This Request for Proposals is issued by Greene County, Virginia for a design-build project to construct the Route 670 Connector, a new two-lane connector road linking Route 670 (Preedy Creek Road) to U.S. Route 29 (Seminole Trail). The project scope includes design and construction of the new connector road, Route 29 auxiliary lanes, right-of-way acquisition, traffic signals, drainage systems, signing and pavement marking, stormwater management, a Transportation Management Plan, erosion and sediment control, and utility relocations. The project is identified as State Project No. 9999-039-591 with IFB Number 2027-003. A pre-proposal meeting is scheduled for November 19, 2026 at 9:00 AM, followed by a utility meeting at 11:00 AM on the same date. Questions must be submitted by December 3, 2026 at 4:00 PM, with County responses due December 17, 2026. Letters of submittal and price proposals are due February 9, 2027 at 2:00 PM, with public opening at 2:30 PM the same day. Notice of Intent to Award is anticipated February 24, 2027, with contract execution by March 17, 2027 and Notice to Proceed on March 18, 2027. Final completion is required by December 8, 2028. The contract will be a fixed-price design-build agreement.

Greene County's estimated contract value ranges from $12 million to $15.4 million. Award will be made to the responsive offeror submitting the lowest price proposal within the County's budget. The offeror must be currently prequalified with the Virginia Department of Transportation and in good standing. The offeror's proposal must remain valid for 120 days after submission. Key requirements include submission of a performance bond and payment bond at 100 percent of contract value, a surety letter confirming bonding capability from a company rated A-minus or better by A.M. Best Company, work history documentation for the lead contractor and lead designer, conceptual roadway plans, and escrow proposal documents detailing all cost estimating information. The Design-Build Project Manager, Quality Assurance Manager, Design Manager, and Construction Manager are identified as key personnel positions with specified qualifications and licensing requirements. Offerors must comply with Virginia prequalification rules, demonstrate no conflicts of interest, and maintain their proposed team throughout the procurement and contract execution phases.

View the file

Other files

File Type Posted
836037treeSalem.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Greene County, Virginia

REQUEST FOR PROPOSALS

A DESIGN-BUILD PROJECT

#SMART18 – Route 670 Connector

From: Route 670 (Preedy Creek Road) To: Route 29 (Seminole Trail)

Greene County, Virginia

State Project No.: 9999 - 039-591

IFB Number: 2027-003

DATE: October 30, 2026

In accordance with Va. Code Section 2.2-4343.1, Greene County does not discriminate against faith-based organizations

Request for Proposals #SMART18 – Route 670 Connector Part 1 Greene County, Virginia Instructions for Offerors Project No. 9999 - 039-591 October 30, 2026 IFB # 2027-003

Greene County Page ii

TABLE OF CONTENTS

PART 1

1.0 INTRODUCTION

1.1 Project Overview

1.2 Procurement Overview

2.0 BACKGROUND INFORMATION

2.1 Legislative Authority

2.2 Estimated Contract Value

2.3 Procurement Schedule and Project Milestones

2.4 Greene County’s Point of Contact

2.5 RFP Information Package and RFP Supplementary Information Package

2.6 RFP Documents

2.7 Deviations from the RFP Documents

2.8 Obligation to Meet All of the Requirements of the RFP Documents

3.0 GENERAL PROCEDURES AND REQUIREMENTS

3.1 Offeror’s Pre-Submittal Responsibilities and Representations

3.2 Pre-Proposal Meeting

3.3 Utility Meeting

3.4 Acknowledgment of Receipt of RFP, Revisions and Addenda

4.0 CONTENTS OF PROPOSALS

4.1 Letter of Submittal

4.2 Attachments to the Letter of Submittal

4.3 Price Proposal

4.4 Post Notice of Intent to Award Submittals

5.0 PROPOSAL EVALUATION AND RESPONSIVENESS REVIEW

6.0 PROPOSAL SUBMITTAL REQUIREMENTS

6.1 Due Date, Time and Location

6.2 Format

7.0 QUESTIONS AND CLARIFICATIONS

8.0 AWARD OF CONTRACT, PROPOSAL VALIDITY AND CONTRACT

EXECUTION

8.1 Negotiations and Award of Contract

8.2 Proposal Validity

8.3 Submittals after Notice of Intent to Award

8.4 Contract Execution and Notice to Proceed

8.5 Public Notice of Award

9.0 RIGHTS AND OBLIGATIONS OF GREENE COUNTY

9.1 Reservation of Rights

9.2 No Assumption of Liability

10.0 PROTESTS

11.0 MISCELLANEOUS

11.1 Virginia Freedom of Information Act

11.2 Conflict of Interest

Page iii

11.3 Ethics in Public Contracting Act

11.4 Requirement to Keep Team Intact

11.7 Escrow Proposal Documents

11.8 Administrative Requirements

11.9 Compliance with the Law in Virginia

11.10 Attachments

PART 1

INSTRUCTIONS FOR OFFERORS

1.0 INTRODUCTION

Greene County (or County) submits this Request for Proposals (RFP) to solicit design-build Proposals (Proposals) from those entities (Offerors) interested in contracting to serve as the Design-Builder for the #SMART18 – Route 670 Connector in Greene County, Virginia (Project).

The purpose of this RFP is to determine which Offeror (the “Successful Offeror”) will be awarded the Design-Build contract (Design-Build Contract) for the Project.

The Project priorities are:

• Cost - provide the best price for the scope of work identified in this RFP

1.1 Project Overview

This project will build a new two-lane connector road between U.S. 29 (Seminole Trail) and Route 670 (Preddy Creek Road). The roadway will have one lane in each direction, along with paved shoulders, and will connect to U.S. 29 about 1,250 feet south of the signalized intersection at Route 607 (Cedar Grove Road). The purpose of this new road is to reduce traffic congestion at the nearby Matthew Mill Road intersection, which currently experiences heavy traffic and long delays. By providing an additional connection to U.S. 29, traffic will be better distributed across the area. At the new intersection with U.S. 29, a Continuous Green-T (CGT) design is proposed.

This design allows most southbound traffic on U.S. 29 to keep moving without stopping, while traffic turning onto or off the new connector is controlled by a traffic signal. This design was selected after reviewing multiple alternatives and was found to provide better overall operations compared to a traditional signalized intersection by minimizing delay and preventing long queues from extending to nearby intersections during periods of peak traffic flows. To support these improvements, the existing median opening at Heatherton Drive will be modified to allow right-in and right-out movements only. This project will improve safety and help maintain efficient traffic flow along U.S. 29. Overall, the Route 670 Connector and proposed CGT intersection work together to improve traffic operations, enhance safety, and support future growth along the Seminole Trail (US 29) corridor.

The Project includes, among other things the Design and Construction of (a) the new Route

670 Connection, (b) Route 29 auxiliary lanes, (c) right of way acquisition, (e) traffic signals, (f) drainage, (g) signing and pavement marking, (h) stormwater management, (i) Transportation Management Plan, (j) erosion and sediment control, and (k) utility relocations within the Project limits. Refer to Part 2 of the RFP (Technical Requirements) for the scope of work, technical information and requirements.

Coordination with all third party stakeholders (less the Virginia Department of Transportation) is the responsibility of the Design-Builder.

1.2 Procurement Overview

Greene County will use a single-phase selection process on the Project. In accordance with the requirements of this RFP, interested Offerors will submit a Proposal consisting of a Letter of Submittal, Attachments to the Letter of Submittal, and Price Proposal consistent with Part 1, Section 4.0. Additionally, the Offeror who submits the lowest Proposal Price will develop and deliver the Post Notice of Intent to Award Submittals consistent with Part 1, Section 4.4.

An Offeror’s Proposal must meet all requirements established by this RFP. Requirements of this RFP generally will use the words “shall”, “will”, or “must” (or equivalent terms) to identify a required item that must be submitted with an Offeror’s Proposal. Failure to meet an RFP requirement may render an Offeror’s Proposal non-responsive.

The Offeror whose Proposal is deemed responsive, who submitted the lowest Price

Proposal, and whose Price Proposal is within Greene County’s budget for design and construction will be recommended for an award of a fixed price Design-Build Contract by the Greene County Board of Supervisors. The award of the contract will be made to the Successful Offeror in accordance with Part 1, Section 8.0 of the RFP.

2.0 BACKGROUND INFORMATION

2.1 Legislative Authority

§ 33.2-209(B) of the Code of Virginia authorizes Greene County and the Commonwealth Transportation Board (CTB) to develop and award contracts using the Design-Build contracting method. In accordance with the law, Greene County completed the Finding of Public Interest (FOPI) dated February 25, 2025. The FOPI is available for inspection upon request.

2.2 Estimated Contract Value

Greene County’s current estimated contract value for this Project is between $12 million to $15,400,000.

2.3 Procurement Schedule and Project Milestones

2.3.1 Greene County currently anticipates conducting the procurement of the Project in accordance with the following list of milestones leading to award of the Design-Build Contract.

This schedule is subject to revision and Greene County reserves the right to modify this schedule as it finds necessary, in its sole discretion.

.1 Advertise RFP October 30, 2026

.2 Pre-Proposal Meeting w/ Offerors November 19, 2026 (9:00 AM prevailing local time)

.3 Utility Meeting w/ Offerors November 19, 2026 (11:00 AM prevailing local time)

.4 RFP Questions Due to Greene County December 3, 2027 (4:00 PM prevailing local time)

.5 County responses to Questions or Clarifications December 17, 2026

.6 Letter of Submittal & Price Proposal Due Date February 9, 2027 (2:00 PM prevailing local time)

.7 Open Letters of Submittal & Price Proposals February 9, 2027 (2:30 PM prevailing local time)

.8 Notice of Intent to Award February 24, 2027 .9 Design-Build Contract Execution March 17, 2027 .10 Notice to Proceed March 18, 2027 .11 Final Completion December 8, 2028

2.3.2 Greene County has established the following milestones for contract completion dates for the Project, and Offerors shall base their proposals on such milestones.

.1 Final Completion shall be no later than the date set forth in Part 1, Section 2.3.1.

.2 If an Offeror proposes Final Completion date earlier than those shown in Part 1, Section 2.3.1 above, then such proposed date will be deemed by Greene County as the contractual completion date for the Design-Build Contract for all purposes, including liquidated damages.

2.4 Greene County’s Point of Contact

Greene County’s sole point of contact (POC) for matters related to the RFP shall be Terry Beigie. Greene County’s POC is the only individual authorized to discuss this RFP with any interested parties, including Offerors. All communications with Greene County’s POC about the Project or this RFP shall be in writing, as required by applicable provisions of this RFP.

Name: Terry Beigie Address: Greene County Administration Building 40 Celt Road Stanardsville, VA 22973

Mailing Address: P.O. Box 358 Stanardsville, VA 22973

Phone: 434-985-5293 E-Mail: tbeigie@gcva.us

Greene County disclaims the accuracy of information derived from any source other than Greene County’s POC, and the use of any such information is at the sole risk of the Offeror.

All communications and requests for information shall be submitted by the Offeror’s Point of Contact identified in the Letter of Submittal. Written communications to Greene County from

Offerors shall specifically reference the correspondence as being associated with #SMART18 – Route 670 Connector, Project No. 9999-039-591.”

2.5 RFP Information Package and RFP Supplementary Information Package

An RFP Information Package and an RFP Supplementary Information Package are available at the digital download link below. The contents of the information packages are listed in Part 2 of the RFP.

Shortcut: Greene IFB 2027-003 - Route 670 Connector

Hyperlink: https://kimleyhorn-my.sharepoint.com/:f:/r/personal/jonathan_oliver_kimley-horn_com/Documents/SHARED/External%20Shares/Greene%20IFB%202027-003%20- %20Route%20670%20Connector?d=w1d0344edd53649feb34faa0963e1ed2f&csf=1&web=1&e =9zMbi2

2.6 RFP Documents

2.6.1 The documents included in this RFP (collectively the RFP Documents) consist of the following parts and any addenda, as well as any attachments and exhibits contained or identified in such sections:

PART 1 – REQUEST FOR PROPOSALS, INSTRUCTIONS FOR OFFERORS

PART 2 – PROJECT TECHNICAL INFORMATION AND REQUIREMENTS

INCLUDING RFP INFORMATION PACKAGE

PART 3 – LUMP SUM DESIGN-BUILD AGREEMENT

EXHIBIT 1 TO PARTS 3, 4 AND 5 – PROJECT SPECIFIC TERMS

PART 4 – GENERAL CONDITIONS

PART 5 – DIVISION I AMENDMENTS TO STANDARD SPECIFICATIONS

Greene County is using the Virginia Department of Transportation’s standard documents with Greene County modifications including Part 3, 4 and 5 (November 2016) documents. These documents have been compiled into a standard package available for download at the following location: https://www.vdot.virginia.gov/about/divisions/alternative-delivery/. Standard template Parts 3, 4 and 5 will be incorporated into the Final Contract by reference.

2.6.2 Each Offeror shall review the RFP Documents and provide questions or requests for clarification, including but not limited to terms that it considers to be ambiguous or to which it takes exception. Such questions or requests for clarification will be submitted to Greene County’s POC within the time specified in Part 1, Section 2.3.1 of this RFP. Greene County will review all questions and/ or requests for clarification received and, if it deems appropriate, in its sole discretion, may modify the RFP Documents through an Addendum. Offerors shall base their Proposals on the terms and conditions of the RFP Documents included in the latest issued Addendum.

The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.

https://kimleyhorn-my.sharepoint.com/:f:/r/personal/jonathan_oliver_kimley-horn_com/Documents/SHARED/External%20Shares/Greene%20IFB%202027-003%20-%20Route%20670%20Connector?d=w1d0344edd53649feb34faa0963e1ed2f&csf=1&web=1&e=9zMbi2&xsdata=MDV8MDJ8YnJpYW4ubWNwZXRlcnNAa2ltbGV5LWhvcm4uY29tfDViMzIwMTNhMjIwMDQ3OWIyY2Y5MDhkZjMwNjMzNDUxfDdlMjIwZDMwMGI1OTQ3ZTU4YTgxYTRhOWQ5YWZiZGM0fDB8MHw2MzkyODI4NzQ3NjI0NTQxMzl8VW5rbm93bnxUV0ZwYkdac2IzZDhleUpGYlhCMGVVMWhjR2tpT25SeWRXVXNJbFlpT2lJd0xqQXVNREF3TUNJc0lsQWlPaUpYYVc0ek1pSXNJa0ZPSWpvaVRXRnBiQ0lzSWxkVUlqb3lmUT09fDB8fHw%3d&sdata=SzFydjFXN1oxVC9JNXJoakI2NXdCQS91SmxPRk5EQzgwcTUxaHFsSkRxRT0%3d https://kimleyhorn-my.sharepoint.com/:f:/r/personal/jonathan_oliver_kimley-horn_com/Documents/SHARED/External%20Shares/Greene%20IFB%202027-003%20-%20Route%20670%20Connector?d=w1d0344edd53649feb34faa0963e1ed2f&csf=1&web=1&e=9zMbi2&xsdata=MDV8MDJ8YnJpYW4ubWNwZXRlcnNAa2ltbGV5LWhvcm4uY29tfDViMzIwMTNhMjIwMDQ3OWIyY2Y5MDhkZjMwNjMzNDUxfDdlMjIwZDMwMGI1OTQ3ZTU4YTgxYTRhOWQ5YWZiZGM0fDB8MHw2MzkyODI4NzQ3NjI0Njk1NzR8VW5rbm93bnxUV0ZwYkdac2IzZDhleUpGYlhCMGVVMWhjR2tpT25SeWRXVXNJbFlpT2lJd0xqQXVNREF3TUNJc0lsQWlPaUpYYVc0ek1pSXNJa0ZPSWpvaVRXRnBiQ0lzSWxkVUlqb3lmUT09fDB8fHw%3d&sdata=b1pScktsV3hwZGphYlpiYUZmS0huTEJ4UXJRcGp6ek44OWtXOFJ0aXY4ST0%3d https://kimleyhorn-my.sharepoint.com/:f:/r/personal/jonathan_oliver_kimley-horn_com/Documents/SHARED/External%20Shares/Greene%20IFB%202027-003%20-%20Route%20670%20Connector?d=w1d0344edd53649feb34faa0963e1ed2f&csf=1&web=1&e=9zMbi2&xsdata=MDV8MDJ8YnJpYW4ubWNwZXRlcnNAa2ltbGV5LWhvcm4uY29tfDViMzIwMTNhMjIwMDQ3OWIyY2Y5MDhkZjMwNjMzNDUxfDdlMjIwZDMwMGI1OTQ3ZTU4YTgxYTRhOWQ5YWZiZGM0fDB8MHw2MzkyODI4NzQ3NjI0Njk1NzR8VW5rbm93bnxUV0ZwYkdac2IzZDhleUpGYlhCMGVVMWhjR2tpT25SeWRXVXNJbFlpT2lJd0xqQXVNREF3TUNJc0lsQWlPaUpYYVc0ek1pSXNJa0ZPSWpvaVRXRnBiQ0lzSWxkVUlqb3lmUT09fDB8fHw%3d&sdata=b1pScktsV3hwZGphYlpiYUZmS0huTEJ4UXJRcGp6ek44OWtXOFJ0aXY4ST0%3d https://kimleyhorn-my.sharepoint.com/:f:/r/personal/jonathan_oliver_kimley-horn_com/Documents/SHARED/External%20Shares/Greene%20IFB%202027-003%20-%20Route%20670%20Connector?d=w1d0344edd53649feb34faa0963e1ed2f&csf=1&web=1&e=9zMbi2&xsdata=MDV8MDJ8YnJpYW4ubWNwZXRlcnNAa2ltbGV5LWhvcm4uY29tfDViMzIwMTNhMjIwMDQ3OWIyY2Y5MDhkZjMwNjMzNDUxfDdlMjIwZDMwMGI1OTQ3ZTU4YTgxYTRhOWQ5YWZiZGM0fDB8MHw2MzkyODI4NzQ3NjI0Njk1NzR8VW5rbm93bnxUV0ZwYkdac2IzZDhleUpGYlhCMGVVMWhjR2tpT25SeWRXVXNJbFlpT2lJd0xqQXVNREF3TUNJc0lsQWlPaUpYYVc0ek1pSXNJa0ZPSWpvaVRXRnBiQ0lzSWxkVUlqb3lmUT09fDB8fHw%3d&sdata=b1pScktsV3hwZGphYlpiYUZmS0huTEJ4UXJRcGp6ek44OWtXOFJ0aXY4ST0%3d https://kimleyhorn-my.sharepoint.com/:f:/r/personal/jonathan_oliver_kimley-horn_com/Documents/SHARED/External%20Shares/Greene%20IFB%202027-003%20-%20Route%20670%20Connector?d=w1d0344edd53649feb34faa0963e1ed2f&csf=1&web=1&e=9zMbi2&xsdata=MDV8MDJ8YnJpYW4ubWNwZXRlcnNAa2ltbGV5LWhvcm4uY29tfDViMzIwMTNhMjIwMDQ3OWIyY2Y5MDhkZjMwNjMzNDUxfDdlMjIwZDMwMGI1OTQ3ZTU4YTgxYTRhOWQ5YWZiZGM0fDB8MHw2MzkyODI4NzQ3NjI0Njk1NzR8VW5rbm93bnxUV0ZwYkdac2IzZDhleUpGYlhCMGVVMWhjR2tpT25SeWRXVXNJbFlpT2lJd0xqQXVNREF3TUNJc0lsQWlPaUpYYVc0ek1pSXNJa0ZPSWpvaVRXRnBiQ0lzSWxkVUlqb3lmUT09fDB8fHw%3d&sdata=b1pScktsV3hwZGphYlpiYUZmS0huTEJ4UXJRcGp6ek44OWtXOFJ0aXY4ST0%3d https://www.vdot.virginia.gov/about/divisions/alternative-delivery/

2.6.3 Addenda to the RFP Documents, if any, will be posted on the Greene County Bid Board at https://greenecountyva.gov/Bids.aspx.

2.7 Deviations from the RFP Documents

No deviations from the requirements of the RFP Documents will be valid unless they are set forth in an Addendum prior to receipt of the Offeror’s Letter of Submittal.

2.8 Obligation to Meet All of the Requirements of the RFP Documents

If awarded the Design-Build Contract, the Design-Builder will be obligated to meet all of the requirements of the RFP Documents for the Contract Price and within the Contract Time(s). Offerors are on notice that Greene County’s review of Attachments to the Letter of Submittal, as well as its issuance of any Addendum, shall not be construed as relieving the Design- Builder of this obligation. Offerors are on further notice that Greene County will review, comment and/or approve the Design-Builder’s final design after the award of the Design-Build Contract, in accordance with Part 4, Article 2.

3.0 GENERAL PROCEDURES AND REQUIREMENTS

Part 1, Section 3.0 provides general information, procedures and requirements related to the pre-submittal period to be followed by all Offerors.

3.1 Offeror’s Pre-Submittal Responsibilities and Representations

3.1.1 Each Offeror shall be solely responsible for examining the RFP Documents, including any Addenda issued to such documents, and any and all conditions which may in any way affect its Proposal or the performance of the work on the Project, including but not limited to:

.1 Examining and carefully studying the RFP Documents, including any Addenda and other information or data identified in the RFP Documents;

.2 Visiting the Project Site and becoming familiar with the general, local, and Site conditions that may affect the cost, progress, or performance of its work on the Project;

.3 Offerors are prohibited to access Greene County or VDOT right of way and private property within the Project Limits to perform any activities other than to observe the conditions of the site, unless otherwise approved/ authorized in writing by VDOT’s POC included in Part 1, Section 2.4. Unmanned Aerial Systems (UAS) flights during the RFP phase are prohibited unless approved by the Department.

Furthermore, the Offerors are on notice that any unauthorized access to Greene County or VDOT right of way and private property within the Project may be considered sufficient for the disqualification of the Offeror or may render the Offeror’s Proposal non-responsive or both;

https://greenecountyva.gov/Bids.aspx

.4 Contacting each utility owner with facilities existing within the project limits to determine the scope of work for each owner’s utility relocation. The Offeror shall address all potential impacts with each affected utility owner and ensure resolution of all such impacts have been included in the Offeror’s Letter of Submittal and Attachments and Price Proposals;

.5 Addressing all potential impacts with third parties and ensuring all such impacts have been included in the Offeror’s Letter of Submittal and Attachments and Price Proposals;

.6 Becoming familiar with and satisfying itself as to all federal, state, and local laws and regulations that may affect the cost, progress, or performance of its work on the Project;

.7 Determining that the RFP Documents are sufficient to indicate and convey understanding of all terms and conditions for the performance of Offeror’s work on the Project; and

.8 Notifying Greene County in writing, in accordance with the processes set forth in

Part 1, Section 7.0, of all conflicts, errors, ambiguities, or discrepancies that Offeror discovers in the RFP Documents.

Any failure to fulfill these responsibilities is at the Offeror’s sole risk and no relief will be provided by Greene County.

3.2 Pre-Proposal Meeting

Greene County will hold a virtual Pre-Proposal meeting of potential Offerors on the date and time set forth in Part 1, Section 2.3.1.A Teams meeting link and information is provided below:

Join: https://teams.microsoft.com/meet/29612227155714?p=00HtPqHasJmq42iZZr Meeting ID: 296 122 271 557 14 Passcode: Q3LM6fB9

3.3 Utility Meeting

Greene County will hold a virtual Utility Meeting of potential Offerors on the date and time set for in Part 1, Section 2.3.1. A Teams meeting link and information is below:

Join: https://teams.microsoft.com/meet/2235457417474399?p=QYzqkSqiDN7RwxK3Yj Meeting ID: 223 545 741 747 439 9 Passcode: mP6Gg2cP https://teams.microsoft.com/meet/29612227155714?p=00HtPqHasJmq42iZZr https://teams.microsoft.com/meet/2235457417474399?p=QYzqkSqiDN7RwxK3Yj

3.4 Acknowledgment of Receipt of RFP, Revisions and Addenda

Offeror shall provide Greene County the Acknowledgement of Receipt of RFP, Revisions, and/or Addenda (Form C-78-RFP), set forth as Attachment 3.4, signed by the Offeror’s Point of Contact or Principal Officer, with submission of the Proposal, which will serve as acknowledgement that Offeror has received this RFP.

4.0 CONTENTS OF PROPOSALS

Part 1, Section 4.0 describes specific information that must be included in the Letter of Submittal, Attachments to the Letter of Submittal, Price Proposal, and Post Notice of Intent to Award Submittal. The format for the presentation of such information is described in Part 1, Section 6.0.

4.0.1 Offerors will submit a two part Proposal:

.1 The Letter of Submittal will consist of all information required under Part 1, Section

4.1 and Section 4.2 and will be submitted electronically via eVA (https://eva.virginia.gov/) by the date and time set forth in Part 1, Section 2.3.1, and separate from that submitted for the Price Proposal. Offerors shall complete the Letter of Submittal Checklist, Attachment 4.0.1.1, and include it with their Letter of Submittal. The purpose of the Letter of Submittal checklist is to aid the Offeror in ensuring all submittal requirements have been included in the Offeror’s Letter of Submittal and to provide a page reference indicating the location in the Letter of Submittal of each submittal requirement. It shall also include an original signed copy of Acknowledgement of Receipt of RFP, Revisions and/ or Addenda (Form C-78-RFP), Attachment 3.4.

.2 The Price Proposal will consist of the information required by Part 1, Section 4.3, and will be submitted electronically via eVA (https://eva.virginia.gov/) by the date and time set forth in Part 1, Section 2.3.1, and separate from that submitted for the Letter of Submittal. Offerors shall complete the Price Proposal Checklist, Attachment 4.0.1.2, and include it with their Price Proposal. The purpose of the Price Proposal Checklist is to aid the Offeror in ensuring all submittal requirements have been included in the submittal.

4.0.2 Offerors shall be aware that Greene County reserves the right to conduct an independent investigation of any information, including prior experience, identified in a Proposal by contacting project references, accessing public information, contacting independent parties, or any other means. Greene County also reserves the right to request additional information from an Offeror during the evaluation of that Offeror’s Proposal.

4.0.3 If an Offeror has concerns about information included in its Proposal that may be deemed confidential or proprietary, the Offeror shall adhere to the requirements set forth by Part 1, Section 11.1.2.

4.1 Letter of Submittal

4.1.1 The Letter of Submittal shall be on the Offeror's letterhead and identify the full legal name and address of the Offeror. The Offeror is defined as the legal entity who will execute the Contract with Greene County . The Letter of Submittal shall be signed by an authorized representative of Offeror's organization. All signatures on the Letter of Submittal shall be original and handwritten.

4.1.2 Declare Offeror’s intent, if selected, to enter into a contract with Greene County for the Project in accordance with the terms of this RFP.

4.1.3 Pursuant to Part 1, Section 8.2, declare that the offer represented by the Proposal will remain in full force and effect for one hundred twenty (120) days after the date the Price Proposal is submitted to Greene County (“Letter of Submittal & Price Proposal Due Date”).

4.1.4 Identify the name, title, address, phone and fax numbers, and e-mail address of an individual who will serve as the Point Of Contact for the Offeror.

4.1.5 Identify the name, address and telephone number of the individual who will serve as the Principal Officer for the Offeror. (e.g., President, Treasurer, Chairperson of the Board of Directors, etc.).

4.1.6 Identify whether the Offeror will be structured as a corporation, limited liability company, general partnership, joint venture, limited partnership or other form of organization. Identify the team members who will undertake financial responsibility for the Project and describe any liability limitations. If the Offeror is a limited liability company, partnership or joint venture, describe the bonding approach that will be used and the members of such organizations who will have joint and several liability for the performance of the work required for the Project. A single 100% performance bond and a single 100% payment bond shall be provided regardless of any co-surety relationship.

4.1.7 Identify the full legal name of the Lead Contractor, the Lead Designer, and Quality Assurance firm for this Project. The Lead Contractor is defined as the Offeror that will serve as the prime/ general contractor responsible for overall construction of the Project and will serve as the legal entity who will execute the Contract with Greene County. The Lead Designer is defined as the prime design consulting firm responsible for the overall design of this Project. The Quality Assurance firm is defined as the firm proposed by the Offeror to provide the Quality Assurance Manager for the Project.

4.1.8 State the Offeror’s VDOT prequalification number and current VDOT prequalification status (active, inactive, etc.) in the Letter of Submittal. A copy of the current listing of the Firm’s prequalification posted on VDOT’s website indicating Offeror is currently prequalified will be provided in the Attachments to the Letter of Submittal. The Offeror must be in good standing and prequalified to bid on the Project as outlined in VDOT’s Rules Governing Prequalification Privileges at the time of the Letter of Submittal & Price Proposal Due Date. In order to prequalify as a Joint Venture, a completed “Joint Venture Bidding Agreement” must be submitted to and approved by Greene County. A copy of approved Joint Venture Bidding Agreement shall be included in the attachments to the Letter of Submittal.

4.1.9 Provide Final Completion Date. The proposed date herein shall be no later than the date set forth in Part 1, Section 2.3.1. An earlier Final Completion date proposed by the Offeror will be deemed by Greene County as the contractual completion date for the Design-Build Contract for all purposes, including liquidated damages in accordance with Part 3, Section 5.5.

4.2 Attachments to the Letter of Submittal

4.2.1 Provide the full legal name and address of all affiliated and/or subsidiary companies of the Offeror on Attachment 4.2.1. Indicate which companies are affiliates and which companies are subsidiaries. An affiliate shall be considered as any business entity which is closely associated to another business entity so that one entity controls or has power to control the other entity either directly or indirectly; or, when a third party has the power to control or controls both; or where one business entity has been so closely allied with another business entity through an established course of dealings, including but not limited to the lending of financial wherewithal, engaging in joint ventures, etc. as to cause a public perception that the two firms are one entity. Firms that are owned by a holding company or a third party, but otherwise meet the above conditions and do not have interlocking directorships or joint officers serving, are not considered to be affiliates.

If the Offeror does not have any affiliated and/or subsidiary companies, other than the Offeror’s legal business entity, indicate this on Attachment 4.2.1.

The Offeror shall not submit more than one Proposal for this Project. If more than one

Proposal is submitted by an individual, partnership, Corporation, or any party of a Joint Venture, then all Proposals submitted by that individual, partnership, Corporation or Joint Venture shall be disqualified. If more than one Proposal is submitted by an affiliate or subsidiary company of an individual, partnership, Corporation or any party of a Joint Venture, then all Proposals submitted by that individual, partnership, Corporation or Joint Venture shall be disqualified.

4.2.2 Execute and return the attached Certification Regarding Debarment Form(s) Primary Covered Transactions, set forth as Attachment 4.2.2(a) and Certification Regarding Debarment Form(s) Lower Tier Covered Transactions, set forth as Attachment 4.2.2(b) for the Lead Contractor, Lead Designer and Quality Assurance firm.

If Lead Contractor, Lead Designer and Quality Assurance firm are unable to execute the certification, then prospective participant shall attach an explanation to its Certification Regarding Debarment Form. Failure to execute the certification will not necessarily result in denial of award, but will be considered in determining the Offeror’s responsibility. Providing false information may result in federal criminal prosecution or administrative sanctions.

4.2.3 A copy of the current listing of the Firm’s prequalification posted on VDOT’s website indicating Offeror is currently prequalified as outlined in Section III H in VDOT’s Rules

Governing Prequalification Privileges shall be satisfied. A copy of the approved Joint Venture Bidding Agreement, if applicable, shall be included.

4.2.4 Include a letter from a surety or insurance company (with a Best’s Financial Strength Rating of A minus and Financial Size Category VIII or better by A.M. Best Co.) stating that the Offeror is capable of obtaining a performance and payment bond based on the current estimated contract value referenced in Part 1, Section 2.2, which bonds will cover the Project and any warranty periods (per RFP Part 4). The letter of surety shall clearly state the rating categorization noted above and reference the estimated contract value as identified in Part 1, Section 2.2, in a manner similar to the notation provided below:

“As surety for [the above named Contractor], [XYZ Company] with A.M. Best Financial Strength Rating [rating] and Financial Size Category [Size Category] is capable of obtaining 100% Performance Bond and 100% Labor and Materials Payment Bond in the amount of the anticipated cost of construction, and said bonds will cover the Project and any warranty periods as provided for in the Contract Documents on behalf of the Contractor, in the event that such firm be the successful bidder and enter into a contract for this Project.”

4.2.5 All business entities on the Offeror’s proposed team must comply with the law with regard to their organizational structure, any required registration with governmental agencies and/or entities, and any required governmental licensure, whether business, commercial, individual, or professional in nature, and nothing herein is intended to contradict, nor to supersede, State and Federal laws and regulations regarding the same. All business entities on the Offeror’s proposed team shall be eligible at the time of their Proposal, under the law and relevant regulations, to offer and to provide any services proposed or related to the Project. All business entities on the Offeror’s proposed team shall satisfy all commercial and professional registration requirements, including, but not limited to those requirements of the Virginia State Corporation Commission (SCC) and the Virginia Department of Professional and Occupational Regulations (DPOR).

For the Lead Contractor, Lead Designer and Quality Assurance firm, provide full size copies of DPOR licenses and SCC registrations, or evidence indicating the same, should be included in the appendix of the Letter of Submittal. Additionally, the following information should be provided on Attachment 4.2.5:

.1 The SCC registration information for the Lead Contractor, Lead Designer and Quality Assurance firm. Provide the name, registration number, type of corporation and status.

.2 For this Project, the DPOR registration information for each office practicing or offering to practice professional services in Virginia. For the Lead Designer and Quality Assurance firm, provide the business name, address, registration type, registration number and expiration date.

Failure to comply with the law with regard to those legal requirements in Virginia (whether federal or state) regarding your organizational structure, any required registration with governmental agencies and/or entities, and any required governmental licensure, whether business, individual, or professional in nature may render your Proposal, in the sole and reasonable discretion of the Department, non-responsive and in that event your Proposal may not be given any consideration for selection of contract award.

4.2.6 Complete the Work History Forms for both the Lead Contractor and Lead Designer.

Identify on the Lead Contractor Work History Form (Attachment 4.2.6(a)) three (3) relevant projects by the Lead Contractor for this Project as identified in Part 1, Section 4.1.7, focusing on what the Offeror considers most relevant in demonstrating the Lead Contractor’s qualifications to serve as the Lead Contractor for this Project.

If work identified on the Lead Contractor Work History Form was performed by an affiliated or subsidiary company of the Lead Contractor, explain the justification for utilizing an affiliated or subsidiary company to satisfy the relevant project experience on this Project and the control the Lead Contractor will exercise over the affiliated or subsidiary company on this Project.

Additionally, identify the full legal name of the affiliated or subsidiary company, describe their role on this Project, and discuss how the Lead Contractor will be responsible for the work performed by the affiliated or subsidiary company on this Project. For all projects on the Lead Contractor Work History Form, identify the prime design consultant responsible for the overall project design of the projects listed on the Lead Contractor Work History Form.

Identify on the Lead Designer Work History Form (Attachment 4.2.6(b)) three (3) relevant projects by the Lead Designer for this Project identified in Part 1, Section 4.1.7, focusing on what the Offeror considers most relevant in demonstrating the Lead Designer’s qualifications to serve as the Lead Designer for this Project.

For all projects on the Lead Designer Work History Form, identify the prime/ general contractor responsible for overall construction of the projects listed on the Lead Designer Work History Form.

4.2.7 Provide Conceptual Roadway Plans showing the general Project layout. Include 11” x 17” copies of (a) plan view indicating the number of lanes specified in the RFP Information Package, and (b) typical sections of the proposed improvements. Minimally, the Conceptual Roadway Plans shall meet the requirements of the Design Criteria Table (Attachment 2.2.1 of Part 2), indicate that the limits of construction are within the existing/proposed right-of-way limits shown in the RFP Conceptual Plans, and, as applicable, identify:

.1 Lane widths .2 Shoulder widths .3 Horizontal curve data and associated design speeds

.4 Minimum pavement sections .5 Cross slopes

4.3 Price Proposal

The information and attachments provided in Part 1, Section 4.3 shall be submitted on the due date and time set forth in Part 1, Section 2.3.1. If the Price Proposal is not submitted on the above specified date and time, then the Offeror shall be deemed non-responsive and will be disqualified from participating in the design-build procurement for this Project. Offerors shall complete the Price Proposal Checklist, Attachment 4.0.1.2, and include it with their Price Proposal.

The purpose of the Price Proposal Checklist is to aid the Offeror in ensuring all submittal requirements have been included in the submittal. Additionally, the Offeror shall:

4.3.1 Specify, on the form set forth in Attachment 4.3.1, a Cost Breakdown Summary in whole numbers and the Proposal Price, in both numbers and words. Offerors are advised that the prices set forth above shall be considered full compensation to Offeror for all design and construction of this Project, to include: labor, material, equipment, permits, taxes, overhead, profit and any other expenses of any kind applicable to the work to be undertaken by Offeror associated with such work, including, but not limited to, any escalation, extended site overhead, acceleration of schedule, and/or shift of construction sequencing.

4.3.2 Provide the required information set forth in Part 3, Section 6.3, Adjustments to Asphalt Steel, and Fuel Prices.

4.3.3 Provide the Proposal Guaranty required by Section 102.07 of Division I Amendments to the Standard Specifications. A copy of the Proposal Guaranty Form C-24 may be found at http://vdotforms.vdot.virginia.gov/. If the Price Proposal Guaranty is not submitted with the Price Proposal, then the Offeror shall be deemed non-responsive and will be disqualified from participating in the Design-Build procurement for this Project.

4.3.4 Provide the Sworn Statement Forms (C-104, C-105), as set forth in Attachments 4.3.4(a) and 4.3.4(b) respectively.

4.4 Post Notice of Intent to Award Submittals

Within three (3) business days of Notice of Intent to Award, the Successful Offeror shall deliver to Greene County documents required by this Section for its review and approval. Greene County may seek clarifications on any such documents. If Greene County disapproves any such submittal, Greene County may, in its sole discretion, disqualify the Successful Offeror.

4.4.1 Furnish an organizational chart showing the “chain of command” of all companies (including affiliated or subsidiary), including individuals responsible for pertinent disciplines, proposed on the Offeror’s team. Identify major functions to be performed and their reporting relationships in managing, designing and constructing the Project. The organizational chart should show a clear separation and independence of a contractual relationship of any kind with the Quality Control (QC) and Quality Assurance (QA) programs for construction activities. This includes separation between QA and QC inspection and field/laboratory testing in accordance with the http://vdotforms.vdot.virginia.gov/

Minimum Requirements for Quality Assurance and Quality Control on Design Build and P3 Projects, July 2018.

4.4.2 Provide the identity of and information about the following Key Personnel listed below.

This information is to be provided on the Key Personnel Resume Form attached hereto as Attachment 4.4.2(a). At the time of Proposal submittal, the Key Personnel shall be an employee of the respected firm shown on the Organizational Chart and dedicated to the Project.

.1 Design-Build Project Manager (DBPM) – This individual shall be responsible for the overall Project design and construction and shall have the necessary expertise and experience required to supervise and exercise a degree of control of the Work. Work is comprised of all Design-Builder’s design, construction, quality management, contract administration and other services required by the Contract Documents, including procuring and furnishing all materials, equipment, services and labor reasonably inferable from the Contract Documents in a timely manner.

The individual should be capable of answering questions/inquiries relevant to the project. The DBPM shall be responsible for meeting the Design-Builder’s obligations under the Contract and avoiding and resolving disputes under Section

10.2.2 of RFP Part 4 - General Conditions of Contract. This individual shall also coordinate any required public outreach and public meetings.

.2 Quality Assurance Manager (QAM) – This individual shall be from an independent firm that has no contractual relationship of any kind with the Quality Control (QC) firm and no involvement in construction operations (to include QC inspection and testing) for the Project. The QAM shall be responsible for the quality assurance (QA) inspection and testing of all materials used and ensure the overall quality of the work performed on the Project, to include monitoring of the contractor's quality control (QC) program. The QAM will ensure that all work and materials, testing, and sampling are performed in conformance with the contract requirements and the "approved for construction" plans and specifications. This individual shall be a registered, licensed, Professional Engineer in the Commonwealth of Virginia.

.3 Design Manager (DM) – This individual shall be responsible for coordinating the individual design disciplines and ensuring the overall Project design is in conformance with the Contract Documents. The DM shall be responsible for establishing and overseeing a QA/QC program for all pertinent disciplines involved in the design of the Project, including, review of design, working plans, shop drawings, specifications, and constructability of the Project. This individual shall be a registered, licensed, Professional Engineer in the Commonwealth of Virginia.

.4 Construction Manager – This individual, who will be required to be on the

Project site for the duration of construction operations, shall be responsible for managing the construction process to include all Quality Control (QC) activities to ensure the materials used and work performed meet contract requirements and the

“approved for construction” plans and specifications. This individual shall hold a Virginia Department of Environmental Quality (DEQ) Responsible Land Disturber (RLD) Certification and a VDOT Erosion and Sediment Control Contractor Certification for Qualified Personnel (ESCCC-QP) or a statement shall be included indicating this individual will hold these certifications prior to the commencement of construction. Provide a current list of assignments and the anticipated duration of each assignment for all projects in which the Construction Manager is currently obligated.

4.4.3 In accordance with the requirements set forth in Part 1, Section 4.2.5, the following information should be provided on Attachment 4.2.5:

.1 The SCC registration information for each business entity on the Offeror’s proposed team. Provide the name, registration number, type of corporation and status.

.2 For this Project, the DPOR registration information for each office practicing or offering to practice professional services in Virginia for each business entity on the Offeror’s proposed team. Provide the business name, address, registration type, registration number and expiration date.

.3 For this Project, the DPOR license information for each Key Personnel practicing or offering to practice professional services in Virginia. Provide the name, the address, type, the registration number, expiration date and the office location where each Key Personnel member is offering to practice professional services in Virginia.

.4 For this Project, the DPOR license information for those services not regulated by the Board for Architects, Professional Engineers, Land Surveyors, Certified Interior Designers, and Landscape Architects (i.e. real estate appraisal). Provide the name, address, type, the registration number, and the expiration date of the individual offering services in Virginia.

4.4.4 Provide a Proposal Schedule for the entire Project outlining the Offeror’s proposed plan to accomplish the Work. The Proposal Schedule submission should include:

.1 Proposal Schedule: The Proposal Schedule should depict the Offeror’s proposed overall sequence of work, and times during each work task and deliverable required to complete the Project will be accomplished. This shall include all Work necessary to achieve Final Completion by the date in Section 2.3.1. The Proposal Schedule should be organized using a hierarchical Work Breakdown Structure (WBS), broken down into major phases of the Project (i.e. project milestones, project management, Scope Validation Period, design, public involvement, environmental, right-of-way, utility, and construction, etc.) The Proposal Schedule should depict the anticipated project critical path (based on the longest path), reviews by

Department, FHWA, other regulatory agencies; and work by suppliers, subcontractors, and other involved parties, as applicable.

.2 Proposal Schedule Narrative: A Proposal Schedule Narrative shall be provided for the Proposal Schedule submitted that describes the Offeror’s proposed overall plan to accomplish the Work and, if applicable, to attain incentive(s) including, but not limited to the overall sequencing, a description and explanation of the Critical Path, proposed means and methods, and other key assumptions on which the Proposal Schedule is based.

In addition to hard copy, the Offeror shall provide “PDF” copies of the Proposal Schedule and narrative; as well as a back-up copy of the Proposal Schedule’s source document in any of the following electronic file formats: “XER”, “PRX”,”MPP”, or “MPX”, on Bid Express (bidexpress.com). Offerors are to note that in addition to the Proposal Schedule, the Design- Builder will develop and submit a Preliminary Schedule and a Baseline Schedule in accordance with Part 3, Section 11.1.

4.4.5 Provide a Schedule of Items for the Price Proposal utilizing the Schedule of Items Form attached hereto as Attachment 4.4.5. This Schedule of Items shall identify the material quantities and costs of each proposed pay item that make up the total Contract Price. The material quantities and costs listed for each proposed pay item shall, to the extent possible, correspond to VDOT’s list of standard and non-standard pay items. Any items considered for price adjustments shall be identified. The value associated with each pay item shall be inclusive of all direct and indirect costs, overhead, profit and any other expenses of any kind. The items and quantities shall be clearly supported by the escrowed pricing documents. In addition to the “PDF” copy of the Schedule of Items, the Offeror shall provide the Schedule of Items in Microsoft Excel format.

Payment for mobilization shall not be scheduled prior to the initiation of construction work. The pay item for mobilization shall be distributed between two separate installments. The first installment of fifty percent (50%) of the Design-Builder’s total mobilization cost may be scheduled following partial mobilization and initiation of construction work. The second installment may be scheduled following completion of substantial mobilization, including erection of the Design- Builder’s offices and buildings, if any. Preliminary engineering items including, but not limited to, surveying, geotechnical investigations and utility coordination shall not be considered as construction work for the purpose of mobilization. Bonds and insurance premiums, and field office expenses at project start-up will not be considered part of mobilization activities.

4.4.6 Submit, for the Price Proposal, a proposed monthly payment schedule showing the anticipated monthly earnings schedule on which funds will be required.

4.4.7 Provide the Escrow Proposal Documents in accordance with Part 1, Section 11.7

5.0 PROPOSAL EVALUATION AND RESPONSIVENESS REVIEW

https://www.bidexpress.com/

5.0.1 Greene County will open and read the Price Proposals publicly on the date and time set forth in Part 1, Section 2.3.1.

5.0.2 After opening the Price Proposals, Greene County will determine if the Proposal of the Offeror with the lowest Proposal Price for the Project is responsive.

5.0.3 If Greene County considers the Proposal of the Offeror with the lowest Proposal Price to be non-responsive, then Greene County will determine if the Proposal of the Offeror with the next lowest Proposal Price is responsive.

6.0 PROPOSAL SUBMITTAL REQUIREMENTS

Part 1, Section 6.0 describes the requirements that all Offerors must satisfy in submitting Proposals. Failure of any Offeror to submit its Proposal in accordance with this RFP may result in rejection of its Proposal.

6.1 Due Date, Time and Location

The Letter of Submittal and Attachments and Price Proposals shall be submitted submitted electronically via eVA (https://eva.virginia.gov/) by the Offeror by the due date and time set forth in Part 1, Section 2.3.1 (Letter of Submittal Due Date and Price Proposal Submission Date). The Post Notice of Intent to Award Submittals shall be submitted by the Successful Offeror three (3) days after Notice of Intent to Award.

Greene County will not allow late submission after the deadline identified in Part 1, Section

2.3.1. If the Proposals are not submitted on or before the above specified date and time, then the Offeror shall be deemed non-responsive and will be disqualified from participating in the procurement for this Project.

Neither fax nor email submissions will be accepted. Offerors are responsible for effecting delivery via eVA by the deadline set forth in Part 1, Section 2.3.1.

6.2 Format

Preferably, the Technical and Price Proposals should meet Americans with Disabilities Act (ADA) and Section 508 (amendment to the Rehabilitation Act of 1973) requiring electronic documents accessible to people with disabilities. Section 508 reference documentation can be found at https://www.section508.gov/manage/laws-and-policies/

The Proposal format is prescribed below. If Greene County determines that a Proposal does not comply with or satisfy requirements of this Section, Greene County may find such Proposal to be non-responsive and may be disqualified from participating in the design-build procurement for this Project.

https://eva.virginia.gov/ https://www.section508.gov/manage/laws-and-policies/

6.2.1 The 1) Letter of Submittal and Attachments to the Letter of Submittal, 2) Price Proposal, and 3) Post Notice of Intent to Award Submittals shall be submitted electronically via Bid Express (bidexpress.com) by the due date and time set forth in Part 1, Section 2.3.1.

6.2.2 Each Offeror shall submit the Letter of Submittal and Attachments, containing the entire proposal in a single cohesive Adobe PDF file. Photos and graphics contained in the PDF copy shall be compressed to 220 pixels per inch (ppi) or less prior to conversion in order to minimize the file size to the greatest extent possible.

The Letter of Submittal and Attachments to the Letter of Submittal shall be securely bound with an identity on its front cover. Three ring binders are not permissible.

The Letter of Submittal and Attachments to the Letter of Submittal shall be:

• Divided into two volumes:

o Volume I shall:

Include all…