853513janiWmata.pdf
PDF 620 KB Posted
- Attached to
- Janitorial Services
- Solicitation number
- 0000010963
- Issued by
- District of Columbia
About this file
Invitation for Bids Summary
This Invitation for Bids (IFB) document is issued by the Washington Metropolitan Area Transit Authority (WMATA) for janitorial services at multiple District of Columbia and Maryland facilities. WMATA seeks qualified contractors to provide comprehensive janitorial services including personnel, equipment, tools, supplies, and supervision to maintain four primary office locations: Power Branch (1950 Stanford Court, Hyattsville, MD—2,000 sq. ft.), Power Branch (4700 Cobb Road, Hyattsville, MD—5,400 sq. ft.), Power Branch Shady Grove (15903D Sommerville Drive, Derwood, MD—2,700 sq. ft.), and ATCM & TRPM Branch Farrington (6100 Farrington Avenue, Alexandria, VA—10,000 sq. ft.). Services include restroom cleaning, floor maintenance, carpet cleaning, window cleaning, waste removal, and emergency services. The pre-bid conference and site visit are scheduled for October 29, 2026, at 10:00 a.m. Questions must be submitted by November 2, 2026. Bids are due by November 24, 2026, at 2:00 p.m., with bid opening occurring at the same time. The contract is structured as a firm fixed price award for one base year with three one-year renewal options, with approximately 248 working days (Monday through Friday) per year. Services are required between 6:00 a.m. and 2:00 p.m. daily.
This solicitation (IFB No. 0000010963, Contract ID CTRPM277080) is designated as a Small/Micro Business set-aside, restricting responses to certified small businesses only, with no Minority Business Enterprise (MBE) requirements. Bidders must submit pricing for all five line items covering the four locations plus estimated emergency services (up to four events annually). Monthly costs must be inclusive of all labor, materials, daily, weekly, monthly, and semi-annual services. The contractor must provide all equipment, supplies, and cleaning chemicals (except for replenishable items such as paper towels, hand soap, toilet tissue, and trash liners, which WMATA provides). Pre-award evaluation requires submission of financial statements, evidence of technical proficiency through current and completed contracts, proof of responsibility, and background checks for all personnel accessing WMATA facilities. The bidder must acknowledge receipt of all amendments and maintain a bid acceptance period of 120 calendar days. Award will be made to the lowest responsive and responsible bidder.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation for Bids
[Non-Federal]
Title: Janitorial Services
Solicitation No.: 0000010963
Contract Type: Firm Fixed Price
Contract ID: CTRPM277080
Posted Date: Oct 26, 2026 01:00 PM
Pre-Bid Conference & Site Visit Date:
Oct 29, 2026 – 10:00a.m
Question Due Date: Nov 02, 2026
Bid Opening Date: Nov 24, 2026 02:00 PM
Washington Metropolitan Area Transit Authority
Table of Contents NOTICE TO BIDDERS ................................................................ ERROR! BOOKMARK NOT DEFINED.
SOLICITATION, OFFER AND AWARD ...................................... ERROR! BOOKMARK NOT DEFINED.
SOLICITATION INSTRUCTIONS ................................................ ERROR! BOOKMARK NOT DEFINED.
PRE-AWARD EVALUATION DATA ........................................... ERROR! BOOKMARK NOT DEFINED.
TECHNICAL SPECIFICATIONS -- SCOPE OF WORK.............. ERROR! BOOKMARK NOT DEFINED.
PRICE SCHEDULE SHEET ........................................................ ERROR! BOOKMARK NOT DEFINED.
REPRESENTATIONS AND CERTIFICATIONS ......................... ERROR! BOOKMARK NOT DEFINED.
SPECIAL TERMS AND CONDITIONS ....................................... ERROR! BOOKMARK NOT DEFINED.
STANDARD TERMS AND CONDITIONS ................................... ERROR! BOOKMARK NOT DEFINED.
MAPT COOPERATIVE RIDER CLAUSE
APPENDICES .............................................................................. ERROR! BOOKMARK NOT DEFINED.
APPENDIX A -- INSURANCE REQUIREMENTS ................................ ERROR! BOOKMARK NOT DEFINED.
APPENDIX B -- N/A
APPENDIX-B-1 -- SBE ......................................................................... ERROR! BOOKMARK NOT DEFINED.
APPENDIX B-2 -- N/A .......................................................................... ERROR! BOOKMARK NOT DEFINED.
APPENDIX B-3
APPENDIX C -- N/A
APPENDIX D - WMATA SERVICE LEVEL AGREEMENT N/A .......... ERROR! BOOKMARK NOT DEFINED.
GLOSSARY
NOTICE TO BIDDERS
SUBJECT: IFB/EVENT No. 0000010963
The Washington Metropolitan Area Transit Authority (WMATA) is seeking bids from qualified contractors to provide Janitorial Services to include all personnel, equipment, tools, supplies, supervision and other items necessary to perform the services described below in the Scope of Work.
NOTE:
This IFB [ ] Does [ x ] Does Not include Minority Business Enterprise (MBE) requirements.
This IFB [ x ] Is [ ] Is Not being issued as a Small/Micro Business set aside for response from small certified businesses only.
Pre-Bid Conference – A Pre-Bid Conference is scheduled for Oct 29, 2026, at 10:00 a.m. (see Special Terms and Conditions, Section 2). A Site Visit to one of the locations will follow.
Questions - If you have any technical, contractual, or administrative questions, please e-mail them to lpepper@wmata.com no later than close of business, Nov 2, 2026. If an amendment(s) is issued resulting from questions and answers, it will be posted on the WMATA Supplier Portal. Please adhere to the deadline for proposing any questions. All questions must be in writing and may be responded through amendment(s).
Bid Due Date - Your bid must be received with all required submittals as stated below in the IFB, no later than 02:00 PM, Nov 24, 2026.
Temporary Bid results will be displayed publicly on the WMATA Supplier Portal immediately following the bid opening date and time. The final results will be after evaluation and at the time of award.
Preliminary Bid Opening Link:
https://supplier.wmata.com/psp/supplier/SUPPLIER/ERP/c/AUC_MANAGE_BIDS.WT_CL_BID_OPEN_CM
P.GBL
IN ORDER TO ENSURE THAT YOUR BID COMPLIES WITH THE AUTHORITY'S PROCUREMENT
REGULATIONS AND THAT IT WILL BE ACCEPTABLE TO THE AUTHORITY, THE FOLLOWING
FORMS MUST BE COMPLETED, SIGNED (IF INDICATED) & SUBMITTED AS SPECIFIED
BELOW WITH YOUR BID:
PRICE SCHEDULES;
SOLICITATION, OFFER & AWARD FORM;
PRE-AWARD EVALUATION DATA, with requested attachments
REPRESENTATIONS AND CERTIFICATIONS;
CERTIFICATE(S) OF INSURANCE
APPENDIX B-1 - SBE
FAILURE TO SUBMIT ANY PORTION OF THESE REQUIREMENTS AS SPECIFIED MAY CAUSE
YOUR BID TO BE CONSIDERED NONRESPONSIVE AND SUBSEQUENTLY REJECTED.
Please provide a name and email address of the point of contact for your bid in case the Contract Administrator has any questions.
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
SOLICITATION, OFFER AND AWARD
SOLICITATION
SOLICITATION ID:
0000010963
CONTRACT ID: CTRPM277080
SOLICITATION TYPE:
IFB
Date Issued:
Oct 26, 2026 01:00 PM
ISSUED BY:
John T Jackson, Contracting Officer Pepper, Lydia, Contract Administrator
ADDRESS:
Washington Metropolitan Area Transit Authority Office of Procurement and Materials 300 7th Street, SW 5th Floor Washington, DC 20024
CONTACT INFORMATION:
Pepper, Lydia Contract Administrator, at lpepper@wmata.com (email) and (phone).
All bids are subject to the following:
1. The Solicitation Instructions that are attached.
2. The Special and Standard Terms and Conditions that are attached.
3. The Price Schedule.
4. Such other provisions, representations, certifications, and specifications as are attached or incorporated herein by reference.
BIDDER
Name and Address (Street, City, County, State, and zip code)
Email Address Phone Number
DUN & BRADSTREET
ID Number
Check if remittance is different from above -- enter such address in Schedule Name and Title of Person Authorized to Sign Offer (Print or Type)
Signature Offer Date
AWARD (To be completed by WMATA)
ACCEPTANCE AND AWARD ARE HEREBY MADE FOR THE FOLLOWING ITEM(S):
ITEM NO. QUANTITY UNIT UNIT PRICE
Name of Contracting Officer (Print or Type) SIGNATURE AWARD DATE
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
SOLICITATION, OFFER AND AWARD
CONTINUATION SHEET
THE UNDERSIGNED ACKNOWLEDGES RECEIPT OF THE FOLLOWING AMENDMENTS
TO SOLICITATION IFB/EVENT #0000010963
Amendment Number Dated
Amendment Number Dated
Amendment Number Dated
Amendment Number Dated
Amendment Number Dated
Amendment Number Dated
Failure to acknowledge receipt of all amendments may render the bid nonresponsive.
Authorized Signature
Company Name
Date ___________
SOLICITATION INSTRUCTIONS
1. COMMON TERMINOLOGY
The Washington Metropolitan Area Transit Authority (WMATA) shall use electronic commerce whenever practicable or cost-effective. The use of terms commonly associated with paper transactions (e.g., "copy," "document," "page," "printed," "sealed envelope," and "stamped") shall not be interpreted to restrict the use of electronic commerce. Where necessary, Contracting Officers may also supplement the electronic transactions by using other media of transmission to meet the requirements of any contract action governed by these procedures (e.g., correspondence by email, or to transmit hard copies of drawings). The term 'solicitation' shall refer to this Invitation for Bids (IFB).
2. SUBMITTING ELECTRONIC BIDS
a. Electronic bids submitted through the WMATA Supplier Portal are required during the open solicitation period. It is important to pay special attention to the solicitation requirements for submitting your bid. Bids will not be permitted after the stated bid opening time.
b. All bids will be submitted in a format that identifies the specific solicitation number and title.
All formats are accepted except for ZIP, EXE, DLL and XLSM.
c. The electronic bid must contain Bidder's full name, address, phone number, and e-mail address.
d. Bidders will be unable to submit a bid, regardless of format, after the established deadline for the solicitation has passed. Please be sure to verify the bid opening date and review all amendments.
e. When bids are submitted electronically, the Office of Procurement & Materials (PRMT) will be notified automatically by a system-generated e-mail, immediately upon receipt. This e-mail will be anonymous so as not to identify the vendor.
f. Notices sent out from the electronic solicitation system will be sent to the Bidders' designated e-mail addresses. However, each Bidder is responsible for viewing the most current updates and amendments posted on WMATA's Procurement Opportunities webpage. To ensure that all such notices are received, you must make sure that your profile email addresses are up to date.
g. All bids will be electronically dated, and time stamped upon receipt by the system currently in use by WMATA.
h. Submitted bids will remain unopened by WMATA until the scheduled date and time for bid opening.
i. WMATA will not be responsible for any delay of delivery, including delays related to e-mail programs, servers, or acts of nature.
j. If you have questions concerning the e-procurement process, contact our Procurement IT Team at prmt_suppliersupport@wmata.com. Also include the assigned Contract Administrator, whose name and contact information are included in the solicitation.
k. Costs incurred for developing bids in anticipation of award are the responsibility of Bidder and shall not be charged to WMATA.
3. INTRODUCTION
This solicitation is intended to seek proposals from qualified firms who can satisfy the requirements in order to award a contract to perform services and/or provide the supplies as described in the Statement of Work (SOW). Since this is a public invitation for bids, award of a contract hereunder shall be to the bidder whose bid provides the lowest price among all bids that are responsive to the requirements set forth herein.
The Authority contemplates award of a firm fixed price contract. The Authority will not make multiple awards unless the contract is being awarded by line item or the solicitation states the number of the lowest responsive bids that may result in contract awards. (For example, 2 or 3 of the lowest responsive bids.)
4. GOODS TO BE FURNISHED/SERVICES TO BE SUPPLIED
In preparing bids, Bidders are advised that:
a. If "services" are to be performed pursuant to this solicitation, they must be provided in all respects as specified in the Contract and include the services to be furnished, together with any labor, materials or other work necessary for satisfactory and complete performance.
b. If "supplies" are to be provided pursuant to this solicitation, they must be delivered in all respects as specified in the Contract and include the items to be furnished, together with any labor, service or other work necessary for satisfactory and complete performance.
5. PREPARATION OF BIDS
a. Bidders shall furnish all information requested by the solicitation and, in so doing, are expected to examine the solicitation and all referenced documents carefully. Failure to do so will be at the Bidder's risk.
b. Bidder shall sign the Solicitation, Offer and Award form and print or type its name on the Price Schedule and on each continuation sheet, if an entry has been made. Erasures or other changes must be initialed by the person signing the bid.
c. In preparing the bid, the Bidder should be aware that all prices for the work shall be deemed to include the cost of all work, labor and materials required by the Contract including, without limitation, delivery charges, insurance, container charges or other expenses bond premiums or any other expenses incidental to the work, including, authorized travel expenses, as well as expenses for compliance with Federal, state or local laws or regulatory requirements. WMATA does not pay for travel within the Metro transit zone (DC, MD and VA). Travel costs may only be included if authorized by the Statement of Work (SOW). All prices are deemed to be Free on Board (F.O.B.) Destination.
d. Bids shall be submitted on the Price Schedule furnished, or copies thereof, and must be signed, prior to being uploaded. If erasures or other changes appear on the forms, such erasures or changes must be initialed by the person signing the bid.
e. Discounts for prompt payment will not be considered. However, any offered discount will be included within the award of the Contract and the Authority will apply it, if payment is made within the discount period referenced in the bid.
f. The Price Schedule may include prices for one or more items that are unit prices, lump sum bids, or a combination thereof.
g. All bid prices shall be deemed to include the cost of all work, labor and materials required by the Contract, including without limitation, delivery charges, insurance, container charges or any other expenses incidental to the work, including, but not limited to authorized travel expenses, expenses associated with compliance with Federal, state or local laws or regulatory requirements. All bid prices are deemed to be F.O.B. Destination.
h. Unless specifically called for in the Price Schedule, alternate bids will not be considered.
6. EXPLANATIONS TO BIDDERS
a. Any explanation desired by a Bidder regarding the meaning or interpretation of the solicitation or Contract including, without limitation, the terms and conditions, technical specifications or Scope of Work, and Contract drawings, must be requested in writing with sufficient time allowed for a reply to reach all Bidders before the bid opening date. Absent extraordinary circumstances, all inquiries must be transmitted in a time frame to ensure the Contracting Officer's receipt at least ten (10) days prior to the date specified as the bid opening. All such requests must be submitted via e-mail to the Contract Administrator.
Include the solicitation number and Contract title in any correspondence.
b. Any information that WMATA furnishes to a prospective Bidder relating to this solicitation will be provided in writing to all prospective Bidders in the form of an amendment if, in the Contracting Officer's judgment, the information is necessary to the preparation and/or submittal of bids, or lack of such information would be otherwise prejudicial to other prospective Bidders.
c. Oral explanations, representations or instructions of any kind relating to the subject matter of this solicitation given at any time before award of the Contract by any employee, officer or agent of WMATA, will not be binding upon WMATA. WMATA does not assume responsibility for the accuracy of any such communication.
d. The failure of a prospective Bidder to request an explanation will serve to preclude it from claiming any ambiguity, inconsistency or error that should have been discovered by a reasonably prudent Bidder.
7. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF BIDS
a. WMATA reserves the right to amend any of the terms of this solicitation or the Contract prior to the date set for bid opening. Copies of any such amendments will be furnished via email to all prospective Bidders.
b. Bidders are required to acknowledge receipt of all amendment(s) to the solicitation on the designated form to be submitted with their bid. Failure to acknowledge all amendments may cause the bid to be considered not responsive to the solicitation, which would require rejection of the bid.
c. If, in the Contracting Officer's judgment, any amendment(s) would require material changes in bid quantities and/or price, the date set for bid opening may be postponed for such period that, in the Contracting Officer's opinion, will enable Bidders to revise their bids. In such instances, the amendment will include an announcement of the new date for bid opening.
d. In the event of an amendment, all other terms and conditions of the solicitation shall remain unchanged.
8. RESPONSIVE BID
a. Bidders are advised that a bid that is at variance or noncompliant with any provision of this solicitation, including a qualified or conditional bid, may be rejected as non-responsive.
b. The Contracting Officer may reject a bid as non-responsive if, in his or her judgment, the prices are materially unbalanced. Prices are materially unbalanced when they are significantly understated for one or more element(s) of work and significantly overstated for the other element(s) of work.
c. WMATA reserves the right to waive minor errors or omissions in bids and to deem them responsive.
9. WITHDRAWAL OF BIDS
Bids may be withdrawn via email to the Contract Administrator, if received prior to the bid opening date. WMATA reserves the right to accept any bid in its possession as of the bid opening date.
10. BID ACCEPTANCE PERIOD AND BIDDER'S DEFAULT
a. In order to allow for adequate evaluation, the acceptance period for this solicitation is one hundred twenty (120) calendar days after the bid opening date and time. The only acceptable evidence to establish the time of the Authority's receipt is the electronic time/date stamp of that event on the bid generated by WMATA's Supplier's Portal.
b. By submission of its bid, Bidder agrees that it shall be irrevocable and shall remain available to WMATA to award a Contract pursuant to this solicitation for not less than the acceptance period. Bidder's failure to furnish required documents and/or to execute a Contract from WMATA in accordance with its bid, during the acceptance period shall constitute a Bidder's default.
c. In the event of a Bidder's default, Bidder shall be liable to WMATA for all associated damages and costs, including without limitation, WMATA's "cost to cover." The "cost to cover" is the difference between the bid price and the price WMATA ultimately pays for the work encompassed in this solicitation, whether through award of a Contract to another Bidder, pursuant to this solicitation or otherwise.
11. BID MISTAKE
a. A Bidder who seeks to withdraw its bid subsequent to bid opening due to a claimed mistake or error in its preparation shall notify the Contracting Officer, in writing, immediately upon realizing the mistake. Such notification must set forth the details of, and explanation for, the claimed mistake. The Contracting Officer shall evaluate the claimed mistake and determine whether Bidder will be permitted to withdraw its bid. A bid may not be withdrawn before 120 days after bid closing without the Contracting Officer's written approval.
b. In the event of an apparent discrepancy between any unit price and its associated extended price, the unit price will be presumed to be correct. The Contracting Officer may award a Contract to a low Bidder based upon the unit price, subject to the additional terms of this clause.
c. A Bidder claiming a mistake shall, at the Contracting Officer's request, appear before the Contracting Officer to provide testimony and/or documentation that may include Bidder's computation sheets and calculations, to assist in WMATA's determination.
d. Nothing contained herein shall preclude the Contracting Officer from allowing a Bidder to cure a deficiency in an otherwise responsive bid where he or she determines that such deficiency is in the nature of a minor informality or irregularity.
12. PRE-AWARD INFORMATION/CONTRACTOR RESPONSIBILITY
a. In order to be eligible for award of a Contract, a Bidder must affirmatively demonstrate to the Contracting Officer's satisfaction that it is responsible for purposes of contract award.
Such demonstration must include a showing that it maintains the requisite integrity, overall technical expertise and experience, (including prior performance on other WMATA contracts or contracts with other agencies/authorities), and sufficient financial resources to perform the Contract in a timely, satisfactory and appropriate manner. Failure to demonstrate responsibility may result in rejection of Bidder as non-responsible.
b. The Contracting Officer may conduct a pre-award survey and/or take other actions to obtain information regarding the Bidder's responsibility. The bidder shall promptly supply information that the Contracting Officer requests regarding its responsibility, in such manner and form as he or she requests.
c. Among other items, the Contracting Officer shall review the following:
i) A completed and signed "Pre-Award Evaluation Data" form (copy attached), including all referenced financial statements and information; and
ii) Evidence that the Bidder's past performance on contracts with WMATA or other authorities/ agencies was acceptable.
iii) Evidence that the Bidder is not suspended, debarred, proposed for debarment or otherwise excluded from receiving Federal awards in the System for Award Management (SAM) at www.sam.gov.
d. The Bidder's failure to supply this information or otherwise fully cooperate with WMATA's inquiry may result in a determination that the bidder is not responsible for purposes of this solicitation and thereby ineligible for award.
13. PRE-AWARD RESPONSIBILITY MEETING
WMATA reserves the right to require that a pre-award meeting be held with the apparent low Bidder prior to Contract award to further assist WMATA in determining Bidder's responsibility for purposes of award. The Contractor shall be represented at such meeting by individual(s) fully familiar with the Contract's responsibility requirements including, where requested by the Contracting Officer, representative(s) of one or more major subcontractor(s), if there is a question about a subcontractor's responsibility.
14. BASIS FOR CONTRACT AWARD
a. Award(s) of this Contract will be made based solely on the lowest price as stated in the Price Schedule, to the Bidder(s) (i) whose bid is judged to be responsive to the terms of the solicitation and (ii) who demonstrates to the Contracting Officer's satisfaction that it is responsible for purposes of award of this Contract.
b. Except when awarding a requirements contract, WMATA may make multiple awards if the Contract is being awarded by line item or if the solicitation indicates the number of low bidders to whom awards may be made. (ex. 2 or 3 lowest bidders)
c. WMATA reserves the right to reject all bids and cancel this solicitation at any time prior to award.
d. Award notices posted on WMATA's web page (or Supplier Portal) and/or emailed to the apparent low Bidder(s) within the acceptance period shall result in a binding Contract(s) without further action by either party.
e. The Authority reserves the right to seek additional information or clarification from any bidder regarding any minor nonconformance and/or statement that is found to be ambiguous prior to making an award.
15. EQUAL EMPLOYMENT OPPORTUNITY
In order to be eligible for award of a Contract pursuant to this solicitation, Bidder will be required to comply with all applicable Equal Employment Opportunity laws and regulations.
16. WMATA'S TAX EXEMPT STATUS
a. Pursuant to Section 78 of WMATA's Compact, as adopted by the District of Columbia (D.C.
Official Code § 9-1107.01 et seq.), the State of Maryland (Md. Transportation Code §10- 204), and the Commonwealth of Virginia (Code of Virginia § 33.2-3100 et seq.) and consented to by the U.S. Congress in Pub. L. 89-774, 80 Stat. 1324 as amended, WMATA has been accorded exemption from taxes as follows: "WMATA and the Board shall not be required to pay taxes or assessments upon any of the property acquired by it or under its jurisdiction, control, possession or supervision, or upon its activities in the operation and maintenance of any transit facility or upon any revenues therefrom, and the property and income derived therefrom shall be exempted from all Federal, State, District of Columbia, municipal, and local taxation. This exemption shall include without limitation, all motor vehicle license fees, sales taxes and motor fuel taxes."
b. WMATA shall not be required to pay late charges, fines or any form of pre-judgment interest.
c. By submitting the bid, Bidder certifies that none of the taxes that WMATA is exempt from are included in its bid.
d. WMATA shall not be responsible for social security taxes, other employment taxes, income tax, gross receipts taxes or franchise taxes imposed on the Contractor.
e. The Contractor shall notify the Contracting Officer within in 30 days of discovery, (or within 30 days of when an event should have been discovered), of matters that may have resulted in an over charge to WMATA because of inclusion of taxes in the Contract price from which WMATA is exempt under this clause and shall take action as the Contracting Officer directs. WMATA shall be entitled to a reduction in the Contract price reflecting such amount and a refund of monies paid related to such taxes, plus applicable interest.
17. RESTRICTION ON DISCLOSURE AND USE OF DATA
WMATA shall provide all reasonable precautions to ensure that proprietary, technical and pricing information remains within the review process. Bidders shall attach to any proprietary data submitted with the bid the following legend:
a. "The data furnished pursuant to this solicitation shall not be disclosed outside WMATA, be duplicated, or used, in whole or in part, for any purpose other than to evaluate the bid in compliance with WMATA's PARP. If a Contract is awarded on the basis of this bid, WMATA shall have the right to duplicate, use, and disclose this data, in any manner and for any purpose consistent with the execution of the Contract.
b. This legend does not limit WMATA's right to use information contained in this data if WMATA obtains it from another independent, legitimate source.
c. Except for the foregoing limitations, WMATA, its employees or its agents may duplicate, use, and disclose in any manner and for any purpose whatsoever, all data furnished in any proposal to this solicitation."
18. ENGLISH AND UNITED STATES CURRENCY
With respect to both this solicitation and the resultant Contract:
a. All communications (oral, written, electronic and otherwise including but, not limited to, software coding) shall be in English.
b. All pricing shall be in United States dollars.
19. REQUEST FOR RECORDS
WMATA regularly receives requests for records from the public. It is WMATA's policy to make official agency records, including electronic records, available to the public, unless specifically prohibited by WMATA's PARP or applicable laws.
a. "Records" means any existing writings, drawings, maps, recordings, tapes, film, microfilm, correspondence, forms, cards, photographs, optical disks, photocopies, and records stored by computer (electronic records) that are made or received by WMATA in connection with a public contract. A record does not include uncirculated personal notes, papers, electronic records and any other records that were created and retained solely as work papers for personal use of the Contracting Officer, Contract Administrator or other WMATA employee or agent.
b. After award of this Contract, WMATA may release and/or post the name of the successful Bidder and the amount of the award in the ordinary course of business. This information is available on WMATA's website under "Business with Metro" or directly from the Contract Administrator.
c. After award of this Contract, the winning bid as incorporated into this Contract may be subject to release by WMATA in the ordinary course of business or in response to a request for records made pursuant to the PARP. Requests for Records that are not made available during the procurement or debriefing process will be submitted in accordance with the PARP. Requests must be in writing and sent by mail to the PARP Administrator, Legal Department 7E, Washington Metropolitan Area Transit Authority P.O. Box 44390 Washington, D.C. 20026-4390, or by electronic mail at parp@wmata.com or by facsimile to the attention of the PARP Administrator at (202) 962-2550. If a request for records is sent directly to a Contract Administrator, department, or independent office, that entity shall immediately forward the request to the PARP Administrator in the Legal Department. If records are subject to a PARP request, a member of the PARP team will contact the company to begin the PARP document review process, which includes providing detailed written justifications for any information for which exemptions are claimed.
i) detailed written justifications for any information for which exemptions are claimed.
ii) Neither WMATA's bidding process nor the PARP process generally allow for the release of information that would cause competitive harm to the bidders, other organizations, WMATA's employees, or interests. Information that will be withheld includes the following:
1) The bids of unsuccessful bidders, except for the total amount;
2) Personal information (this does not include education and qualifications which are released) about the successful bidder or its employees that is not available to the public on the website of the successful bidder;
3) Unit price details of the successful bid (this does not include the bottom line price, which is released);
4) The names of the bidders who file protest(s) to the solicitation or its award;
5) The written adjudication of any protests;
6) Personal information concerning WMATA's employees; and
7) Trade secrets and confidential commercial or financial information obtained from a bidder.
iii) If your company's records are subject to a PARP request (i.e., if it is the successful Bidder), a broad claim of confidentiality for the entire bid is rarely acceptable, and will likely be rejected during the PARP process. Therefore, WMATA suggests that you narrowly identify your confidential/proprietary information based on the following guidance:
iv) Information that may be withheld/redacted: Detailed pricing except bottom line offer amounts;
v) Public information subject to release:
1) Any information on your company's website;
2) Publicly known information (even if not on your company's website);
3) General company background;
4) Mere compliance with IFB requirements; and
5) Anything standard to the industry.
d. Upon WMATA's request, the successful Bidder shall provide WMATA with a redacted copy of its bid. Redactions shall be made only to those portions or pages of the bid that the successful Bidder claims are confidential. By identifying portions or pages of the bid as confidential, the successful Bidder warrants that it customarily and actually treats the identified portions or pages as confidential. If the successful bid is responsive to a PARP request, WMATA will require Bidder to sign a statement affirming that Bidder customarily and actually treats as confidential all information redacted by Bidder. If any of Bidder's redactions are challenged through a PARP appeal or otherwise, the Bidder shall assist
WMATA in defense of its redactions and reimburse WMATA for any and all damages, liabilities, fees, and other costs incurred by WMATA in defense of Bidder's redactions.
20. NOTICE OF PROTEST POLICY
a. WMATA's procedure for the administrative resolution of protests is set forth in Chapter 17 of WMATA's Office of Procurement & Materials Best Practices Manual (BPM). The procedures contain strict rules for filing a timely protest, for responding to a notice that a protest has been filed, and other procedural matters.
b. The basis on which FTA will review a grantee's protest decision is defined in Chapter 17 of the BPM and in FTA Circular 4220.1G as may be updated from time to time. FTA will generally exercise discretionary jurisdiction over cases deemed to involve issues important to the overall third-party contracting program. FTA's decision to decline jurisdiction over a protest does not imply approval of or agreement with the Authority's decision or that FTA has determined that this Contract is eligible for Federal participation.
c. Alleged violation(s) must be submitted to the Contracting Officer who will administratively decide the protest.
d. Nothing contained herein or in the FTA Circular shall be construed to define WMATA as a federal agency. Legal action, if permitted, contesting WMATA's decisions is governed by the Washington Metropolitan Area Transit Authority Compact, Pub. L. No. 89--774, 80 Stat.
1324 (1966), as amended. Nothing herein shall be construed as a waiver of any of WMATA's immunities from suit.
PRE-AWARD EVALUATION DATA
PROJECT DESCRIPTION: Janitorial Services
1. Name of firm
2. Address:
3. [ ] Individual [ ] Partnership [ ] Corporation [ ] Joint Venture
4. Date organized .
State where incorporated or organized .
5. Names of officers or partners:
a.
b.
c.
d.
e.
f.
6. How long has your firm been in business under its present name?
7. Attach as Schedule One (1) a list of similar current contracts that demonstrate your firm's technical proficiency, each with contract amount, name of contracting party, character or type of work and percentage of completion.
8. Attach as Schedule Two (2) a list of similar contracts, each with contract amount, name of contracting party, and character or type of work for similar contracts completed in the last two
(2) years.
9. In the last two (2) years has your firm been denied an award where it was the apparent low
Bidder? If the answer is yes, attach as Schedule Three (3) the full particulars regarding each occurrence.
10. Has your firm failed to complete, in the last two (2) years, any contract on which it was the successful Bidder? If the answer is yes, attach as Schedule Four (4), the full particulars regarding each occurrence.
11. Financial resources available as working capital for the Contract:
a. Cash on hand: $
b. Sources of credit:
12. Attach as Schedule Five (5) previous two years of financial statements and letters from banks regarding credit as required by "Pre-Award Information" clause.
13. What percentage of work (Contract amount) does your firm intend performing with its own personnel?
14. Attach as Schedule Six (6), a list of all principal subcontractors and the percentage and character of work (Contract amount) that each will perform. Principal items of work shall include, but not be limited to, those items listed in the "Pre-Award Information" clause.
15. If the Contractor or subcontractor is in a joint venture, submit "Pre-Award Evaluation Data" forms for each member of the joint venture.
The above information is confidential and will not be divulged to any unauthorized personnel.
The undersigned certifies to the accuracy of all information.
COMPANY:
SIGNATURE:
NAME:
TITLE:
DATE:
TECHNICAL -- SCOPE OF WORK
SCOPE OF WORK (SOW)
JANITORIAL SERVICES
1. Introduction
The Washington Metropolitan Area Transit Authority (WMATA) is seeking bids from qualified contractors to provide Janitorial Services to include all personnel, equipment, tools, supplies, supervision and other items necessary to perform the services described below in the Scope of Work.
Period of Performance is One Base Year with Three, one-year Options.
The required objective is to maintain the facilities in such a manner that the location provides a clean, healthy, and safe work environment for occupants and visitors of state-owned or leased office facilities:
• Lighting fixtures
• Air-vents / and (the outside)
• Waste-receptacles (including ash-receptacles)
• Restrooms
• Locker rooms / showers
• Entrance / Lobby
• Elevators
• Corridors (including drinking fountains)
• Stairwells
• Landings
• Garages / loading areas
• Driveways
• Sidewalks
• Recycling Rubbish / Waste removal (to dumpster sites)
• Conference / Meeting Rooms/Staff Offices / workstations
• Closets, File, and Storage-rooms
• Floors
• Interior Windows (including window treatments such as blinds, etc.)
• Furniture (including desks, tables, cabinets, work-surfaces, upholstery, etc.)
• 1st Floor, exterior windows
2. Background
The Contractor shall provide all personnel, equipment, tools, supplies, supervision and other items necessary to perform the Janitorial Services as described below under Section I, Locations: WORKLOAD DATA LOCATIONS/HOURS OF OPERATION as set forth in this Scope of Work.
3. Scope of Work
Contractor shall perform the task descriptions that follow, which are the minimum acceptable cleaning performance standards:
A. PER VISIT SERVICES
1. Scrub - Restroom Floors/Hard Surface Stairwell Floors:
Close restrooms. Remove all movable objects from area and place approved closed signage to area prior to completion of task. Apply approved cleaning solution at approved dilution to area to be scrubbed. Do not allow solution to dry.
a) Quickly agitate small section coated with solution with approved stiff bristle brush. Be sure grouting is clean.
b) Use wet vacuum to pick up dirty solutions.
c) Thoroughly mop rinses area with clean cotton mop and clean water. Make sure all walls;
doors, etc. are also thoroughly rinsed.
d) Thoroughly mop a second time with clean cotton mop and clean water. Make sure all walls; doors, etc. are also thoroughly rinsed a second time.
e) After floor is thoroughly dry, replace all objects moved from area. Remove signs and reopen.
f) Scrub all walls including partitions
2. Wall Spot Cleaning:
a) Thoroughly clean all spots, smudges, stains, etc. from walls, partitions and modular partitions using approved chemicals at approved dilutions.
b) Wipe dry with clean soft cloth.
c) Also, thoroughly clean all interior glass with approved alcohol- based glass cleaner and wipe dry with clean dry cloth. All surfaces must be dirt and streak free.
3. Dusting:
a) There shall be no obvious dust streaks.
b) Corners, crevices, molding and ledges (including heating) shall be free of all obvious dust.
c) There shall be no oils, spots or smudges on desk or dusted surfaces.
d) Thoroughly dust all vertical and horizontal surfaces in all cleanable areas with approved dust cloth or tool treated with an approved water-based dust control chemical, up to and including ceiling vents, air bars, and lighting devices, window blinds, etc.
e) Do not move dusting residue from spot to spot but remove directly from the areas in which dirt lies by the most effective means appropriate; treated dusting cloths or vacuum tools.
I. Leave no dust streaks.
II. Leave corners, crevices, molding and ledges free of dust and cobwebs.
III. Leave no oil spots or smudges on dusted surfaces caused by dusting tools.
4. Horizontal surfaces:
a) Include, but are not limited to, counter tops, file cabinets, tables, coatracks, etc.
b) Telephones, ashtrays, etc., must be lifted and dusted under.
c) Do not disturb work papers. Dusting high and low includes, but is not limited to, partition tops, pictures, chair rungs, etc.
d) Window hangings are either Venetian blinds or drapes. Dust Venetian blinds.
e) Lightly vacuum drapes.
5. Remove Recyclable Paper (as applicable):
Pick up all recyclable paper from marked containers centrally located throughout the building and remove to designated containers in the loading dock area. This does not include individual boxes on desks.
6. Clean Air Bars and Vents: Vacuum excess dust and dirt from air bars.
a) Damp wipes clean with approved disinfectant solution and wipe dry.
7. Glass Cleaning (Lobby):
a) Glass Cleaning is a part of the overall task of lobby cleaning.
b) Glass cleaning shall be performed as specified.
c) It is expected that all lobby glass, including doors, revolving doors and windows (to the limit of reach from floor level) shall be spot clean inside and out.
d) All handprints, smudges, and soil are to be removed during the performance of this task.
e) If necessary, clean the entire door, revolving door or window to accomplish clean glass.
8. Cleaning Ash Receptacles and Surrounding Areas:
a) Cigarettes or cigar butts, matches and other discarded material shall be removed from the receptacle and the receptacle wiped so that it is free of dust, ashes, odors, tar, streaks and nicotine stains.
b) Ashtrays placed on the exterior of the building shall be emptied and cleaned as needed to maintain a clean appearance.
c) The areas surrounding such ashtrays and adjacent building entrances are to be included as part of this cleaning task.
d) Sweeping and removal of cigarette butts and emptying of ashtrays as needed to clean the area.
9. Rubbish Removal:
Contractor must bag all waste material and place inside containers provided for that purpose.
10. Damp Wiping:
a) This task consists of using a clean damp cloth or sponge to remove all dirt spots, streaks, from walls, vents glass and other specified surfaces and then drying to provide a polished appearance.
b) The wetting solution must contain an appropriate cleaning agent.
c) When damp wiping in toilet areas, use a multi-purpose disinfectant and deodorizer.
11. Dust Mop:
a) Thoroughly dust mops all non-carpeted areas.
b) Move and dust mop under all easily movable objects (chairs, waste receptacles, tables on wheels, typing stands, boxes, etc.). Be sure to replace all items moved.
c) Dust mops must be treated with water-based dust control chemical.
d) Place dust and dirt into plastic trash bag, tie off and remove to Dumpster.
12. Damp Mop: Thoroughly damp mops all non-carpeted areas.
a) Move and damp mop under all easily movable objects (chairs, waste receptacles, tables on wheels, typing stands, boxes, etc.).
b) Be sure to replace all items after floor has dried completely.
c) Use a clean cotton mop head that is in good condition.
d) Use clean water always (change water often).
e) Mop head must be only damp. No excess water can be left behind.
f) Approved proper chemicals at proper dilution must be used always.
g) Finished floor must be clean and streak free.
h) The floors must be properly prepared, thoroughly swept to remove visible dirt and debris, wads of gum, tar and foreign substances from the floor surfaces.
i) Upon completion of the wet mopping or scrubbing, the floor must be clean and free of dirt, water streaks, mop marks, strings; properly rinsed and dry mopped to present an overall appearance of cleanliness.
j) All surfaces must be dry, and corners and cracks clean after the wet mopping or scrubbing.
k) All furniture readily movable by one person and intended to be moved frequently must be moved during all floor cleaning operations and replaced in original positions upon completion.
l) Baseboards, walls, vents, furniture and equipment must in no way be splashed, disfigured or damaged during these operations, but rather left in a clean condition.
13. Floor Cleaning / Thorough Sweeping:
a) Floors shall be clean and free of trash and foreign matter.
b) No dirt, dust shall be left in corners, behind radiators, under furniture or behind doors.
c) Prepare the floor by sweeping to remove all visible dirt and debris.
14. Empty Waste Receptacles:
a) Empty all containers that are provided for the disposal of waste i.e., waste baskets, torpedo type containers, sanitary napkin disposal bins, boxes, etc. into plastic bags, tie off and remove to dumpster.
b) Dispose of items in waste containers only unless clearly marked for disposal.
c) Liners must be used in all waste receptacles and must be changed as needed and no less than once per month.
d) Waste containers in restrooms; break rooms, lunchrooms and conference rooms must be inspected daily and changed as needed.
15. Restroom Cleaning:
a) When restroom cleaning during the day, an approved sign must be placed at the entrance warning tenants that the restroom is closed.
b) A schedule for closing restrooms must be established with the Facility Manager in advance.
c) Prior to any changes, COTR must approve any changes in this schedule.
15.1 Fill Dispensers (Restroom Cleaning):
Dispensers of all types must be checked daily and filled when necessary (soap, toilet tissue, paper towels, sanitary napkin, (etc.).
15.2 Dusting (Restroom Cleaning):
Completely dust all fixtures, ledges, edges, shelves, exposed pipes, partitions, door frames, tops of file cabinets, etc.
15.3 Pay attention to the tops of these items.
An approved dust cloth or dusting tool, treated with water-based dust control chemical, must be used. Areas not cleared by office occupants are not dusted.
15.4 Disinfect (Restroom Cleaning):
a) Clean and disinfect waste receptacles and dispensers inside and outside.
b) Use proper chemicals for surface to be cleaned at proper dilution. After item has been cleaned completely, wipe item with approved *disinfectant solution and allow air to dry.
c) Clean and Disinfect Sinks (Restroom Cleaning): Thoroughly clean all sinks, including bottom, faucets, and spigots, with approved crème cleanser.
d) Rinse thoroughly as all crème cleanser residues must be removed. Then wipe each item with approved *disinfectant solution and allow air dry.
15.5 Clean Glass and Mirrors (Restroom Cleaning):
a) Thoroughly clean all glass and mirrors using an approved alcohol-based glass cleaner.
Use a soft, clean cloth. Dry completely.
b) Surface should be streak, smear, and smudge free.
c) Make sure attached frames, edges, and shelves are also cleaned and dried as well as the glass surface. Squeegee may be used as needed.
15.6 Clean and Disinfect Toilets and Urinals (Restroom Cleaning):
a) Thoroughly clean toilets, toilet seats, and urinals with approved acid free bowl cleaner, rinse thoroughly. (Approved acid cleaner may not be used more than once per month and should be used on the interior of toilet or urinal only.)
b) Great care must be taken to avoid any chrome when acid cleaner is used).
c) Wipe each toilet, toilet seat and urinal completely with approved disinfectant solution.
Buff-dry to a streak, smear and smudge free "shine". Leave seats in a raised position.
15.7 Clean and Disinfect Walls, Doors, Partitions and Handrails (Restroom Cleaning):
a) Thoroughly clean all walls (including switch and plug covers), doors (including entrance doors inside and outside), partitions and handrails with proper approved chemicals and proper approved dilution.
b) Rinse thoroughly as needed, then wipe all areas with approved *disinfectant solution and allow to dry air.
15.8 Damp Mop - *Disinfectant (Restroom Cleaning):
a) Thoroughly damp mops all non-carpeted areas. Move and damp mop under all easily movable objects (chairs, waste receptacles, tables on wheels, typing stands, boxes, etc.).
b) Be sure to replace all items after floor has dried completely.
c) Use a clean cotton mop head that is in good condition.
d) Use clean water always (change water often).
e) Mop head must be only damp.
f) No excess water can be left behind.
g) Approved proper chemicals at proper dilution must be used always.
h) Finished floor must be clean and streak free.
i) Thoroughly damp mop floor with approved *disinfectant solution.
j) Allow the area to air dry. Note: All disinfectant solutions must be changed after each restroom cleaning.
k) The disinfectant solution used for the damp mopping process is to be emptied down the floor drain in each restroom.
l) This practice will help reduce unpleasant odors coming from the floor drains.
16. Clean and Service Restroom, disinfect Showers, shower walls and stalls (Restroom/Locker Room where applicable):
a) Thoroughly clean all showers, including bottom, faucets, and spigots, with approved crème cleanser.
b) Thoroughly clean all walls, floors, (including plug covers), doors (including entrance doors inside and outside), partitions and handrails with proper approved chemicals and proper approved dilution.
c) Rinse thoroughly as needed, then wipe all areas with approved *disinfectant solution and allow to dry air.
d) Visually check - dispensers must be filled, trash removed, and restrooms spot cleaned as needed and as requested by the CCI.
17. Cleaning, High Traffic Areas:
a) High traffic area is any area that would receive heavy traffic and that would require cleaning as specified.
b) Areas would include corridors, lobbies, waiting areas, conference rooms, or any area so designated by the Contracting
18. Cleaning, High Traffic Areas:
High traffic area is any area that would receive heavy traffic and that would require cleaning as specified.
a) Areas would include corridors, lobbies, waiting areas, conference rooms, or any area designated by the Contracting
B. ONCE PER WEEK SERVICES
1. Damp Mopping and Spray Buffing:
a) Floors shall be slip resistant, free of marks, skipped areas, streaks, and map strands.
b) Walls, baseboards, vents and other surfaces shall be free of splashing and marks from the equipment.
c) The finished area should have a uniform luster.
d) There shall be no buildup of finish in corners.
e) Dust mopping must be performed with a treated mop.
f) After sweeping and damp mopping operation, all floors must be clean and free from strings, bristles and dirt streaks.
g) Leave no dirt in corners, behind radiators, under furniture, behind doors, on stairs or landings.
h) Leave no dirt where sweepings were picked up.
i) Leave no dirt, trash, or foreign matter under desks, tables or chairs.
2. Remove Carpet Runners (as applicable):
a) Carpet runners must be removed from floor to allow for proper cleaning, as needed.
b) Be sure to remove excess water from runner with approved wet pick up vacuum before carpet runners are removed.
c) Carpet runners must be extracted as specified during ice melt/salt usage, to maintain a clean appearance.
3. Replace Carpet Runners (as applicable):
After floor has been properly cleaned and is completely dry, replace carpet runners in their original locations.
C. TWICE PER WEEK SERVICES
1. Carpet Cleaning by Thorough Vacuuming:
a) Carpets shall be clean and free from dust balls, dirt and other debris; nap on carpet shall lie in one direction upon completion of the vacuuming task.
d) Prior to vacuuming area, move and vacuum under all easily movable objects (chairs, waste receptacles, tables on wheels, typing stands, boxes, etc.).
e) Be sure to replace all items moved.
f) After vacuuming, leave all rugs clean, free from dust balls, dirt and other debris.
g) Prior to vacuuming, broom all edges not reached by vacuum. Straight suction vacuuming is not acceptable.
h) The departments require that a motor driven Commercial grade vacuum with HEPA filtered exhaust or equipment that meet these standards be used exclusively in all carpeted areas where water and/or snow does not present a problem.
i) Empty dust and dirt from vacuum cleaner into a plastic trash bag, tie off and remove to a dumpster.
As part of the vacuuming process, carpet spot cleaning is required on an ongoing basis.
D. ONCE PER MONTH SERVICES
1. Carpet Cleaning by Hot Water Extraction:
Perform vacuuming, and carpet cleaning by extraction method with commercial grade equipment only (preferably truck mounted equipment). Prior to carpet cleaning all carpeting, including carpet runners, must be thoroughly cleaned as follows:
a) All movable items must be removed from area(s) to be cleaned (i.e., chairs, waster receptacles, all free-standing tables, typing stands, boxes, plants, all temporary floor coverings, etc.) and area thoroughly vacuumed.
b) Thoroughly spray next area to be cleaned with approved pre-treats or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .