854021padot107648.pdf

PDF 1 MB Posted

Attached to
5th Street: Rising Sun to US 1 Traffic Signals
Solicitation number
107648
Issued by
Philadelphia County, Philadelphia City, Pennsylvania

About this file

This is a proposal report for Pennsylvania Department of Transportation (PennDOT) Project 107648, a municipally-sponsored contract let by the City of Philadelphia for infrastructure improvements on State Route 0000 Section 648. The project encompasses upgrades to existing traffic signals, construction of bumpouts at various intersections, replacement of existing pavement and sidewalk, upgrades to existing ADA ramps, upgrades to existing street lighting, improvement of roadway drainage, and miscellaneous construction activities along 5th Street from Rising Sun Avenue to U.S. Route 1/Roosevelt Boulevard in Philadelphia County. The bid package includes extensive project items and quantities ranging from excavation (3,470 cubic yards of Class 1 excavation) to traffic signal equipment installation (64 pedestrian signal heads with countdown features, 79 traffic signal heads, and numerous conduit and cable installations), landscape materials (35 Aurora Dogwood trees), and pavement markings. The project is scheduled for bid opening on December 10, 2026, at 11:00 a.m., with an anticipated notice to proceed on March 8, 2027, and required completion by December 21, 2029. Prequalification of bidders is required, and no pre-bid meeting is scheduled.

The project cost range is estimated between $10,000,000.00 and $12,499,999.99, and it is identified as a federally-funded project subject to federal-aid construction requirements, including Buy America provisions, prevailing wage rates, and Disadvantaged Business Enterprise (DBE) requirements with a 0% DBE goal. The contract is partially financed with federal funds and includes specific provisions for erosion and sediment control, post-construction stormwater management, and infiltration testing. Contractors must comply with Pennsylvania's prevailing wage rates, the Geographic and Economic Hiring Preference (GEHP) program requiring 20% of journeyperson hours and 40% of apprentice hours from Priority Zip Code residents, Executive Order 11246 Equal Employment Opportunity requirements, and the Worker Protection and Investment Certification program. The project includes multiple special provisions addressing traffic restrictions, air pollution control, material specifications, asphalt paving tolerances, and extensive utility coordination with SEPTA trolley lines, Philadelphia Water Department, and PECO. The contract will be executed by the City of Philadelphia, with the contractor required to name the city as an additional insured on all insurance certificates and payments to be made directly by the municipality.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL REPORT

Project: 107648 Bid Package: 1

Current Let: 12/10/2026 11:00:00 AM Version: Current

Addendum Count: 0

District: 06 County: Philadelphia

SR/SEC/Group ID: 0000/648/CMAQ, MTF

Description 5th Street: Rising Sun to US 1 - D/B activities limited to ADA Ramps (City Bid# 3958 ECMS)

PROPOSAL Report - Project 107648

Page 1 of 153October 29, 2026 08:44:51 AM

TABLE OF CONTENTS

BID PACKAGE SUMMARY 5

PROJECT ITEMS AND QUANTITIES 6

SPECIAL PROVISIONS 15

G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) 15 G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW 15 C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413 16 C172A - a00172 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876 23 C173B - a00173 CHANGES TO SPECIFICATIONS: SECTION 106 29 G401A - a00401 ADVANCE NOTICE OF TRAFFIC RESTRICTIONS 32 G501A - a00501 AIR POLLUTION CONTROL IN AIR BASINS 32 G1601A - a01601 E.E.O. COVERED AREA 33 G2302A - a02302 Worker Protection and Investment 33 G2701B - a02701 LOCAL AUTHORITY CONTRACT--DEPARTMENT LET 34 G2903A - a02903 LOCALLY SPONSORED PROJECT REIMBURSEMENT PROCESS 35 00 - aGEOGRAPHIC AND ECONOMIC HIRING PREFERENCE (GEHP) SPECIAL PROVISION 35 00 - aSEPTA COORDINATION 40 S6012B - b06012 - SECTION 601.3(f) BACKFILLING TRENCH 41 I68C - c00068 ITEM 9000-5101 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION

AGGREGATE 42

I70C - c00070 ITEM 9000-5103 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION

CONCRETE 43

I6091L - c06091 ITEM 0609-0009 EQUIPMENT PACKAGE 44 I19992A - c19992 ITEM 1999-9999 TRAINEES 45 I65001A - c65001 ITEM 9000-4999 CITY OF PHILADELPHIA APPLE IPAD(S) FOR INSPECTION 47 I69021A - c69021 ITEM 9001-0103 PROVISION OF SERVICES FROM CITY OF PHILA SURVEY

DISTRICT PHL 48

I69025A - c69025 ITEM 9001-0107 VEHICLE REMOVAL PHL 49 P121A - D06 Additional Specifications 51 P118A - D06 Changes to Specifications for City of Philadelphia Projects: Section 102,103, 105, 107, 108, 110 52 P127A - D06 City of Philadelphia Special Provisions 53

P115A - D06 INSURANCE 57

P124A - D06 Wage Rates 59

00 - DEWATERING 59

00 - e00010 PRIVATE UTILITY CASTING COORDINATION 60 00 - e00011 SEPTA UTILITY CASTING COORDINATION 60 00 - f00020 ITS & TRAFFIC SYSTEMS TESTING PROCEDURES 61

00 - ITEM 0901-0001 MAINTENANCE AND PROTECTION OF TRAFFIC DURING

CONSTRUCTION 65

00 - ITEM 4203-0006 SAW CUTTING, CONCRETE FOOTWAY PHL 68

00 - ITEM 4676-0001 CEMENT CONCRETE SIDEWALK PHL 68

Page 2 of 153October 29, 2026 08:44:51 AM

00 - ITEM 4676-0002 CEMENT CONCRETE SIDEWALK SEALED JOINTS PHL 69

I69006A - ITEM 4686-0050 CONSTRUCTION SURVEYING, TYPE D SURVEY DISTRICT

COORDINATION PHL 70

00 - ITEM 4695-0002 DETECTABLE WARNING SURFACES, CAST IRON PHL 71

00 - ITEM 4808-0100 – TREE - AURORA DOGWOOD (CORNUS X RUTBAN) 2” CAL. B&B 72

00 - ITEM 4810-0052 SELECTIVE TREE REMOVAL, CITY QUALIFIED CONTRACTOR 73

00 - ITEM 4910-5055 2” DIRECT BURIAL CONDUIT WITH SAND BACKFILL 74

00 - ITEM 9000-0001 15” VITRIFIED CLAY PIPE 74

00 - ITEM 9000-0003 CLASS 1 EXCAVATION FOR TROLLEY TRACKS 76

00 - ITEM 9000-0004, 9000-0012 & 9000-0013 6",8" & 10" DUCTILE IRON

WATER MAIN 76

00 - ITEM 9000-0005 CATENARY POLE REMOVAL 78

00 - ITEM 9000-0006 and 9000-0007 FIRE HYDRANT, STANDARD PRESSURE 78 00 - ITEM 9000-0008 to 9000-0010 4’ OPEN MOUTH INLET, GRATE, TRAP 79

00 - ITEM 9000-0011 CONCRETE COLLAR 80

00 - ITEM 9000-0014 PLAIN CEMENT CONCRETE CURB, VARIABLE HEIGHT 81

00 - ITEM 9000-0223 SADDLE CONNECTION 81

00 - ITEM 9000-0323 RESET PWD WATER VALVE BOX 82

00 - ITEM 9000-0326 RESET PWD MANHOLE FRAME AND COVER (36" AND SMALLER) 83

00 - ITEM 9000-0328 REBUILD PWD MANHOLE 83

00 - ITEM 9000-0350 REIMBURSEMENT FOR TESTING OF OVERHEAD CATENARY – SEPTA

TROLLEY LINES 84

00 - ITEM 9000-0353 INLET PROTECTION FOR OPEN MOUTH GRATE INLET 86

00 - ITEM 9000-0354 INLET PROTECTION FOR OPEN MOUTH INLET 87

00 - ITEM 9000-0530 and 9000-0531 – AWG 4 and AWG 6 UNDERGROUND CABLE, ALUMINUM, 1 CONDUCTOR 87

00 - ITEM 9000-0760 REMOVE AND SEAL INLET 89

00 - ITEM 9000-2001 and 9000-2002 PVC STREET LIGHTING CONDUIT, 2-INCH and 3-INCH 90 00 - ITEM 9000-2004 and 9000-2005 PVC CONDUIT ELBOW, 2-INCH and 3-INCH 92 00 - ITEM 9000-2006 and 9000-2007 COMPOSITE JUNCTION BOX 93 00 - ITEM 9000-2009 and 9000-2010 2" and 3" STEEL TRAFFIC CONDUIT UNDER

TRACK 95

00 - ITEM 9000-2011 and 9000-2012 STEEL TRAFFIC CONDUIT, 2” and 3" OPEN TRENCH 96

00 - ITEM 9000-2027 STANDARD D-POLE FOUNDATION 97

00 - ITEM 9000-2030 and 9000-2031 ATC CONTROLLER ASSEMBLY, ATC 350 and 352 CABINET

(PICK UP AND INSTALL) 98

00 - ITEM 9000-2040 TRAFFIC C-POST, 20’ (PICK UP AND INSTALL) 101

00 - ITEM 9000-2041 TRAFFIC D-POLE, 30’ (PICK UP AND INSTALL) 102

00 - ITEM 9000-2042 to 9000-2046 TRAFFIC SIGNAL SUPPORT, XX' MAST ARM (PICK UP

AND INSTALL) 103

00 - ITEM 9000-2047 and 9000-2048 STANDARD FOUNDATION, TYPE 1 and Type 2 105

00 - ITEM 9000-2049 REMOVE TRAFFIC SIGNAL EQUIPMENT 107

00 - ITEM 9000-2050 and 9000-2051 REMOVE FOUNDATION 108 00 - ITEM 9000-2059 3-SECTION, 12" TRAFFIC SIGNAL HEAD WITH PROGRAMMABLE 109

Page 3 of 153October 29, 2026 08:44:51 AM

LOUVERS

00 - ITEM 9000-2060 and 9000-2061 3-SECTION, 12" TRAFFIC SIGNAL HEAD 110

00 - ITEM 9000-2062 PEDESTRIAN SIGNAL HEAD, COUNTDOWN 112

00 - ITEM 9000-2063 and 9000-2064 TRAFFIC SIGNAL CABLE, XX CONDUCTOR 113 00 - ITEM 9000-2065 and 9000-2066 UNDERGROUND ELECTRICAL SERVICE CONNECTION 115

00 - ITEM 9000-2067 AERIAL ELECTRICAL SERVICE CONNECTION, TRAFFIC SIGNAL 116

00 - ITEM 9000-2068 TRIPLEX SERVICE CABLE 117

00 - ITEM 9000-2071 ACCESSIBLE PEDESTRIAN SYSTEM (APS) PEDESTRIAN STATION 118

00 - ITEM 9000-2072 and 9000-2073 OPTICAL EMERGENCY PRE-EMPTION DETECTORS 119

00 - ITEM 9000-2074 ATMS INTEGRATION AND SOFTWARE MODIFICATIONS 121

00 - ITEM 9000-2079 to 9000-2081 FURNISH & INSTALL METRO STREET NAME SIGN 121

00 - ITEM 9000-2083 OVERHEAD STREET NAME SIGN 123

00 - ITEM 9000-2084 TRAFFIC SIGN POSTS 124

00 - ITEM 9000-2085 TRAFFIC SIGN, POST MOUNTED 125

00 - ITEM 9000-2086 TRAFFIC SIGN, OVERHEAD MOUNTED 126

00 - ITEM 9000-2087 REMOVE TRAFFIC SIGN POST AND SIGN 127

00 - ITEM 9000-2088 FURNISH AND INSTALL SESSION SMART ROUTER 128

00 - ITEM 9000-2090 FIBER OPTIC ETHERNET COMMUNICATIONS APPLIANCE, 1G LAYER 2

SWITCH 129

00 - ITEM 9000-2091 FIBER OPTIC PATCH PANEL, 24-PORT 130

00 - ITEM 9000-2092 ELECTRICAL SERVICE TO SEPTA BUS SHELTER 131

00 - ITEM 9000-4001 REMOVE EXISTING POLE 132

00 - ITEM 9000-4002 REMOVE CABLES IN UNDERGROUND CONDUIT 133

00 - ITEM 9000-4003 DECORATIVE PEDESTRIAN POLE 133

00 - ITEM 9000-4005 LED COBRA HEAD LUMINAIRE 136

00 - ITEM 9000-4006 LED POST TOP LUMINAIRE 137

00 - ITEM 9000-4007 PEDESTRIAN LIGHT POLE FOUNDATION 139

00 - ITEM 9000-4008 SERVICE DISCONNECT 140

00 - ITEM 9000-4009 6 FOOT BRACKET ARM FOR LUMINAIRE ON TRAFFIC POLE 141

00 - ITEM 9000-4010 PECO SERVICE – STREET LIGHTING 142

00 - ITEM 9000-4011 COORDINATION WITH PECO 143

00 - ITEM 9000-4012 LIGHTING CONTROL SYSTEM 143

00 - ITEM 9000-4013 REMOVE LIGHT POLE FOUNDATION 144

00 - ITEM 9000-9011 OFF DUTY UNIFORMED POLICE OFFICER 145

00 - ITEM 9001-0672 DESIGN OF ADA RAMPS (BY QUADRANT) PHL 146

00 - ITEM 9001-0960 WHITE HOT THERMOPLASTIC LEGEND, “BUS”, 8’-0” PHL 153

Page 4 of 153October 29, 2026 08:44:51 AM

BID PACKAGE SUMMARY

Project: 107648 Bid Package: 1

Project Type: Municipal Posted:

Federal Project Status: PENNDOT Oversight Non-NHS State Type of Work: NEW AND REVISED MAJOR TRAFFIC SIGNALS

Prequalification Required: Yes Pre-Bid Meeting: None

408 Version: 2026-1

Scheduled Let: 12/10/2026 11:00:00 AM Project Cost Range: $10,000,000.00 - $12,499,999.99 Anticipated NTP: 03/08/2027 Structure Work: 0.00%

Required Completion: 12/21/2029 DBE: 0% Wage Rates: Yes

Description:

The description and location of the project is as follows: upgrade existing traffic signals, build bumpouts at various intersections, replace existing pavement and sidewalk, upgrade existing ADA Ramps, upgrade existing street lighting, improve roadway drainage, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0000 SECTION 648 in PHILADELPHIA COUNTY from Rising Sun Avenue to U.S 1/Roosevelt Boulevard.

Additional Information:

This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.

Page 5 of 153October 29, 2026 08:44:51 AM

PROJECT ITEMS AND QUANTITIES

Alt Item Work Class Code Unit Of

Measure Quantity Unit Price PDP Spec

Prov Add Action

0203-0001 C Cubic Yard 3,470.0000 N

CLASS 1 EXCAVATION

0203-0006 G4 Linear Foot 8,180.0000 N

SAW CUTTING

4203-0006 G4 Linear Foot 7,865.0000 N Proj

SAW CUTTING , CONCRETE FOOTWAY PHL

0212-0014 C3, H, M2 Square Yard 665.0000 N

GEOTEXTILE, CLASS 4, TYPE A

0301-0004 D Square Yard 1,810.0000 N

PLAIN CEMENT CONCRETE BASE COURSE, 8" DEPTH

0350-0106 C, E Square Yard 2,350.0000 N

SUBBASE 6" DEPTH (NO. 2A)

0350-0120 C, E Cubic Yard 178.0000 N

SUBBASE (NO. 2A)

0413-0245 F Square Yard 20,662.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALS, 9.5 MM MIX, 1 1/2"

DEPTH, SRL-H

0413-0255 F Ton 22.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALS, 9.5 MM MIX, SRL- H

0413-2071 F Ton 552.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE (LEVELING), PG 64S-22, 0.3 TO < 3 MILLION ESALS, 9.5

MM MIX, SRL-H

0413-6045 F Square Yard 1,810.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALS, 19.0 MM MIX, 2 1/2"

DEPTH

0413-6047 F Ton 954.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALS, 19.0 MM MIX

0413-9999 X Dollar 8,800.0000 $1.00 Y

PERCENT WITHIN LIMITS (PWL) LOT INCENTIVE/DISINCENTIVE

0460-0001 F4 Square Yard 35,628.0000 N

ASPHALT TACK COAT

0491-0012 F3 Square Yard 20,662.0000 N MILLING OF ASPHALT PAVEMENT SURFACE, 1 1/2" DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR

0491-0019 F3 Square Yard 7,190.0000 N MILLING OF ASPHALT PAVEMENT SURFACE, VARIABLE DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR

Page 6 of 153October 29, 2026 08:44:51 AM

0608-0001 X Lump Sum 1.0000 N

MOBILIZATION

0609-0003 X Lump Sum 1.0000 N

INSPECTOR'S FIELD OFFICE AND INSPECTION FACILITIES, TYPE B

0609-0009 X Lump Sum 1.0000 N Std

EQUIPMENT PACKAGE

4676-0001 K Square Yard 1,434.0000 N Proj

CEMENT CONCRETE SIDEWALK PHL

4676-0002 K Square Yard 5,963.0000 N Proj

CEMENT CONCRETE SIDEWALK SEALED JOINTS PHL

0676-0004 K Square Yard 665.0000 N

DRIVEWAY APRONS AND SIDEWALKS THROUGH DRIVEWAYS

4686-0050 X Lump Sum 1.0000 N Std

CONSTRUCTION SURVEYING, TYPE D SURVEY DISTRICT COORDINATION PHL

0688-0020 X Lump Sum 1.0000 N

MICROCOMPUTER, TYPE C

0689-0005 X Lump Sum 1.0000 N

CPM SCHEDULE, WITH UPDATES

0690-0001 X Dollar 1,000.0000 $1.00 Y

INTERNAL FACILITATION

4695-0002 K Square Foot 620.0000 N Proj

DETECTABLE WARNING SURFACE, CAST IRON PHL

4808-0100 M Each 35.0000 N Proj

TREE - AURORA DOGWOOD (CORNUS X RUTBAN) 2" CAL. B&B

4810-0052 A, M1 Each 1.0000 N Proj

SELECTIVE TREE REMOVAL , CITY QUALIFIED CONTRACTOR

0811-0003 J2, M Linear Foot 684.0000 N

TEMPORARY PROTECTIVE FENCE

0845-0001 M2 Dollar 1,000.0000 $1.00 Y

UNFORESEEN WATER POLLUTION CONTROL

0855-0003 M2 Each 2.0000 N

PUMPED WATER FILTER BAG

0855-0004 M2 Each 2.0000 N

REPLACEMENT PUMPED WATER FILTER BAG

0860-0000 M2 Each 2.0000 N

INLET FILTER BAG FOR TYPE M INLET

0901-0001 Q Lump Sum 1.0000 N Proj

Page 7 of 153October 29, 2026 08:44:51 AM

MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION

0910-0002 C1, P8 Each 2.0000 N

JUNCTION BOXES J.B.-2

0910-4114 P8 Linear Foot 13,659.0000 N

AWG 4 UNDERGROUND CABLE, COPPER, 1 CONDUCTOR

0910-4115 P8 Linear Foot 4,553.0000 N

AWG 6 UNDERGROUND CABLE, COPPER, 1 CONDUCTOR

4910-5055 C1, P8 Linear Foot 9,017.0000 N Proj

2" DIRECT BURIAL CONDUIT WITH SAND BACKFILL

0910-5175 C1, P8 Linear Foot 50.0000 N

2" EXPOSED CONDUIT

0910-7210 P8 Lump Sum 1.0000 N

TESTING OF ENTIRE LIGHTING SYSTEM

0945-0001 R Each 86.0000 N

RESET POST MOUNTED SIGNS, TYPE F

0954-0151 C1, P8 Linear Foot 457.0000 N

TRENCH AND BACKFILL, TYPE I

0954-0152 C1, P8 Linear Foot 1,499.0000 N

TRENCH AND BACKFILL, TYPE II

0954-0153 C1, P8 Linear Foot 807.0000 N

TRENCH AND BACKFILL, TYPE III

0954-0154 C1, P8 Linear Foot 2,497.0000 N

TRENCH AND BACKFILL, TYPE IV

0960-0001 O2 Linear Foot 92.0000 N

4" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS

0960-0002 O2 Linear Foot 7,384.0000 N

4" YELLOW HOT THERMOPLASTIC PAVEMENT MARKINGS

0960-0005 O2 Linear Foot 13,616.0000 N

6" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS

0960-0011 O2 Linear Foot 112.0000 N

12" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS

0960-0021 O2 Linear Foot 6,077.0000 N

24" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS

0960-0101 O2 Each 3.0000 N

WHITE HOT THERMOPLASTIC LEGEND, "ONLY", 8' - 0"

0960-0222 O2 Each 2.0000 N

WHITE HOT THERMOPLASTIC LEGEND, "RIGHT ARROW", 12' - 0" X 3' - 0"

Page 8 of 153October 29, 2026 08:44:51 AM

0960-0224 O2 Each 1.0000 N

WHITE HOT THERMOPLASTIC LEGEND, "LEFT ARROW", 12' - 0" X 3' - 0"

0960-0226 O2 Each 1.0000 N

WHITE HOT THERMOPLASTIC LEGEND, "THRU AND RIGHT ARROW", 20' - 0" X 3' - 7"

0960-0430 O2 Each 39.0000 N

WHITE HOT THERMOPLASTIC LEGEND, "BIKE", 6' - 0"

0960-0432 O2 Each 39.0000 N

WHITE HOT THERMOPLASTIC LEGEND, "STRAIGHT ARROW", 6' - 0" X 1' -8"

0962-1004 O Linear Foot 700.0000 N

24" WHITE WATERBORNE PAVEMENT MARKINGS

0962-1005 O Linear Foot 11,300.0000 N

4" YELLOW WATERBORNE PAVEMENT MARKINGS

1999-9999 Z Hour 1,000.0000 N Std

TRAINEES

9000-0001 H Linear Foot 88.0000 N Proj

15" VITRIFIED CLAY PIPE

9000-0003 C Cubic Yard 12.0000 N Proj

CLASS 1 EXCAVATION FOR TROLLEY TRACK

9000-0004 H Linear Foot 28.0000 N Proj

6" DUCTILE WATER MAIN

9000-0005 C, C1 Each 6.0000 N Proj

CATENARY POLE REMOVAL

9000-0006 H Each 3.0000 N Proj

REMOVE FIRE HYDRANT, STANDARD PRESSURE

9000-0007 H Each 3.0000 N Proj

STANDARD PRESSURE FIRE HYDRANT WITH CENTER COMPRESSION LOCK

9000-0008 H Each 2.0000 N Proj

4' OPEN MOUTH GRATE INLET TOP

9000-0009 H Each 5.0000 N Proj

4' OPEN MOUTH INLET TOP

9000-0010 H Each 7.0000 N Proj

4' CATCH BASIN WITH INLET TRAP

9000-0011 H Each 3.0000 N Proj

CONCRETE COLLAR

9000-0012 H Linear Foot 8.0000 N Proj

8" DUCTILE IRON WATER MAIN

9000-0013 H Linear Foot 14.0000 N Proj

10" DUCTILE IRON WATER MAIN

Page 9 of 153October 29, 2026 08:44:51 AM

9000-0014 K Linear Foot 7,304.0000 N Proj

PLAIN CEMENT CONCRETE CURB, VARIABLE HEIGHT

9000-0223 H Each 4.0000 N Proj

SADDLE CONNECTION

9000-0323 H Each 33.0000 N Proj

RESET PWD WATER VALVE BOX

9000-0326 H Each 82.0000 N Proj

RESET PWD MANHOLE FRAME AND COVER (36" AND SMALLER)

9000-0328 H Vertical Foot 3.0000 N Proj

REBUILD PWD MANHOLE

9000-0350 X Dollar 10,000.0000 $1.00 Y Proj

REIMBURSEMENT FOR TESTING OF OVERHEAD CATENARY - SEPTA TROLLEY LINES

9000-0353 C, C3, H Each 2.0000 N Proj

INLET PROTECTION FOR OPEN MOUTH GRATE INLET

9000-0354 C, C3, H Each 66.0000 N Proj

INLET PROTECTION FOR OPEN MOUTH INLET

9000-0530 P Linear Foot 28,134.0000 N Proj

AWG 4 UNDERGROUND CABLE, ALUMINUM, 1 CONDUCTOR

9000-0531 P Linear Foot 9,378.0000 N Proj

AWG 6 UNDERGROUND CABLE, ALUMINUM, 1 CONDUCTOR

9000-0760 H Each 7.0000 N Proj

REMOVE AND SEAL INLET

9000-2001 P Linear Foot 2,171.0000 N Proj

PVC STREET LIGHTING CONDUIT, 2-INCH

9000-2002 P Linear Foot 2,737.0000 N Proj

PVC TRAFFIC SIGNAL CONDUIT, 3-INCH

9000-2004 P Each 68.0000 N Proj

PVC CONDUIT ELBOW, 2-INCH

9000-2005 P Each 64.0000 N Proj

PVC CONDUIT ELBOW, 3-INCH

9000-2006 P Each 30.0000 N Proj

COMPOSITE JUNCTION BOX 12"X18"X12" DEEP

9000-2007 P Each 8.0000 N Proj

CIRCULAR COMPOSITE JUNCTION BOX 39" DIA LID X 18" DEEP

9000-2009 P Linear Foot 273.0000 N Proj

2" STEEL TRAFFIC CONDUIT UNDER TRACK

9000-2010 P Linear Foot 273.0000 N Proj

Page 10 of 153October 29, 2026 08:44:51 AM

3" STEEL TRAFFIC CONDUIT UNDER TRACK

9000-2011 P Linear Foot 523.0000 N Proj

STEEL TRAFFIC CONDUIT, 2" OPEN TRENCH

9000-2012 P Linear Foot 523.0000 N Proj

STEEL TRAFFIC CONDUIT, 3" OPEN TRENCH

9000-2027 P Each 11.0000 N Proj

STANDARD D-POLE FOUNDATION

9000-2030 P Each 3.0000 N Proj

ATC STANDARD CONTROLLER ASSEMBLY, ATC 350 CABINET (PICK UP AND INSTALL)

9000-2031 P Each 5.0000 N Proj

ATC STANDARD CONTROLLER ASSEMBLY, ATC 352 CABINET (PICK UP AND INSTALL)

9000-2040 P Each 43.0000 N Proj

TRAFFIC C-POST, 20' (PICK UP AND INSTALL)

9000-2041 P Each 11.0000 N Proj

TRAFFIC D-POLE, 30' (PICK UP AND INSTALL)

9000-2042 P Each 3.0000 N Proj

TRAFFIC SIGNAL SUPPORT, 20' MAST ARM (PICK UP AND INSTALL)

9000-2043 P Each 7.0000 N Proj

TRAFFIC SIGNAL SUPPORT, 25' MAST ARM (PICK UP AND INSTALL)

9000-2044 P Each 9.0000 N Proj

TRAFFIC SIGNAL SUPPORT, 30' MAST ARM (PICK UP AND INSTALL)

9000-2045 P Each 4.0000 N Proj

TRAFFIC SIGNAL SUPPORT, 35' MAST ARM (PICK UP AND INSTALL)

9000-2046 P Each 1.0000 N Proj

TRAFFIC SIGNAL SUPPORT, 40' MAST ARM (PICK UP AND INSTALL)

9000-2047 P Each 23.0000 N Proj

STANDARD FOUNDATION, TYPE 1 (35' OR LESS)

9000-2048 P Each 1.0000 N Proj

STANDARD FOUNDATION, TYPE 2 (40' TO 45')

9000-2049 P Each 8.0000 N Proj

REMOVE TRAFFIC SIGNAL EQUIPMENT

9000-2050 C Each 10.0000 N Proj

REMOVE FOUNDATION

9000-2051 C Each 5.0000 N Proj

REMOVE ENTIRE FOUNDATION

9000-2059 P Each 6.0000 N Proj

TRAFFIC SIGNAL HEAD WITH PROGRAMMABLE LOUVERS

Page 11 of 153October 29, 2026 08:44:51 AM

9000-2060 P Each 16.0000 N Proj

3-SECTION, 12" TRAFFIC SIGNAL HEAD, POLE MOUNT

9000-2061 P Each 63.0000 N Proj

3-SECTION, 12" TRAFFIC SIGNAL HEAD, OVERHEAD MOUNT

9000-2062 P Each 64.0000 N Proj

PEDESTRIAN SIGNAL HEAD, COUNTDOWN

9000-2063 P Linear Foot 4,803.0000 N Proj

TRAFFIC SIGNAL CABLE, 5 CONDUCTOR

9000-2064 P Linear Foot 4,653.0000 N Proj

TRAFFIC SIGNAL CABLE, 30 CONDUCTOR

9000-2065 P8 Each 8.0000 N Proj

UNDERGROUND ELECTRICAL SERVICE CONNECTION, LIGHTING

9000-2066 P Each 8.0000 N Proj

UNDERGROUND ELECTRICAL SERVICE CONNECTION, TRAFFIC SIGNAL

9000-2067 P Each 8.0000 N Proj

AERIAL ELECTRICAL SERVICE CONNECTION, TRAFFIC SIGNAL

9000-2068 P Linear Foot 200.0000 N Proj

TRIPLEX SERVICE CABLE

9000-2071 P Each 64.0000 N Proj

ACCESSIBLE PEDESTRIAN SYSTEM (APS), PEDESTRIAN STATION

9000-2072 P Each 8.0000 N Proj

OPTICAL EMERGENCY PRE-EMPTION & TRANSIT SIGNAL PRIORITY SYSTEM, TWO DETECTORS

9000-2073 P Each 16.0000 N Proj

ADDITIONAL OPTICAL EMERGENCY PRE-EMPTION DETECTORS

9000-2074 P Dollar 58,000.0000 $1.00 Y Proj

ATMS INTEGRATION AND SOFTWARE MODIFICATIONS

9000-2079 R Each 8.0000 N Proj

FURNISH & INSTALL METRO STREET NAME SIGN 48"X18"

9000-2080 R Each 32.0000 N Proj

FURNISH & INSTALL METRO STREET NAME SIGN 36"X18"

9000-2081 R Each 24.0000 N Proj

FURNISH & INSTALL METRO STREET NAME SIGN 48"X12"

9000-2083 R Square Foot 288.0000 N Proj

OVERHEAD STREET NAME SIGN

9000-2084 R Each 51.0000 N Proj

TRAFFIC SIGN POSTS

9000-2085 R Each 50.0000 N Proj

TRAFFIC SIGN, POST MOUNTED

Page 12 of 153October 29, 2026 08:44:51 AM

9000-2086 R Each 11.0000 N Proj

TRAFFIC SIGN, OVERHEAD MOUNTED

9000-2087 R Each 97.0000 N Proj

REMOVE TRAFFIC SIGN POST AND SIGN

9000-2088 P4 Each 8.0000 N Proj

FURNISH AND INSTALL SESSION SMART ROUTER

9000-2090 P4 Each 8.0000 N Proj

FIBER OPTIC ETHERNET COMMUNICATIONS APPLIANCE, 1G LAYER 2 SWITCH

9000-2091 P4 Each 8.0000 N Proj

FIBER OPTIC PATCH PANEL, 24-PORT

9000-2092 P8 Each 2.0000 N Proj

ELECTRICAL SERVICE TO SEPTA BUS SHELTER

9000-4001 C Each 39.0000 N Proj

REMOVE EXISTING POLE

9000-4002 P Each 4,028.0000 N Proj

REMOVE CABLES IN UNDERGROUND CONDUIT

9000-4003 P Each 115.0000 N Proj

DECORATIVE PEDESTRIAN POLE

9000-4005 P Each 32.0000 N Proj

LED COBRA HEAD LUMINAIRE

9000-4006 P Each 115.0000 N Proj

LED POST TOP LUMINAIRE

9000-4007 P Each 104.0000 N Proj

PEDESTRIAN LIGHT POLE FOUNDATION

9000-4008 P8 Each 20.0000 N Proj

SERVICE DISCONNECT

9000-4009 P Each 32.0000 N Proj

6 FOOT BRACKET ARM FOR LUMINAIRE ON TRAFFIC POLE

9000-4010 P8 Each 22.0000 N Proj

PECO SERVICE - STREET LIGHTING

9000-4011 P8 Lump Sum 1.0000 N Proj

COORDINATION WITH PECO

9000-4012 P8 Lump Sum 1.0000 N Proj

LIGHTING CONTROL SYSTEM

9000-4013 C Each 39.0000 N Proj

REMOVE LIGHT POLE FOUNDATION

9000-4999 X Each 5.0000 N Std

Page 13 of 153October 29, 2026 08:44:51 AM

CITY OF PHILADELPHIA APPLE IPAD(S) FOR INSPECTION

9000-5101 X Lump Sum 1.0000 N Std

ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION AGGREGATE

9000-5103 X Lump Sum 1.0000 N Std

ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION CONCRETE

9000-9011 X Dollar 100,000.0000 $1.00 Y Proj

OFF-DUTY UNIFORMED POLICE OFFICER

9001-0103 X Dollar 35,000.0000 $1.00 Y Std

PROVISION OF SERVICES FROM CITY OF PHILA SURVEY DISTRICT PHL

9001-0107 X Dollar 7,500.0000 $1.00 Y Std

VEHICLE REMOVAL PHL

9001-0672 X Each 35.0000 N Proj

DESIGN OF ADA RAMPS (BY QUADRANT) PHL

9001-0960 O2 Each 5.0000 N Proj

WHITE HOT THERMOPLASTIC LEGEND, "BUS", 8'-0" PHL

Page 14 of 153October 29, 2026 08:44:51 AM

SPECIAL PROVISIONS

Special Provision: G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) Addendum:

Action:

Item(s) Associated:

Header:

APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL)

Provision Body:

APPLICABLE DESIGNATED SPECIAL PROVISIONS. The following Designated Special Provisions are found in Appendix C and apply to this bid proposal.

DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects.

DSP8. F.A.R. - Required Contract Provisions Federal-Aid Construction Contracts FHWA-1273 (Revised October 23, 2023). Also attached to the Proposal/Contract.

DSP9. Special Supplement - Anti-Pollution Measures - August 26, 1999.

DSP12. Executive Order 11246, with Appendix A and B.

DSP13. Buy America.

DSP15. Commonwealth Standard Terms and Conditions.

DSP16. Lobbying Certification Form. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).

DSP17. Federal Audit Clause.

DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances.

DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities.

Project Specific Details:

Special Provision: G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW Addendum:

CONTRACT PROVISIONS - RIGHT TO KNOW LAW

Page 15 of 153October 29, 2026 08:44:51 AM

Provision Body:

I. Contract Provisions – Right to Know Law 8-K-1532

a. The Pennsylvania Right-to-Know Law (RTKL), 65 P.S. §§ 67.101-3104, applies to this Contract.

b. If the Department needs assistance in any matter arising out of the RTKL related to this Contract, the Department will notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Department.

c. Upon written notification from the Department that it requires assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor will:

1. Provide the Department, within 10 calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Department reasonably believes is Requested Information and may be a public record under the RTKL; and

2. Provide such other assistance as the Department may reasonably request, in order to comply with the RTKL with respect to this Contract.

d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, notify the Department and provide, within 7 calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.

e. The Department will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Department determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Department determine that the Requested Information is clearly not exempt from disclosure, provide the Requested Information within 7 calendar days of receipt of written notification of the Department’s determination.

f. Failing to provide the Requested Information within the time period required by these provisions, indemnify and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of this failure, including any statutory damages assessed against the Department.

g. The Department will reimburse the Contractor for any costs associated with complying with these provisions only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.

h. The Contractor may file a legal challenge to any Department decision to release a record to the public with the Office of Open Records, or in the Pennsylvania Courts, however, indemnify the Department for any legal expenses incurred by the Department as a result of such a challenge and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of the failure, including any statutory damages assessed against the Department, regardless of the outcome of such legal challenge. As between the parties, agree to waive all rights or remedies that may be available as a result of the Department’s disclosure of Requested information pursuant to the RTKL.

i. The Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Contract and continue as long as the Requested Information remains in the Contractor's possession.

Special Provision: C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413

Addendum:

Action:

Item(s) Associated:

Page 16 of 153October 29, 2026 08:44:51 AM

CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413

Provision Body:

SECTION 313—SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, BASE COURSE

Section 313.3(m) Tests for Depth. Revise to read as follows:•

(m) Tests for Depth.

(m) Tests for Depth. Replace with the following:

Control the loose depth of each layer to construct the base course to the compacted depth indicated and within the specified tolerance. On the top lift and in the presence of the Inspector, drill full-depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed base course and at other locations the Inspector suspects are deficient. After the Inspector completes depth measurements, backfill, compact, and seal core holes with the mixture used to construct the course.

The Inspector will measure the full-depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. Immediately delineate the limits of pavement deficient in depth from the core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is less than 1/2 inch deficient of the design depth. The defective course will be the full width of the affected lane.

SECTION 314—SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, ASPHALT RICH BASE COURSE

Section 314.3(m) Tests for Depth. Revise to read as follows:•

(m) Tests for Depth.

(m) Tests for Depth. Replace with the following:

Control the loose depth of each layer to construct the ARBC to the compacted depth indicated and within the specified tolerance. In the presence of the Inspector, drill full-depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed ARBC and at other locations the Inspector suspects are deficient. After the Inspector completes depth measurements, backfill, compact, and seal core holes with ARBC.

The Inspector will measure the full-depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. Immediately delineate the limits of pavement deficient in depth from the core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is less than 1/2 inch deficient of the design depth. The defective course will be the full width of the affected lane.

SECTION 360—ASPHALT TREATED PERMEABLE BASE COURSE

Section 360.2(e)3. Production. Revise to read as follows:•

3. Production. During the first day of production, take at least three asphalt content and gradation tests to verify the mixture conforms to the JMF. After the first day, perform tests for asphalt content and aggregate gradation according to the QC Plan and PTM No. 1. Produce ATPBC conforming to the gradation requirements in Table A and with an asphalt content within 0.8% of the JMF (n=1). Ensure the aggregate is uniformly coated with asphalt and no runoff of excess asphalt is observed.

Section 360.3(m). Tests for Depth. Revise to read as follows:•

(m) Tests for Depth: Binder and Wearing Courses. Replace with the following:

Carefully dig or drill one random 6-inch diameter test hole selected by the Representative according to PTM No. 1 to the full depth of the ATPBC for each 3,000 square yards, or less, of completed base course. The Representative may require additional test holes in areas the Representative suspects are deficient in depth. The Representative will measure the depth of the base course. Using material acceptable to the Representative, backfill the test holes and compact the material to fill the test hole flush with the completed base course.

Page 17 of 153October 29, 2026 08:44:51 AM

ATPBC deficient in depth by 1/2 inch or more is defective. Immediately delineate the limits of ATPBC deficient in depth from the location by proceeding longitudinally, forward and backward, obtaining additional test holes every 50 feet until the depth is less than 1/2 inch deficient of the indicated depth. The defective course will be the full width of the affected lane.

SECTION 410—SUPERPAVE MIXTURE DESIGN, STANDARD AND RPS CONSTRUCTION OF PLANT-MIXED ASPHALT FINE-

GRADED COURSES

Section 410.3. CONSTRUCTION. Revise to read as follows:•

410.3 CONSTRUCTION—Section 413.3 using the test procedures, limits, and tolerances for a 9.5 mm nominal maximum aggregate size mixture except where procedures, limits and tolerances are specifically indicated for a 9.5 mm fine-graded nominal maximum aggregate size mixture and as modified as follows:

Revise Table G to include 9.5 mm Fine Grade Wearing Course as follows:

TABLE G

Mixture Minimum Indicated Compacted Depths

Mixture Minimum Depth

9.5 mm Fine Grade Wearing Course 1 inch

SECTION 412—SUPERPAVE MIXTURE DESIGN, CONSTRUCTION OF PLANT-MIXED 6.3 MM ASPHALT OVERLAY COURSES

Section 412.3(a)2. Preplacement Meeting. Revise to read as follows:•

2. Preplacement Meeting. At least 2 weeks before placing asphalt paving mixtures, schedule an asphalt preplacement meeting with the Representative to review at a minimum the specification, paving operation QC Plan, sequence of paving operations, asphalt mixture temperature checks, mixture acceptance, density acceptance and the care and custody of asphalt acceptance samples.

Section 412.3(h)1.a. Placing. Revise to read as follows:•

1.a Placing. Unless otherwise allowed, deliver, place, and compact 6.3 mm paving mixtures during daylight hours. Ensure the mixture does not contain lumps of cold material. Deliver and place 6.3 mm paving mixtures at the laying temperatures specified in Table B.

Material placed outside the temperature limits as specified in Table B is defective.

Utilize a Material Transfer Vehicle (MTV) as specified in Section 108.05(c)5 for 6.3 mm paving mixtures unless otherwise approved by the Representative.

Section 412.4(a)4.b. Dispute Resolution. Revise TABLE H to read as follows:•

TABLE H

Dispute Resolution Retest Cost Table

Test Method

Mixture Acceptance Retest Cost if Retest Results Indicate

100% Pay Factor(s) for Full Lots (n > 3)* or Single Sample (n=1) Requirements in Table B were met for Partial Lots (n < 3)**

Mixture Acceptance Retest Cost if Retest Results Indicate

< 100% Pay Factor(s) for Full Lots (n > 3)* or Single Sample (n=1) Requirements in Table B were not met for Partial Lots (n < 3)**

PTM No.

702/739 $900 $3,500

PTM No. 757 $500 $2,000

Page 18 of 153October 29, 2026 08:44:51 AM

* For full lots (n ≥ 3) where the original test results indicated a defective lot, only the pay factor(s) where original test results indicated a defective lot for asphalt content or percent passing the 75 μm (No. 200) sieve will be utilized to determine the retest cost.

** For partial lots (n < 3) where the original test results indicated a pay parameter (asphalt content, percent passing the 75 µm (No. 200) sieve, or both) did not meet the Single Sample (n = 1) requirements in Table B, only the pay parameter(s) that did not meet the Single Sample (n =1) requirements will be utilized to determine the retest cost.

SECTION 413—SUPERPAVE MIXTURE DESIGN, STANDARD AND RPS CONSTRUCTION OF PLANT-MIXED ASPHALT

COURSES WITH PERCENT WITHIN LIMITS AND LTS TESTING (PWS-LTS)

Section 413.2(e)1. Recycled Asphalt Material. Revise to read as follows:•

1. Virgin Material Mixtures. Size, uniformly grade, and combine aggregate fractions, asphalt binder, and either WMA Technology additive(s) or modifier(s) in proportions to produce a JMF that conforms to the material, gradation, and volumetric Superpave Asphalt Mixture Design requirements according to Bulletin 27, Chapter 2A. Produce an asphalt mixture for the specified nominal maximum aggregate size and design ESALs except as procedurally modified by the WMA Technology Manufacturer Technical Representative (Technical Representative) to address laboratory procedures when preparing, compacting and testing asphalt mixtures to achieve a uniform blend. Special additive(s) or modifier(s) need not be used if mixture temperature, workability, and compaction can be achieved solely through plant mechanical modification to produce foamed asphalt. Do not incorporate the WMA Technology additive, modifier or process during the volumetric asphalt mixture design process, so that the JMF volumetrics and material percentages are based on a mixture with no WMA Technology. Only use the WMA Technology additive, modifier or process to evaluate results from moisture susceptibility testing during the mix design process. Develop an asphalt mixture JMF, then incorporate the WMA Technology additive, modifier, or process into that JMF during production. Create an asphalt JMF cover sheet (Form TR-448A) for approval containing the WMA Technology used, additive dosage rate or percent water added for foaming, material code, and the TSR data from the moisture susceptibility testing.

Submit a copy of each completed JMF, signed by a certified Asphalt Level 2 plant technician, to the DME/DMM at least 3 weeks before the planned start of mixture production. Include a list of all material sources and the asphalt mixture producer in the JMF.

Provide the calibration factors (Cf and 200 Cf) according to PTM No. 757 with the JMF. Do not start mixture production until after the DME/DMM reviews the JMF.

Submit a new JMF with a change in material sources or if a new JMF is necessary to produce a mixture conforming to this specification.

No additional revisions were made to Section 413.2(e)1.•

Section 413.2(e)1.d.5. Volumetric Analysis of Compacted Specimens. Revise TABLE A as follows:•

TABLE A

Job-Mix Formula Composition Tolerance Requirements of the Completed Mix

Single Sample (n=1) Multiple

Samples (n > 3)

Gradation Passing 12.5 mm (1/2 inch) and Larger Sieves +8% +6% Passing 9.5 mm (3/8 inch) to 150 µm (No. 100) Sieves (Inclusive) +6% +4%

Passing 75 µm (No. 200) Sieve +3.0% +2.0% Asphalt Content

19.0 mm Asphalt mixtures and smaller +0.7% +0.4%

25.0 mm Asphalt mixtures and larger +0.8% +0.5%

Temperature of Mixture (F) Chemical, Organic, Foaming Additives

Mechanical Foaming Equipment/Process

Class of Material

Type of Material Maximum*

Page 19 of 153October 29, 2026 08:44:51 AM

Minimum* Minimum* PG 58S-28 Asphalt Binder 215 230 310 PG 64S-22 Asphalt Binder 220 240 320 PG 64E-22 Asphalt Binder 240 260 330

All other Binders Asphalt Binder

The higher of 215 or the minimum temp.

specified in Bulletin 25 minus 45F

The higher of 230 or the minimum temp.

specified in Bulletin 25 minus 30F

As specified in Bulletin

* Outline in the Producer QC Plan and follow more restrictive temperature requirements provided by the WMA technology manufacturer or Technical Representative(s) for production and placement of the mixture. Determine the SGC compaction temperature for the production QC which yields the same target air voids as the designed JMF. Include the SGC compaction temperature in the Producer QC Plan. Compact the completed mixture in the SGC for QC volumetric analysis at the SGC compaction temperature according to the guidelines provided by the Technical Representative.

Section 413.2(i)2. Certification Acceptance. Revise to read as follows:•

2. Certification Acceptance. Acceptance by certification is appropriate for the following mixtures, conditions, or applications:

Scratch courses, leveling courses less than 2-inch depth and driveway adjustments.•

Mixtures used by Department maintenance forces.•

Mixtures purchased by local or municipal governments.•

Mixtures placed in quantities not exceeding 500 tons in a continuous placement operation unless otherwise directed by the Representative.

Mixtures used for parking lots.•

All 4.75 mm NMAS asphalt mixtures.•

Other mixtures, conditions, or applications as approved by the Representative.•

2.a General. Obtain certification from the mixture Producer. Use all QC tests during mixture production as acceptance tests. Certify mixtures using Form CS-4171B. Include, or attach, the QC test results on the form. Provide the form to the Inspector-in-Charge within 1 working day after completing the QC tests. Certify mixtures as specified in Section 106.03(b)3 and the requirements below.

2.b Certification of Mixture. Certify each mixture daily if QC test results conform to the single sample and multiple sample JMF production tolerances of Table A. The acceptance values will be:

Asphalt Content.•

Percent Passing the 2.36 mm (No. 8) sieve (not applicable for 4.75 mm NMAS asphalt mixtures).•

Percent Passing the 75 µm (No. 200) sieve.•

If using printed ticket results in place of laboratory test results for asphalt content, certify that at least 90% of each day’s printed ticket results for asphalt content are within 0.2 percentage points of the JMF.

If the mixture does not conform to the above requirements, do not certify the mixture. Instead, provide all QC test results to the Inspector-in-Charge. If using printed ticket results for asphalt content, provide the percentage of daily printed ticket results within 0.2 percentage points of the JMF to the Inspector-in-Charge. Payment will be determined according to Table H based on the QC test results.

If a day’s production is interrupted by corrective action, material produced after the corrective action may be certified if QC test results conform to production tolerances.

2.c Maintaining Approval to Certify Mixtures. The Department may suspend a plant’s approval to certify mixtures if QC is not performed according to the Producer QC Plan, mixtures are not produced according to Bulletin 27, a mixture cannot be certified on 2

Page 20 of 153October 29, 2026 08:44:51 AM consecutive production days, or as described below.

The Department may take IA samples of the completed mixture at the plant. In the presence of the Department, test the IA samples for asphalt content and gradation according to the test methods indicated in the Producer QC Plan. Take immediate corrective actions if the mixture does not conform to Table A.

The Department may take QA samples of the completed mixture at the plant or on the roadway directly from the uncompacted mixture placed by the paving equipment specified in Section 413.3(e). The Department will test QA samples according to PTM No. 757 or PTM No. 702, Modified Method D, if previously identified problematic aggregates are used in the mixture, for conformance to Table A. If the results of the QA samples do not comply with Table A, review the Producer QC Plan and the QC test results that followed the QA samples for conformance to Table A. If QC results do not conform to Table A, perform the corrective actions necessary to provide a mixture conforming to Table A.

After completing corrective actions or the sample review, the Department will perform an on-site evaluation of the Producer’s plant operation and QC and then take a sample of the completed mixture at the plant. In the presence of the Representative, test the sample.

If the sample does not comply with Table A, the Department will suspend certification. Immediately suspend shipping mixtures accepted by certification to the project.

After testing verifies that the produced mixture conforms to Tables A and B and with the Representative present, conduct JMF verification according to the Producer QC Plan. After successfully completing JMF verification, resume both certification and shipping mixtures accepted by certification to the project.

Section 413.3(a)2. Preplacement Meeting. Revise to read as follows:•

2. Preplacement Meeting. At least 2 weeks before placing asphalt paving mixtures, schedule an asphalt preplacement meeting with the Representative to review at a minimum the specification, paving operation QC Plan, sequence of paving operations, asphalt mixture temperature checks, mixture acceptance, density acceptance and the care and custody of asphalt acceptance samples.

Section 413.3(d). Hauling Equipment. Revise to read as follows:•

(d) Hauling Equipment. Haul the mixtures in tightly sealed vehicles that do not contain petroleum oils, solvents, or other materials that adversely affect asphalt mixture. Provide covers of sufficient size and quality to protect the entire load under all conditions.

Maintain the proper and uniform placement temperature as specified in Section 413.3(h)1. Provide insulation on all sides of the truck body, a double-walled truck body, or a heated truck body when the air temperature is below 50F from October 1 to April 30. Provide a 3/8-inch diameter hole near the center and approximately two-thirds the distance down from the top of the vehicular box, on both sides, to allow for asphalt mixture temperature checks. If trucks cannot be provided with these holes, provide the Representative with two infrared temperature devices along with documentation that the devices were verified annually through an independent verification service or with a blackbody calibration block before paving for asphalt mixture temperature checks.

Section 413.3(f). Rollers. Revise to read as follows:•

(f) Rollers. Use steel wheel, pneumatic tire, vibratory, or oscillating rollers as specified in Sections 108.05(c)3.a, 3.b, 3.c, 3.e, 3.f, 3.h, or (c)4. Operate rollers according to manufacturer's recommendations. Use vibratory and oscillating rollers with separate controls for frequency and amplitude.

Section 413.3(h)1.a. Placing. Revise to read as follows:•

1.a Placing. Unless otherwise allowed or indicated, deliver, place, and compact asphalt paving mixtures during daylight hours.

Ensure the mixture does not contain lumps of cold material. Deliver and place mixtures at the laying temperatures specified in Table A for the type and class of material used. Do not incorporate any material delivered outside the temperature limits as specified in Table A. Material placed outside the temperature limits as specified in Table A is defective.

Utilize a Material Transfer Vehicle (MTV) as specified in Section 108.05(c)5 for RPS pavements unless otherwise approved by the Representative.

Section 413.3(h)1.e. Safety Edge. Revise to read as follows:•

1.e. Safety Edge. Construct the Safety Edge as the standard edge treatment on the outside edge of asphalt pavements and shoulders. Use the Safety Edge for both wearing and binder courses with a depth of 1.5 inches or greater. Do not place the Safety Edge at total depths greater than 5 inches. The Safety Edge is not required where curb or sidewalk are encountered or where the face of guiderail is directly over the edge of pavements. Do not place the Safety Edge for base, leveling, or scratch courses.

Page 21 of 153October 29, 2026 08:44:51 AM

Construct the Safety Edge with the same material used to construct the roadway course being placed or, if specified, the paved shoulders. Attach a device to the paver to confine material at the end gate and extrude the asphalt material in a wedge shape. Use an adjustable device that allows the operator to vary the slope extruded at the paver to account for the angle becoming steeper during compaction (roll up). Before construction, the Safety Edge device must be approved by the Representative(s).

Compact the roadway or paved shoulder as required by the specifications. Do not delay rolling of the mat adjacent to the Safety Edge. After compaction of the mat is complete, provide a Safety Edge meeting the final shape requirements as shown on the Standard Drawings. The completed angle of the Safety Edge must be 26 degrees to 40 degrees measured from the pavement cross slope extended. At the beginning of each day’s paving, measure the angle of the Safety Edge from the pavement cross slope extended. Perform measurements after final compaction is complete. If the angle of the Safety Edge does not meet the slope requirements, stop paving, and provide corrective action. Do not resume production paving until final shape requirements of Safety Edge are achieved.

Allow automatic transition to intersections, driveways, guiderail sections, and obstructions.

Use the device to constrain the asphalt head, reducing the area and increasing the density of the extruded profile. A single plate strike-off method is not allowed. Do not place the Safety Edge on organic material.

Section 413.3(h)2.a.1. Partially Completed Lots (n=2 or less). Revise to read as follows:•

2.a.1 Partially Completed Lots (n=2 or less). When process conditions change to an extent that a partially completed lot cannot be combined with the most recently completed lot, samples will be independently evaluated on the partially completed lot. For asphalt content and percent passing the 75 μm (No. 200) sieve, mixture acceptance samples will be evaluated individually as specified in Section 413.2(e), Table A (n=1) criteria. For density, mat density acceptance samples will be evaluated individually using the criteria in Table E.

If samples tested for asphalt content and percent passing the 75 μm (No. 200) sieve meet the n=1 criteria of Table A, and samples tested for density meet the criteria in Table E, payment will be 100% of the contract unit price. If samples tested for asphalt content and percent passing the 75 μm (No. 200) sieve do not meet the n=1 criteria of Table A, the material will be considered defective. If samples tested for density are no more than 2.0% below the minimum or no more than 2.0% above the maximum limits of Table E, payment will be 90% of the contract unit price. If samples for density are more than 2.0% below the minimum or more than 2.0% above the maximum limits of Table E, the pavement will be considered defective.

Unless otherwise directed in writing by the District Executive, remove and replace defective work.

No additional revisions were made to Section 413.3(h)2.a.1.•

Section 413.3(h)2.c.1. LTS Testing. Revise to read as follows:•

2.c.1 LTS Testing. The LTS will test the mixture acceptance samples according to PTM No. 757 or PTM No. 702, Modified Method D and PTM No. 739, if previously identified problematic aggregates are used in the mixture, to determine asphalt content and the percent passing the 75 μm (No. 200) sieve. The LTS will use the calibration factors (Cf and 200 Cf) provided with the JMF for PTM No. 757. For individual increment test results outside of the single sample (n=1) tolerances in Table A, the LTS will analyze the test results for extreme values according to PTM No. 4 at the 5% significance level. If discarding an extreme value reduces a lot to less than three remaining test results, the Department will accept the lot as specified in Section 413.3(h)2.a.1. The Department will accept lots with three or more test results as specified in Section 413.4(a)4 or Section 413.4(b).

If the asphalt content or the percent passing the 75 μm (No. 200) sieve is not within the single sample (n=1) or multiple sample (n≥3) tolerances in Table A for two consecutive lots or a total of three lots, stop all production of the JMF. Determine the cause of the problem and provide a proposed solution to the Department.

Do not resume production of the JMF until the Representative reviews the proposed solution and authorizes production to continue.

The LTS will test Gmm verification samples as specified in Section 413.3(j)4.d.

Section 413.3(j)4.a. General. Revise to read as follows:•

4.a General. Pavement cores are required for accepting the density of RPS construction. Pavement cores are required for standard construction of extended-season paving, unless waived by the Representative as specified in Section 413.3(b)1. Pavement cores are appropriate for accepting the density of standard construction if all the following materials, conditions, or applications exist:

Materials placed at indicated compacted depths greater than or equal to the minimum depths specified in Table G.•

Page 22 of 153October 29, 2026 08:44:51 AM

Materials placed on stable and uniform bases.•

TABLE G

Mixture Minimum Indicated Compacted Depths

Mixture Minimum Depth

9.5 mm Wearing Course 1 1/2 in.

12.5 mm Wearing Course 2 in.

19 mm Binder Course 2 1/2 in.

25 mm Binder Course 3 in.

Section 413.3(m). Tests for Depth: Binder and Wearing Courses. Revise to read as follows:•

(m) Tests for Depth: Binder and Wearing Courses.