853986padot84258.pdf

PDF 966 KB Posted

Attached to
Pennsylvania Avenue over Delaware Canal Bridge Replacement
Solicitation number
84258
Issued by
Bucks County, Pennsylvania

About this file

This is a proposal report for a partial design-build project issued by the Pennsylvania Department of Transportation (PennDOT) for the replacement of the Pennsylvania Avenue Bridge over Delaware Canal in Bucks County, Pennsylvania. The project, identified as Project 84258 with Bid Package 1, involves bridge structure replacement and construction of concrete curb ramps limited to ADA compliance improvements on State Route 2073, Section BPA, in Morrisville Borough. The project is located from approximately 212 feet west of Hillcrest Avenue to approximately 260 feet east of Union Street. The current let date is scheduled for December 10, 2026, at 11:00 AM, and the proposal report contains 109 pages detailing project items, quantities, and special provisions. The bid package includes multiple contract line items encompassing bridge structure work, retaining walls, temporary excavation support systems, concrete curb ramps, and various construction materials and equipment.

The proposal report details special provisions and bidding requirements across numerous categories, including applicable federal provisions, road user liquidated damages, traffic restrictions, erosion and sediment control, equal employment opportunity requirements, worker protection standards, electronic ticketing for aggregates and concrete, trainees, and design quality assurance. The project incorporates design activities for ADA curb ramps as a specific component. No addenda have been issued as of the report date of November 5, 2026. The document references utility coordination with PECO, fabricated structural steel painting, bridge barrier installation, protective coating applications, and excavation work with various material classifications. Additional provisions address contractor indemnification, construction restrictions, and notification requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL REPORT

Project: 84258 Bid Package: 1

Current Let: 12/10/2026 11:00:00 AM Version: Current

Addendum Count: 0

District: 06 County: Bucks

SR/SEC/Group ID: 2073/BPA/---

Description Pennsylvania Avenue over Delaware Canal (Design Activities Limited to ADA curb ramps)

PROPOSAL Report - Project 84258

Page 1 of 109November 5, 2026 14:14:46 PM

TABLE OF CONTENTS

BID PACKAGE SUMMARY 5

PROJECT ITEMS AND QUANTITIES 6

SPECIAL PROVISIONS 15

G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) 15 G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW 15 C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413 16 C172A - a00172 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876 23 C173B - a00173 CHANGES TO SPECIFICATIONS: SECTION 106 29 G311A - a00311 ROAD USER LIQUIDATED DAMAGES (RULD) 32 G401A - a00401 ADVANCE NOTICE OF TRAFFIC RESTRICTIONS 32 G501A - a00501 AIR POLLUTION CONTROL IN AIR BASINS 33 G901B - a00901 ALTERNATE EROSION AND SEDIMENT POLLUTION CONTROL PLAN 33 G1001B - a01001 CONSTRUCTION PROCEDURES - EROSION AND SEDIMENT POLLUTION

CONTROL 34

G1301A - a01301 DISPLAYING OF CORE BORING SAMPLES. 35 G1601A - a01601 E.E.O. COVERED AREA 35 G2302A - a02302 Worker Protection and Investment 36 S6012B - b06012 - SECTION 601.3(f) BACKFILLING TRENCH 37 I68C - c00068 ITEM 9000-5101 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION

AGGREGATE 38

I70C - c00070 ITEM 9000-5103 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION

CONCRETE 39

I2032D - c02032 ITEM 9203-0102 & 0103 - TEMPORARY EXCAVATION SUPPORT AND

PROTECTION SYSTEM 40

I6091L - c06091 ITEM 0609-0003 EQUIPMENT PACKAGE 43 I19992A - c19992 ITEM 1999-9999 - TRAINEES 45 I30021B - c80021 ITEM 8120-0001 - BRIDGE STRUCTURE, AS DESIGNED, S-39934 46 00 - c80022 ITEM 8120-0002/8120-0003 - CONCRETE RETAINING WALL, AS DESIGNED, S- 42518, S-42519 47 D29890C - d10000 SPECIAL BIDDING – DESIGN-BUILD 48 D29899A - d10010 QUALITY PLAN WITH QUALITY ASSURANCE REVIEW BY DEPARTMENT -

LOW BID DESIGN 57

D600E - d10020 D06 ITEM 9694-6002 - DESIGN OF CONCRETE CURB RAMPS, DISTRICT 6 60 D660C - d10030 D06 CONSTRUCTION OF CONCRETE CURB RAMPS 64 00 - e10000 ADDITIONAL INSURED PARTIES 66 00 - e10010 ADDITIONAL PARTIES FOR CONTRACTOR TO INDEMNIFY 66 00 - e10020 CONSTRUCTION RESTRICTIONS 67 00 - e10030 NOTICE TO CONTRACTOR 67 00 - e10040 UTILITIES - PECO INFORMATION 68 00 - f10010 FABRICATED STRUCTURAL STEEL, PAINTED 68 00 - f10020 PA TYPE 10M BRIDGE BARRIER, PAINTED 69

Page 2 of 109November 5, 2026 14:14:46 PM

00 - f10030 PROTECTIVE COATING FOR REINFORCED CONCRETE SURFACES (EPOXY

RESIN), COLORED 70

00 - ITEM 4203-0001 – CLASS 1 EXCAVATION UNSUITABLE MATERIAL 70

00 - ITEM 4205-0267 – SELECTED BORROW EXCAVATION ROCK, CLASS R-7 CHOKED WITH

CLASS R-4 71

00 - ITEM 4601-6119 –19”x30” ELLIPTICAL RCP, TYPE B HORIZONTAL,<1.5’ FILL,50 YEAR

DESIGN LIFE(OPEN JOINT) 72

00 - ITEM 4601-6120–24”x38” ELLIPTICAL RCP, TYPE B HORIZONTAL,<1.5’ FILL,50 YEAR

DESIGN LIFE(OPEN JOINT) 72

00 - ITEM 4605-2670 – TYPE E-S ENDWALL FOR 36” PIPE, COLORED 73

00 - ITEM 4619-0458 – PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 2, TANGENT (MASH), COATED 73

00 - ITEM 4620-0400 – TERMINAL SECTION, SINGLE, PAINTED 74

00 - ITEM 4620-1600 – TYPE 31-S GUIDE RAIL, PAINTED 75

00 - ITEM 4620-2033 – THRIE-BEAM GUIDE RAIL TO PA TYPE 10M BRIDGE BARRIER

TRANSITION WITH CURB, PAINTED 76

00 - ITEM 4865-0001 – SILT BARRIER FENCE, 18&#034; HEIGHT EXCLUSION BARRIER FOR

RED BELLIED COOTER 77

00 - ITEM 4935-0420–RECT. RAPID FLASH. BEACON ASSEMBLY WITH PED. PUSH BUTTON

(SINGLE SIDED) POWDER COATED 78

00 - ITEM 5018-0001 - REMOVAL OF EXISTING BRIDGE, S-39934 79

00 - ITEM 9000-0001 - VIBRATION MONITORING AND CONTROL 80

00 - ITEM 9000-0002 - CANAL SEED MIXTURE 84

00 - ITEM 9000-0003 - OVER-EXCAVATION AND BACKFILL WITH CLASS C CEMENT

CONCRETE 85

00 - ITEM 9000-0004 - OVER-EXCAVATION AND BACKFILL WITH COARSE AGGREGATE

UNDER FOUNDATION 86

00 - ITEM 9000-0005 – STREET LIGHT REMOVAL AND INSTALLATION 87

00 - ITEM 9000-0006 – AIDS TO NAVIGATION PLAN 87

00 - ITEM 9000-0007 – REMOVE FENCE 88

00 - ITEM 9000-0008 – RESTORE LANDSCAPING BED 89

00 - ITEM 9000-0011 – CLAY LINER 89

00 - ITEM 9000-0012 – NO. 10 AASHTO AGGREGATE, RED ARGILLITE, 6&#034; DEPTH 90

00 - ITEM 9000-0013 – REMOVE PRIVATE SIGN 91

00 - ITEM 9000-0014 – ARCHAEOLOGICAL MONITORING DURING CONSTRUCTION 92

00 - ITEM 9000-0015 – 12” SQUARE YARD DRAIN 93

00 - ITEM 9000-0016 – UTILITY POLE SLEEVE 93

00 - ITEM 9000-0017– THRIE-BEAM GUIDE RAIL TO PA TYPE 10M BRIDGE BARRIER TRANS.

W CURB,TIMBER POSTS PAINT 94

00 - ITEM 9000-0018 - MODIFICATIONS TO EXISTING STONE WALL 95

00 - ITEM 9000-0019 – LED LUMINAIRE, ARM MOUNT 96

00 - ITEM 9000-0021 – TEMPORARY DRAINAGE STRUCTURE 97

00 - ITEM 9000-0022 – TEMPORARY DRAINAGE CONNECTION 98

00 - ITEM 9000-0023 – TEMPORARY DRAINAGE DIVERSION 98

00 - ITEM 9000-0024 – TEMPORARY STREAM DIVERSION 99

Page 3 of 109November 5, 2026 14:14:46 PM

00 - ITEM 9000-0025 – INSTALLATION OF AT&T AND VERIZON CONDUIT SYSTEM 100

00 - ITEM 9000-0026 – UTILITY RELOCATION – WATER LINE 101

00 - ITEM 9000-0027 – UTILITY RELINING – SEWER LINE 102

00 - ITEM 9000-0028 - INSTALLATION OF PECO GAS TEMPORARY AND PERMANENT

FACILITIES 103

00 - ITEM 9000-0029 - TESTING AND REMOVAL OF UNIDENTIFIED ASBESTOS AND LEAD

CONTAINING MATERIAL 104

00 - ITEM 9000-0031 – UTILITY TEST PIT 105

00 - ITEM 9000-0034/9000-0035 - REMOVAL OF EXISTING RETAINING WALL 106

00 - ITEM 9000-0040 - HISTORIC RESOURCES CONSULTATION 107

Page 4 of 109November 5, 2026 14:14:46 PM

BID PACKAGE SUMMARY

Project: 84258 Bid Package: 1

Project Type: Standard Posted:

Federal Project Status: PENNDOT Oversight Non-NHS State Type of Work: BRIDGE REPLACEMENT

Prequalification Required: Yes Pre-Bid Meeting: None

408 Version: 2026-1

Scheduled Let: 12/10/2026 11:00:00 AM Project Cost Range: $5,000,000.00 - $7,499,999.99 Anticipated NTP: 01/25/2027 Structure Work: 62.00%

Required Completion: 10/04/2029 DBE: 0% Wage Rates: Yes

Description:

This partial design/build project is for the replacement of the Pennsylvania Avenue Bridge over Delaware Canal and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 2073, SECTION BPA, in BUCKS COUNTY, MORRISVILLE BOROUGH from approximately 212 feet west of Hillcrest Avenue at segment 0070 offset 1115 to approximately 260 feet east of Union Street at segment 0070 offset 0400.

Additional Information:

This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to contact Contract Awards and be escorted to the 7th Floor Contract Awards Room. Contract Awards can be reached at 717-395-9754.

Due to recent changes in the Keystone Building, there is no longer a reception on the 5th Floor to greet and check-in visitors.

Page 5 of 109November 5, 2026 14:14:46 PM

PROJECT ITEMS AND QUANTITIES

Alt Item Work Class Code Unit Of

Measure Quantity Unit Price PDP Spec

Prov Add Action

0201-0001 A Lump Sum 1.0000 N

CLEARING AND GRUBBING

4203-0001 C Cubic Yard 752.0000 N Proj

CLASS 1 EXCAVATION UNSUITABLE MATERIAL

0205-0100 C1 Cubic Yard 6.0000 N

FOREIGN BORROW EXCAVATION

4205-0267 C1 Cubic Yard 425.0000 N Proj

SELECTED BORROW EXCAVATION ROCK, CLASS R-7 CHOKED WITH CLASS R-4

0208-0001 C Hour 4.0000 N

SPECIAL ROLLING

0208-0002 C1 Cubic Yard 519.0000 N

EXCAVATION/BACKFILL/COMPACTION

0208-0003 C3, H, M2 Square Yard 779.0000 N

GEOTEXTILE CLASS 4

0212-0001 C3, H, M2 Linear Foot 95.0000 N

GEOTEXTILE, CLASS 1

0212-0014 C3, H, M2 Square Yard 2,553.0000 N

GEOTEXTILE, CLASS 4, TYPE A

0313-0420 E Square Yard 1,557.0000 N SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALs, 25.0 MM MIX, 3" DEPTH

0350-0106 C, E Square Yard 1,813.0000 N

SUBBASE 6" DEPTH (NO. 2A)

0413-0245 F Square Yard 1,557.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALS, 9.5 MM MIX, 1 1/2"

DEPTH, SRL-H

0413-6045 F Square Yard 1,557.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALS, 19.0 MM MIX, 2 1/2"

DEPTH

0460-0003 F4 Square Yard 3,114.0000 N

ASPHALT TACK COAT (NTT/CNTT)

4601-6119 H Linear Foot 32.0000 N Proj

19" X 30" ELLIPTICAL REINFORCED CONCRETE PIPE, TYPE B HORIZONTAL, < 1.5' FILL, 50 YEAR DESIGN LIFE (OPEN

JOINT)

0601-6120 H Linear Foot 33.0000 N

24" X 38" ELLIPTICAL REINFORCED CONCRETE PIPE, TYPE B HORIZONTAL, < 1.5' FILL, 50 YEAR DESIGN LIFE

Page 6 of 109November 5, 2026 14:14:46 PM

4601-6120 H Linear Foot 11.0000 N Proj

24" X 38" ELLIPTICAL REINFORCED CONCRETE PIPE, TYPE B HORIZONTAL, < 1.5' FILL, 50 YEAR DESIGN LIFE (OPEN

JOINT)

E 0601-7326 H Linear Foot 26.0000 N

24" REINFORCED CONCRETE PIPE, TYPE B, 10' - 2' FILL

O 0601-0315 H Linear Foot 26.0000 N

24" THERMOPLASTIC PIPE, GROUP I, 15'-1.5' FILL

O 0601-2867 H Linear Foot 26.0000 N 30" CORRUGATED ALUMINUM ALLOY PIPE, TYPE I, (2 2/3" X 1/2" CORRUGATIONS), 12 GAGE

E 0601-7355 H Linear Foot 125.0000 N

36" REINFORCED CONCRETE PIPE, TYPE B, 15' - 2' FILL

O 0601-2870 H Linear Foot 125.0000 N 42" CORRUGATED ALUMINUM ALLOY PIPE, TYPE I, (2 2/3" X 1/2" CORRUGATIONS), 12 GAGE

O 0601-0319 H Linear Foot 125.0000 N

36" THERMOPLASTIC PIPE, GROUP I, 15'-1.5' FILL

E 0604-7313 H Linear Foot 53.0000 N

18" REINFORCED CONCRETE PIPE, TYPE B, (OPEN JOINT), 15' - 1.5' FILL

O 0604-0400 H Linear Foot 53.0000 N

18" PERFORATED THERMOPLASTIC PIPE, GROUP VI, 15'-2' FILL

O 0604-2844 H Linear Foot 53.0000 N 21" PERFORATED CORRUGATED ALUMINUM ALLOY PIPE, TYPE I, (2 2/3" X 1/2" CORRUGATIONS), 14 GAGE

O 0604-9424 H Linear Foot 53.0000 N 21" PERFORATED CORRUGATED ALUMINIZED STEEL PIPE, TYPE I, (2 2/3" X 1/2" CORRUGATIONS), 12 GAGE

E 0604-7340 H Linear Foot 49.0000 N

30" REINFORCED CONCRETE PIPE, TYPE B, (OPEN JOINT), 10' - 2' FILL

O 0604-0404 H Linear Foot 49.0000 N

30" PERFORATED THERMOPLASTIC PIPE, GROUP VI, 15'-2' FILL

O 0604-2969 H Linear Foot 49.0000 N 36" PERFORATED CORRUGATED ALUMINUM ALLOY PIPE, TYPE I, (3" X 1" CORRUGATIONS), 12 GAGE

O 0604-9429 H Linear Foot 49.0000 N 36" PERFORATED CORRUGATED ALUMINIZED STEEL PIPE, TYPE I, (2 2/3" X 1/2" CORRUGATIONS), 12 GAGE

4605-2670 K Each 1.0000 N Proj

TYPE E-S ENDWALL FOR 36" PIPE , COLORED

0605-2850 K Each 3.0000 N

STANDARD INLET BOX, HEIGHT < /= 10'

0605-2854 K Each 6.0000 N

TYPE 4 INLET BOX, HEIGHT < /= 10'

0605-2855 K Each 1.0000 N

TYPE 4 INLET BOX, HEIGHT > 10' AND < /= 20'

Page 7 of 109November 5, 2026 14:14:46 PM

0605-5701 K Set 2.0000 N

TYPE C CONCRETE TOP UNIT, 4" CURB HEIGHT AND BICYCLE SAFE GRATE

0605-5711 K Set 4.0000 N

TYPE C CONCRETE TOP UNIT, 6" CURB HEIGHT AND BICYCLE SAFE GRATE

0605-5721 K Set 4.0000 N

TYPE C CONCRETE TOP UNIT, 8" CURB HEIGHT AND BICYCLE SAFE GRATE

0606-0150 C1, K Set 1.0000 N

GRADE ADJUSTMENT OF EXISTING MANHOLES

0608-0001 X Lump Sum 1.0000 N

MOBILIZATION

0609-0003 X Lump Sum 1.0000 N

INSPECTOR'S FIELD OFFICE AND INSPECTION FACILITIES, TYPE B

0609-0009 X Lump Sum 1.0000 N Std

EQUIPMENT PACKAGE

0610-7001 H2 Linear Foot 95.0000 N

4" PAVEMENT BASE DRAIN

0612-0001 C1, H Linear Foot 100.0000 N

SUBGRADE DRAINS

0617-0001 H Linear Foot 48.0000 N

SLOTTED DRAINS

4619-0458 J3 Each 1.0000 N Proj PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 2, TANGENT (MASH) , COATED

4620-0400 J Each 1.0000 N Proj

TERMINAL SECTION, SINGLE , PAINTED

4620-1600 J Linear Foot 13.0000 N Proj

TYPE 31-S GUIDE RAIL , PAINTED

4620-2033 J Each 1.0000 N Proj THRIE-BEAM GUIDE RAIL TO PA TYPE 10M BRIDGE BARRIER TRANSITION WITH CURB , PAINTED

0630-0025 K Linear Foot 132.0000 N

PLAIN CEMENT CONCRETE CURB, 4" HEIGHT, INCLUDING REMOVAL OF EXISTING CURB

0630-0035 K Linear Foot 527.0000 N

PLAIN CEMENT CONCRETE CURB, 6" HEIGHT, INCLUDING REMOVAL OF EXISTING CURB

0630-0045 K Linear Foot 166.0000 N

PLAIN CEMENT CONCRETE CURB, 8" HEIGHT, INCLUDING REMOVAL OF EXISTING CURB

0633-0200 K Linear Foot 103.0000 N

PLAIN CONCRETE MOUNTABLE CURB, TYPE A

0676-0001 K Square Yard 465.0000 N

Page 8 of 109November 5, 2026 14:14:46 PM

CEMENT CONCRETE SIDEWALK

0676-0004 K Square Yard 11.0000 N

DRIVEWAY APRONS AND SIDEWALKS THROUGH DRIVEWAYS

0676-0011 K Square Yard 25.0000 N

PLAIN CEMENT CONCRETE ISLAND

0686-0050 X Lump Sum 1.0000 N

CONSTRUCTION SURVEYING, TYPE D

0689-0005 X Lump Sum 1.0000 N

CPM SCHEDULE, WITH UPDATES

0690-0001 X Dollar 1,000.0000 $1.00 Y

INTERNAL FACILITATION

E 0695-0004 K Square Foot 80.0000 N

DETECTABLE WARNING SURFACE, POLYMER COMPOSITE

O 0695-0003 K Square Foot 80.0000 N

DETECTABLE WARNING SURFACE, POLYMER CONCRETE

O 0695-0002 K Square Foot 80.0000 N

DETECTABLE WARNING SURFACE, CAST IRON

0802-0003 C1, M Square Yard 1,848.0000 N

TOPSOIL FURNISHED AND PLACED

0804-0025 M3 Pound 42.0000 N

SEEDING AND SOIL SUPPLEMENTS - FORMULA B RESIDENTIAL MIX, INCLUDING MULCH

0804-0032 M3 Pound 10.0000 N

SEEDING - FORMULA T TEMPORARY GRASS MIX, INCLUDING MULCH

0806-0121 M2 Square Yard 854.0000 N

TEMPORARY EXTENDED-TERM, ROLLED EROSION CONTROL PRODUCT, TYPE 3B

0845-0001 M2 Dollar 1,000.0000 $1.00 Y

UNFORESEEN WATER POLLUTION CONTROL

0849-0010 C1 Each 2.0000 N

ROCK CONSTRUCTION ENTRANCE

0855-0003 M2 Each 1.0000 N

PUMPED WATER FILTER BAG

0855-0004 M2 Each 1.0000 N

REPLACEMENT PUMPED WATER FILTER BAG

0860-0002 M2 Each 12.0000 N

INLET FILTER BAG FOR TYPE C INLET

0860-0012 M2 Each 2.0000 N

CONCRETE BLOCK/GRAVEL INLET PROTECTION FOR TYPE C INLET

Page 9 of 109November 5, 2026 14:14:46 PM

4865-0001 M2 Linear Foot 397.0000 N Proj

SILT BARRIER FENCE, 18" HEIGHT EXCLUSION BARRIER FOR RED BELLIED COOTER

0867-0012 M2 Linear Foot 410.0000 N

COMPOST FILTER SOCK, 12" DIAMETER

0901-0001 Q Lump Sum 1.0000 N

MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION

0901-0231 Q Day 100.0000 N

ADDITIONAL WARNING LIGHTS, TYPE B

0901-0240 Q, R Square Foot 200.0000 N

ADDITIONAL TRAFFIC CONTROL SIGNS

0910-0001 C1, P8 Each 2.0000 N

JUNCTION BOXES J.B.-1

0910-0154 P8 Each 2.0000 N

POLE FOUNDATION, TYPE FC

E 0910-0262 P8 Each 1.0000 N

STEEL LIGHTING POLE WITH 6-FOOT BRACKET ARM (30-FOOT MOUNTING HEIGHT) TYPE S

O 0910-1062 P8 Each 1.0000 N

ALUMINUM LIGHTING POLE WITH 6-FOOT BRACKET ARM (30-FOOT MOUNTING HEIGHT) TYPE S

E 0910-0270 P8 Each 1.0000 N

STEEL LIGHTING POLE WITH 15-FOOT BRACKET ARM (30-FOOT MOUNTING HEIGHT) TYPE S

O 0910-1070 P8 Each 1.0000 N

ALUMINUM LIGHTING POLE WITH 15-FOOT BRACKET ARM (30-FOOT MOUNTING HEIGHT) TYPE S

0910-4117 P8 Linear Foot 696.0000 N

AWG 10 UNDERGROUND CABLE, COPPER, 1 CONDUCTOR

0910-5059 C1, P8 Linear Foot 116.0000 N

3" DIRECT BURIAL CONDUIT

0910-6000 C1, P8 Linear Foot 116.0000 N

TRENCH

0910-7020 P8 Each 1.0000 N

COMPLETE POWER SUPPLY SYSTEM

0910-7210 P8 Lump Sum 1.0000 N

TESTING OF ENTIRE LIGHTING SYSTEM

0931-0001 R Square Foot 28.0000 N

POST MOUNTED SIGNS, TYPE B

0935-0001 R Square Foot 6.0000 N

POST MOUNTED SIGNS, TYPE F

4935-0420 P Each 2.0000 N Proj

RECTANGULAR RAPID FLASHING BEACON ASSEMBLY WITH PEDESTRIAN PUSH BUTTON (SINGLE SIDED) POWDER

COATED

Page 10 of 109November 5, 2026 14:14:46 PM

0937-0107 J, R Each 4.0000 N

GUIDE RAIL MOUNTED DELINEATOR TYPE B, (W/W)

0937-0114 J, R Each 4.0000 N

GUIDE RAIL MOUNTED DELINEATOR TYPE D, (W/W)

0937-0196 J1, R Each 4.0000 N

BARRIER MOUNTED DELINEATOR, TOP MOUNT TYPE R, (W/W)

0937-0320 R Each 3.0000 N

FLEXIBLE DELINEATOR POST, GROUND-MOUNT TYPE GM-1, WHITE POST WITH WHITE SHEETING

0941-0001 R Each 1.0000 N

RESET POST MOUNTED SIGNS, TYPE B

0954-0013 P8 Linear Foot 155.0000 N

3 INCH CONDUIT

0954-0151 C1, P8 Linear Foot 155.0000 N

TRENCH AND BACKFILL, TYPE I

0954-0201 P8 Linear Foot 155.0000 N

SIGNAL CABLE, 14 AWG, 3 CONDUCTOR

0954-0301 P8 Each 1.0000 N

JUNCTION BOX, JB-26

0954-0403 P8 Each 1.0000 N

ELECTRICAL SERVICE, TYPE C

0960-0001 O2 Linear Foot 736.0000 N

4" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS

0960-0002 O2 Linear Foot 805.0000 N

4" YELLOW HOT THERMOPLASTIC PAVEMENT MARKINGS

0960-0021 O2 Linear Foot 200.0000 N

24" WHITE HOT THERMOPLASTIC PAVEMENT MARKINGS

0960-0036 O2 Linear Foot 15.0000 N

24" YELLOW HOT THERMOPLASTIC TRANSVERSE PAVEMENT MARKINGS

0960-0111 O2 Each 1.0000 N

WHITE HOT THERMOPLASTIC LEGEND, "X ING", 8' - 0"

0960-0112 O2 Each 1.0000 N

WHITE HOT THERMOPLASTIC LEGEND, "PED", 8' - 0"

0960-0142 O2 Each 1.0000 N

WHITE HOT THERMOPLASTIC LEGEND, "AHEAD", 8' - 0"

0964-0001 O Linear Foot 215.0000 N

4" WHITE EPOXY PAVEMENT MARKINGS

0964-0002 O Linear Foot 165.0000 N

Page 11 of 109November 5, 2026 14:14:46 PM

4" YELLOW EPOXY PAVEMENT MARKINGS

0964-0108 O3 Each 1.0000 N

WHITE EPOXY LEGEND, "AHEAD", 8' - 0"

0964-0111 O3 Each 1.0000 N

WHITE EPOXY LEGEND, "X ING" , 8'-0"

0964-0112 O3 Each 1.0000 N

WHITE EPOXY LEGEND, "PED" , 8'-0"

1002-0052 S7 Pound 100,418.0000 N

REINFORCEMENT BARS, EPOXY COATED

1002-0053 S7 Pound 15,020.0000 N

1002-0190 S7 Pound 10,160.0000 N

1002-0220 S7 Pound 300.0000 N

STAINLESS STEEL REINFORCEMENT BARS

5018-0001 T1 Lump Sum 1.0000 N Proj

REMOVAL OF EXISTING BRIDGE , S-39934

1091-0331 K1 Linear Foot 50.0000 N

EPOXY INJECTION CRACK SEAL

1999-9999 Z Hour 1,000.0000 N Std

TRAINEES

8120-0001 S1 Lump Sum 1.0000 N Std

BRIDGE STRUCTURE, AS DESIGNED, S-39934

8120-0002 S5 Lump Sum 1.0000 N Proj

CONCRETE RETAINING WALL, AS DESIGNED, S-42518

8120-0003 S5 Lump Sum 1.0000 N Proj

CONCRETE RETAINING WALL, AS DESIGNED, S-42519

9000-0001 X Lump Sum 1.0000 N Proj

VIBRATION MONITORING AND CONTROL

9000-0002 M3 Pound 3.0000 N Proj

CANAL SEED MIXTURE

9000-0003 C1 Cubic Yard 18.0000 N Proj

OVER-EXCAVATION AND BACKFILL WITH CLASS C CEMENT CONCRETE

9000-0004 C1 Cubic Yard 131.0000 N Proj

OVER-EXCAVATION AND BACKFILL WITH COARSE AGGREGATE UNDER FOUNDATION

9000-0005 P8 Each 3.0000 N Proj

STREET LIGHT REMOVAL AND INSTALLATION

Page 12 of 109November 5, 2026 14:14:46 PM

9000-0006 Q Lump Sum 1.0000 N Proj

AIDS TO NAVIGATION PLAN

9000-0007 J Linear Foot 196.0000 N Proj

REMOVE FENCE

9000-0008 M Lump Sum 1.0000 N Proj

RESTORE LANDSCAPING BED

9000-0011 C1 Cubic Yard 183.0000 N Proj

CLAY LINER

9000-0012 C1, E Square Yard 111.0000 N Proj

NO. 10 AASHTO AGGREGATE, RED ARGILLITE, 6" DEPTH

9000-0013 X Lump Sum 1.0000 N Proj

REMOVE PRIVATE SIGN

9000-0014 X Dollar 15,000.0000 $1.00 Y Proj

ARCHAEOLOGICAL MONITORING DURING CONSTRUCTION

9000-0015 H Each 1.0000 N Proj

12" SQUARE YARD DRAIN

9000-0016 X Lump Sum 1.0000 N Proj

UTILITY POLE SLEEVE

9000-0017 J Each 1.0000 N Proj

THRIE-BEAM GUIDE RAIL TO PA TYPE 10M BRIDGE BARRIER TRANSITION WITH CURB, TIMBER POSTS ON RADIUS

AND PAINTED

9000-0018 K1 Lump Sum 1.0000 N Proj

MODIFICATIONS TO EXISTING STONE WALL

9000-0019 P8 Each 2.0000 N Proj

LED LUMINAIRE, ARM MOUNT

9000-0021 H Each 1.0000 N Proj

TEMPORARY DRAINAGE STRUCTURE

9000-0022 H Each 2.0000 N Proj

TEMPORARY DRAINAGE CONNECTION

9000-0023 H Linear Foot 247.0000 N Proj

TEMPORARY DRAINAGE DIVERSION

9000-0024 H Lump Sum 1.0000 N Proj

TEMPORARY STREAM DIVERSION

9000-0025 ZZ Lump Sum 1.0000 N Proj

INSTALLATION OF AT&T AND VERIZON CONDUIT SYSTEM

9000-0026 H Lump Sum 1.0000 N Proj

UTILITY RELOCATION - WATER LINE

9000-0027 H Lump Sum 1.0000 N Proj

UTILITY RELINING - SEWER LINE

Page 13 of 109November 5, 2026 14:14:46 PM

9000-0028 ZZ Lump Sum 1.0000 N Proj

INSTALLATION OF PECO GAS TEMPORARY AND PERMANENT FACILITIES

9000-0029 B1 Dollar 5,000.0000 $1.00 Y Proj

TESTING AND REMOVAL OF UNIDENTIFIED ASBESTOS AND LEAD CONTAINING MATERIAL

9000-0031 X Dollar 10,000.0000 $1.00 Y Proj

UTILITY TEST PIT

9000-0034 T1 Lump Sum 1.0000 N Proj

REMOVAL OF EXISTING RETAINING WALL, S-42518

9000-0035 T1 Lump Sum 1.0000 N Proj

REMOVAL OF EXISTING RETAINING WALL, S-42519

9000-0040 X Dollar 15,000.0000 $1.00 Y Proj

HISTORIC RESOURCES CONSULTATION

9000-5101 X Lump Sum 1.0000 N Std

ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION AGGREGRATE

9000-5103 X Lump Sum 1.0000 N Std

ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION CONCRETE

9203-0102 C1, S5 Lump Sum 1.0000 N Std

TEMPORARY EXCAVATION SUPPORT AND PROTECTION SYSTEM, S-42518

9203-0103 C1, S5 Lump Sum 1.0000 N Std

TEMPORARY EXCAVATION SUPPORT AND PROTECTION SYSTEM, S-42519

9694-6002 X Each 6.0000 N Std

DESIGN OF CEMENT CONCRETE CURB RAMPS, DISTRICT 6

Page 14 of 109November 5, 2026 14:14:46 PM

SPECIAL PROVISIONS

Special Provision: G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) Addendum:

Action:

Item(s) Associated:

Header:

APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL)

Provision Body:

APPLICABLE DESIGNATED SPECIAL PROVISIONS. The following Designated Special Provisions are found in Appendix C and apply to this bid proposal.

DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects.

DSP8. F.A.R. - Required Contract Provisions Federal-Aid Construction Contracts FHWA-1273 (Revised October 23, 2023). Also attached to the Proposal/Contract.

DSP9. Special Supplement - Anti-Pollution Measures - August 26, 1999.

DSP12. Executive Order 11246, with Appendix A and B.

DSP13. Buy America.

DSP15. Commonwealth Standard Terms and Conditions.

DSP16. Lobbying Certification Form. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).

DSP17. Federal Audit Clause.

DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances.

DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities.

Project Specific Details:

Special Provision: G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW Addendum:

CONTRACT PROVISIONS - RIGHT TO KNOW LAW

Page 15 of 109November 5, 2026 14:14:46 PM

Provision Body:

I. Contract Provisions – Right to Know Law 8-K-1532

a. The Pennsylvania Right-to-Know Law (RTKL), 65 P.S. §§ 67.101-3104, applies to this Contract.

b. If the Department needs assistance in any matter arising out of the RTKL related to this Contract, the Department will notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Department.

c. Upon written notification from the Department that it requires assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor will:

1. Provide the Department, within 10 calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Department reasonably believes is Requested Information and may be a public record under the RTKL; and

2. Provide such other assistance as the Department may reasonably request, in order to comply with the RTKL with respect to this Contract.

d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, notify the Department and provide, within 7 calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.

e. The Department will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Department determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Department determine that the Requested Information is clearly not exempt from disclosure, provide the Requested Information within 7 calendar days of receipt of written notification of the Department’s determination.

f. Failing to provide the Requested Information within the time period required by these provisions, indemnify and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of this failure, including any statutory damages assessed against the Department.

g. The Department will reimburse the Contractor for any costs associated with complying with these provisions only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.

h. The Contractor may file a legal challenge to any Department decision to release a record to the public with the Office of Open Records, or in the Pennsylvania Courts, however, indemnify the Department for any legal expenses incurred by the Department as a result of such a challenge and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of the failure, including any statutory damages assessed against the Department, regardless of the outcome of such legal challenge. As between the parties, agree to waive all rights or remedies that may be available as a result of the Department’s disclosure of Requested information pursuant to the RTKL.

i. The Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Contract and continue as long as the Requested Information remains in the Contractor's possession.

Special Provision: C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413

Addendum:

Action:

Item(s) Associated:

Page 16 of 109November 5, 2026 14:14:46 PM

CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413

Provision Body:

SECTION 313—SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, BASE COURSE

Section 313.3(m) Tests for Depth. Revise to read as follows:•

(m) Tests for Depth.

(m) Tests for Depth. Replace with the following:

Control the loose depth of each layer to construct the base course to the compacted depth indicated and within the specified tolerance. On the top lift and in the presence of the Inspector, drill full-depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed base course and at other locations the Inspector suspects are deficient. After the Inspector completes depth measurements, backfill, compact, and seal core holes with the mixture used to construct the course.

The Inspector will measure the full-depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. Immediately delineate the limits of pavement deficient in depth from the core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is less than 1/2 inch deficient of the design depth. The defective course will be the full width of the affected lane.

SECTION 314—SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, ASPHALT RICH BASE COURSE

Section 314.3(m) Tests for Depth. Revise to read as follows:•

(m) Tests for Depth.

(m) Tests for Depth. Replace with the following:

Control the loose depth of each layer to construct the ARBC to the compacted depth indicated and within the specified tolerance. In the presence of the Inspector, drill full-depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed ARBC and at other locations the Inspector suspects are deficient. After the Inspector completes depth measurements, backfill, compact, and seal core holes with ARBC.

The Inspector will measure the full-depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. Immediately delineate the limits of pavement deficient in depth from the core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is less than 1/2 inch deficient of the design depth. The defective course will be the full width of the affected lane.

SECTION 360—ASPHALT TREATED PERMEABLE BASE COURSE

Section 360.2(e)3. Production. Revise to read as follows:•

3. Production. During the first day of production, take at least three asphalt content and gradation tests to verify the mixture conforms to the JMF. After the first day, perform tests for asphalt content and aggregate gradation according to the QC Plan and PTM No. 1. Produce ATPBC conforming to the gradation requirements in Table A and with an asphalt content within 0.8% of the JMF (n=1). Ensure the aggregate is uniformly coated with asphalt and no runoff of excess asphalt is observed.

Section 360.3(m). Tests for Depth. Revise to read as follows:•

(m) Tests for Depth: Binder and Wearing Courses. Replace with the following:

Carefully dig or drill one random 6-inch diameter test hole selected by the Representative according to PTM No. 1 to the full depth of the ATPBC for each 3,000 square yards, or less, of completed base course. The Representative may require additional test holes in areas the Representative suspects are deficient in depth. The Representative will measure the depth of the base course. Using material acceptable to the Representative, backfill the test holes and compact the material to fill the test hole flush with the completed base course.

Page 17 of 109November 5, 2026 14:14:46 PM

ATPBC deficient in depth by 1/2 inch or more is defective. Immediately delineate the limits of ATPBC deficient in depth from the location by proceeding longitudinally, forward and backward, obtaining additional test holes every 50 feet until the depth is less than 1/2 inch deficient of the indicated depth. The defective course will be the full width of the affected lane.

SECTION 410—SUPERPAVE MIXTURE DESIGN, STANDARD AND RPS CONSTRUCTION OF PLANT-MIXED ASPHALT FINE-

GRADED COURSES

Section 410.3. CONSTRUCTION. Revise to read as follows:•

410.3 CONSTRUCTION—Section 413.3 using the test procedures, limits, and tolerances for a 9.5 mm nominal maximum aggregate size mixture except where procedures, limits and tolerances are specifically indicated for a 9.5 mm fine-graded nominal maximum aggregate size mixture and as modified as follows:

Revise Table G to include 9.5 mm Fine Grade Wearing Course as follows:

TABLE G

Mixture Minimum Indicated Compacted Depths

Mixture Minimum Depth

9.5 mm Fine Grade Wearing Course 1 inch

SECTION 412—SUPERPAVE MIXTURE DESIGN, CONSTRUCTION OF PLANT-MIXED 6.3 MM ASPHALT OVERLAY COURSES

Section 412.3(a)2. Preplacement Meeting. Revise to read as follows:•

2. Preplacement Meeting. At least 2 weeks before placing asphalt paving mixtures, schedule an asphalt preplacement meeting with the Representative to review at a minimum the specification, paving operation QC Plan, sequence of paving operations, asphalt mixture temperature checks, mixture acceptance, density acceptance and the care and custody of asphalt acceptance samples.

Section 412.3(h)1.a. Placing. Revise to read as follows:•

1.a Placing. Unless otherwise allowed, deliver, place, and compact 6.3 mm paving mixtures during daylight hours. Ensure the mixture does not contain lumps of cold material. Deliver and place 6.3 mm paving mixtures at the laying temperatures specified in Table B.

Material placed outside the temperature limits as specified in Table B is defective.

Utilize a Material Transfer Vehicle (MTV) as specified in Section 108.05(c)5 for 6.3 mm paving mixtures unless otherwise approved by the Representative.

Section 412.4(a)4.b. Dispute Resolution. Revise TABLE H to read as follows:•

TABLE H

Dispute Resolution Retest Cost Table

Test Method

Mixture Acceptance Retest Cost if Retest Results Indicate

100% Pay Factor(s) for Full Lots (n > 3)* or Single Sample (n=1) Requirements in Table B were met for Partial Lots (n < 3)**

Mixture Acceptance Retest Cost if Retest Results Indicate

< 100% Pay Factor(s) for Full Lots (n > 3)* or Single Sample (n=1) Requirements in Table B were not met for Partial Lots (n < 3)**

PTM No.

702/739 $900 $3,500

PTM No. 757 $500 $2,000

Page 18 of 109November 5, 2026 14:14:46 PM

* For full lots (n ≥ 3) where the original test results indicated a defective lot, only the pay factor(s) where original test results indicated a defective lot for asphalt content or percent passing the 75 μm (No. 200) sieve will be utilized to determine the retest cost.

** For partial lots (n < 3) where the original test results indicated a pay parameter (asphalt content, percent passing the 75 µm (No. 200) sieve, or both) did not meet the Single Sample (n = 1) requirements in Table B, only the pay parameter(s) that did not meet the Single Sample (n =1) requirements will be utilized to determine the retest cost.

SECTION 413—SUPERPAVE MIXTURE DESIGN, STANDARD AND RPS CONSTRUCTION OF PLANT-MIXED ASPHALT

COURSES WITH PERCENT WITHIN LIMITS AND LTS TESTING (PWS-LTS)

Section 413.2(e)1. Recycled Asphalt Material. Revise to read as follows:•

1. Virgin Material Mixtures. Size, uniformly grade, and combine aggregate fractions, asphalt binder, and either WMA Technology additive(s) or modifier(s) in proportions to produce a JMF that conforms to the material, gradation, and volumetric Superpave Asphalt Mixture Design requirements according to Bulletin 27, Chapter 2A. Produce an asphalt mixture for the specified nominal maximum aggregate size and design ESALs except as procedurally modified by the WMA Technology Manufacturer Technical Representative (Technical Representative) to address laboratory procedures when preparing, compacting and testing asphalt mixtures to achieve a uniform blend. Special additive(s) or modifier(s) need not be used if mixture temperature, workability, and compaction can be achieved solely through plant mechanical modification to produce foamed asphalt. Do not incorporate the WMA Technology additive, modifier or process during the volumetric asphalt mixture design process, so that the JMF volumetrics and material percentages are based on a mixture with no WMA Technology. Only use the WMA Technology additive, modifier or process to evaluate results from moisture susceptibility testing during the mix design process. Develop an asphalt mixture JMF, then incorporate the WMA Technology additive, modifier, or process into that JMF during production. Create an asphalt JMF cover sheet (Form TR-448A) for approval containing the WMA Technology used, additive dosage rate or percent water added for foaming, material code, and the TSR data from the moisture susceptibility testing.

Submit a copy of each completed JMF, signed by a certified Asphalt Level 2 plant technician, to the DME/DMM at least 3 weeks before the planned start of mixture production. Include a list of all material sources and the asphalt mixture producer in the JMF.

Provide the calibration factors (Cf and 200 Cf) according to PTM No. 757 with the JMF. Do not start mixture production until after the DME/DMM reviews the JMF.

Submit a new JMF with a change in material sources or if a new JMF is necessary to produce a mixture conforming to this specification.

No additional revisions were made to Section 413.2(e)1.•

Section 413.2(e)1.d.5. Volumetric Analysis of Compacted Specimens. Revise TABLE A as follows:•

TABLE A

Job-Mix Formula Composition Tolerance Requirements of the Completed Mix

Single Sample (n=1) Multiple

Samples (n > 3)

Gradation Passing 12.5 mm (1/2 inch) and Larger Sieves +8% +6% Passing 9.5 mm (3/8 inch) to 150 µm (No. 100) Sieves (Inclusive) +6% +4%

Passing 75 µm (No. 200) Sieve +3.0% +2.0% Asphalt Content

19.0 mm Asphalt mixtures and smaller +0.7% +0.4%

25.0 mm Asphalt mixtures and larger +0.8% +0.5%

Temperature of Mixture (F) Chemical, Organic, Foaming Additives

Mechanical Foaming Equipment/Process

Class of Material

Type of Material Maximum*

Page 19 of 109November 5, 2026 14:14:46 PM

Minimum* Minimum* PG 58S-28 Asphalt Binder 215 230 310 PG 64S-22 Asphalt Binder 220 240 320 PG 64E-22 Asphalt Binder 240 260 330

All other Binders Asphalt Binder

The higher of 215 or the minimum temp.

specified in Bulletin 25 minus 45F

The higher of 230 or the minimum temp.

specified in Bulletin 25 minus 30F

As specified in Bulletin

* Outline in the Producer QC Plan and follow more restrictive temperature requirements provided by the WMA technology manufacturer or Technical Representative(s) for production and placement of the mixture. Determine the SGC compaction temperature for the production QC which yields the same target air voids as the designed JMF. Include the SGC compaction temperature in the Producer QC Plan. Compact the completed mixture in the SGC for QC volumetric analysis at the SGC compaction temperature according to the guidelines provided by the Technical Representative.

Section 413.2(i)2. Certification Acceptance. Revise to read as follows:•

2. Certification Acceptance. Acceptance by certification is appropriate for the following mixtures, conditions, or applications:

Scratch courses, leveling courses less than 2-inch depth and driveway adjustments.•

Mixtures used by Department maintenance forces.•

Mixtures purchased by local or municipal governments.•

Mixtures placed in quantities not exceeding 500 tons in a continuous placement operation unless otherwise directed by the Representative.

Mixtures used for parking lots.•

All 4.75 mm NMAS asphalt mixtures.•

Other mixtures, conditions, or applications as approved by the Representative.•

2.a General. Obtain certification from the mixture Producer. Use all QC tests during mixture production as acceptance tests. Certify mixtures using Form CS-4171B. Include, or attach, the QC test results on the form. Provide the form to the Inspector-in-Charge within 1 working day after completing the QC tests. Certify mixtures as specified in Section 106.03(b)3 and the requirements below.

2.b Certification of Mixture. Certify each mixture daily if QC test results conform to the single sample and multiple sample JMF production tolerances of Table A. The acceptance values will be:

Asphalt Content.•

Percent Passing the 2.36 mm (No. 8) sieve (not applicable for 4.75 mm NMAS asphalt mixtures).•

Percent Passing the 75 µm (No. 200) sieve.•

If using printed ticket results in place of laboratory test results for asphalt content, certify that at least 90% of each day’s printed ticket results for asphalt content are within 0.2 percentage points of the JMF.

If the mixture does not conform to the above requirements, do not certify the mixture. Instead, provide all QC test results to the Inspector-in-Charge. If using printed ticket results for asphalt content, provide the percentage of daily printed ticket results within 0.2 percentage points of the JMF to the Inspector-in-Charge. Payment will be determined according to Table H based on the QC test results.

If a day’s production is interrupted by corrective action, material produced after the corrective action may be certified if QC test results conform to production tolerances.

2.c Maintaining Approval to Certify Mixtures. The Department may suspend a plant’s approval to certify mixtures if QC is not performed according to the Producer QC Plan, mixtures are not produced according to Bulletin 27, a mixture cannot be certified on 2

Page 20 of 109November 5, 2026 14:14:46 PM consecutive production days, or as described below.

The Department may take IA samples of the completed mixture at the plant. In the presence of the Department, test the IA samples for asphalt content and gradation according to the test methods indicated in the Producer QC Plan. Take immediate corrective actions if the mixture does not conform to Table A.

The Department may take QA samples of the completed mixture at the plant or on the roadway directly from the uncompacted mixture placed by the paving equipment specified in Section 413.3(e). The Department will test QA samples according to PTM No. 757 or PTM No. 702, Modified Method D, if previously identified problematic aggregates are used in the mixture, for conformance to Table A. If the results of the QA samples do not comply with Table A, review the Producer QC Plan and the QC test results that followed the QA samples for conformance to Table A. If QC results do not conform to Table A, perform the corrective actions necessary to provide a mixture conforming to Table A.

After completing corrective actions or the sample review, the Department will perform an on-site evaluation of the Producer’s plant operation and QC and then take a sample of the completed mixture at the plant. In the presence of the Representative, test the sample.

If the sample does not comply with Table A, the Department will suspend certification. Immediately suspend shipping mixtures accepted by certification to the project.

After testing verifies that the produced mixture conforms to Tables A and B and with the Representative present, conduct JMF verification according to the Producer QC Plan. After successfully completing JMF verification, resume both certification and shipping mixtures accepted by certification to the project.

Section 413.3(a)2. Preplacement Meeting. Revise to read as follows:•

2. Preplacement Meeting. At least 2 weeks before placing asphalt paving mixtures, schedule an asphalt preplacement meeting with the Representative to review at a minimum the specification, paving operation QC Plan, sequence of paving operations, asphalt mixture temperature checks, mixture acceptance, density acceptance and the care and custody of asphalt acceptance samples.

Section 413.3(d). Hauling Equipment. Revise to read as follows:•

(d) Hauling Equipment. Haul the mixtures in tightly sealed vehicles that do not contain petroleum oils, solvents, or other materials that adversely affect asphalt mixture. Provide covers of sufficient size and quality to protect the entire load under all conditions.

Maintain the proper and uniform placement temperature as specified in Section 413.3(h)1. Provide insulation on all sides of the truck body, a double-walled truck body, or a heated truck body when the air temperature is below 50F from October 1 to April 30. Provide a 3/8-inch diameter hole near the center and approximately two-thirds the distance down from the top of the vehicular box, on both sides, to allow for asphalt mixture temperature checks. If trucks cannot be provided with these holes, provide the Representative with two infrared temperature devices along with documentation that the devices were verified annually through an independent verification service or with a blackbody calibration block before paving for asphalt mixture temperature checks.

Section 413.3(f). Rollers. Revise to read as follows:•

(f) Rollers. Use steel wheel, pneumatic tire, vibratory, or oscillating rollers as specified in Sections 108.05(c)3.a, 3.b, 3.c, 3.e, 3.f, 3.h, or (c)4. Operate rollers according to manufacturer's recommendations. Use vibratory and oscillating rollers with separate controls for frequency and amplitude.

Section 413.3(h)1.a. Placing. Revise to read as follows:•

1.a Placing. Unless otherwise allowed or indicated, deliver, place, and compact asphalt paving mixtures during daylight hours.

Ensure the mixture does not contain lumps of cold material. Deliver and place mixtures at the laying temperatures specified in Table A for the type and class of material used. Do not incorporate any material delivered outside the temperature limits as specified in Table A. Material placed outside the temperature limits as specified in Table A is defective.

Utilize a Material Transfer Vehicle (MTV) as specified in Section 108.05(c)5 for RPS pavements unless otherwise approved by the Representative.

Section 413.3(h)1.e. Safety Edge. Revise to read as follows:•

1.e. Safety Edge. Construct the Safety Edge as the standard edge treatment on the outside edge of asphalt pavements and shoulders. Use the Safety Edge for both wearing and binder courses with a depth of 1.5 inches or greater. Do not place the Safety Edge at total depths greater than 5 inches. The Safety Edge is not required where curb or sidewalk are encountered or where the face of guiderail is directly over the edge of pavements. Do not place the Safety Edge for base, leveling, or scratch courses.

Page 21 of 109November 5, 2026 14:14:46 PM

Construct the Safety Edge with the same material used to construct the roadway course being placed or, if specified, the paved shoulders. Attach a device to the paver to confine material at the end gate and extrude the asphalt material in a wedge shape. Use an adjustable device that allows the operator to vary the slope extruded at the paver to account for the angle becoming steeper during compaction (roll up). Before construction, the Safety Edge device must be approved by the Representative(s).

Compact the roadway or paved shoulder as required by the specifications. Do not delay rolling of the mat adjacent to the Safety Edge. After compaction of the mat is complete, provide a Safety Edge meeting the final shape requirements as shown on the Standard Drawings. The completed angle of the Safety Edge must be 26 degrees to 40 degrees measured from the pavement cross slope extended. At the beginning of each day’s paving, measure the angle of the Safety Edge from the pavement cross slope extended. Perform measurements after final compaction is complete. If the angle of the Safety Edge does not meet the slope requirements, stop paving, and provide corrective action. Do not resume production paving until final shape requirements of Safety Edge are achieved.

Allow automatic transition to intersections, driveways, guiderail sections, and obstructions.

Use the device to constrain the asphalt head, reducing the area and increasing the density of the extruded profile. A single plate strike-off method is not allowed. Do not place the Safety Edge on organic material.

Section 413.3(h)2.a.1. Partially Completed Lots (n=2 or less). Revise to read as follows:•

2.a.1 Partially Completed Lots (n=2 or less). When process conditions change to an extent that a partially completed lot cannot be combined with the most recently completed lot, samples will be independently evaluated on the partially completed lot. For asphalt content and percent passing the 75 μm (No. 200) sieve, mixture acceptance samples will be evaluated individually as specified in Section 413.2(e), Table A (n=1) criteria. For density, mat density acceptance samples will be evaluated individually using the criteria in Table E.

If samples tested for asphalt content and percent passing the 75 μm (No. 200) sieve meet the n=1 criteria of Table A, and samples tested for density meet the criteria in Table E, payment will be 100% of the contract unit price. If samples tested for asphalt content and percent passing the 75 μm (No. 200) sieve do not meet the n=1 criteria of Table A, the material will be considered defective. If samples tested for density are no more than 2.0% below the minimum or no more than 2.0% above the maximum limits of Table E, payment will be 90% of the contract unit price. If samples for density are more than 2.0% below the minimum or more than 2.0% above the maximum limits of Table E, the pavement will be considered defective.

Unless otherwise directed in writing by the District Executive, remove and replace defective work.

No additional revisions were made to Section 413.3(h)2.a.1.•

Section 413.3(h)2.c.1. LTS Testing. Revise to read as follows:•

2.c.1 LTS Testing. The LTS will test the mixture acceptance samples according to PTM No. 757 or PTM No. 702, Modified Method D and PTM No. 739, if previously identified problematic aggregates are used in the mixture, to determine asphalt content and the percent passing the 75 μm (No. 200) sieve. The LTS will use the calibration factors (Cf and 200 Cf) provided with the JMF for PTM No. 757. For individual increment test results outside of the single sample (n=1) tolerances in Table A, the LTS will analyze the test results for extreme values according to PTM No. 4 at the 5% significance level. If discarding an extreme value reduces a lot to less than three remaining test results, the Department will accept the lot as specified in Section 413.3(h)2.a.1. The Department will accept lots with three or more test results as specified in Section 413.4(a)4 or Section 413.4(b).

If the asphalt content or the percent passing the 75 μm (No. 200) sieve is not within the single sample (n=1) or multiple sample (n≥3) tolerances in Table A for two consecutive lots or a total of three lots, stop all production of the JMF. Determine the cause of the problem and provide a proposed solution to the Department.

Do not resume production of the JMF until the Representative reviews the proposed solution and authorizes production to continue.

The LTS will test Gmm verification samples as specified in Section 413.3(j)4.d.

Section 413.3(j)4.a. General. Revise to read as follows:•

4.a General. Pavement cores are required for accepting the density of RPS construction. Pavement cores are required for standard construction of extended-season paving, unless waived by the Representative as specified in Section 413.3(b)1. Pavement cores are appropriate for accepting the density of standard construction if all the following materials, conditions, or applications exist:

Materials placed at indicated compacted depths greater than or equal to the minimum depths specified in Table G.•

Page 22 of 109November 5, 2026 14:14:46 PM

Materials placed on stable and uniform bases.•

TABLE G

Mixture Minimum Indicated Compacted Depths

Mixture Minimum Depth

9.5 mm Wearing Course 1 1/2 in.

12.5 mm Wearing Course 2 in.

19 mm Binder Course 2 1/2 in.

25 mm Binder Course 3 in.

Section 413.3(m). Tests for Depth: Binder and Wearing Courses. Revise to read as follows:•

(m) Tests for Depth: Binder and Wearing Courses. Construct the pavement to the depth indicated and within the specified tolerances.

For courses with a designed course depth and density acceptance by non-movement or optimum rolling pattern, the Inspector will calculate the weight per square yard for verification of yield. If yield results indicate insufficient course depth, drill one 6-inch diameter core for each 500 tons of material placed to determine the extent of the deficient depth as defined below. Core locations will be determined according to PTM No. 1.

For courses with density acceptance by lots, the inspector will measure the depth of each sublot according to PTM No. 737 using the density acceptance samples. After the Inspector completes depth measurements, backfill, compact, and seal core holes with the mixture used to construct the course.

This is the start of the file's text. The full file is on GovTribe.