853943sewerAlex.pdf

PDF 305 KB Posted

Attached to
Edison Street, West Reed Avenue, and Dale Street Sewer Repairs
Solicitation number
2041
Issued by
Fairfax County, Virginia

About this file

Summary

This Invitation to Bid (ITB) is issued by the City of Alexandria, Virginia for construction services related to the Edison Street, West Reed Avenue, and Dale Street Sewer Repairs project. The solicitation seeks qualified and responsible bidders to furnish all labor, materials, equipment, supervision, bonds, and insurance necessary to complete the Work in accordance with the Contract Documents, including construction plans and technical specifications. The project is structured in two phases: Phase 1 involves mobilization and test pits with a 40 calendar-day duration, and Phase 2 encompasses construction activities with a 230 calendar-day duration, for a total contract period of 270 calendar days from the Notice to Proceed. The solicitation opened on November 5, 2026 at 2:00 PM EST, with questions due by November 19, 2026 at 5:00 PM EST, and bids are due by December 17, 2026 at 3:00 PM EST. The bid opening will be conducted virtually via Microsoft Teams. The work is located in Alexandria, Virginia, with workdays and hours excluding public holidays established by Federal law and City Code Section 11-5.

The contract requires submission of financial security including a bid guarantee of not less than five percent (5%) of the bid amount, along with performance and payment bonds each in the amount of 100% of the Contract amount. Liquidated damages are assessed at $1,350 per calendar day for failure to achieve Substantial Completion within the adjusted Contract Period. Monthly partial payments will be made with five percent (5%) retainage, or contractors may elect to use an escrow account procedure in lieu of retainage. The contractor must comply with prevailing wage requirements as established by the Department of Labor and Industrial Relations Wage Determination, as this is a public works contract exceeding $250,000. All work must be performed in accordance with applicable federal, state, and local laws, including OSHA and Virginia safety regulations. The contractor must obtain a valid Virginia contractor's license and current Alexandria business license, and is responsible for all permits, licenses, and compliance documentation. No set-asides are indicated in this solicitation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Edison Street, West Reed Avenue, and Dale Street

Sewer Repairs City of Alexandria, VA

100 N. Pitt Street, Suite 301

Alexandria, VA 22314

The Seal of the City of Alexandria may not be used on any materials in response to this Soli‐ citation without written permission from the Purchasing Agent, or unless the requirements of this Solicitation specifically call for the Seal to be incorporated in the response.

Nov 5th 2026, 2:00PM EST - Dec 17th 2026, 3:00PM EST

City of Alexandria

Invitation to Bid (Construction)

ITB: Edison Street, West Reed Avenue, and Dale Street Sewer Repairs

ITB No.: 2041

Table of Contents

Contents Page #

Project Details 7

1. Part A - General Information 8

1.1. Solicitation General Information 8

1.2. Procurement Schedule 8

1.3. Introduction 9

1.4. General Overview 9

1.5. Contracting Officer’s Representative and Contracting Officer’s Technical Representative 9

1.6. Financial Security 9

1.7. Faith–Based Organizations Nondiscrimination 10

2. Part B - Construction Scope of Work 11

2.1. General Overview 11

2.2. Performance Period, Location, and Workdays/Hours 11

2.3. Scope of Work 11

2.4. Contractor Responsibilities 12

3. Part C - Construction Special Terms and Conditions 14

3.1. General Overview 14

3.2. Change Management - Work 14

3.3. Change Management - Contract 15

3.4. Completion and Close-Out 15

3.5. Construction Documents and Interpretation 17

3.6. Contract Administration 18

3.7. Eligibility Requirements 20

3.8. Financial Security 20

3.9. Inspection of Construction 21

3.10. Labor Compliance 22

3.11. Liquidated Damages 22

3.12. Payment Mechanics 23

3.13. Quality and Acceptance of Work 26

3.14. Safety 26

3.15. Schedule of Values 26

3.16. Site Conditions and Risk Allocation 27

3.17. Quantity Adjustments (if applicable) 29

4. Part D - General Terms and Conditions 30

4.1. Assignment 30

4.2. Assignment of Risk 30

4.3. Audit and Price Adjustment 30

4.4. Brand Name or Equivalent 30

4.5. Choice of Law; Venue 31

4.6. Claims and Disputes 31

4.7. Claims for Damages 32

4.8. Code Compliance 32

4.9. Commercial Warranties 32

4.10. Compliance with Applicable Law 32

4.11. Compliance with the Bid or Proposal 33

4.12. Compliance with the Immigration Reform and Control Act of 1986 33

4.13. Conditional Bids or Proposals 33

4.14. Contract Term Deviations 33

4.15. Copyright/License for Drawings and Specifications 33

4.16. Drug-Free Workplace 34

4.17. Entire Agreement 34

4.18. Equal Employment Opportunity 34

4.19. Ethics in Public Contracting 36

4.20. Federal, State, and Local Taxes 36

4.21. Felony Convictions 37

4.22. Force Majeure 37

4.23. Freedom of Information 37

4.24. Indemnification 37

4.25. Independent Pricing 38

4.26. Inspection of Supplies 38

4.27. Insurance Requirements 38

4.28. Interpretation of Contract: Notice of Ambiguities 39

4.29. Non-Waiver 40

4.30. Notice 40

4.31. Oral Modification 40

4.32. Pre-Bid / Pre-Proposal Conferences 40

4.33. Protests and Appeals 41

4.34. Prompt Payment 41

4.35. Proprietary and Confidential Information 41

4.36. Royalties and Patents 41

4.37. Samples 41

4.38. Severability 42

4.39. Small-, Minority-, and Women-Owned Business Outreach 42

4.40. Specific Environmental Obligations 42

4.41. Successors, Assigns, and Legal Representatives 42

4.42. Survival 42

4.43. Termination 42

4.44. Third-Part Beneficiary 44

4.45. Transportation Costs and Other Fees or Expenses 45

5. Part E - Instructions to Bidders 46

5.1. Questions 46

5.2. Vendor Registration 46

5.3. Bid Submission Information and Instructions 46

5.4. Acceptance Period 46

5.5. Award 46

5.6. Bid or Proposal Submission and Presentation Costs 47

5.7. Late Bids 47

5.8. No Response Form 47

5.9. Opening of Bids 47

5.10. Mistakes in Bids 47

5.11. Withdrawal of Bids 47

5.12. Bidder Qualifications 47

6. Part F - Evaluation and Method of Award 49

6.1. Evaluation Factors for Award 49

6.2. Reservation of Right 49

6.3. Responsibility Determination 49

7. Part G - Required Forms 50

7.1. Bid Table 50

7.2. Attachment A - Authorized Signatory Statement 50

7.3. Attachment C - Required Information form 50

7.4. Attachment D - Certifications Statement forms 51

7.5. Attachment E - Reference Sheet 51

7.6. Attachment F - Subcontractors List 51

7.7. Attachment G - No Response form 51

8. Part H - Exhibits 53

8.1. Exhibit A - Definitions 53

8.2. Exhibit B - Edison Street Plans and Specifications 62

8.3. Exhibit C - West Reed Avenue and Dale Street Plans and

Specifications 62

8.4. Exhibit D DOLI Wage Determination 62

8.5. Exhibit E - Sample Construction Contract 62

8.6. Exhibit F - Sample Posting Compliance form 63

8.7. Exhibit G - Sample Pay Scale Certificate 63

8.8. Exhibit H - Information Technology Terms and Conditions 63

Appendix A: Bid Item Table 67

Project Details

Project Edison Street, West Reed Avenue, and Dale Street Sewer Repairs

Ref. # 2041

Type IFB

Description Edison Street, West Reed Avenue, and Dale Street Sewer Repairs

Open Date Nov 5th 2026, 2:00PM EST

Questions Due Date Nov 19th 2026, 5:00PM EST

Close Date Dec 17th 2026, 3:00PM EST

Project Owner Tony Esse

Solicitation Meeting Link

Solicitation Opening Meeting Link https://events.gcc.teams.microsoft.com/event/314a7c51-b7b9-4ad8-8671-7ff78936cb45@feaa9b31-4375-4aee-adcc-c76ad32a890b?

source=copyLinkLegacyShareLinkDialog

Events

Event Name Duration Description

Open Date Nov 5th 2026, 2:00PM EST Posting date for the Opportunity

Questions Due Date Nov 19th 2026, 5:00PM EST Deadline to submit Questions

Close Date Dec 17th 2026, 3:00PM EST Deadline for Submissions

1. Part A - General Information

1.1 Solicitation General Information

Solicitation General Information

Solicitation Type: Invitation to Bid (Construction)

Number: 2041

Title: Edison Street, West Reed Avenue, and Dale Street Sewer Repairs

Point of Contact: Tony G. Esse

Contact Email: tony.esse@alexandriava.gov

1.2 Procurement Schedule

Procurement Schedule

Advertisement

Final Date for Vendor

Questions

Question must be sent via Tony G. Esse

Solicitation Responses

Due

Award

The timeframes listed above apply to events related to the Solicitation and the City’s due diligence process. The activities with specific dates must be completed as indicated unless otherwise changed by the City by issuance of a written Amendment.

The Bid Opening meeting will be virtual. If you would like to attend the bid opening, please go to the

Microsoft Teams Webinar link provided below:

https://events.gcc.teams.microsoft.com/event/314a7c51-b7b9-4ad8-8671-7ff78936cb45@feaa9b31-4375-4aee-adcc-c76ad32a890b?source=copyLinkLegacyShareLinkDialog mailto:tony.esse@alexandriava.gov mailto:tony.esse@alexandriava.gov https://events.gcc.teams.microsoft.com/event/314a7c51-b7b9-4ad8-8671-7ff78936cb45@feaa9b31-4375-4aee-adcc-c76ad32a890b?source=copyLinkLegacyShareLinkDialog https://events.gcc.teams.microsoft.com/event/314a7c51-b7b9-4ad8-8671-7ff78936cb45@feaa9b31-4375-4aee-adcc-c76ad32a890b?source=copyLinkLegacyShareLinkDialog https://events.gcc.teams.microsoft.com/event/314a7c51-b7b9-4ad8-8671-7ff78936cb45@feaa9b31-4375-4aee-adcc-c76ad32a890b?source=copyLinkLegacyShareLinkDialog https://events.gcc.teams.microsoft.com/event/314a7c51-b7b9-4ad8-8671-7ff78936cb45@feaa9b31-4375-4aee-adcc-c76ad32a890b?source=copyLinkLegacyShareLinkDialog https://events.gcc.teams.microsoft.com/event/314a7c51-b7b9-4ad8-8671-7ff78936cb45@feaa9b31-4375-4aee-adcc-c76ad32a890b?source=copyLinkLegacyShareLinkDialog https://events.gcc.teams.microsoft.com/event/314a7c51-b7b9-4ad8-8671-7ff78936cb45@feaa9b31-4375-4aee-adcc-c76ad32a890b?source=copyLinkLegacyShareLinkDialog

1.3 Introduction

The City of Alexandria, Virginia (the “City”) is an urban community of 15.75 square miles with a population of approximately 159,647. With its stable residential neighborhoods, its historic districts, and its proximity to Washington, D.C., the City continues to attract new residents, tourists, and businesses.

1.4 General Overview

The City of Alexandria, Virginia (the “City”) issues this Invitation to Bid (“ITB”) to obtain sealed Bids from qualified and responsible Bidders for the Edison Street, West Reed Avenue, and Dale Street Sewer Repairs identified in this Solicitation. The successful Bidder must furnish all labor, materials, equipment, supervision, bonds, and insurance necessary to complete the Work in strict accordance with the Contract Documents, including the construction plans and technical specifications issued with this Solicitation.

1.5 Contracting Officer’s Representative and Contracting Officer’s Technical Representative

The Contracting Officer’s Representative (COR) and the Contracting Officer’s Technical Representative (COTR) are responsible for administration and technical coordination, as applicable. Neither the COR nor the COTR has authority to modify the Contract, issue Change Orders, or waive Contract requirements. All contractual changes must be authorized in writing by the Purchasing Agent.

The following individual is appointed as the authorized COR:

Daphne Kott, PE, Deputy Director

Department of Transportation and Environmental Servies

2331 Mill Road Suite 320

Alexandria, VA 22314 daphne.kott@alexandriava.gov

The following individual is appointed as the authorized COTR:

Mitch Dillon. PE

Department of Transportation and Environmental Servies

2331 Mill Road Suite 320

Alexandria, VA 22314 mitch.dillon@alexandriava.gov

The Contractor must contact the COTR to coordinate the schedule and placement of contracted /Work.

1.6 Financial Security

This Solicitation requires the submission of a bid guarantee and the furnishing of performance and payment bonds by the successful Bidder, as more fully described in Part C – Construction Special Terms and Conditions. Failure to comply with applicable financial security requirements may result in rejection of the Bid response or forfeiture of the bid guarantee, as applicable.

mailto:daphne.kott@alexandriava.gov mailto:daphne.kott@alexandriava.gov mailto:mitch.dillon@alexandriava.gov mailto:mitch.dillon@alexandriava.gov

1.7 Faith–Based Organizations Nondiscrimination

Pursuant to Virginia Code § 2.2-4343.1, the City of Alexandria does not discriminate against faith-based organizations in the solicitation, evaluation, award, or administration of contracts. A faith-based organization contracting with the City shall not discriminate against any recipient of goods, services, or disbursements on the basis of religion, religious belief, or refusal to actively participate in any religious practice, or on the basis of race, age, color, gender, sexual orientation, gender identity, national origin, or any other status protected by applicable law. If an individual objects to the religious character of a contracted provider, the City shall offer access to equivalent goods or services from an alternative provider.

2. Part B - Construction Scope of Work

2.1 General Overview

This module describes the general Scope of Work for the Project. Detailed requirements for construction administration, performance, scheduling, and payment are addressed in Part C – Construction Special Terms and

Conditions and Part D – General Terms and Conditions.

Bids shall be submitted strictly in accordance with the requirements of the Solicitation and shall not include narrative proposals unless expressly required.

2.2 Performance Period, Location, and Workdays/Hours

Period of Performance

The Contractor must achieve Substantial Completion within two hundred seventy (270) calendar days from the Notice to Proceed as administered in accordance with Part C – Construction Special Terms and

Conditions.

Work Location and Work Days/Hours

Work location: Alexandria, Virginia.

Workdays/hours, except for public holidays established by Federal law and City Code Section 11-5.

Project Phasing Phase 1 – Mobilization & Test Pits. The contractor shall issue all submittals and the project schedule to the City project team, submit for all local permits including hauling permits and right-of-way/ excavation permits, complete all test pitting as required by the contract and mobilize to begin construction. Duration of this phase is forty (40) calendar days.

Phase 2 - Construction. Phase 2 will begin following at the conclusion and acceptance of phase 1 and will end upon substantial completion of both project sites. Substantial completion requires the installation of all project features, restoration of all public access and beneficial use of the features.

Asphalt paving may be postponed and complete following substantial completion; however, temporary patchwork must be maintained by the contractor until site turnover. Duration of this phase is two hundred thirty (230) calendar days.

The Scope of Work for each phase is described in the drawings, specifications, and other Contract Documents. Required sequencing constraints applicable to the Work are identified herein for informational purposes.

Contract Time requirements, phase completion periods, and any applicable Liquidated Damages associated with phased completion are governed by Part C – Construction Special Terms and Conditions.

2.3 Scope of Work

Contractor obligations, performance standards, inspection requirements, scheduling, and payment provisions are addressed in Part C – Construction Special Terms and Conditions and Part D – General Terms and Conditions.

Refer to Part H Exhibits B for Drawing, Specifications and Technical Documents

Exhibit B – 1: Construction Plans dated February 15, 2026 Exhibit B – 2: Specifications dated January 15, 2026 Exhibit B – 3: Geotechnical report dated November 10, 2025

1.

2.

A.

B.

3.

A.

B.

C.

D.

2.4 Contractor Responsibilities

Provide a baseline construction schedule within 30 calendar days after Notice of Proceed

Reporting – The Contractor must:

Submit monthly progress report summaries Percent complete Work performed during reporting period Work planned for the next reporting period Schedule impacts, if any

B. Maintain and submit daily work logs, upon request of the City

C. Comply and promptly notify the City if writing of:

Delays Differing site conditions Safety incident Material shortages affecting the schedule

Coordination and Communication Responsibilities – The Contract must:

Coordinate all work with the City’s Project Manager and other contractors working on or adjacent to the site.

Attend pre-construction, progress, and closeout meetings as required by the City.

Designate a Project Superintendent with authority over on-site operations.

Provide advance notice of activities that may:

Disrupt City operations Affect the public Require utility shutdowns.

Documentation and Recordkeeping

Contractor shall maintain current copies of all permits, licenses, and inspections required for the Work.

Contractor shall maintain red-line drawings reflecting as-built conditions.

Contractor shall submit shop drawings, product data, and submittals in accordance with the Contract Documents.

Contractor shall retain project records for ___ years following Final Completion, if required.

Safety and Compliance Responsibilities – The Contractor must:

Comply with all OSHA, VOSH, and applicable safety regulations.

Be responsible for site safety, including protection of workers, the public, and property.

Promptly report accidents, injuries, or hazardous conditions to the City.

Maintain a site-specific safety plan, if required by the Contract Documents.

Quality Control Responsibilities – The Contractor must:

Perform all Work in a good and workmanlike manner.

Promptly correct defective or non-conforming work at no additional cost to the City.

Coordinate required testing and inspections.

Be responsible for the quality of work performed by subcontractors.

Closeout Responsibilities – The Contractor must:

Achieve Substantial Completion and Final Completion in accordance with the Contract.

Submit

Warranties and guarantees Operation and maintenance manuals As-built drawings

1.

2.

A.

3.

A.

B.

C.

D.

5.

A.

B.

C.

D.

6.

A.

B.

C.

D.

7.

A.

B.

C.

D.

8.

A.

B.

Final lien waivers

C. Complete all punch list items within the time established by the City.

3. Part C - Construction Special Terms and Conditions

3.1 General Overview

This section covers the Special Terms and Conditions for this Solicitation. Bidders are encouraged to thoroughly review all Solicitation Documents to ensure a responsible and responsive Bid is submitted. These Construction

Special Terms and Conditions apply only to construction contracts and supplement the City’s Part D - General Terms and Conditions. In the event of a conflict or inconsistency, Part C - Construction Special Terms and Conditions governs all construction-related inspection, testing, acceptance, and correction of the Work.

3.2 Change Management - Work

Change Orders

The City may order changes in the Work consisting of additions, deletions, or modifications, the Contract Sum and the Contract Period being adjusted accordingly. Such changes in the Work shall be authorized only by written Change Order signed by the Contracting Officer. The Contract Sum and the Contract Period shall be changed only by Change Order signed by the Contracting Officer.

Proposed Change Orders

A Proposed Change Order (PCO) is a written request from the Contractor to the Owner requesting a change in the Contract Sum and/or Contract Time, in response to a Request for Proposal, a Field Order, or Architect’s

Supplemental Instructions, a Request for Information, a Construction Change Directive, or any other reason for a change to the Contract Sum and/or Contract Time. A PCO must be submitted within twenty (20) calendar days, or within such other longer period as the Owner may agree in writing to allow. If the City determines that the Contractor's PCO is acceptable, the City Shall prepare and issue, or cause to be prepared and issued, a

Change Order which will authorize the Contractor to proceed with the Change in the Work for the cost and time stated in the Proposed Change Order, or as otherwise may be agreed upon by the parties. The amounts stated in the Change Order for the cost and time to perform the Change in the Work shall be binding on the parties.

Construction Change Directive

A Construction Change Directive (CCD) is a written order prepared and signed by the City directing a change in the Work prior to issuance of a Change Order, and issued for one of the following reasons:

If the parties are unable to agree as to the reasonable cost and Change in the Work, the City shall make a unilateral determination of the reasonable cost and time to perform the Change in the Work, based upon his own estimates, the Contractor's submission or a combination thereof. A Construction Change Directive shall be issued for the amounts of cost and time determined by the City and shall become binding upon the Contractor unless the Contractor submits its protest in writing to the City within thirty (30) days of the issuance of the Change Directive.

If the work required in the Change Order is sufficiently urgent due to safety or other reasons as to not allow time to negotiate cost and time, a CCD may be issued in writing by the City to the contractor, for which the Contractor shall immediately initiate the work, and complete promptly and expeditiously.

Final agreement on cost of the CCD shall be negotiated and agreed to by both parties by the earliest possible date. (Template attached)

Change Order Overhead and Profit:

The percentages for overhead, profit, and commission to be allowed for net increases in the Contractor's cost caused by Change Order Work must, in no case, be allowed to exceed the following:

1.

2.

3.

A.

B.

4.

Overhead Profit Commission

To the Contractor for Work performed by its own forces

10% Plus 5% _ _

To the Contractor for Work performed by other than its own forces

_ _ _ _ 10%

To the Subcontractor for Work performed by other than its own forces

_ _ Plus 5% _ _

Itemization:

In submitting its Change Order request, the Contractor must provide a complete cost breakdown that lists and substantiates each item of Work and each item of cost.

3.3 Change Management - Contract

Contract Modifications:

The Contract may be modified only by a written Contract Modification executed by the Purchasing Agent or other authorized City representative. No oral statement, course of conduct, or written communication not executed as a Contract Modification shall be binding on the City.

A Contract Modification may add to, delete from, or otherwise revise the scope, quantity, price, delivery requirements, or other terms of the Contract, as authorized by the City. The Contractor shall not proceed with any modified or additional work or services unless and until a written Contract Modification has been issued by the City.

When requested by the City, the Contractor shall submit information reasonably necessary to support the proposed modification. The City may accept, reject, or negotiate any proposed modification in its sole discretion.

3.4 Completion and Close-Out

Closeout Deliverables

The Contractor must furnish all closeout deliverables required by the Contract Documents, including, but not limited to, record drawings (as-builts), operation and maintenance manuals, warranties, certifications, training documentation (if applicable), and other required closeout materials. All closeout deliverables must be submitted in the form, quantity, and format required by the City.

Record Drawings (As-Builts)

The Contractor must maintain a complete and accurate set of record drawings that reflect the Work as actually constructed. Record drawings must be updated as the Work progresses and must clearly identify all changes from the Contract Documents, including revisions to dimensions, locations, materials, equipment, and installed systems. Final record drawings must be submitted to the City prior to Final Acceptance unless otherwise approved in writing.

Operation and Maintenance Manuals

The Contractor must submit operation and maintenance manuals for all systems, equipment, and components requiring ongoing operation or maintenance. Manuals must include manufacturer data, operating instructions, maintenance requirements, recommended spare parts, warranty information, and emergency procedures, as

5.

1.

A.

B.

C.

1.

2.

3.

applicable. Operation and maintenance manuals must be submitted and accepted by the City prior to Final

Acceptance.

Warranties and Guarantees

The Contractor must submit all required warranties, guarantees, and certifications in writing, properly executed by the Contractor and applicable manufacturers or suppliers. Unless otherwise stated in the Contract

Documents, warranty periods commence upon Final Acceptance.

Training Documentation

Where training is required by the Scope of Work, the Contractor must complete all required training and submit applicable training materials, certifications, and attendance records prior to Final Acceptance.

Additional Closeout Documentation

The Contractor must provide all additional documentation required for project closeout, which may include, but is not limited to:

final inspection and testing reports;

commissioning documentation (if applicable);

lien waivers, releases, or affidavits consent of surety to final payment

Substantial Completion

When the Contractor considers that the Work, or such portion of the Work, which the City agrees, in writing, to accept separately, is substantially complete, the Contractor must give the COTR written notice of such fact, together with a list of any items acknowledged to be incomplete or not in accordance with the Contract Documents. The Contractor must also give notice to Code Enforcement and obtain any necessary inspections and correct any deficiencies as a condition for Substantial Completion.

Upon receipt of the Contractor’s notice, the City will make an inspection to determine whether the Work or such designated portion, is substantially complete. If the City’s inspection discloses any items, whether or not included on the Contractor’s list, that are incomplete or not in accordance with the Contract Documents and that prevent Substantial Completion, the Contractor shall, upon notification by the City, complete or correct such items before the City issues the Certificate of Substantial Completion. The Contractor must then submit a request for another inspection by the City to determine Substantial Completion. At the time of the issuance of the Certificate of Substantial Completion, the City must provide the Contractor with a comprehensive Punch List of items to be completed and/or corrected. The Contractor must proceed promptly to complete and correct items on the Punch List. Failure to include an item on the Punch List does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.

When the Work, or such designated portion of the Work, is substantially complete, the City must prepare and issue a Certificate of Substantial Completion (in the form of AIA Document G704), which must establish the date of Substantial Completion, the applicable responsibilities of the City and the Contractor for security, maintenance, utilities, damage to the Work, insurance, and other related matters, and must fix the time within which the Contractor must finish all items on the list accompanying the Certificate of Substantial Completion. The Certificate of Substantial Completion must be submitted to the Contractor for written acceptance of the responsibilities assigned, and a fully executed copy must be retained by the City.

Upon Substantial Completion of the Work, or such designated portion of the Work, and upon application by the Contractor and issuance of a Certificate of Substantial Completion, the City must make payment, less retainage, for such Work or such portion of the Work as provided in the Contract Documents.

Issuance of a Certificate of Substantial Completion establishes the date the Work is sufficiently complete for its intended use and does not constitute final acceptance of the Work or a waiver of any rights or remedies under the Contract.

Final Completion and Payment

Upon written notification by the Contractor that the Work has reached final completion, and upon the

Contractor’s submission of a final application for payment, the City will conduct a final inspection of the Work.

When the City determines that the Work has been satisfactorily completed and the Contract Documents have

4.

5.

6.

A.

B.

C.

D.

7.

A.

B.

C.

D.

E.

8.

been fully performed (including the Contractor's and Subcontractor’s releases of liens and submission and acceptance of all required closeout deliverables), the City must promptly prepare and issue a final Certificate for Payment.

3.5 Construction Documents and Interpretation

Variance Between Plans and Specifications

If there is any discrepancy, inconsistency, or variance between the plans and specifications and the Solicitation Documents with respect to any item, note, or requirement, the Contractor must promptly notify the City and request a written interpretation or direction. The Solicitation Documents govern and form the basis for the preparation of the plans and specifications. Any deviation from the requirements of the Solicitation Documents requires prior written authorization from the Purchasing Agent. Work, materials, or operations that are reasonably necessary to produce a complete and functional Project, and that are customary for the type of Work involved, are deemed included even if not expressly shown or specified, unless such items are of an unusual or extraordinary nature.

If any discrepancies, ambiguities, omissions, or conflicts exist within the drawings or specifications, or between the drawings and specifications, that affect pricing, the Contractor and its Subcontractors are deemed to have based their pricing on the more costly method, material, or requirement necessary to perform the Work in accordance with the Contract Documents, unless the City provides written direction to the contrary.

Specification Interpretation

The Contractor is responsible for reviewing and coordinating all drawings, specifications, and Contract

Documents and must promptly notify the City of any discrepancies, ambiguities, or conflicts. The City’s interpretation of the Contract Documents is final and binding unless otherwise provided in the Contract.

Specifications and Drawings for Construction

The Contractor must keep on the Work site a copy of the drawings and specifications and must at all times give the COTR access to them. Anything mentioned in the specifications and not shown on the drawings, and not mentioned in the specifications, must be of like effect as if shown or mentioned in both. In case of a difference between drawings and specifications, the specifications must govern. In the event of a discrepancy between the figures in the drawings and the specifications, the specifications must govern. In case of a discrepancy in the figures in the drawings or in the specifications, the matter must be submitted promptly to the COTR who must make a prompt decision in writing. Any adjustment by the Contractor without such a determination must be at its own risk and expense.

Whenever the words “directed,” “required,” “ordered,” “designated,” “prescribed,” or similar terms are used in the drawings or specifications, such terms mean the direction, requirement, order, designation, or prescription of the City’s Contracting Officer’s Technical Representative (COTR), unless expressly stated otherwise. Likewise, the words “approved,” “acceptable,” “satisfactory,” or words of similar meaning mean satisfactory to the COTR, unless expressly stated otherwise.

Where the phrases “as shown,” “as indicated,” “as detailed,” or words of similar meaning are used, the reference is to the drawings forming part of the Contract Documents, unless expressly stated otherwise. The term “provide,” as used in the Contract Documents, means furnish and install complete and in place.

Shop Drawings: Drawings and other submittals prepared and submitted to the City by the Contractor, Subcontractor, or any lower-tier Subcontractor pursuant to the Contract, showing in detail:

The proposed fabrication and assembly of structural or other components; and The installation, including form, fit, and attachment details, of materials or equipment required for the Work.

The term Shop Drawings includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance data, test data, and similar materials furnished to explain in detail specific portions of the Work required by the Contract.

If this Contract requires Shop Drawings, the Contractor must coordinate all such drawings and review them for accuracy, completeness, and compliance with contract requirements and must indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted to the

1.

A.

B.

2.

3.

A.

B.

C.

4.

A.

B.

A.

COTR without evidence of the Contractor's approval must be returned for resubmission. The COTR will indicate approval or disapproval of the shop drawings and, if not approved as submitted, must state the City's reasons for disapproval. Any Work done before such approval must be at the Contractor's risk. Approval by the COTR must not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of the Contract Documents.

If Shop Drawings propose any variation from the requirements of the Contract Documents, the Contractor must clearly identify and describe each variation in a written statement submitted separately from the Shop Drawings at the time of submission. Approval of any variation that changes the Scope of Work, Contract Price, or time for performance requires issuance of a written Contract Modification by the Purchasing Agent. Minor variations that do not affect the Scope of Work, Contract Price, or time for performance may be approved without issuance of a Contract Modification.

Note: Part C, Clause 5.3 (Specifications for Drawings for Construction), in its entirety, must be included in all

Subcontracts at any tier.

3.6 Contract Administration

Subcontractors and Outside Associates, and Consultants

Any Subcontractors, outside associates, and consultants required by the Contractor in connection with the services covered by the Contract Documents will be limited to individuals or firms that were specifically identified as part of the bid submission on Attachment F Subcontractor List. The Contractor must obtain the

Contracting Officer's written consent before making any substitution for these Subcontractors, Associates, and

Consultants.

The Contractor must incorporate all applicable Contract requirements, including terms and conditions, into all subcontracts at any tier, in every subcontract issued pursuant to or under the Contract resulting from this

Solicitation.

Suspension of Work

The Contracting Officer, for the convenience of the City, order the Contractor in writing to suspend all or any portion of the Work for a period of time determined by the Contracting Officer. Upon receipt of such a written order, the Contractor must promptly comply with the suspension as directed.

Material and Workmanship

All equipment, material, and articles incorporated into the Work covered by the Contract Documents must be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in the Contract Documents. Reference in the Specifications to equipment, material, articles or patented processes by trade name, make or catalog number, must be regarded as establishing a standard of quality and must not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article or process that, in the judgment of the COTR, is equal to that named in the Specifications, unless otherwise specifically provided in this Contract.

The Contractor must obtain the COTR’s approval of the machinery and mechanical and other equipment to be incorporated into the Work. When requesting approval, the Contractor must furnish to the COTR: the name of the manufacturer; the model number; and other information concerning: the performance, capacity, nature and rating of the machinery and other mechanical equipment. When required by the Contract or the COTR, the Contractor must also obtain the COTR’s approval of the material or articles which the Contractor contemplates incorporating into the Work. When directed to do so, the Contractor must submit Samples for approval at its expense and with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval must be installed or used at the risk of subsequent rejection.

All Work under this Contract must be performed in a skillful and workmanlike manner. The Contractor must provide competent supervision at all times during the progress of the Work. The COTR may require, in writing, that the Contractor remove from the Work any employee the COTR deems incompetent, careless, or otherwise objectionable.

Superintendence by the Contractor

B.

1.

2.

3.

A.

B.

C.

At all times during performance of the Contract, and until the Work is completed and accepted, the Contractor must personally supervise the Work or designate a competent Superintendent who is acceptable to the COTR and who has full authority to act on behalf of the Contractor at the worksite. The Contractor must submit the name and relevant experience of the proposed Superintendent to the COTR for approval before the

Superintendent is permitted to perform in this capacity.

Use and Possession Before Completion

The City may take possession of or use any completed or partially completed portion of the Work at any time. Before taking possession of or using any portion of the Work, the COTR must provide the Contractor with a written list of items remaining to be completed or corrected for the portion of the Work the City intends to possess or use. The omission of any item from such list does not relieve the Contractor of its obligation to fully perform the Work in accordance with the Contract Documents. The City’s possession or use of any portion of the Work does not constitute acceptance of the Work or any part of the Work.

While the City is in possession of or using any portion of the Work, the Contractor is relieved of responsibility for loss of or damage to that portion of the Work to the extent such loss or damage results directly from the City’s possession or use, notwithstanding the provisions of the Contract regarding permits and responsibilities. If the City’s possession or use delays the progress of the Work or causes the Contractor to incur additional costs, the Purchasing Agent must determine whether an equitable adjustment to the Contract Price or time for completion is warranted, and the Contract must be modified in writing according.

Cleaning Up

The Contractor must at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the Work, the Contractor must remove from the work area or premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the City. Upon completing the

Work, the Contractor must leave the work area in a clean, neat, and orderly condition satisfactory to the

COTR.

Layout of Work

The Contractor must lay out its work from City-established base lines and benchmarks indicated on the drawings and must be responsible for all measurements in connection with the layout. The Contractor must furnish, at its own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the Work. The Contractor must be responsible for executing the Work to the lines and grades that may be established or indicated by the COTR. The Contractor must also be responsible for maintaining and preserving all stakes and other marks established by the COTR until authorized to remove them. If such marks are destroyed by the Contractor or through its negligence before their removal is authorized, the COTR may replace them and deduct the replacement cost from any amounts due or to become due to the Contractor.

Schedules

Construction Schedule: Within ten (10) business days of receiving the award of the Contract, the Contractor must prepare and submit to the COTR a construction schedule for the Work. The construction schedule must be a Critical Path Method schedule or other schedule in form reasonably acceptable to the COTR and must provide for completion of the Work within the Contract Period provided in the Solicitation Documents. The construction schedule must be updated monthly, or at other appropriate intervals as directed by the COTR.

Submittal Schedule: The Contractor must prepare and keep current a schedule of submittals (Submittal Schedule) that is coordinated with the construction schedule and allows the COTR a reasonable time to review all submittals.

Waiver of Contract Period: The City's receipt or approval of any construction schedule or Submittal Schedule submitted by Contractor must not constitute a waiver by the City of the requirements. The Contract Period may be adjusted only by a written Time Extension or Change Order signed by the Contracting Officer.

Time Extensions

5.

A.

B.

6.

7.

8.

A.

B.

C.

9.

The parties agree that no Time Extension extending the Contract Period will be allowed unless granted in writing and signed by the Purchasing Agent. Notice of delay must be given in writing to the COR/COTR within five (5) Business Days of its occurrence. In the event of a continuing cause of delay, only one notice is required. The Contractor must apply for any Time Extension in writing, setting forth in detail the reasons for and causes of the delay, and an estimate of the probable cost and effect of such delay on the progress of the

Work, and must submit its application to the COR/COTR not more than twenty (20) Calendar Days after the commencement of the delay; otherwise the application for extension must be waived.

3.7 Eligibility Requirements

The Contractor must, without additional expense to the City, obtain any necessary licenses.

Contractor's License:

In accordance with Section 54.1-1103 of the Code of Virginia, 1950, as amended, the Contractor and each

Subcontractor must have a valid Virginia contractor’s license. The Virginia contractor’s registration number for each Subcontractor must be listed on the subcontract list.

Alexandria Business Licenses:

In accordance with Chapter 1, Title 9, of the Code of the City of Alexandria, the following must possess a current City business license:

Contractor;

All subcontractors, sub-Subcontractors, and suppliers at any tier with a definite place of business in the City; and All subcontractors, sub-Subcontractors, and suppliers at any tier, without a definite place of business in the City, the gross receipts of which, from business conducted in the City, are expected to exceed twenty-five thousand dollars ($25,000) in any calendar year.

3.8 Financial Security

Bid Surety

Each bid must be accompanied by a cashier's check or a certified check of the bidder payable to the City or by a certified copy of the bid bond from a surety company acceptable to the City and authorized to do business in the Commonwealth of Virginia, properly executed in favor of the City for not less than five percent (5%) of the amount representing the bid or sum total noted on Attachment B. Pricing Schedule.

Performance and Payment Bonds

The successful bidder must deliver to the City a performance bond and a payment bond, properly executed by a surety company acceptable to the City and authorized to do business in the Commonwealth of Virginia, each in the amount of one hundred percent (100%) of the respective Contract amount.

The Contractor must, within fifteen (15) Calendar Days after the date of Notice of Intent to Award, execute and deliver to the City the Performance and Payment Bonds; satisfactory evidence of all insurance coverage (as required by Part D – General Terms and Conditions – Insurance Requirements) required under this Contract and by law, and proof satisfactory to the City of the authority of the person or persons executing the Contract and the performance and payment bonds before a Contract will be validated by the City. A Contract is not be binding until it has been validated by the City and a copy of such fully validated Contract is delivered to the Contractor.

Failure upon the part of the Contractor to execute and deliver Certificate(s) of Insurance (as required by Part D – General Terms and Conditions – Insurance Requirements) and Performance and Payment Bonds (Part A – Solicitation General Information) within fifteen (15) Calendar Days after Notice of Intent to Award, and is just cause for the forfeiture of the bid guaranty to the City, which forfeiture is considered not as a penalty, but in liquidation of damages sustained. Award may then, at

1.

2.

A.

B.

C.

1.

2.

A.

B.

C.

the sole discretion of the City, be made to the next lowest responsive, responsible bidder, or all bids may be rejected and the solicitation re-advertised.

Additional Bond Security

If any surety upon any bond furnished in connection with this Contract becomes unacceptable to the

Purchasing Agent, or if any such surety fails to furnish reports as to its financial condition from time to time as requested by the City, or if the Contract price is increased to such an extent that the bond value becomes inadequate in the opinion of the Purchasing Agent, the Contractor must promptly furnish such additional security as may be required from time to time to protect the interests of the City and of persons supplying labor or materials in the prosecution of the Work contemplated by this Contract. Failure of the Contractor to promptly provide additional security as may be required may be grounds for termination for default.

3.9 Inspection of Construction

In this Clause, the term "Work" includes, but is not limited to, materials, workmanship, and the manufacture and fabrication of components.

The City has the right to inspect and test all services called for by the Contract at times and places practicable, during the term of the Contract. City inspections and tests must not unduly delay the Work.

The Contractor must maintain an adequate inspection system and perform such inspections as will ensure that the Work called for by this Contract conforms to Contract requirements. The Contractor must maintain complete inspection records and make them available to the City. All Work must be conducted under the general direction of the COR/COTR and is subject to City inspection and testing at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the Contract.

The Contractor must furnish promptly, without any additional charge, all facilities, labor and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the COR/COTR. The City may charge the Contractor any additional inspection or test costs when the Work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. Special full-size and performance tests must be performed if and as described in the contract

City inspections and tests are for the sole benefit of the City and do not:

Relieve the Contractor of responsibility for providing adequate quality control measures;

Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

Constitute or imply acceptance; or Affect the continuing rights of the City after acceptance of the completed Work under Part C, Clause

9.9 below.

The presence or absence of a City Inspector does not relieve the Contractor from any contract requirement, nor is the Inspector authorized to change any term or condition of the specification without the COR/COTR’s written authorization.

If any of the Work does not conform to Contract requirements, the City may require the Contractor to perform the Work again in conformity with Contract requirements, at no increase in Contract Price. The City may choose to accept the Work if it is in the public's best interest, with an appropriate adjustment to the contract price.

The Contractor must segregate and remove promptly rejected material from the premises.

When the defects in the Work cannot be corrected by re-performance, the City may:

Require the Contractor to take necessary action to ensure that future performance conforms to Contract requirements; and Reduce the Contract price to reflect the reduced value of the Work performed.

If the Contractor fails to perform the Work promptly again or take the necessary action to ensure future performance in conformity with Contract requirements, the City may:

3.

1.

2.

3.

4.

5.

A.

B.

C.

D.

6.

7.

8.

9.

A.

B.

10.

By contract or otherwise, perform the services and charge the Contractor any cost incurred by the City that is directly related to performance of such service; or Terminate the Contract for default.

If, before acceptance of the entire Work, the City decides to examine already completed Work by removing it or tearing it out, the Contractor, upon request, must promptly furnish all necessary facilities, labor, and materials. If the Work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or Subcontractors, the Contractor must defray the expenses of the examination and satisfactory reconstruction. However, if the Work is found to meet contract requirements, the Purchasing Agent must make an equitable adjustment, as determined by the Purchasing Agent, for the additional services involved in the examination and reconstruction, including, if the completion of the Work was thereby delayed, an extension of time.

Unless otherwise specified in the contract, the City must accept, as promptly as practicable after completion and inspection, all Work required by the contract or the portion of the Work the COR/COTR determines can be accepted separately. Acceptance must be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the City's rights under any warranty or guarantee.

3.10 Labor Compliance

Payment of Prevailing Wage for Work Performed on Construction Contracts

Each public works contract that is for construction and construction related maintenance greater than two hundred fifty thousand dollars ($250,000) must require that the bidders, contractors, and Subcontractors pay wages, salaries, benefits, and other remuneration to any mechanic, laborer, or worker employed, retained, or otherwise hired to perform services in connection with the construction or construction related maintenance contract at or above the prevailing wage rate shown in Part H Section 8.4 pursuant to the provisions of the Alexandria City Code § 3-3-31.2 and § 3-3-63.1. These provisions of the Alexandria City Code are hereby incorporated by reference.

3.11 Liquidated Damages

Time is of the Essence. Time is of the essence for the Contract. The City and the Contractor acknowledge and agree that if the Contractor fails to achieve Substantial Completion within the Contract Period (as adjusted by written Time Extensions and Change Orders executed in accordance with the Contract), the City will incur actual damages that are difficult to determine with certainty.

Amount and Assessment. For each Calendar Day that Substantial Completion is delayed beyond the Contract Period (as adjusted), the Contractor must pay the City liquidated damages in the amount of $1350 per Calendar Day (“Liquidated Damages”). The parties agree that this daily amount is a reasonable estimate of the City’s probable damages for late completion and is not a penalty.

Phased Completion (If applicable)

If the Contract Documents require the Work to be completed in phases, each phase shall have its own required completion date as set forth in the Solicitation Documents or as established by an approved construction schedule.

Failure to achieve Substantial Completion of any required phase by its applicable phase completion date, as adjusted by approved written Time Extensions or Change Orders, shall subject the Contractor to Liquidated Damages for that phase.

Unless otherwise expressly stated in the Contract Documents:

Liquidated Damages shall accrue separately for each phase based on the applicable phase completion date; and…