This Invitation for Bids (IFB) document issued by Augusta County, Virginia seeks sealed bids for the Natural Chimneys Park D Loop Electrical Upgrade project located at 94 Natural Chimneys Lane, Mt. Solon, Virginia. The scope of work includes providing and installing a new 800-ampere panelboard with associated breakers to replace the existing service panelboard for D Loop, new conductors from the existing CT cabinet to the new panelboard, four new direct-buried aluminum feeders sized appropriately, and 26 new RV pedestals (24 units rated 30/20 amperes and 2 units rated 50/30/20 amperes) with post extension kits. The IFB was advertised on November 6, 2026, with a mandatory pre-bid conference scheduled for November 18, 2026, at 10:00 a.m. at the project site. Sealed bids are due on December 2, 2026, at 2:00 p.m., with Notice of Intent to Award expected December 7, 2026, Notice to Proceed and contract signing on December 18, 2026, and project completion required by April 1, 2027. All work must be performed in accordance with manufacturer installation instructions and applicable codes and standards.
Bids shall be submitted as a lump sum on the County-provided bid form and must include all overhead, profit, labor, materials, equipment, and incidental work necessary to complete the project. A bid guarantee equal to five percent of the total bid amount, in the form of a Bid Bond or Certified Check, is required with all construction bids. The apparent low bidder must be determined to be responsible and responsive before contract award. The contractor must obtain a Standard Performance Bond and Standard Labor and Material Payment Bond, each in an amount equal to 100 percent of the accepted bid, from surety companies licensed in Virginia. Virginia contractor licensing requirements apply: a Class A license is required if the contract value is $120,000 or more or if total construction work within any 12-month period exceeds $750,000; a Class B license is required for contracts between $7,500 and $120,000. The contract price will be paid upon final inspection and acceptance, with the entire balance due within 30 days of the final certificate. No set-asides are identified in this solicitation. Bids will be evaluated based on the lowest responsive and responsible bid price within a reasonable completion timeframe, with the County reserving the right to reject all bids or negotiate with the apparent low bidder if funding limitations exist.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Augusta County, Virginia
Notice of Invitation for Bids
Issue Date: November 6th, 2026 IFB# 114301-27-01
Title: Natural Chimneys Park D Loop Electrical Upgrade
Work Site: Natural Chimneys Park/Campground, 94 Natural Chimneys Lane, Mt. Solon, VA
Sealed Bids Will Be Received: December 2nd, 2026 at 2 p.m.
Location to Submit Bids: Lacy Stajduhar, VCA, Purchasing Assistant Finance Department 18 Government Center Ln PO Box 590 Verona, VA 24482
Additional copies of this Notice may be obtained along with the complete Invitation for Bids at www.co.augusta.va.us or by contacting the Bid Officer:
Lacy Stajduhar, VCA, Purchasing Assistant Central Accounting Phone: (540) 245-5741 Email: lstajduhar@co.augusta.va.us
In compliance with this Invitation for Bids (IFB) and all conditions imposed in this IFB, the undersigned firm hereby offers and agrees to furnish all goods and services required by this IFB at the prices indicated in the pricing schedule, and the undersigned firm hereby certifies that all information provided below and in any schedule attached hereto is true, correct, and complete.
Name and Address Of Firm:
_____________________________________________ Date: ________________________________________ _____________________________________________ By: ________________________________________ _____________________________________________ ( Signature In Ink) __________________________Zip Code:___________ Name: ________________________________________ eVA Vendor ID or DUNS #:______________________ (Please Print) Fax Number: (___) ____________________________ Title: _________________________________________ E-mail Address: _______________________________ Telephone Number: (___)_________________________
Note: This public body does not discriminate against faith-based organizations in accordance with the Code of Virginia, § 2.2-
4343.1 or against a bidder or offeror because of race, religion, color, sex, national origin, age, disability, sexual orientation, gender identity, political affiliation, or veteran status or any other basis prohibited by state law relating to discrimination in employment. Faith-based organizations may request that the issuing agency not include subparagraph 1.e in General Terms and Condition C. Such a request shall be in writing and explain why an exception should be made in that Invitation for Bids or request for proposal.
http://www.co.augusta.va.us/ mailto:lstajduhar@co.augusta.va.us
Proposed Schedule of Events
IFB # 114301-27-01
Schedule of Events:
1. Advertise: November 6th, 2026
2. Mandatory Pre-Bid Conference November 18th, 2026 – 10 a.m.
Location: Natural Chimneys Park 94 Natural Chimneys Lane, Mount Solon, VA
3. Bid Due Date: December 2nd, 2026 – 2 p.m.
4. Review Initial Lowest Bid: December 3rd, 2026
5. Notice of Intent to Award December 7th, 2026
6. Notice to Proceed - Contract Signing: December 18th, 2026
7. Completion Date: April 1st, 2027
DATES AND TIMES ARE TENTATIVE AND SUBJECT TO CHANGE
Instruction to Bidders
As found herein, the Invitation for Bids (IFB) consists of the Notice of Invitation for Bids, this Instruction To Bidders, the Bid Form, the Pre-Bid Question Form, the proposed Construction Contract with General Conditions, the Special Conditions (if any), the Scope of Work as described by the Plans and Specifications, other documents listed in the Specifications including any applicable forms to be used, and any addenda which may be issued, specifically including any report from a Pre-Bid Conference, all of which documents request qualified Bidders to submit competitive prices or bids for providing the described work on the project.
1. CONDITIONS AT SITE OR STRUCTURE: Bidders shall visit the site and shall be responsible for ascertaining pertinent local conditions such as location, accessibility, general character of the site or building, and the character and extent of existing work within or adjacent to the site. Claims, as a result of failure to have done so, will not be considered by the County.
2. EXPLANATIONS TO BIDDERS: No oral explanation regarding the meaning of drawings and specifications will be made and no oral instructions will be given before the award of the contract.
Discrepancies, omissions, or doubts as to the meaning of any IFB document, drawings, or specifications shall be communicated in writing to the designated Bid Officer for interpretation. Bidders should use the "Pre-bid Question Form" provided in the bid documents. Bidders must so act to assure that questions reach the Bid Officer at least ten (10) business days prior to the time set for the receipt of bids to allow a sufficient time for an addendum to reach them before the submission of their bids. If, however, there are two (2) weeks or less between the first bid advertisement and the time set for receipt of bids, then Bidders must submit questions so that they reach the Bid Officer no later than three
(3) business days prior to the time set for receipt of bids. Any interpretation made will be in the form of an addendum to the IFB which will be forwarded to all Bidders, and its receipt shall be acknowledged by the Bidder on the Bid Form.
3. TIME FOR COMPLETION:
(a) The Contract Completion Date will be designated by the County in the Notice to Proceed in one of the following manners:
(1) If the County specified a mandatory Contract Completion Date in the Invitation for Bids, the date designated in the Notice to Proceed will be no later than that date, or
(2) If a mandatory Contract Completion Date was absent from the Invitation for Bids, the Contract Completion Date designated in the Notice to Proceed will be determined through the bidding process taking into account the Contractor’s proposed Time for Completion.
(b) Unless otherwise specified, the Contractor shall achieve Final Completion within thirty (30) days after the date of Substantial Completion.
(c) The Contractor, in preparing and submitting its bid, is required to take into consideration normal weather conditions. Normal weather does not mean statistically average weather, but rather means a range of weather conditions which might be anticipated (i.e., conditions which are not extremely unusual). Normal weather conditions shall be determined from the public historical records available for the Augusta County area, including the U.S. Department of Commerce, Local Climatological Data Sheets, Oceanic and Atmospheric Administration/Environmental Data and Information Service, National Climatic Center, and the National Weather Service. No additional compensation will be paid to the Contractor because of adverse weather conditions;
however, an extension of time for abnormal weather will be considered by the County as indicated in the General Conditions.
4. PREPARATION AND SUBMISSION OF BIDS:
(a) Bids shall be submitted on the forms furnished, or copies thereof, and shall be signed in ink.
Erasures or other changes in a bid must be explained or noted over the signature of the Bidder.
Bids containing any conditions, omissions, unexplained erasures, alterations or items not called for in the proposal, or irregularities of any kind may be rejected by the County as being incomplete or non-responsive.
(b) Each bid must give the complete legal name and full business address of the Bidder and be signed by the Bidder, or the Bidder's authorized representative, with his/her usual signature.
Bids by partnerships must be signed in the partnership name by one of the general partners of the partnership or an authorized representative, followed by the designation/title of the person signing, and a list of the partners. Bids by corporations must be signed with the legal name of the corporation followed by the name of the state in which it is incorporated and by the signature and title of the person authorized to bind it in this matter. The name of each person signing shall be typed or printed below the signature. A signature on a bid by a person who identifies his/her title as "President," "Secretary," "Agent," or other designation without disclosing the principal firm shall be held to be the bid of the individual signing. When requested by the County, satisfactory evidence of the authority of the officer signing on behalf of the corporation shall be furnished. Trade or fictitious names may be referenced by using "t/a _____," but bids shall be in the legal name of the person or entity submitting the bid.
(c) Bids with the bid guarantee shall be enclosed in a sealed envelope which shall be marked and addressed as indicated by the advertisement. If a contract is for one hundred twenty thousand dollars ($120,000) or more, or if the total value of all construction, removal, repair, or improvements undertaken by the Bidder within any twelve-month period is seven hundred fifty thousand dollars ($750,000) or more, the Bidder is required under Title 54.1, Chapter 11, Code of Virginia (1950), as amended, to be licensed in Virginia as a "Class A Contractor." If a contract is for seven thousand five hundred dollars ($7,500) or more, but less than one hundred twenty thousand dollars ($120,000), the Bidder is required to be licensed in Virginia as a "Class B Contractor." Unless otherwise specified in the Notice of Invitation for Bids, a Class B contractor may bid on project. The Bidder shall place on the outside of the envelope containing the bid and shall place in the bid over its authorized representative's signature whichever of the following notations is appropriate and insert its Contractor license/registration number:
Licensed Class ___ (A or B) Virginia Contractor No. ______________
If the Bidder fails to provide this information on its bid or on the envelope containing the bid and fails to promptly provide said Contractor license number to the County in writing when requested to do so before or after the opening of bids, the Bidder shall be deemed to be in violation of § 54.1-1112 of the Code of Virginia (1950), as amended, and its bid will not be considered.
(d) The Board for Contractors has interpreted the definition of "contractor" in Va. Code § 54.1-1100 to mean that "[a] licensed contractor may bid on work, or enter into a contract for work, which is outside the scope of the contractor's license classification or specialty services provided that the contractor subcontracts that work to properly licensed contractors and the work of the subcontractors is incidental to the contract." Therefore, the County may, as a part of determining whether the Bidder is "responsible," require the apparent low Bidder to submit a listing of its subcontractors along with the license number and classification or specialty of each.
(e) The Bidder must also place its Employer Identification Number (SSN or EIN) in the space provided at the bottom of the Bid Form.
5. BID GUARANTEE:
(a) All construction bids (including the Total Base Bid plus all Additive Bid items) shall be accompanied by a Bid Bond or Certified Check payable to the County as obligee in an amount equal to five percent (5%) of the amount of the bid. A Bid Bond must be issued by a surety company which is legally authorized by the Virginia State Corporation Commission to engage in fidelity and surety business in the Commonwealth of Virginia. Such Bid Bond shall guarantee that the Bidder will not withdraw its bid during the period of thirty (30) days following the opening of bids; that if its bid is accepted, it will enter into a formal contract with the County in accordance with the Contract included as a part of the IFB Documents; that it will submit a properly executed and authorized Standard Performance Bond and Standard Labor and Material Payment Bond acceptable in form and content to the County; and that in the event of the withdrawal of said bid within said period, or failure to enter into said contract and give said bonds within ten (10) days after it has received notice of acceptance of its bid, the Bidder shall be liable to the County for the difference between the amount specified in said bid and such larger amount of which the County may contract with another party to perform the work covered by said bid, up to the amount of the bid guarantee. This amount represents the damage to the County on account of the default of the Bidder in any particular hereof. See Va.
Code § 2.2-4336.
(b) See Va. Code § 2.2-4338 for provisions allowing alternative forms of bid security in lieu of a Bid
Bond.
(c) The Bid Bonds or other bid security will be returned to all except the three lowest Bidders after the formal opening of bids. The remaining Bid Bonds or bid security will be returned to the Bidders after the County and the accepted Bidder have executed the Contract and the Performance Bond and the Payment Bond have been approved by the County.
(d) If the required Contract and bonds have not been executed within thirty (30) days after the date of the opening of the bids, then the bond or other bid security of any Bidder will be returned upon its request, provided it has not been notified of the acceptance of its bid prior to the date of such request.
6. MODIFICATION OF BIDS: A Bidder may withdraw or modify its bid provided that the designated officer or agency of the County has received written notice prior to the deadline fixed for bid receipt.
The withdrawal or modification must be signed again by the authorized representative of the contractor making the modification or withdrawal. Written modification may be made by a revised sealed bid form, by a writing on the envelope, or by a separate document. The modification should state specifically what is to be modified and by what amount or state the item to be modified and what the correct amount should be. Unless otherwise specified by the Bidder, the modification will be applied to the TOTAL BASE BID amount shown on the Bid Form. In order to maintain the integrity of the sealed bidding process, modifications should be phrased as increases or decreases in the total bid (i.e. minus $5000); they should not state a new total base bid. The County will not accept bid withdrawals or modifications by telegram, facsimile, or email.
7. RECEIPT OF BIDS:
(a) Bids will be received at or before the date and the hour and at the place stipulated in the Invitation for Bids as may be modified by subsequent Addenda.
(b) It is the responsibility of the Bidder to assure that its bid and any bid modifications are delivered to the place designated for receipt of bids by the date and hour (deadline) set for receipt of bids.
Therefore, it is the Bidder's responsibility to take into account all factors which may impact on its bid deliverer/courier's ability to deliver the bid and to implement whatever actions are necessary to have the bid delivered to the proper bid receipt location prior to the bid receipt deadline. No bids or bid modifications submitted or offered after the date and hour designated for receipt of bids will be accepted or considered. Again, the County will not accept any bid, bid withdrawal, or bid modification by telegram, facsimile, or email.
(c) The Bid Officer is the County's representative designated to receive bids at the time and place noted in the IFB and to open the bids received at the appointed time.
(d) The official time used for the receipt of responses is determined by reference to the clock designated by the Bid Officer. The Bid Officer shall determine when the Bid Receipt Deadline has arrived and shall announce that the Deadline has arrived and that no further bids or bid modifications will be accepted. All bids and bid modifications in the possession of the Bid Officer and his/her assistants at the time the announcement is completed are deemed to be timely, whether or not the bid envelope has been physically date/time stamped or otherwise marked by the time the Bid Officer makes the deadline announcement.
8. OPENING OF BIDS:
(a) Bids will be opened at the time and place stated in the Invitation for Bids or as modified by subsequent Addenda, and their contents publicly announced. The Bid Officer shall decide when the specified time for bid opening has arrived. No responsibility will be attached to any officer or agent for the premature opening of a bid not properly addressed and identified.
(b) The provisions of § 2.2-4342 of the Code of Virginia (1950), as amended, shall be applicable to the inspections of bids received.
9. ERRORS IN BIDS: A Bidder may withdraw his bid from consideration if the price bid was substantially lower than the other bids due solely to a mistake therein, provided the bid was submitted in good faith, and the mistake was a clerical mistake as opposed to a mistake of judgment, and was actually due to an unintentional arithmetic error or an unintentional omission of a quantity of work, labor, or material made directly in the compilation of a bid, which unintentional arithmetic error or unintentional omission can be clearly shown by objective evidence drawn from inspection or original work papers, documents, and materials used in the preparation of the bid sought to be withdrawn.
County policy requires that Bidders for public construction contracts be given an opportunity to withdraw their bids due to error. The withdrawal procedure outlined below will be utilized:
Withdrawal procedure: The Bidder shall give notice in writing of his claim to withdraw his bid due to error within two (2) business days after the conclusion of the bid opening procedure and shall submit original work papers, documents, and materials used in the preparation of the bid with such notice. The contract shall not be awarded until the two (2) working day period has lapsed.
The delivery of a Bidder’s original work papers, documents, and other materials used in preparation of the bid must be submitted either in person or by registered mail. The County will treat the materials as trade secrets or proprietary information subject to the conditions of subsection F of Va.
Code § 2.2-4342.
No bid shall be withdrawn under this section when the result would be the awarding of the contract to another bid of the same Bidder or of another Bidder in which the ownership of the withdrawing Bidder is more than five (5) percent of the awarded Bidder.
No Bidder who is permitted to withdraw a bid shall, for compensation, supply any material or labor to or perform any subcontract or other work agreement for the person or firm to whom the contract is awarded or otherwise benefit, directly or indirectly, from the performance of the project for which the withdrawn bid was submitted.
If a bid is successfully withdrawn, the lowest remaining bid shall be deemed to be the lowest bid. However, the County may deny the withdrawal of a bid pursuant to Va. Code § 2.2-4330. The County must notify the Bidder in writing of its decision not to allow their withdrawal, stating its reasons, and award the contract to such Bidder at the bid price, provided that such Bidder is responsible and responsive.
10. REJECTION OF BIDS: The County reserves the right to cancel the Invitation for Bids and to reject all bids at its sole discretion when such rejection is in the interest of the County, or to reject the bid of any Bidder who is determined to be not responsive or responsible. A statement justifying the decision to reject all bids will be placed in the procurement file.
11. DETERMINATION OF RESPONSIBILITY: Each Bidder shall be prepared, if so requested by the County, to present evidence of its experience, qualifications, and financial ability to carry out the terms of the Contract.
Prior to award of the Contract, an evaluation will be made to determine if the low Bidder has the capability, in all respects, to perform fully the contract requirements and the moral and business integrity and reliability which will assure good faith performance, and who has been pre-qualified, if required. Factors to be evaluated include, but are not limited to:
(a) sufficient financial ability to perform the contract as evidenced by the Bidder's ability to obtain payment and performance bonds from an acceptable surety;
(b) appropriate experience to perform the Work described in the bid documents;
(c) any judgments entered against the Bidder, or any officers, directors, partners, or owners of the Bidder for breach of a contract for any type of construction;
(d) any substantial noncompliance with the terms and conditions of prior contracts with a public body without good cause where the substantial noncompliance is documented;
(e) a conviction of the Bidder or any officer, director, partner, project manager, procurement manager, chief financial officer, or owner in the last five years of a crime relating to governmental or non-governmental construction or contracting; or
(f) any current debarment of the contractor, any officer, director or owner, from bidding or contracting by any public body of any state, any state agency, or any agency of the federal government.
The County reserves the right to disqualify or refuse to accept the bid of any Bidder who has been convicted, or entered a plea of guilty or nolo contendere, in any federal or state court to any charge involving any unlawful, corrupt, or collusive practice involving a public contract whether federal, state, or local, or who has been determined in any judicial proceeding to have violated any antitrust, bid-rigging, or collusive practice statute in connection with any public contract, or against whom such formal criminal prosecution or other judicial proceeding has been instituted.
A Bidder who, despite being the apparent low Bidder, is determined not to be a responsible Bidder shall be notified in writing in conformity with the procedures in § 2.2-4359 of the Code of Virginia (1950), as amended.
12. AWARD OF CONTRACT:
(a) Basis for Contract Award: The Contract, if awarded, will be awarded to the lowest responsive and responsible Bidder, if any, provided its bid is reasonable and it is in the best interest of the County to accept it, and subject to the County's right to reject any and all bids and to waive informality in the bids and in the bidding. The Bid Form may contain a multi-part Base Bid and may contain Additive Bid Items. Determination of the lowest responsible Bidder, if any, will be based on the Total Base Bid Amount entered on the Bid Form including any properly submitted bid modifications plus as many Additive Bid Items taken in sequence as the County in its discretion chooses to award. Where the sum of the values entered in the multiple parts do not agree with the Total Base Bid amount, the Total Base Bid amount entered on the bid form, including any properly submitted bid modifications, shall take precedence. Also, where there is a discrepancy between the total base bid in its written format and the total base bid in its numeric format, the written format shall prevail.
(b) Lowest Bidder: The lowest Bidder is normally the bid that guarantees the performance of the contract requirements for the least dollar amount within a reasonable amount of time.
However, the County may take into account variations in the bids’ times for completion by considering the possibility of either a positive or negative fiscal impact. In its discretion, the County may perform a cost-savings analysis taking into account potential profits from use, savings on other expenses, and any other financial benefits that may derive from an earlier completion date. If after such analysis a bid with a greater Total Base Bid and earlier completion date is determined to actually be the lowest Bidder, that Bidder will be awarded the contract.
(c) Informalities: Pursuant to Va. Code § 2.2-4319, the County reserves the right to waive any informality in the bids when such waiver is in the County's interest.
(d) Negotiation With Lowest Responsible Bidder: If award of a contract to the lowest responsive and responsible Bidder is precluded because of limitations on available funds, under the provisions of Va. Code § 2.2-4318 (the Public Procurement Act), the County reserves the right to negotiate the Total Base Bid amount with the lowest responsive, responsible Bidder to obtain a contract price within the available funds. Such negotiations may involve changes in either the features or scope of the work included in the Base Bid. Such negotiations with the apparent low Bidder may include reducing the quantity, quality, or other cost saving mechanisms involving items in the Total Base Bid. Negotiations for Additive Bid Items are excluded. The County shall notify the lowest responsive and responsible Bidder that such a situation exists and the County and Bidder shall then conduct their negotiations in person, by mail, by telephone, or by any means they find convenient. If an acceptable contract can be negotiated, the changes to the Invitation for Bids documents agreed upon in the negotiations shall be summarized in a "Post Bid Modification" and included in the contract. If an acceptable contract cannot be negotiated, the County shall terminate negotiations and reject all bids.
(e) Notice of Award: The Notice of Award, the Notice of Intent to Award, or the Notice of Decision to Award will be posted at the County's standard location for posting notices. In addition, the County may also post such notice on the County's website.
13. ETHICS IN PUBLIC CONTRACTING: The provisions, requirements, and prohibitions as contained in § 2.2-4367 et seq., Code of Virginia (1950), as amended, pertaining to bidders, offerors, contractors, and subcontractors are applicable to this project.
14. PRE-BID CONFERENCE: A pre-bid conference has been scheduled as indicated in the Invitation for Bids. The pre-bid conference is mandatory. Should any potential Bidders have questions, they may submit them to Lacy Stajduhar using the Pre-Bid Question Form found on page 13 Forms may be submitted by emailing lstajduhar@co.augusta.va.us. In the event specific information not contained in this Invitation for Bids is provided to any Bidder, the same specific information will be provided to any other Bidders who have indicated interest in the contract with the County.
mailto:lstajduhar@co.augusta.va.us
Bid Form
Project Title: Natural Chimneys Park D Loop Electrical Upgrade
IFB # 114301-27-01
Qualification of Bidders:
Under Virginia law, all Bidders must prove their eligibility to perform and / or satisfy the requirements of this contract before bidding. To this end, all Bidders must be properly licensed or certified and have not been debarred.
License or Certificate Number: ____________________________
Note: This should also appear on the outside of your sealed bid.
Bidders must also have the capability in all respects to fully satisfy all of the contractual requirements.
Years in Business:
Indicate the length of time your firm has been in business providing this type of construction:
_______________years ______________months.
References:
Indicate below a listing of at least three (3) recent references for whom you have provided construction of similar scope and time frame. Include the date service was furnished and the name and address of the person bid officer has your permission to contact.
Date Client Telephone Number / Email / Contact
Bidder’s Proposal:
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the County in the form included in the Invitation for Bids to perform all work as specified or indicated for the prices and within the timed indicated in this Bid and in accordance with the terms and conditions of the Invitation for Bids.
Bidder accepts all of the terms and conditions of the Invitation for Bids including the Instructions to Bidders. Specifically, the Bidder accepts without limitation those terms and conditions dealing with the disposition of Bid Security. The Bid will remain subject to acceptance for 180 (one hundred eighty) days after the Bid opening, or for such longer period of time that the Bidder may agree to in writing upon request of the County.
Bidder’s representations:
In submitting this Bid, Bidder represents, as set forth in the Invitation for Bids, that:
A. Bidder has examined and carefully studied all documents contained in the Invitation for Bids and the following addenda, receipt of which is hereby acknowledged.
B. Bidder has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, and performance of the work.
C. Bidder is familiar with and is satisfied as to all federal, state, and local laws and regulations that may affect cost, progress, and performance of the work.
D. Bidder has carefully studied all applicable explorations and tests including, but not limited to, subsurface and/or hazardous environmental conditions.
E. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the work at the price bid.
F. Bidder is aware of the general nature of work to be performed by the County and others at the site (if any) that relates to the work.
G. Bidder has given the County written notice of all conflicts, errors, ambiguities, or discrepancies that the Bidder has discovered in the Invitation for Bids and subsequent addenda, and the written resolution thereof by the County is acceptable.
H. The Invitation for Bids and subsequent addenda are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the work for which this Bid is submitted.
Bidder further represents that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over the County.
Bidder will complete the Work in accordance with the Contract Documents for the following project, in accordance with the attached price schedule.
Bids shall be LUMP SUM and shall include ALL WORK necessary to complete the project to the full intent of the plans. In the event of additions or deductions to the work required by the Contract Documents, the successful Bidder will be paid extra or shall credit the County, as the case may be, on the basis of the unit prices quoted herein. Prices shall include all overhead, profit, labor, materials, equipment, and incidental work and shall be the sum total compensation payable or creditable for such items of work in place. These unit prices shall be good for the duration of the contract.
Bids will be considered irregular and may be rejected if the unit prices contained in the bid are obviously unbalanced so that they are substantially in excess of the cost analysis values as determined by the Augusta County Engineer’s Office. Augusta County reserves the right to reject an individual unit price included herein.
Natural Chimneys Park D Loop Electrical Upgrade:
TOTAL BASE BID (Does not include excavation work)
(MUST BE IN NUMERIC AND WRITTEN FORMAT) $ ______________________ (NUMERIC)
__________________________________________________________________Dollars (WRITTEN) This blank is your definite bid. Failure to correctly complete this blank will not be considered an informality under any circumstances. The written entry will take precedence over the numeric entry.
Cost to include excavation work, bedding with clean sand, six (6) inches below and six (6) inches above the utility lines, backfilling, compacting, seeding and strawing the disturbed areas:
$_________________________ (Numeric)
____________________________________________________________________Dollars (written)
EARLIEST POSSIBLE START DATE:
Firm Name and Address:
_____________________________________________ Telephone ( ) ________________
_____________________________________________ Fax ( ) _____________________
Signature: ____________________________________ Date: _________________________
Type/Print: ___________________________________
Title: ________________________________________ EIN#: ________________________
Email: _______________________________________
Pre-Bid Question Form
IFB: # 114301-27-01
The undersigned potential Bidder would like to request a written clarification, interpretation, or explanation to the following question or question(s):
Please note that all questions should be directed to the Bid Officer designated on the Notice of Invitation for Bids and should be received at least six (6) business days prior to the time set for the receipt of bids to allow for sufficient time for an addendum to reach all Bidders. If there are two (2) weeks or less between the issuance of the Invitation for Bids and the time set for receipt of bids, then Bidders may continue to submit questions up until three (3) business days prior to the time set for receipt of bids.
The County will endeavor to respond to all inquiries in the timeliest manner possible. However, if in its discretion it determines the inquiry to be inappropriate for any reason, it may refuse to respond. Multiple inquiries of substantially the same question may be answered in one addendum.
Firm Name and Address:
____________________________________ Telephone (____) ______________
____________________________________ Fax (____) ___________________
____________________________________ Email _______________________
Signature: ____________________________ Date: ________________________
Title: ________________________________
AUGUSTA COUNTY, VIRGINIA
CONSTRUCTION CONTRACT
WITH GENERAL CONDITIONS
IFB #114301-27-01
THIS AGREEMENT is made and entered into this ______ day of ___________________, 2026, by and between THE COUNTY OF AUGUSTA, VIRGINIA, a political subdivision of the
Commonwealth of Virginia, hereinafter referred to as "the County" or "the Owner," and
______________________________________________, hereinafter referred to as "the
Contractor."
W I T N E S S E T H:
For and in consideration of the mutual covenants contained herein, the parties agree as follows:
1. Contract Documents. The Contract between the County and the Contractor shall consist of this document signed by the County and the Contractor and the following documents which are expressly incorporated herein by reference:
A. The Invitation for Bids and the Bid submitted.
B. Terms and General Conditions.
C. Special Conditions & Special Provisions.
D. All modifications, including addenda and subsequent change orders.
E. Any other documents expressly incorporated herein, or in any other construction document.
2. Contractor's obligations. The Contractor shall (A) furnish all of the materials and perform all of the work in the construction of the Natural Chimneys D Loop Electrical Upgrade, hereinafter called the "Work," as more specifically defined in the attached General Conditions, in accordance with the attached Plans and Specifications on the land owned by the County designated as 94 Natural Chimneys Lane., Mt. Solon VA, 22843, in Augusta County, Virginia; and
(B) perform and observe all its other obligations under the Contract Documents.
3. County's obligations. The County shall (A) pay the Contractor the Contract Price (as defined below) for the Contractor's performance in accordance with and subject to the
Contract Documents; (B) obtain any needed construction financing; and (C) perform and observe all its other obligations under the Contract Documents.
4. Contract price. The Contract Price shall be the total base bid plus or minus any modifications, including addenda and subsequent change orders. The total base bid is
WITNESS the following signatures and seals:
COUNTY OF AUGUSTA, VIRGINIA
By: ____________________________________
(SEAL) ATTEST: _________________________
Contractor
By: _____________________________________
(SEAL)
ATTEST: _________________________
AUGUSTA COUNTY, VIRGINIA
CONSTRUCTION CONTRACT
TERMS AND GENERAL CONDITIONS
1. DEFINITIONS
Whenever used in these Terms and General Conditions of the Construction Contract ("General Conditions") or in any other of the Contract Documents, the following terms have the meanings indicated, which are applicable to both the singular and plural and the male and female gender thereof:
A/E: A professional firm or consultant providing combined architectural and engineering design services for construction and building projects.
Beneficial Occupancy: The condition after Substantial Completion but prior to Final Completion of the Project at which time the Project, or portion thereof, is sufficiently complete and systems operational such that the County could, after obtaining necessary approvals and certificates, occupy and utilize the space for its intended use. Guarantees and warranties applicable to that portion of the Work begin on the date the County accepts the Project, or a portion thereof, for such Beneficial Occupancy, unless otherwise specified in the Supplemental Conditions or by separate agreement.
Change Order: A document issued on or after the effective date of the Contract between the County and the Contractor which is agreed to by the Contractor and approved by the County, and which authorizes an addition, deletion, or revision in the Work, including any adjustment in the Contract Price and/or the Contract Completion Date. A Change Order, once signed by all parties, is incorporated into and becomes a part of the Contract.
Construction: The term used to include new construction, reconstruction, renovation, restoration, major repair, demolition, and all similar work upon buildings and ancillary facilities, including any draining, dredging, excavation, grading, or similar work upon real property.
Contract: The "Contract Documents" as set forth in the document entitled "Construction Contract with General Conditions" signed by the County and the Contractor. As stated in the Construction Contract with General Conditions, the Contract Documents encompass (i) the Invitation for Bids and the Bid submitted, (ii) the instant Terms and General Conditions, (iii) any Special Conditions & Special Provisions, (iv) all modifications, including addenda and subsequent change orders, and (v) any other documents expressly incorporated by reference in the instant Terms and General Conditions or any other of the Contract Documents.
Contract Completion Date: The calendar date by which the Work must be substantially complete. The Contract Completion Date is customarily established in the Notice To Proceed based on the Time for Completion. In some instances, however, the Contract contains a mandatory Contract Completion Date, which shall be stated in the Invitation for Bids. The Contract Completion Date may only be modified by a duly approved Change Order.
Contract Price: The total compensation payable to the Contractor for performing the Work as set forth in the Construction Contract with General Conditions, subject to modification by Change Order.
Contractor: The person with whom the County has entered into a contractual agreement to do the Work.
County: Augusta County, or the agency or department thereof which is a party to the Contract. For purposes of the Contract, the term County shall include the County whether or not the County owns the site or the building.
County’s or Owner's Representative: The Owner's Representative as used herein shall be the County's designated representative on the Project. The Owner's Representative shall be the person through whom the County generally conveys written decisions and notices. In the event of the incapacity or other unavailability of the designated Owner's Representative, the County Administrator shall be the Owner's Representative until a substitute is named.
Day(s): Calendar day(s) unless otherwise noted.
Defective: An adjective which, when modifying the word Work, refers to Work that is unsatisfactory, faulty, deficient, does not conform to the Contract Documents, or does not meet the requirements of inspections, standards, tests, or approvals required by the Contract Documents, or Work that has been damaged prior to final payment (unless responsibility for the protection thereof has been expressly assumed by the County at Substantial Completion or Beneficial Occupancy).
Drawing: A page or sheet of the Plans which presents a graphic representation, usually drawn to scale, showing the technical information, design, location, and dimensions of various elements of the Work.
The graphic representations include, but are not limited to, plan views, elevations, transverse and longitudinal sections, large and small scale sections and details, isometrics, diagrams, schedules, tables, and/or pictures.
Emergency: Any unforeseen situation, combination of circumstances, or a resulting state that would result in one or more of the following: (a) danger to life or property, (b) interruption or termination of essential services, (c) substantial financial loss to the procuring agency, or (d) inability to meet a mandatory deadline.
Field Order: A written order issued by the County’s Representative which clarifies or explains the plans or specifications, or any portion or detail thereof, without changing the design, the Contract Price, the Time for Completion, or the Contract Completion Date.
Final Completion Date: The date of the County's acceptance of the Work from the Contractor upon confirmation from the County’s Representative and the Contractor that the Work is totally complete.
Notice: All written notices, including demands, instructions, claims, approvals, and disapprovals required or authorized under the Contract Documents. Any written notice by either party to the Contract shall be sufficiently given by any one or combination of the following, whichever shall first occur: (1) delivered by hand to the last known business address of the person to whom the notice is due; (2) delivered by hand to the person's authorized agent, representative, or officer wherever they may be found; or (3) enclosed in a postage prepaid envelope addressed to such last known business address and delivered to a United States Postal Service official or mailbox. Notice is effective upon such delivery. All notices to the County should be directed to the County's Representative.
If the County and the Contractor agree in writing that Notices transmitted by Facsimile (Fax) or Email are acceptable for the Project, such Notice shall be transmitted to the Fax number or Email address listed in the agreement and, in the case of Fax, shall have a designated space for the Fax Notice recipient to acknowledge his receipt by authorized signature and date. The Fax Notice with authorized signature acknowledging receipt shall be Faxed back to the sender. The Faxed Notice shall be effective on the date it is acknowledged by authorized signature. Emailed notices shall be acknowledged by Reply Email upon receipt. All Faxed and Emailed Notices shall also be sent by hard copy, which shall be effective upon delivery, as provided herein. Notice shall be effective upon the date of acknowledgment of the Faxed or the Emailed Notice or the date of delivery, whichever occurs first.
Notice to Proceed: A written notice given by the County to the Contractor fixing the date on which the Contract time will commence for the Contractor to begin the performance of the Work in accordance with the requirements of the Contract Documents. The Notice to Proceed will customarily identify a Contract Completion Date.
Owner: Augusta County, Virginia.
Person: This term includes any individual, corporation, partnership, association, company, business, trust, joint venture, or other legal entity.
Plans: The term used to describe the group or set of project-specific drawings which are included in the Contract Documents.
Project: The term used instead of the specific or proper assigned title of the entire undertaking which includes, but is not limited to, the "Work" described by the Contract Documents.
Project Inspector: One or more persons utilized by the County to inspect the Work for the County and/or to document and maintain records of activities at the Site to the extent required by the County.
The County shall notify the Contractor in writing of the appointment of such Project Inspector(s).
Provide: Shall mean furnish and install ready for its intended use.
Site: Shall mean the location at which the Work is performed or is to be performed.
Specifications: That part of the Contract Documents containing the written administrative requirements and the technical descriptions of materials, equipment, construction systems, standards, and workmanship which describe the proposed Work in sufficient detail and provide sufficient information for the Building Official to determine code compliance and for the Contractor to perform the Work.
Subcontractor: A person having a direct contract with Contractor or with any other Subcontractor for the performance of the Work.
Submittals: All shop, fabrication, setting and installation drawings, diagrams, illustrations, schedules, samples, and other data which are specifically prepared by or for the Contractor to illustrate some portion of the Work and all illustrations, brochures, standard schedules, performance charts, instructions, diagrams, and other information prepared by a Supplier and submitted by the Contractor to illustrate material, equipment, or conformance of some portion of the Work with the requirements of the Contract Documents.
Substantial Completion: The condition when the County agrees that the Work, or a specific portion thereof, is sufficiently complete, in accordance with the Contract Documents, so that it can be utilized by the County for the purposes for which it was intended. The County at its sole discretion may, after obtaining the necessary approvals and certificates, take Beneficial Occupancy at this time or choose to wait to occupy until after Final Completion is achieved.
Supplemental Conditions: Project-specific modifications to standard general contract terms. Issued to add, change, or delete boilerplate clauses in a base contract to fit a specific location, scope, insurance requirement, or legal framework.
Supplier: A manufacturer, fabricator, distributor, materialman, or other vendor who provides material for the Project but does not provide on-site labor.
Time for Completion: The number of consecutive days following the issuance of the Notice to Proceed which the Contractor has to substantially complete all Work required by the Contract. When the Notice to Proceed is issued, it states a Contract Completion Date, which has been set by the County based on the Time for Completion. The Time for Completion may only be modified by a duly approved Change Order.
Underground Facilities: Any item of public or private property which is buried or placed below ground or submerged for use in connection with the storage or conveyance of water, sewage, electronic telecommunications, electric energy, cable television, oil, petroleum products, gas, or other substances, and includes but is not limited to pipes, sewers, combination storm/sanitary sewer systems, conduits, wells, cables, valves, lines, wires, manholes, attachments, and those portions of poles below ground.
Work: The services performed under this Contract including, but not limited to, furnishing labor and furnishing and incorporating materials and equipment into the construction. The Work also includes the entire completed construction, or the various separately identifiable parts thereof, required to be furnished under the Contract Documents.
2. CONTRACT DOCUMENTS
(a) Original copies. The Contract between County and Contractor shall be signed by the County and the Contractor in as many original counterparts as may be mutually agreed upon, each of which shall be considered an original.
(b) Time of the essence. All time limits stated in the Contract Documents, including but not limited to the Time for Completion of the Work, are of the essence of the Contract.
(c) Severability clause. If any provision of this Contract shall be held invalid by any court of competent jurisdiction, such holding shall not invalidate any other provision.
(d) Conflicting clauses. In the event there is a conflict between the provisions of the General Conditions and Special Conditions, the provisions of the Special Conditions shall apply. A specific provision in any other Contract Document shall take precedence over a provision of the General Conditions unless such precedence would result in a violation of law.
3. LAWS AND REGULATIONS
(a) The Contractor shall comply with all laws, ordinances, rules, regulations, and lawful orders of any public authority bearing on the performance of the Work and shall give all notices required thereby.
(b) The Contractor shall assure that all Subcontractors and tradesmen who perform Work on the project are properly licensed by the Department of Professional and Occupational Regulation as required by the Code of Virginia and applicable regulations.
(c) If the Contractor violates laws or regulations that govern the Project, the Contractor shall indemnify and hold the County harmless against any fines and/or penalties that result from such violation. To the extent that such violation is the result of negligence or other actionable conduct of the Contractor, the Contractor shall indemnify and hold the County harmless against any third party claims, suits, awards, actions, causes of action or judgments, including but not limited to attorney's fees and costs incurred thereunder, that result from such violation.
4. NONDISCRIMINATION
(a) During the performance of this Contract, the Contractor agrees as follows:
i. The Contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex, national origin, age, disability, or any other basis prohibited by federal or state law relating to discrimination in employment, except…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .