8.0000 N Std
METRO STREET NAME SIGN 24"X48"
9001-0976 P Each 9.0000 N Std
JUNCTION BOX 12"X18"X12" DEEP TRAFFIC SIGNAL PHL
9001-0977 P Each 43.0000 N Std
JUNCTION BOX 17"X30"X18" DEEP TRAFFIC SIGNAL PHL
9001-0978 P Each 11.0000 N Std
JUNCTION BOX CIRCULAR 39" DIA 18" DEEP TRAFFIC SIGNAL PHL
Page 11 of 107November 6, 2026 15:42:09 PM
SPECIAL PROVISIONS
Special Provision: G51A - a00051 APPLICABLE DESIGNATED SPECIAL PROVISIONS (STATE) Addendum:
Action:
Item(s) Associated:
Header:
APPLICABLE DESIGNATED SPECIAL PROVISIONS (STATE)
Provision Body:
APPLICABLE DESIGNATED SPECIAL PROVISIONS. The following Designated Special Provisions are found in Appendix C and apply to this bid proposal.
DSP4. Diverse Business (DB) Requirements for Non-Federally Funded Construction Projects.
DSP9. Special Supplement - Anti-Pollution Measures - August 26, 1999.
DSP15. Commonwealth Standard Terms and Conditions.
Project Specific Details:
Special Provision: G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW Addendum:
CONTRACT PROVISIONS - RIGHT TO KNOW LAW
Provision Body:
I. Contract Provisions – Right to Know Law 8-K-1532
a. The Pennsylvania Right-to-Know Law (RTKL), 65 P.S. §§ 67.101-3104, applies to this Contract.
b. If the Department needs assistance in any matter arising out of the RTKL related to this Contract, the Department will notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Department.
c. Upon written notification from the Department that it requires assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor will:
1. Provide the Department, within 10 calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Department reasonably believes is Requested
Page 12 of 107November 6, 2026 15:42:09 PM
Information and may be a public record under the RTKL; and
2. Provide such other assistance as the Department may reasonably request, in order to comply with the RTKL with respect to this Contract.
d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, notify the Department and provide, within 7 calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.
e. The Department will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Department determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Department determine that the Requested Information is clearly not exempt from disclosure, provide the Requested Information within 7 calendar days of receipt of written notification of the Department’s determination.
f. Failing to provide the Requested Information within the time period required by these provisions, indemnify and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of this failure, including any statutory damages assessed against the Department.
g. The Department will reimburse the Contractor for any costs associated with complying with these provisions only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.
h. The Contractor may file a legal challenge to any Department decision to release a record to the public with the Office of Open Records, or in the Pennsylvania Courts, however, indemnify the Department for any legal expenses incurred by the Department as a result of such a challenge and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of the failure, including any statutory damages assessed against the Department, regardless of the outcome of such legal challenge. As between the parties, agree to waive all rights or remedies that may be available as a result of the Department’s disclosure of Requested information pursuant to the RTKL.
i. The Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Contract and continue as long as the Requested Information remains in the Contractor's possession.
Special Provision: C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413
Addendum:
CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413
Provision Body:
SECTION 313—SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, BASE COURSE
Section 313.3(m) Tests for Depth. Revise to read as follows:•
(m) Tests for Depth.
(m) Tests for Depth. Replace with the following:
Page 13 of 107November 6, 2026 15:42:09 PM
Control the loose depth of each layer to construct the base course to the compacted depth indicated and within the specified tolerance. On the top lift and in the presence of the Inspector, drill full-depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed base course and at other locations the Inspector suspects are deficient. After the Inspector completes depth measurements, backfill, compact, and seal core holes with the mixture used to construct the course.
The Inspector will measure the full-depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. Immediately delineate the limits of pavement deficient in depth from the core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is less than 1/2 inch deficient of the design depth. The defective course will be the full width of the affected lane.
SECTION 314—SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, ASPHALT RICH BASE COURSE
Section 314.3(m) Tests for Depth. Revise to read as follows:•
(m) Tests for Depth.
(m) Tests for Depth. Replace with the following:
Control the loose depth of each layer to construct the ARBC to the compacted depth indicated and within the specified tolerance. In the presence of the Inspector, drill full-depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed ARBC and at other locations the Inspector suspects are deficient. After the Inspector completes depth measurements, backfill, compact, and seal core holes with ARBC.
The Inspector will measure the full-depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. Immediately delineate the limits of pavement deficient in depth from the core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is less than 1/2 inch deficient of the design depth. The defective course will be the full width of the affected lane.
SECTION 360—ASPHALT TREATED PERMEABLE BASE COURSE
Section 360.2(e)3. Production. Revise to read as follows:•
3. Production. During the first day of production, take at least three asphalt content and gradation tests to verify the mixture conforms to the JMF. After the first day, perform tests for asphalt content and aggregate gradation according to the QC Plan and PTM No. 1. Produce ATPBC conforming to the gradation requirements in Table A and with an asphalt content within 0.8% of the JMF (n=1). Ensure the aggregate is uniformly coated with asphalt and no runoff of excess asphalt is observed.
Section 360.3(m). Tests for Depth. Revise to read as follows:•
(m) Tests for Depth: Binder and Wearing Courses. Replace with the following:
Carefully dig or drill one random 6-inch diameter test hole selected by the Representative according to PTM No. 1 to the full depth of the ATPBC for each 3,000 square yards, or less, of completed base course. The Representative may require additional test holes in areas the Representative suspects are deficient in depth. The Representative will measure the depth of the base course. Using material acceptable to the Representative, backfill the test holes and compact the material to fill the test hole flush with the completed base course.
ATPBC deficient in depth by 1/2 inch or more is defective. Immediately delineate the limits of ATPBC deficient in depth from the location by proceeding longitudinally, forward and backward, obtaining additional test holes every 50 feet until the depth is less than 1/2 inch deficient of the indicated depth. The defective course will be the full width of the affected lane.
SECTION 410—SUPERPAVE MIXTURE DESIGN, STANDARD AND RPS CONSTRUCTION OF PLANT-MIXED ASPHALT FINE-
GRADED COURSES
Section 410.3. CONSTRUCTION. Revise to read as follows:•
410.3 CONSTRUCTION—Section 413.3 using the test procedures, limits, and tolerances for a 9.5 mm nominal maximum aggregate size mixture except where procedures, limits and tolerances are specifically indicated for a 9.5 mm fine-graded nominal maximum aggregate size mixture and as modified as follows:
Revise Table G to include 9.5 mm Fine Grade Wearing Course as follows:
Page 14 of 107November 6, 2026 15:42:09 PM
TABLE G
Mixture Minimum Indicated Compacted Depths
Mixture Minimum Depth
9.5 mm Fine Grade Wearing Course 1 inch
SECTION 412—SUPERPAVE MIXTURE DESIGN, CONSTRUCTION OF PLANT-MIXED 6.3 MM ASPHALT OVERLAY COURSES
Section 412.3(a)2. Preplacement Meeting. Revise to read as follows:•
2. Preplacement Meeting. At least 2 weeks before placing asphalt paving mixtures, schedule an asphalt preplacement meeting with the Representative to review at a minimum the specification, paving operation QC Plan, sequence of paving operations, asphalt mixture temperature checks, mixture acceptance, density acceptance and the care and custody of asphalt acceptance samples.
Section 412.3(h)1.a. Placing. Revise to read as follows:•
1.a Placing. Unless otherwise allowed, deliver, place, and compact 6.3 mm paving mixtures during daylight hours. Ensure the mixture does not contain lumps of cold material. Deliver and place 6.3 mm paving mixtures at the laying temperatures specified in Table B.
Material placed outside the temperature limits as specified in Table B is defective.
Utilize a Material Transfer Vehicle (MTV) as specified in Section 108.05(c)5 for 6.3 mm paving mixtures unless otherwise approved by the Representative.
Section 412.4(a)4.b. Dispute Resolution. Revise TABLE H to read as follows:•
TABLE H
Dispute Resolution Retest Cost Table
Test Method
Mixture Acceptance Retest Cost if Retest Results Indicate
100% Pay Factor(s) for Full Lots (n > 3)* or Single Sample (n=1) Requirements in Table B were met for Partial Lots (n < 3)**
Mixture Acceptance Retest Cost if Retest Results Indicate
< 100% Pay Factor(s) for Full Lots (n > 3)* or Single Sample (n=1) Requirements in Table B were not met for Partial Lots (n < 3)**
PTM No.
702/739 $900 $3,500
PTM No. 757 $500 $2,000
* For full lots (n ≥ 3) where the original test results indicated a defective lot, only the pay factor(s) where original test results indicated a defective lot for asphalt content or percent passing the 75 μm (No. 200) sieve will be utilized to determine the retest cost.
** For partial lots (n < 3) where the original test results indicated a pay parameter (asphalt content, percent passing the 75 µm (No. 200) sieve, or both) did not meet the Single Sample (n = 1) requirements in Table B, only the pay parameter(s) that did not meet the Single Sample (n =1) requirements will be utilized to determine the retest cost.
SECTION 413—SUPERPAVE MIXTURE DESIGN, STANDARD AND RPS CONSTRUCTION OF PLANT-MIXED ASPHALT
COURSES WITH PERCENT WITHIN LIMITS AND LTS TESTING (PWS-LTS)
Section 413.2(e)1. Recycled Asphalt Material. Revise to read as follows:•
1. Virgin Material Mixtures. Size, uniformly grade, and combine aggregate fractions, asphalt binder, and either WMA Technology
Page 15 of 107November 6, 2026 15:42:09 PM additive(s) or modifier(s) in proportions to produce a JMF that conforms to the material, gradation, and volumetric Superpave Asphalt Mixture Design requirements according to Bulletin 27, Chapter 2A. Produce an asphalt mixture for the specified nominal maximum aggregate size and design ESALs except as procedurally modified by the WMA Technology Manufacturer Technical Representative (Technical Representative) to address laboratory procedures when preparing, compacting and testing asphalt mixtures to achieve a uniform blend. Special additive(s) or modifier(s) need not be used if mixture temperature, workability, and compaction can be achieved solely through plant mechanical modification to produce foamed asphalt. Do not incorporate the WMA Technology additive, modifier or process during the volumetric asphalt mixture design process, so that the JMF volumetrics and material percentages are based on a mixture with no WMA Technology. Only use the WMA Technology additive, modifier or process to evaluate results from moisture susceptibility testing during the mix design process. Develop an asphalt mixture JMF, then incorporate the WMA Technology additive, modifier, or process into that JMF during production. Create an asphalt JMF cover sheet (Form TR-448A) for approval containing the WMA Technology used, additive dosage rate or percent water added for foaming, material code, and the TSR data from the moisture susceptibility testing.
Submit a copy of each completed JMF, signed by a certified Asphalt Level 2 plant technician, to the DME/DMM at least 3 weeks before the planned start of mixture production. Include a list of all material sources and the asphalt mixture producer in the JMF.
Provide the calibration factors (Cf and 200 Cf) according to PTM No. 757 with the JMF. Do not start mixture production until after the DME/DMM reviews the JMF.
Submit a new JMF with a change in material sources or if a new JMF is necessary to produce a mixture conforming to this specification.
No additional revisions were made to Section 413.2(e)1.•
Section 413.2(e)1.d.5. Volumetric Analysis of Compacted Specimens. Revise TABLE A as follows:•
TABLE A
Job-Mix Formula Composition Tolerance Requirements of the Completed Mix
Single Sample (n=1) Multiple
Samples (n > 3)
Gradation Passing 12.5 mm (1/2 inch) and Larger Sieves +8% +6% Passing 9.5 mm (3/8 inch) to 150 µm (No. 100) Sieves (Inclusive) +6% +4%
Passing 75 µm (No. 200) Sieve +3.0% +2.0% Asphalt Content
19.0 mm Asphalt mixtures and smaller +0.7% +0.4%
25.0 mm Asphalt mixtures and larger +0.8% +0.5%
Temperature of Mixture (F)
Class of Material
Type of Material
Chemical, Organic, Foaming Additives
Minimum*
Mechanical Foaming Equipment/Process
Minimum* Maximum*
PG 58S-28 Asphalt Binder 215 230 310 PG 64S-22 Asphalt Binder 220 240 320 PG 64E-22 Asphalt Binder 240 260 330
All other Binders Asphalt Binder
The higher of 215 or the minimum temp.
specified in Bulletin 25 minus 45F
The higher of 230 or the minimum temp.
specified in Bulletin 25 minus 30F
As specified in Bulletin
* Outline in the Producer QC Plan and follow more restrictive temperature requirements provided by the WMA technology manufacturer or Technical Representative(s) for production and placement of the mixture. Determine the SGC compaction temperature for the production QC which yields the same target air voids as the designed JMF. Include the SGC compaction temperature in the
Page 16 of 107November 6, 2026 15:42:09 PM
Producer QC Plan. Compact the completed mixture in the SGC for QC volumetric analysis at the SGC compaction temperature according to the guidelines provided by the Technical Representative.
Section 413.2(i)2. Certification Acceptance. Revise to read as follows:•
2. Certification Acceptance. Acceptance by certification is appropriate for the following mixtures, conditions, or applications:
Scratch courses, leveling courses less than 2-inch depth and driveway adjustments.•
Mixtures used by Department maintenance forces.•
Mixtures purchased by local or municipal governments.•
Mixtures placed in quantities not exceeding 500 tons in a continuous placement operation unless otherwise directed by the Representative.
Mixtures used for parking lots.•
All 4.75 mm NMAS asphalt mixtures.•
Other mixtures, conditions, or applications as approved by the Representative.•
2.a General. Obtain certification from the mixture Producer. Use all QC tests during mixture production as acceptance tests. Certify mixtures using Form CS-4171B. Include, or attach, the QC test results on the form. Provide the form to the Inspector-in-Charge within 1 working day after completing the QC tests. Certify mixtures as specified in Section 106.03(b)3 and the requirements below.
2.b Certification of Mixture. Certify each mixture daily if QC test results conform to the single sample and multiple sample JMF production tolerances of Table A. The acceptance values will be:
Asphalt Content.•
Percent Passing the 2.36 mm (No. 8) sieve (not applicable for 4.75 mm NMAS asphalt mixtures).•
Percent Passing the 75 µm (No. 200) sieve.•
If using printed ticket results in place of laboratory test results for asphalt content, certify that at least 90% of each day’s printed ticket results for asphalt content are within 0.2 percentage points of the JMF.
If the mixture does not conform to the above requirements, do not certify the mixture. Instead, provide all QC test results to the Inspector-in-Charge. If using printed ticket results for asphalt content, provide the percentage of daily printed ticket results within 0.2 percentage points of the JMF to the Inspector-in-Charge. Payment will be determined according to Table H based on the QC test results.
If a day’s production is interrupted by corrective action, material produced after the corrective action may be certified if QC test results conform to production tolerances.
2.c Maintaining Approval to Certify Mixtures. The Department may suspend a plant’s approval to certify mixtures if QC is not performed according to the Producer QC Plan, mixtures are not produced according to Bulletin 27, a mixture cannot be certified on 2 consecutive production days, or as described below.
The Department may take IA samples of the completed mixture at the plant. In the presence of the Department, test the IA samples for asphalt content and gradation according to the test methods indicated in the Producer QC Plan. Take immediate corrective actions if the mixture does not conform to Table A.
The Department may take QA samples of the completed mixture at the plant or on the roadway directly from the uncompacted mixture placed by the paving equipment specified in Section 413.3(e). The Department will test QA samples according to PTM No. 757 or PTM No. 702, Modified Method D, if previously identified problematic aggregates are used in the mixture, for conformance to Table A. If the results of the QA samples do not comply with Table A, review the Producer QC Plan and the QC test results that followed the QA samples for conformance to Table A. If QC results do not conform to Table A, perform the corrective actions necessary to provide a mixture conforming to Table A.
After completing corrective actions or the sample review, the Department will perform an on-site evaluation of the Producer’s plant operation and QC and then take a sample of the completed mixture at the plant. In the presence of the Representative, test the sample.
Page 17 of 107November 6, 2026 15:42:09 PM
If the sample does not comply with Table A, the Department will suspend certification. Immediately suspend shipping mixtures accepted by certification to the project.
After testing verifies that the produced mixture conforms to Tables A and B and with the Representative present, conduct JMF verification according to the Producer QC Plan. After successfully completing JMF verification, resume both certification and shipping mixtures accepted by certification to the project.
Section 413.3(a)2. Preplacement Meeting. Revise to read as follows:•
2. Preplacement Meeting. At least 2 weeks before placing asphalt paving mixtures, schedule an asphalt preplacement meeting with the Representative to review at a minimum the specification, paving operation QC Plan, sequence of paving operations, asphalt mixture temperature checks, mixture acceptance, density acceptance and the care and custody of asphalt acceptance samples.
Section 413.3(d). Hauling Equipment. Revise to read as follows:•
(d) Hauling Equipment. Haul the mixtures in tightly sealed vehicles that do not contain petroleum oils, solvents, or other materials that adversely affect asphalt mixture. Provide covers of sufficient size and quality to protect the entire load under all conditions.
Maintain the proper and uniform placement temperature as specified in Section 413.3(h)1. Provide insulation on all sides of the truck body, a double-walled truck body, or a heated truck body when the air temperature is below 50F from October 1 to April 30. Provide a 3/8-inch diameter hole near the center and approximately two-thirds the distance down from the top of the vehicular box, on both sides, to allow for asphalt mixture temperature checks. If trucks cannot be provided with these holes, provide the Representative with two infrared temperature devices along with documentation that the devices were verified annually through an independent verification service or with a blackbody calibration block before paving for asphalt mixture temperature checks.
Section 413.3(f). Rollers. Revise to read as follows:•
(f) Rollers. Use steel wheel, pneumatic tire, vibratory, or oscillating rollers as specified in Sections 108.05(c)3.a, 3.b, 3.c, 3.e, 3.f, 3.h, or (c)4. Operate rollers according to manufacturer's recommendations. Use vibratory and oscillating rollers with separate controls for frequency and amplitude.
Section 413.3(h)1.a. Placing. Revise to read as follows:•
1.a Placing. Unless otherwise allowed or indicated, deliver, place, and compact asphalt paving mixtures during daylight hours.
Ensure the mixture does not contain lumps of cold material. Deliver and place mixtures at the laying temperatures specified in Table A for the type and class of material used. Do not incorporate any material delivered outside the temperature limits as specified in Table A. Material placed outside the temperature limits as specified in Table A is defective.
Utilize a Material Transfer Vehicle (MTV) as specified in Section 108.05(c)5 for RPS pavements unless otherwise approved by the Representative.
Section 413.3(h)1.e. Safety Edge. Revise to read as follows:•
1.e. Safety Edge. Construct the Safety Edge as the standard edge treatment on the outside edge of asphalt pavements and shoulders. Use the Safety Edge for both wearing and binder courses with a depth of 1.5 inches or greater. Do not place the Safety Edge at total depths greater than 5 inches. The Safety Edge is not required where curb or sidewalk are encountered or where the face of guiderail is directly over the edge of pavements. Do not place the Safety Edge for base, leveling, or scratch courses.
Construct the Safety Edge with the same material used to construct the roadway course being placed or, if specified, the paved shoulders. Attach a device to the paver to confine material at the end gate and extrude the asphalt material in a wedge shape. Use an adjustable device that allows the operator to vary the slope extruded at the paver to account for the angle becoming steeper during compaction (roll up). Before construction, the Safety Edge device must be approved by the Representative(s).
Compact the roadway or paved shoulder as required by the specifications. Do not delay rolling of the mat adjacent to the Safety Edge. After compaction of the mat is complete, provide a Safety Edge meeting the final shape requirements as shown on the Standard Drawings. The completed angle of the Safety Edge must be 26 degrees to 40 degrees measured from the pavement cross slope extended. At the beginning of each day’s paving, measure the angle of the Safety Edge from the pavement cross slope extended. Perform measurements after final compaction is complete. If the angle of the Safety Edge does not meet the slope requirements, stop paving, and provide corrective action. Do not resume production paving until final shape requirements of Safety Edge are achieved.
Allow automatic transition to intersections, driveways, guiderail sections, and obstructions.
Page 18 of 107November 6, 2026 15:42:09 PM
Use the device to constrain the asphalt head, reducing the area and increasing the density of the extruded profile. A single plate strike-off method is not allowed. Do not place the Safety Edge on organic material.
Section 413.3(h)2.a.1. Partially Completed Lots (n=2 or less). Revise to read as follows:•
2.a.1 Partially Completed Lots (n=2 or less). When process conditions change to an extent that a partially completed lot cannot be combined with the most recently completed lot, samples will be independently evaluated on the partially completed lot. For asphalt content and percent passing the 75 μm (No. 200) sieve, mixture acceptance samples will be evaluated individually as specified in Section 413.2(e), Table A (n=1) criteria. For density, mat density acceptance samples will be evaluated individually using the criteria in Table E.
If samples tested for asphalt content and percent passing the 75 μm (No. 200) sieve meet the n=1 criteria of Table A, and samples tested for density meet the criteria in Table E, payment will be 100% of the contract unit price. If samples tested for asphalt content and percent passing the 75 μm (No. 200) sieve do not meet the n=1 criteria of Table A, the material will be considered defective. If samples tested for density are no more than 2.0% below the minimum or no more than 2.0% above the maximum limits of Table E, payment will be 90% of the contract unit price. If samples for density are more than 2.0% below the minimum or more than 2.0% above the maximum limits of Table E, the pavement will be considered defective.
Unless otherwise directed in writing by the District Executive, remove and replace defective work.
No additional revisions were made to Section 413.3(h)2.a.1.•
Section 413.3(h)2.c.1. LTS Testing. Revise to read as follows:•
2.c.1 LTS Testing. The LTS will test the mixture acceptance samples according to PTM No. 757 or PTM No. 702, Modified Method D and PTM No. 739, if previously identified problematic aggregates are used in the mixture, to determine asphalt content and the percent passing the 75 μm (No. 200) sieve. The LTS will use the calibration factors (Cf and 200 Cf) provided with the JMF for PTM No. 757. For individual increment test results outside of the single sample (n=1) tolerances in Table A, the LTS will analyze the test results for extreme values according to PTM No. 4 at the 5% significance level. If discarding an extreme value reduces a lot to less than three remaining test results, the Department will accept the lot as specified in Section 413.3(h)2.a.1. The Department will accept lots with three or more test results as specified in Section 413.4(a)4 or Section 413.4(b).
If the asphalt content or the percent passing the 75 μm (No. 200) sieve is not within the single sample (n=1) or multiple sample (n≥3) tolerances in Table A for two consecutive lots or a total of three lots, stop all production of the JMF. Determine the cause of the problem and provide a proposed solution to the Department.
Do not resume production of the JMF until the Representative reviews the proposed solution and authorizes production to continue.
The LTS will test Gmm verification samples as specified in Section 413.3(j)4.d.
Section 413.3(j)4.a. General. Revise to read as follows:•
4.a General. Pavement cores are required for accepting the density of RPS construction. Pavement cores are required for standard construction of extended-season paving, unless waived by the Representative as specified in Section 413.3(b)1. Pavement cores are appropriate for accepting the density of standard construction if all the following materials, conditions, or applications exist:
Materials placed at indicated compacted depths greater than or equal to the minimum depths specified in Table G.•
Materials placed on stable and uniform bases.•
TABLE G
Mixture Minimum Indicated Compacted Depths
Mixture Minimum Depth
9.5 mm Wearing Course 1 1/2 in.
12.5 mm Wearing Course 2 in.
19 mm Binder Course 2 1/2 in.
25 mm Binder Course 3 in.
Page 19 of 107November 6, 2026 15:42:09 PM
Section 413.3(m). Tests for Depth: Binder and Wearing Courses. Revise to read as follows:•
(m) Tests for Depth: Binder and Wearing Courses. Construct the pavement to the depth indicated and within the specified tolerances.
For courses with a designed course depth and density acceptance by non-movement or optimum rolling pattern, the Inspector will calculate the weight per square yard for verification of yield. If yield results indicate insufficient course depth, drill one 6-inch diameter core for each 500 tons of material placed to determine the extent of the deficient depth as defined below. Core locations will be determined according to PTM No. 1.
For courses with density acceptance by lots, the inspector will measure the depth of each sublot according to PTM No. 737 using the density acceptance samples. After the Inspector completes depth measurements, backfill, compact, and seal core holes with the mixture used to construct the course. Deficient depth core(s) resulting in defective work should not be submitted for density acceptance testing. Once the defective work has been removed and replaced, obtain a new density acceptance sample for the sublot(s) as specified in Section 413.3(j)4.c.
Pavement deficient in depth by more than 1/8 inch in three or more adjacent acceptance core locations is defective. The extent of the defective work is the entirety of all sublots represented by the adjacent deficient acceptance core samples. The defective course will be the full width of the affected lane.
Pavement deficient in depth by more than 1/4 inch at a single acceptance core location is defective. Immediately delineate the limits of pavement deficient in depth from the acceptance core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is within 1/4 inch of the design depth. The defective course will be the full width of the affected lane.
Section 413.3(o). Defective Work. Revise to read as follows:•
(o) Defective Work. As specified in Section 105.12 and as follows:
Department acceptance and QA testing will not relieve the Contractor of responsibility for material or work that the Representative determines is defective before the Department issues the acceptance certificate. Remove and replace or repair defective work as directed.
The BOCM, CQAD will review Representative determinations of defective material or work.
Remove and replace pavement defective for temperature as specified in Section 413.3(h)1.a. for pattern segregation as specified in Section 413.3(h)3, for flushing as specified in Section 413.3(h)4, surface tolerance as specified in Section 413.3(l) or Section 313.3(l) and depth as specified in Section 413.3(m), or Section 313.3(m). Remove and replace pavement defective for percent within limits or Payment Factor Percentages as specified in Tables H and I.
Special Provision: C172A - a00172 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876
Addendum:
CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876
Provision Body:
SECTION 107—LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS. Revise to read as follows:•
Page 20 of 107November 6, 2026 15:42:09 PM
107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS—Install and maintain erosion and sediment (E&S) pollution control devices as indicated or submit an alternate plan for accomplishing equal or better temporary and permanent erosion and water pollution control. If an alternate plan is submitted, do not start work until the plan is approved by the County Conservation District and the Department. If a National Pollutant Discharge Elimination System (NPDES) Permit is involved, do not start work until the plan is approved by the DEP or the authorized County Conservation District and the Department. Concrete clean out areas, either contractor designed or indicated within the contract documents, are incidental to the contract items.
When a general or individual NPDES Permit is involved:
At the preconstruction conference, submit a Preparedness, Prevention and Contingency (PPC) Plan and identify a licensed professional (Professional Engineer, Geologist, Land Surveyor or Landscape Architect) registered in the Commonwealth and if applicable, their designee to be present onsite and responsible for implementing critical stages of the approved Post Construction Stormwater Management (PCSM) Plan.
Do not start earth disturbance activities until an environmental preconstruction meeting is held with DEP or delegated CCD.•
Conduct confirmation testing for infiltration, if applicable, as specified in Section 876.•
Within 14 days of completing the construction of a post-construction stormwater management (PCSM) stormwater control measure (SCM) as determined by the licensed professional or designee, submit a completed Chapter 102 SCM Construction Certification Form for each PCSM SCM to the Representative through PPCC. Form CS-102 has information required to complete the Chapter 102 Form(s).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .