This is a bid package document from the Pennsylvania Department of Transportation (PennDOT) for the I-81/I-80 Concrete Pave Repairs project located in Luzerne County and various municipalities in Pennsylvania. The project encompasses pavement and bridge preservation work across 12 structures along State Routes 0081, 0080, and 8005, totaling 53.27 miles. The scope of work includes concrete pavement patching, dowel bar retrofits, slab stabilization, diamond grinding, pavement markings, overlay work on Interstate 80, bridge deck patching and overlays, fiber-reinforced polymer (FRP) repairs of concrete beams, strip seal replacement, waterproofing, expansion joint work, and SIP form removal. Additional work involves full-depth shoulder reconstruction to support traffic during weekend traffic shifts. Traffic control will primarily utilize short-term nighttime setups with some long-term work zones for weekend lane shifts during bridge deck patching and overlay operations. The project is defined by specific segment offsets on both northbound and southbound segments of SR 0081 and eastbound and westbound segments of SR 0080.

The bid package specifies work locations with detailed segment and offset parameters for precise project boundaries. Traffic management strategies emphasize minimizing disruption through predominantly nighttime construction with limited weekend lane shift work. The document provides approved drawings as part of the bid package to guide contractors on exact scope and specifications. Specific pricing terms, bid submission deadlines, site visit requirements, pre-bid meeting details, and contract award information are contained within the complete bid package documentation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL REPORT

Project: 117838 Bid Package: 1

Current Let: 12/03/2026 11:00:00 AM Version: Current

Addendum Count: 0

District: 04 County: Luzerne

SR/SEC/Group ID: 81/338/---

Description I-81/ I-80 Concrete Pave Repairs Luzerne County

PROPOSAL Report - Project 117838

Page 1 of 122November 3, 2026 16:09:46 PM

TABLE OF CONTENTS

BID PACKAGE SUMMARY 4

PROJECT ITEMS AND QUANTITIES 5

SPECIAL PROVISIONS 12

G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) 12 G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW 12 C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413 13 C172A - a00172 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876 20 C173B - a00173 CHANGES TO SPECIFICATIONS: SECTION 106 26 G311A - a00311 ROAD USER LIQUIDATED DAMAGES (RULD) 29 G401A - a00401 ADVANCE NOTICE OF TRAFFIC RESTRICTIONS 37 G901B - a00901 ALTERNATE EROSION AND SEDIMENT POLLUTION CONTROL PLAN 37 G1101B - a01101 CONSTRUCTION PROCEDURES - EROSION AND SEDIMENT POLLUTION

CONTROL 38

G1601A - a01601 E.E.O. COVERED AREA 39 G1902B - a01902 INSURANCE--GENERAL APPLICATION-ADDITIONAL COVERAGE LIMITS 39 G2201A - a02201 RAILROAD COMPANY CONTACT PERSON 40 00 - a02301 MAINTENANCE AND PROTECTION OF RAILROAD TRAFFIC (3rd Party Flagging Direct Hire) 41 G2302A - a02302 Worker Protection and Investment 42 G4401C - a04401 UTILITIES--FOR USE ON PROJECTS WITH MINIMUM OR NO EXCAVATION 43 N10420A - a10420 VERIFICATION OF VERTICAL CLEARANCES 43 S6012B - b06012 - SECTION 601.3(f) BACKFILLING TRENCH 44 S6092B - b06092-SECTION 609.2(f) MISCELLANEOUS MATERIALS 45 I54A - c00054 ITEM 9000-6170 – PORTLAND CEMENT CONCRETE PAVEMENT TRAINING 46 I64A - c00064 ITEM 9000-0042 - RECESSED WET-REFLECTIVE POLYUREA PAVEMENT

MARKING, 6" WHITE 48

I63A - c00065 9000-0813 - 6" RECESSED BLACK REFLECTIVE PAVEMENT MARKING

TAPE 53

I68C - c00068 ITEM 9000-5101 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION

AGGREGATE 56

I70C - c00070 ITEM 9000-5103 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION

CONCRETE 57

00 - c05162 ITEM 4516-2009 - NEW PAVEMENT JOINT, NON-SKEWED , TYPE D JOINT 58 I6091L - c06091 ITEM 0609-0009 EQUIPMENT PACKAGE 59 I19992A - c19992 ITEM 1999-9999 - TRAINEES 60 00 - c90005 ITEM 9000-0005 FIBER REINFORCED POLYMER (FRP) REPAIR OF CONCRETE

BEAM 62

00 - c90011 ITEM 9000-0001 – EMERGENCY MAINTENANCE OF INTERSTATE 80 AND

INTERSTATE 81 65

00 - C90017 ITEM 9000-0024 THRU 0028 - CONCRETE SPALL REPAIR, TYPE 2, DECK

UNDERSIDE 66

00 - CONSTRUCTION REQUIREMENTS AND RESTRICTIONS 69

Page 2 of 122November 3, 2026 16:09:46 PM

G4011B - CONSTRUCTION/HOLIDAY RESTRICTIONS 74

00 - ITEM 0901-0001 – MAINTENANCE AND PROTECTION OF TRAFFIC DURING

CONSTRUCTION 75

00 - ITEM 4350-0121 – SUBBASE (NO. 2A) FOR SHOULDER BACKUP 77

00 - ITEM 4460-0003 – ASPHALT TACK COAT (NTT/CNTT) MODIFIED FOR CONCRETE

SURFACE 78

00 - ITEM 4514-0001 DIAMOND GRINDING OF CONCRETE PAVEMENT, FOR COLLECTION OF

SLURRY MATERIAL 78

00 - ITEM 4521-0001 - TRANSVERSE JOINT CLEANING AND SEALING, TYPE D JOINT 79

00 - ITEM 4901-0460 - FULL-MATRIX CHANGEABLE MESSAGE SIGN WITH

TELECOMMUNICATIONS (RETAINED BY DEPT) 79

00 - ITEM 5040-0002 & 0003 CONCRETE BRIDGE DECK REPAIR, TYPE 2/3 USING POLYESTER

POLYMER CONCRETE 80

00 - ITEM 5090-1017 NEOPRENE STRIP SEAL GLAND REPLACEMENT, INCLUDING CLEANING

AND PAINTING OF DAM 81

00 - ITEM 9000-0002 - SANDBAG DIKE SYSTEM 82

00 - ITEM 9000-0003 - RESET SANDBAG DIKE SYSTEM 83

00 - ITEM 9000-0004 – 6" PERMANENT PREFORMED PATTERNED REFLECTIVE

PAVEMENT MARKING, WHITE 83

00 - ITEM 9000-0006 THRU 0014 - SOUNDING OF SUBSTRUCTURE UNITS 86

I90012A - ITEM 9000-0015 THRU 0023 & 0039 – MAINTENANCE OF EXISTING BRIDGE 87

00 - ITEM 9000-0029 THRU 0037 - ELASTOMERIC WATERPROOFING MEMBRANE 89

00 - ITEM 9000-0038 DOWNSPOUTING REPAIR 92

00 - ITEM 9000-0040 & 0041 - CONC BRIDGE DECK REPAIR, TYPE 2&3, USING RAPID SET

CONCRETE 93

I90151B - ITEM 9000-0151 UNFORESEEN BRIDGE REPAIRS 94

I90153A - ITEM 9000-0153 - CLASS A CEMENT CONCRETE SPECIAL REPAIRS>2" 96

I90154C - ITEM 9000-0154 SILICONE JOINT SEALING SYSTEM 98

I90163A - ITEM 9000-0156 – BRIDGE EXPANSION JOINT SYSTEM 99

00 - ITEM 9000-0392 ADVANCED QUEUE DETECTION SYSTEM 100

00 - ITEM 9000-1010 - DIAMOND GRINDING OF DECK SURFACE 101

00 - ITEM 9000-1011 - HYBRID COMPOSITE SYNTHETIC CONCRETE (HCSC) OVERLAY 103

00 - ITEM 9000-1012 - SIP FORMWORK REMOVAL 112

00 - ITEM 9000-1013 & 1014 - CONCRETE TYPE 2 & 3 REPAIRS, HCSC 113

00 - ITEM 9000-9468 - LIQUID ASPHALT PATCHING MATERIAL-HOT POUR MASTIC (GRAY) 114

00 - ITEM 9901-0351 DIRECT HIRE FOR PROTECTIVE SERVICES (FLAGGING) 116

G4010C - REQUIRED NOTIFICATIONS 117

S9013A - SECTION 901.3(k) Work Area Pavement Markings 118 00 - SP - Construction Requirements - Railroad - Norfolk Southern 119 00 - SP - Environmental Mitigation Commitments 121 00 - SP - General Requirements – Railroad - Norfolk Southern 122

Page 3 of 122November 3, 2026 16:09:46 PM

BID PACKAGE SUMMARY

Project: 117838 Bid Package: 1

Project Type: Standard Posted:

Federal Project Status: PENNDOT Oversight NHS State Type of Work: RESURFACING/OVERLAYS

Prequalification Required: Yes Pre-Bid Meeting: None

408 Version: 2026-1

Scheduled Let: 12/03/2026 11:00:00 AM Project Cost Range: $30,000,000.00 - $34,999,999.99 Anticipated NTP: 01/18/2027 Structure Work: 24.00%

Required Completion: 09/10/2029 DBE: 0% Wage Rates: Yes

Description:

The project involves pavement and bridge preservations of 12 structures along SR 0081, SR 0080 and SR 8005 located in various municipalities in Luzerne County, PA totaling 53.27 miles. Work consists of concrete pavement patching, dowel bar retrofits, slab stabilization, diamond grinding, pavement markings, overlay on Interstate 80, bridge deck patching and overlays on various structures, FRP repairs of concrete beams, strip seal replacement, waterproofing, expansion joints, and SIP form removal. Other work includes full depth shoulder reconstruction to support traffic during weekend traffic shifts. Traffic will be controlled with mostly short-term night time setups, with some long-term work zones for weekend lane shifts while performing bridge deck patching, overlays and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0081, SECTION 338, in LUZERNE COUNTY and Various Municipalities from NB segment 1414 offset 1200 to NB segment 1784 offset 1605 and SB segment 1415 offset 1900 to SB segment 1785 offset 1561.And for STATE ROUTE 0080, SECTION 338, in LUZERNE COUNTY and Various Municipalities from EB segment 2472 offset 0000 to EB segment 2614 offset 0700 and WB segment 2475 offset 1200 to WB segment 2615 offset 0680.

Additional Information:

This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.

Page 4 of 122November 3, 2026 16:09:46 PM

PROJECT ITEMS AND QUANTITIES

Alt Item Work Class Code Unit Of

Measure Quantity Unit Price PDP Spec

Prov Add Action

0203-0001 C Cubic Yard 653.0000 N

CLASS 1 EXCAVATION

0203-0006 G4 Linear Foot 1,445.0000 N

SAW CUTTING

0313-0726 E Square Yard 1,606.0000 N SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, >/= 30 MILLION ESALs, 25.0 MM MIX, 6" DEPTH

0350-0108 C, E Square Yard 1,328.0000 N

SUBBASE 8" DEPTH (NO. 2A)

4350-0121 C, E Ton 1,000.0000 N Proj

SUBBASE (NO. 2A) FOR SHOULDER BACKUP

0419-0264 F Square Yard 2,086.0000 N

STONE MATRIX ASPHALT MIXTURE DESIGN WITH 0 PERCENT RAP, WEARING COURSE, PG 64E-22, LTS ACCEPTANCE

9.5 MM MIX, 2" DEPTH, SRL-E

0450-1621 F1 Ton 250.0000 N

SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, MANUAL PATCHING, PG 64S-22, 10 TO < 30 MILLION

ESALS, 9.5 MM MIX, SRL-E

0460-0003 F4 Square Yard 2,086.0000 N

ASPHALT TACK COAT (NTT/CNTT)

4460-0003 F4 Square Yard 645,255.0000 N Proj

ASPHALT TACK COAT (NTT/CNTT) MODIFIED FOR CONCRETE SURFACE

0483-3111 F4 Square Yard 645,255.0000 N

POLYMER-MODIFIED EMULSIFIED ASPHALT PAVING SYSTEM (MICRO SURFACING), SINGLE APPLICATION ,TYPE A, SRL-E

0489-2000 F Square Yard 645,255.0000 N

ULTRA-THIN BONDED WEARING COURSE, GRADATION TYPE C, PG 64E-22, SRL-E

0491-0013 F3 Square Yard 480.0000 N MILLING OF ASPHALT PAVEMENT SURFACE, 2" DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR

0491-0019 F3 Square Yard 424.0000 N MILLING OF ASPHALT PAVEMENT SURFACE, VARIABLE DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR

0512-0001 G1, G4 Linear Foot 9,838.0000 N

LONGITUDINAL JOINT CLEANING AND SEALING

0514-0001 G1, G2 Square Yard 1,652.0000 N

DIAMOND GRINDING OF CONCRETE PAVEMENT

4514-0001 G1, G2 Square Yard 13,599.0000 N Proj

DIAMOND GRINDING OF CONCRETE PAVEMENT , FOR COLLECTION OF SLURRY MATERIAL

Page 5 of 122November 3, 2026 16:09:46 PM

0516-2007 G1, G4 Linear Foot 4,272.0000 N

PATCHING JOINT

4516-2009 G1, G4 Linear Foot 4,536.0000 N Proj

NEW PAVEMENT JOINT, NON-SKEWED , TYPE D JOINT

0516-2021 C1, E, G1 Cubic Yard 1,177.0000 N

SUBBASE MATERIAL FOR CONCRETE PAVEMENT PATCHING

0516-3037 G1 Square Yard 1,963.0000 N

ACCELERATED CONCRETE PAVEMENT PATCHING, TYPE A, 13" DEPTH

0516-3047 G1 Square Yard 2,509.0000 N

ACCELERATED CONCRETE PAVEMENT PATCHING, TYPE B, 13" DEPTH

0516-3057 G1 Square Yard 5,767.0000 N

ACCELERATED CONCRETE PAVEMENT PATCHING, TYPE C, 13" DEPTH

4521-0001 G4 Linear Foot 11,804.0000 N Proj

TRANSVERSE JOINT CLEANING AND SEALING , TYPE D JOINT

0527-0001 G4 Each 2,973.0000 N

DOWEL RETROFIT

0591-0001 F3 Square Yard 10,980.0000 N

MILLING OF CEMENT CONCRETE PAVEMENT SURFACE

0608-0001 X Lump Sum 1.0000 N

MOBILIZATION

0609-0003 X Lump Sum 1.0000 N

INSPECTOR'S FIELD OFFICE AND INSPECTION FACILITIES, TYPE B

0609-0009 X Lump Sum 1.0000 N Std

EQUIPMENT PACKAGE

0660-0005 F3 Linear Foot 1,605.0000 N MILLED ASPHALT PAVEMENT SHOULDER/GORE RUMBLE STRIPS FOR INTERSTATES, EXPRESSWAYS AND FREEWAYS

0679-0210 L Each 1,550.0000 N

HOLES DRILLED

0679-0501 L Pound 36,280.0000 N

HIGH DENSITY POLYURETHANE MATERIAL, SLAB STABILIZATION

0686-0040 X Lump Sum 1.0000 N

CONSTRUCTION SURVEYING, TYPE C

0689-0005 X Lump Sum 1.0000 N

CPM SCHEDULE, WITH UPDATES

0690-0001 X Dollar 1,000.0000 $1.00 Y

INTERNAL FACILITATION

0845-0001 M2 Dollar 15,000.0000 $1.00 Y

UNFORESEEN WATER POLLUTION CONTROL

Page 6 of 122November 3, 2026 16:09:46 PM

0850-0022 C1 Square Yard 8.0000 N

ROCK, CLASS R-4

0855-0003 M2 Each 2.0000 N

PUMPED WATER FILTER BAG

0855-0004 M2 Each 2.0000 N

REPLACEMENT PUMPED WATER FILTER BAG

0901-0001 Q Lump Sum 1.0000 N Proj

MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION

0901-0102 Q Each 2.0000 N

SHADOW VEHICLE

0901-0203 Q Each 4.0000 N

ARROW PANEL

0901-0231 Q Day 60.0000 N

ADDITIONAL WARNING LIGHTS, TYPE B

0901-0240 Q, R Square Foot 100.0000 N

ADDITIONAL TRAFFIC CONTROL SIGNS

0901-0320 O Linear Foot 147,604.0000 N

4" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, YELLOW

0901-0330 O Linear Foot 214,039.0000 N

4" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, WHITE

4901-0460 Q Each 3.0000 N Proj FULL-MATRIX CHANGEABLE MESSAGE SIGN WITH TELECOMMUNICATIONS (RETAINED BY DEPARTMENT)

0963-0001 O2, O3 Square Foot 9,734.0000 N

PAVEMENT MARKING REMOVAL

0963-0006 O2, O3 Linear Foot 310,404.0000 N

6" PAVEMENT MARKING REMOVAL

0964-0005 O Linear Foot 173,016.0000 N

6" WHITE EPOXY PAVEMENT MARKINGS

0964-0006 O Linear Foot 147,928.0000 N

6" YELLOW EPOXY PAVEMENT MARKINGS

0964-0008 O Linear Foot 18,001.0000 N

8" WHITE EPOXY PAVEMENT MARKINGS

0964-0011 O Linear Foot 2,595.0000 N

12" WHITE EPOXY PAVEMENT MARKINGS

0964-0021 O Linear Foot 1,367.0000 N

24" WHITE EPOXY PAVEMENT MARKINGS

1017-0002 K1 Square Yard 112.0000 N

Page 7 of 122November 3, 2026 16:09:46 PM

PRESSURE MORTAR SURFACING

5040-0002 S9 Square Foot 4,845.0000 N Proj

CONCRETE BRIDGE DECK REPAIR, TYPE 2 USING POLYESTER POLYMER CONCRETE

5040-0003 S9 Square Foot 610.0000 N Proj

CONCRETE BRIDGE DECK REPAIR, TYPE 3 USING POLYESTER POLYMER CONCRETE

1041-0010 F3, S2 Square Yard 42,175.0000 N

SCARIFICATION, 1/4" DEPTH

1047-0010 S3 Square Yard 645.0000 N

POLYESTER POLYMER CONCRETE OVERLAY, 1"

1047-0011 S3 Square Yard 5,513.0000 N

POLYESTER POLYMER CONCRETE OVERLAY, 1 1/4"

1047-0012 S3 Square Yard 465.0000 N

POLYESTER POLYMER CONCRETE OVERLAY, 1 1/2"

5090-1017 T5 Linear Foot 878.0000 N Proj

NEOPRENE STRIP SEAL GLAND REPLACEMENT , INCLUDING CLEANING AND PAINTING OF DAM

1090-1030 K2, S2 Square Yard 1,652.0000 N

BRIDGE DECK AND APPROACH SLAB CRACK SEALING WITH HMWM

1999-9999 Z Hour 5,000.0000 N Std

TRAINEES

9000-0001 Z Dollar 100,000.0000 $1.00 Y Proj

EMERGENCY MAINTENANCE OF INTERSTATE 80 AND INTERSTATE 81

9000-0002 M2 Linear Foot 150.0000 N Proj

SANDBAG DIKE SYSTEM

9000-0003 M2 Linear Foot 150.0000 N Proj

RESET SANDBAG DIKE SYSTEM

9000-0004 O Each 36,491.0000 N Proj

6" PERMANENT PREFORMED PATTERNED REFLECTIVE PAVEMENT MARKING, WHITE

9000-0005 S2 Square Foot 4,515.0000 N Proj

FIBER REINFORCED POLYMER (FRP) REPAIR OF CONCRETE BEAM

9000-0006 S2 Lump Sum 1.0000 N Proj

SOUNDING OF SUBSTRUCTURE UNITS S-42861

9000-0007 S2 Lump Sum 1.0000 N Proj

SOUNDING OF SUBSTRUCTURE UNITS S-42862

9000-0008 S2 Lump Sum 1.0000 N Proj

SOUNDING OF SUBSTRUCTURE UNITS S-42863

9000-0009 S2 Lump Sum 1.0000 N Proj

SOUNDING OF SUBSTRUCTURE UNITS S-42864

Page 8 of 122November 3, 2026 16:09:46 PM

9000-0010 S2 Lump Sum 1.0000 N Proj

SOUNDING OF SUBSTRUCTURE UNITS S-42865

9000-0011 S2 Lump Sum 1.0000 N Proj

SOUNDING OF SUBSTRUCTURE UNITS S-42866

9000-0012 S2 Lump Sum 1.0000 N Proj

SOUNDING OF SUBSTRUCTURE UNITS S-42867

9000-0013 S2 Lump Sum 1.0000 N Proj

SOUNDING OF SUBSTRUCTURE UNITS S-42868

9000-0014 S2 Lump Sum 1.0000 N Proj

SOUNDING OF SUBSTRUCTURE UNITS S-42869

9000-0015 S2 Dollar 10,000.0000 $1.00 Y Std

MAINTENANCE OF EXISTING BRIDGE S-42861

9000-0016 S2 Dollar 10,000.0000 $1.00 Y Std

MAINTENANCE OF EXISTING BRIDGE S-42862

9000-0017 S2 Dollar 10,000.0000 $1.00 Y Std

MAINTENANCE OF EXISTING BRIDGE S-42863

9000-0018 S2 Dollar 25,000.0000 $1.00 Y Std

MAINTENANCE OF EXISTING BRIDGE S-42864

9000-0019 S2 Dollar 10,000.0000 $1.00 Y Std

MAINTENANCE OF EXISTING BRIDGE S-42865

9000-0020 S2 Dollar 10,000.0000 $1.00 Y Std

MAINTENANCE OF EXISTING BRIDGE S-42866

9000-0021 S2 Dollar 10,000.0000 $1.00 Y Std

MAINTENANCE OF EXISTING BRIDGE S-42867

9000-0022 S2 Dollar 10,000.0000 $1.00 Y Std

MAINTENANCE OF EXISTING BRIDGE S-42868

9000-0023 S2 Dollar 10,000.0000 $1.00 Y Std

MAINTENANCE OF EXISTING BRIDGE S-42869

9000-0024 S2, S9 Square Foot 50.0000 N Proj

CONCRETE SPALL REPAIR, TYPE 2, DECK UNDERSIDE S-42861

9000-0025 S2, S9 Square Foot 40.0000 N Proj

CONCRETE SPALL REPAIR, TYPE 2, DECK UNDERSIDE S-42863

9000-0026 S2, S9 Square Foot 50.0000 N Proj

CONCRETE SPALL REPAIR, TYPE 2, DECK UNDERSIDE S-42865

9000-0027 S2, S9 Square Foot 50.0000 N Proj

CONCRETE SPALL REPAIR, TYPE 2, DECK UNDERSIDE S-42866

9000-0028 S2, S9 Square Foot 30.0000 N Proj

CONCRETE SPALL REPAIR, TYPE 2, DECK UNDERSIDE S-42868

Page 9 of 122November 3, 2026 16:09:46 PM

9000-0029 S2 Square Yard 209.0000 N Proj

ELASTOMERIC WATERPROOFING MEMBRANE S-42861

9000-0030 S2 Square Yard 359.0000 N Proj

ELASTOMERIC WATERPROOFING MEMBRANE S-42862

9000-0031 S2 Square Yard 70.0000 N Proj

ELASTOMERIC WATERPROOFING MEMBRANE S-42863

9000-0032 S2 Square Yard 171.0000 N Proj

ELASTOMERIC WATERPROOFING MEMBRANE S-42864

9000-0033 S2 Square Yard 170.0000 N Proj

ELASTOMERIC WATERPROOFING MEMBRANE S-42865

9000-0034 S2 Square Yard 196.0000 N Proj

ELASTOMERIC WATERPROOFING MEMBRANE S-42866

9000-0035 S2 Square Yard 158.0000 N Proj

ELASTOMERIC WATERPROOFING MEMBRANE S-42867

9000-0036 S2 Square Yard 178.0000 N Proj

ELASTOMERIC WATERPROOFING MEMBRANE S-42868

9000-0037 S2 Square Yard 188.0000 N Proj

ELASTOMERIC WATERPROOFING MEMBRANE S-42869

9000-0038 S2, T7 Lump Sum 1.0000 N Proj

DOWNSPOUTING REPAIR

9000-0039 S2 Dollar 15,000.0000 $1.00 Y Std

MAINTENANCE OF EXISTING BRIDGE S-44189

9000-0040 S2, S9 Square Foot 1,500.0000 N Proj CONCRETE BRIDGE DECK REPAIR, TYPE 2, USING RAPID SET CONCRETE WITHOUT MAGNESIUM PHOSPHATE

9000-0041 S2, S9 Square Foot 450.0000 N Proj CONCRETE BRIDGE DECK REPAIR, TYPE 3, USING RAPID SET CONCRETE WITHOUT MAGNESIUM PHOSPHATE

9000-0042 O, O1 Linear Foot 1,479.0000 N Std

RECESSED WET-REFLECTIVE POLYUREA PAVEMENT MARKING, 6" WHITE

9000-0151 S2 Dollar 315,000.0000 $1.00 Y Std

UNFORESEEN BRIDGE REPAIRS

9000-0153 S2 Cubic Foot 725.0000 N Std

CLASS A CEMENT CONCRETE SPECIAL REPAIRS>2"

9000-0154 G4, S2 Linear Foot 1,161.0000 N Std

SILICONE JOINT SEALING SYSTEM

9000-0156 S2, T6 Linear Foot 852.0000 N Std

BRIDGE EXPANSION JOINT SYSTEM

9000-0392 Q Each 1.0000 N Proj

Page 10 of 122November 3, 2026 16:09:46 PM

ADVANCED QUEUE DETECTION SYSTEM

9000-0813 O, O1 Linear Foot 36,491.0000 N Std

6" RECESSED BLACK REFLECTIVE PAVEMENT MARKING TAPE

9000-1010 G2, S9 Square Yard 1,272.0000 N Proj

DIAMOND GRINDING OF DECK SURFACE

9000-1011 S2, S3 Cubic Yard 54.0000 N Proj

HYBRID COMPOSITE SYNTHETIC CONCRETE (HCSC) OVERLAY

9000-1012 S2 Square Foot 431.0000 N Proj

SIP FORMWORK REMOVAL

9000-1013 S2, S9 Square Foot 1,800.0000 N Proj

CONCRETE TYPE 2 REPAIRS, HCSC

9000-1014 S2, S9 Square Foot 646.0000 N Proj

CONCRETE TYPE 3 REPAIRS, HCSC

9000-5101 X Lump Sum 1.0000 N Std

ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION AGGREGATE

9000-5103 X Lump Sum 1.0000 N Std

ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION CONCRETE

9000-6170 X Lump Sum 1.0000 N Std

PORTLAND CEMENT CONCRETE PAVEMENT TRAINING

9000-9468 G1, G4 Pound 2,833.0000 N Proj

LIQUID ASPHALT PATCHING MATERIAL-HOT POUR MASTIC (GRAY)

9901-0351 X Dollar 10,000.0000 $1.00 Y Proj

DIRECT HIRE FOR PROTECTIVE SERVICES (FLAGGING)

Page 11 of 122November 3, 2026 16:09:46 PM

SPECIAL PROVISIONS

Special Provision: G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) Addendum:

Action:

Item(s) Associated:

Header:

APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL)

Provision Body:

APPLICABLE DESIGNATED SPECIAL PROVISIONS. The following Designated Special Provisions are found in Appendix C and apply to this bid proposal.

DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects.

DSP8. F.A.R. - Required Contract Provisions Federal-Aid Construction Contracts FHWA-1273 (Revised October 23, 2023). Also attached to the Proposal/Contract.

DSP9. Special Supplement - Anti-Pollution Measures - August 26, 1999.

DSP12. Executive Order 11246, with Appendix A and B.

DSP13. Buy America.

DSP15. Commonwealth Standard Terms and Conditions.

DSP16. Lobbying Certification Form. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).

DSP17. Federal Audit Clause.

DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances.

DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities.

Project Specific Details:

Special Provision: G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW Addendum:

CONTRACT PROVISIONS - RIGHT TO KNOW LAW

Page 12 of 122November 3, 2026 16:09:46 PM

Provision Body:

I. Contract Provisions – Right to Know Law 8-K-1532

a. The Pennsylvania Right-to-Know Law (RTKL), 65 P.S. §§ 67.101-3104, applies to this Contract.

b. If the Department needs assistance in any matter arising out of the RTKL related to this Contract, the Department will notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Department.

c. Upon written notification from the Department that it requires assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor will:

1. Provide the Department, within 10 calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Department reasonably believes is Requested Information and may be a public record under the RTKL; and

2. Provide such other assistance as the Department may reasonably request, in order to comply with the RTKL with respect to this Contract.

d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, notify the Department and provide, within 7 calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.

e. The Department will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Department determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Department determine that the Requested Information is clearly not exempt from disclosure, provide the Requested Information within 7 calendar days of receipt of written notification of the Department’s determination.

f. Failing to provide the Requested Information within the time period required by these provisions, indemnify and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of this failure, including any statutory damages assessed against the Department.

g. The Department will reimburse the Contractor for any costs associated with complying with these provisions only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.

h. The Contractor may file a legal challenge to any Department decision to release a record to the public with the Office of Open Records, or in the Pennsylvania Courts, however, indemnify the Department for any legal expenses incurred by the Department as a result of such a challenge and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of the failure, including any statutory damages assessed against the Department, regardless of the outcome of such legal challenge. As between the parties, agree to waive all rights or remedies that may be available as a result of the Department’s disclosure of Requested information pursuant to the RTKL.

i. The Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Contract and continue as long as the Requested Information remains in the Contractor's possession.

Special Provision: C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413

Addendum:

Action:

Item(s) Associated:

Page 13 of 122November 3, 2026 16:09:46 PM

CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413

Provision Body:

SECTION 313—SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, BASE COURSE

Section 313.3(m) Tests for Depth. Revise to read as follows:•

(m) Tests for Depth.

(m) Tests for Depth. Replace with the following:

Control the loose depth of each layer to construct the base course to the compacted depth indicated and within the specified tolerance. On the top lift and in the presence of the Inspector, drill full-depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed base course and at other locations the Inspector suspects are deficient. After the Inspector completes depth measurements, backfill, compact, and seal core holes with the mixture used to construct the course.

The Inspector will measure the full-depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. Immediately delineate the limits of pavement deficient in depth from the core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is less than 1/2 inch deficient of the design depth. The defective course will be the full width of the affected lane.

SECTION 314—SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, ASPHALT RICH BASE COURSE

Section 314.3(m) Tests for Depth. Revise to read as follows:•

(m) Tests for Depth.

(m) Tests for Depth. Replace with the following:

Control the loose depth of each layer to construct the ARBC to the compacted depth indicated and within the specified tolerance. In the presence of the Inspector, drill full-depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed ARBC and at other locations the Inspector suspects are deficient. After the Inspector completes depth measurements, backfill, compact, and seal core holes with ARBC.

The Inspector will measure the full-depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. Immediately delineate the limits of pavement deficient in depth from the core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is less than 1/2 inch deficient of the design depth. The defective course will be the full width of the affected lane.

SECTION 360—ASPHALT TREATED PERMEABLE BASE COURSE

Section 360.2(e)3. Production. Revise to read as follows:•

3. Production. During the first day of production, take at least three asphalt content and gradation tests to verify the mixture conforms to the JMF. After the first day, perform tests for asphalt content and aggregate gradation according to the QC Plan and PTM No. 1. Produce ATPBC conforming to the gradation requirements in Table A and with an asphalt content within 0.8% of the JMF (n=1). Ensure the aggregate is uniformly coated with asphalt and no runoff of excess asphalt is observed.

Section 360.3(m). Tests for Depth. Revise to read as follows:•

(m) Tests for Depth: Binder and Wearing Courses. Replace with the following:

Carefully dig or drill one random 6-inch diameter test hole selected by the Representative according to PTM No. 1 to the full depth of the ATPBC for each 3,000 square yards, or less, of completed base course. The Representative may require additional test holes in areas the Representative suspects are deficient in depth. The Representative will measure the depth of the base course. Using material acceptable to the Representative, backfill the test holes and compact the material to fill the test hole flush with the completed base course.

Page 14 of 122November 3, 2026 16:09:46 PM

ATPBC deficient in depth by 1/2 inch or more is defective. Immediately delineate the limits of ATPBC deficient in depth from the location by proceeding longitudinally, forward and backward, obtaining additional test holes every 50 feet until the depth is less than 1/2 inch deficient of the indicated depth. The defective course will be the full width of the affected lane.

SECTION 410—SUPERPAVE MIXTURE DESIGN, STANDARD AND RPS CONSTRUCTION OF PLANT-MIXED ASPHALT FINE-

GRADED COURSES

Section 410.3. CONSTRUCTION. Revise to read as follows:•

410.3 CONSTRUCTION—Section 413.3 using the test procedures, limits, and tolerances for a 9.5 mm nominal maximum aggregate size mixture except where procedures, limits and tolerances are specifically indicated for a 9.5 mm fine-graded nominal maximum aggregate size mixture and as modified as follows:

Revise Table G to include 9.5 mm Fine Grade Wearing Course as follows:

TABLE G

Mixture Minimum Indicated Compacted Depths

Mixture Minimum Depth

9.5 mm Fine Grade Wearing Course 1 inch

SECTION 412—SUPERPAVE MIXTURE DESIGN, CONSTRUCTION OF PLANT-MIXED 6.3 MM ASPHALT OVERLAY COURSES

Section 412.3(a)2. Preplacement Meeting. Revise to read as follows:•

2. Preplacement Meeting. At least 2 weeks before placing asphalt paving mixtures, schedule an asphalt preplacement meeting with the Representative to review at a minimum the specification, paving operation QC Plan, sequence of paving operations, asphalt mixture temperature checks, mixture acceptance, density acceptance and the care and custody of asphalt acceptance samples.

Section 412.3(h)1.a. Placing. Revise to read as follows:•

1.a Placing. Unless otherwise allowed, deliver, place, and compact 6.3 mm paving mixtures during daylight hours. Ensure the mixture does not contain lumps of cold material. Deliver and place 6.3 mm paving mixtures at the laying temperatures specified in Table B.

Material placed outside the temperature limits as specified in Table B is defective.

Utilize a Material Transfer Vehicle (MTV) as specified in Section 108.05(c)5 for 6.3 mm paving mixtures unless otherwise approved by the Representative.

Section 412.4(a)4.b. Dispute Resolution. Revise TABLE H to read as follows:•

TABLE H

Dispute Resolution Retest Cost Table

Test Method

Mixture Acceptance Retest Cost if Retest Results Indicate

100% Pay Factor(s) for Full Lots (n > 3)* or Single Sample (n=1) Requirements in Table B were met for Partial Lots (n < 3)**

Mixture Acceptance Retest Cost if Retest Results Indicate

< 100% Pay Factor(s) for Full Lots (n > 3)* or Single Sample (n=1) Requirements in Table B were not met for Partial Lots (n < 3)**

PTM No.

702/739 $900 $3,500

PTM No. 757 $500 $2,000

Page 15 of 122November 3, 2026 16:09:46 PM

* For full lots (n ≥ 3) where the original test results indicated a defective lot, only the pay factor(s) where original test results indicated a defective lot for asphalt content or percent passing the 75 μm (No. 200) sieve will be utilized to determine the retest cost.

** For partial lots (n < 3) where the original test results indicated a pay parameter (asphalt content, percent passing the 75 µm (No. 200) sieve, or both) did not meet the Single Sample (n = 1) requirements in Table B, only the pay parameter(s) that did not meet the Single Sample (n =1) requirements will be utilized to determine the retest cost.

SECTION 413—SUPERPAVE MIXTURE DESIGN, STANDARD AND RPS CONSTRUCTION OF PLANT-MIXED ASPHALT

COURSES WITH PERCENT WITHIN LIMITS AND LTS TESTING (PWS-LTS)

Section 413.2(e)1. Recycled Asphalt Material. Revise to read as follows:•

1. Virgin Material Mixtures. Size, uniformly grade, and combine aggregate fractions, asphalt binder, and either WMA Technology additive(s) or modifier(s) in proportions to produce a JMF that conforms to the material, gradation, and volumetric Superpave Asphalt Mixture Design requirements according to Bulletin 27, Chapter 2A. Produce an asphalt mixture for the specified nominal maximum aggregate size and design ESALs except as procedurally modified by the WMA Technology Manufacturer Technical Representative (Technical Representative) to address laboratory procedures when preparing, compacting and testing asphalt mixtures to achieve a uniform blend. Special additive(s) or modifier(s) need not be used if mixture temperature, workability, and compaction can be achieved solely through plant mechanical modification to produce foamed asphalt. Do not incorporate the WMA Technology additive, modifier or process during the volumetric asphalt mixture design process, so that the JMF volumetrics and material percentages are based on a mixture with no WMA Technology. Only use the WMA Technology additive, modifier or process to evaluate results from moisture susceptibility testing during the mix design process. Develop an asphalt mixture JMF, then incorporate the WMA Technology additive, modifier, or process into that JMF during production. Create an asphalt JMF cover sheet (Form TR-448A) for approval containing the WMA Technology used, additive dosage rate or percent water added for foaming, material code, and the TSR data from the moisture susceptibility testing.

Submit a copy of each completed JMF, signed by a certified Asphalt Level 2 plant technician, to the DME/DMM at least 3 weeks before the planned start of mixture production. Include a list of all material sources and the asphalt mixture producer in the JMF.

Provide the calibration factors (Cf and 200 Cf) according to PTM No. 757 with the JMF. Do not start mixture production until after the DME/DMM reviews the JMF.

Submit a new JMF with a change in material sources or if a new JMF is necessary to produce a mixture conforming to this specification.

No additional revisions were made to Section 413.2(e)1.•

Section 413.2(e)1.d.5. Volumetric Analysis of Compacted Specimens. Revise TABLE A as follows:•

TABLE A

Job-Mix Formula Composition Tolerance Requirements of the Completed Mix

Single Sample (n=1) Multiple

Samples (n > 3)

Gradation Passing 12.5 mm (1/2 inch) and Larger Sieves +8% +6% Passing 9.5 mm (3/8 inch) to 150 µm (No. 100) Sieves (Inclusive) +6% +4%

Passing 75 µm (No. 200) Sieve +3.0% +2.0% Asphalt Content

19.0 mm Asphalt mixtures and smaller +0.7% +0.4%

25.0 mm Asphalt mixtures and larger +0.8% +0.5%

Temperature of Mixture (F) Chemical, Organic, Foaming Additives

Mechanical Foaming Equipment/Process

Class of Material

Type of Material Maximum*

Page 16 of 122November 3, 2026 16:09:46 PM

Minimum* Minimum* PG 58S-28 Asphalt Binder 215 230 310 PG 64S-22 Asphalt Binder 220 240 320 PG 64E-22 Asphalt Binder 240 260 330

All other Binders Asphalt Binder

The higher of 215 or the minimum temp.

specified in Bulletin 25 minus 45F

The higher of 230 or the minimum temp.

specified in Bulletin 25 minus 30F

As specified in Bulletin

* Outline in the Producer QC Plan and follow more restrictive temperature requirements provided by the WMA technology manufacturer or Technical Representative(s) for production and placement of the mixture. Determine the SGC compaction temperature for the production QC which yields the same target air voids as the designed JMF. Include the SGC compaction temperature in the Producer QC Plan. Compact the completed mixture in the SGC for QC volumetric analysis at the SGC compaction temperature according to the guidelines provided by the Technical Representative.

Section 413.2(i)2. Certification Acceptance. Revise to read as follows:•

2. Certification Acceptance. Acceptance by certification is appropriate for the following mixtures, conditions, or applications:

Scratch courses, leveling courses less than 2-inch depth and driveway adjustments.•

Mixtures used by Department maintenance forces.•

Mixtures purchased by local or municipal governments.•

Mixtures placed in quantities not exceeding 500 tons in a continuous placement operation unless otherwise directed by the Representative.

Mixtures used for parking lots.•

All 4.75 mm NMAS asphalt mixtures.•

Other mixtures, conditions, or applications as approved by the Representative.•

2.a General. Obtain certification from the mixture Producer. Use all QC tests during mixture production as acceptance tests. Certify mixtures using Form CS-4171B. Include, or attach, the QC test results on the form. Provide the form to the Inspector-in-Charge within 1 working day after completing the QC tests. Certify mixtures as specified in Section 106.03(b)3 and the requirements below.

2.b Certification of Mixture. Certify each mixture daily if QC test results conform to the single sample and multiple sample JMF production tolerances of Table A. The acceptance values will be:

Asphalt Content.•

Percent Passing the 2.36 mm (No. 8) sieve (not applicable for 4.75 mm NMAS asphalt mixtures).•

Percent Passing the 75 µm (No. 200) sieve.•

If using printed ticket results in place of laboratory test results for asphalt content, certify that at least 90% of each day’s printed ticket results for asphalt content are within 0.2 percentage points of the JMF.

If the mixture does not conform to the above requirements, do not certify the mixture. Instead, provide all QC test results to the Inspector-in-Charge. If using printed ticket results for asphalt content, provide the percentage of daily printed ticket results within 0.2 percentage points of the JMF to the Inspector-in-Charge. Payment will be determined according to Table H based on the QC test results.

If a day’s production is interrupted by corrective action, material produced after the corrective action may be certified if QC test results conform to production tolerances.

2.c Maintaining Approval to Certify Mixtures. The Department may suspend a plant’s approval to certify mixtures if QC is not performed according to the Producer QC Plan, mixtures are not produced according to Bulletin 27, a mixture cannot be certified on 2

Page 17 of 122November 3, 2026 16:09:46 PM consecutive production days, or as described below.

The Department may take IA samples of the completed mixture at the plant. In the presence of the Department, test the IA samples for asphalt content and gradation according to the test methods indicated in the Producer QC Plan. Take immediate corrective actions if the mixture does not conform to Table A.

The Department may take QA samples of the completed mixture at the plant or on the roadway directly from the uncompacted mixture placed by the paving equipment specified in Section 413.3(e). The Department will test QA samples according to PTM No. 757 or PTM No. 702, Modified Method D, if previously identified problematic aggregates are used in the mixture, for conformance to Table A. If the results of the QA samples do not comply with Table A, review the Producer QC Plan and the QC test results that followed the QA samples for conformance to Table A. If QC results do not conform to Table A, perform the corrective actions necessary to provide a mixture conforming to Table A.

After completing corrective actions or the sample review, the Department will perform an on-site evaluation of the Producer’s plant operation and QC and then take a sample of the completed mixture at the plant. In the presence of the Representative, test the sample.

If the sample does not comply with Table A, the Department will suspend certification. Immediately suspend shipping mixtures accepted by certification to the project.

After testing verifies that the produced mixture conforms to Tables A and B and with the Representative present, conduct JMF verification according to the Producer QC Plan. After successfully completing JMF verification, resume both certification and shipping mixtures accepted by certification to the project.

Section 413.3(a)2. Preplacement Meeting. Revise to read as follows:•

2. Preplacement Meeting. At least 2 weeks before placing asphalt paving mixtures, schedule an asphalt preplacement meeting with the Representative to review at a minimum the specification, paving operation QC Plan, sequence of paving operations, asphalt mixture temperature checks, mixture acceptance, density acceptance and the care and custody of asphalt acceptance samples.

Section 413.3(d). Hauling Equipment. Revise to read as follows:•

(d) Hauling Equipment. Haul the mixtures in tightly sealed vehicles that do not contain petroleum oils, solvents, or other materials that adversely affect asphalt mixture. Provide covers of sufficient size and quality to protect the entire load under all conditions.

Maintain the proper and uniform placement temperature as specified in Section 413.3(h)1. Provide insulation on all sides of the truck body, a double-walled truck body, or a heated truck body when the air temperature is below 50F from October 1 to April 30. Provide a 3/8-inch diameter hole near the center and approximately two-thirds the distance down from the top of the vehicular box, on both sides, to allow for asphalt mixture temperature checks. If trucks cannot be provided with these holes, provide the Representative with two infrared temperature devices along with documentation that the devices were verified annually through an independent verification service or with a blackbody calibration block before paving for asphalt mixture temperature checks.

Section 413.3(f). Rollers. Revise to read as follows:•

(f) Rollers. Use steel wheel, pneumatic tire, vibratory, or oscillating rollers as specified in Sections 108.05(c)3.a, 3.b, 3.c, 3.e, 3.f, 3.h, or (c)4. Operate rollers according to manufacturer's recommendations. Use vibratory and oscillating rollers with separate controls for frequency and amplitude.

Section 413.3(h)1.a. Placing. Revise to read as follows:•

1.a Placing. Unless otherwise allowed or indicated, deliver, place, and compact asphalt paving mixtures during daylight hours.

Ensure the mixture does not contain lumps of cold material. Deliver and place mixtures at the laying temperatures specified in Table A for the type and class of material used. Do not incorporate any material delivered outside the temperature limits as specified in Table A. Material placed outside the temperature limits as specified in Table A is defective.

Utilize a Material Transfer Vehicle (MTV) as specified in Section 108.05(c)5 for RPS pavements unless otherwise approved by the Representative.

Section 413.3(h)1.e. Safety Edge. Revise to read as follows:•

1.e. Safety Edge. Construct the Safety Edge as the standard edge treatment on the outside edge of asphalt pavements and shoulders. Use the Safety Edge for both wearing and binder courses with a depth of 1.5 inches or greater. Do not place the Safety Edge at total depths greater than 5 inches. The Safety Edge is not required where curb or sidewalk are encountered or where the face of guiderail is directly over the edge of pavements. Do not place the Safety Edge for base, leveling, or scratch courses.

Page 18 of 122November 3, 2026 16:09:46 PM

Construct the Safety Edge with the same material used to construct the roadway course being placed or, if specified, the paved shoulders. Attach a device to the paver to confine material at the end gate and extrude the asphalt material in a wedge shape. Use an adjustable device that allows the operator to vary the slope extruded at the paver to account for the angle becoming steeper during compaction (roll up). Before construction, the Safety Edge device must be approved by the Representative(s).

Compact the roadway or paved shoulder as required by the specifications. Do not delay rolling of the mat adjacent to the Safety Edge. After compaction of the mat is complete, provide a Safety Edge meeting the final shape requirements as shown on the Standard Drawings. The completed angle of the Safety Edge must be 26 degrees to 40 degrees measured from the pavement cross slope extended. At the beginning of each day’s paving, measure the angle of the Safety Edge from the pavement cross slope extended. Perform measurements after final compaction is complete. If the angle of the Safety Edge does not meet the slope requirements, stop paving, and provide corrective action. Do not resume production paving until final shape requirements of Safety Edge are achieved.

Allow automatic transition to intersections, driveways, guiderail sections, and obstructions.

Use the device to constrain the asphalt head, reducing the area and increasing the density of the extruded profile. A single plate strike-off method is not allowed. Do not place the Safety Edge on organic material.

Section 413.3(h)2.a.1. Partially Completed Lots (n=2 or less). Revise to read as follows:•

2.a.1 Partially Completed Lots (n=2 or less). When process conditions change to an extent that a partially completed lot cannot be combined with the most recently completed lot, samples will be independently evaluated on the partially completed lot. For asphalt content and percent passing the 75 μm (No. 200) sieve, mixture acceptance samples will be evaluated individually as specified in Section 413.2(e), Table A (n=1) criteria. For density, mat density acceptance samples will be evaluated individually using the criteria in Table E.

If samples tested for asphalt content and percent passing the 75 μm (No. 200) sieve meet the n=1 criteria of Table A, and samples tested for density meet the criteria in Table E, payment will be 100% of the contract unit price. If samples tested for asphalt content and percent passing the 75 μm (No. 200) sieve do not meet the n=1 criteria of Table A, the material will be considered defective. If samples tested for density are no more than 2.0% below the minimum or no more than 2.0% above the maximum limits of Table E, payment will be 90% of the contract unit price. If samples for density are more than 2.0% below the minimum or more than 2.0% above the maximum limits of Table E, the pavement will be considered defective.

Unless otherwise directed in writing by the District Executive, remove and replace defective work.

No additional revisions were made to Section 413.3(h)2.a.1.•

Section 413.3(h)2.c.1. LTS Testing. Revise to read as follows:•

2.c.1 LTS Testing. The LTS will test the mixture acceptance samples according to PTM No. 757 or PTM No. 702, Modified Method D and PTM No. 739, if previously identified problematic aggregates are used in the mixture, to determine asphalt content and the percent passing the 75 μm (No. 200) sieve. The LTS will use the calibration factors (Cf and 200 Cf) provided with the JMF for PTM No. 757. For individual increment test results outside of the single sample (n=1) tolerances in Table A, the LTS will analyze the test results for extreme values according to PTM No. 4 at the 5% significance level. If discarding an extreme value reduces a lot to less than three remaining test results, the Department will accept the lot as specified in Section 413.3(h)2.a.1. The Department will accept lots with three or more test results as specified in Section 413.4(a)4 or Section 413.4(b).

If the asphalt content or the percent passing the 75 μm (No. 200) sieve is not within the single sample (n=1) or multiple sample (n≥3) tolerances in Table A for two consecutive lots or a total of three lots, stop all production of the JMF. Determine the cause of the problem and provide a proposed solution to the Department.

Do not resume production of the JMF until the Representative reviews the proposed solution and authorizes production to continue.

The LTS will test Gmm verification samples as specified in Section 413.3(j)4.d.

Section 413.3(j)4.a. General. Revise to read as follows:•

4.a General. Pavement cores are required for accepting the density of RPS construction. Pavement cores are required for standard construction of extended-season paving, unless waived by the Representative as specified in Section 413.3(b)1. Pavement cores are appropriate for accepting the density of standard construction if all the following materials, conditions, or applications exist:

Materials placed at indicated compacted depths greater than or equal to the minimum depths specified in Table G.•

Page 19 of 122November 3, 2026 16:09:46 PM

Materials placed on stable and uniform bases.•

TABLE G

Mixture Minimum Indicated Compacted Depths

Mixture Minimum Depth

9.5 mm Wearing Course 1 1/2 in.

12.5 mm Wearing Course 2 in.

19 mm Binder Course 2 1/2 in.

25 mm Binder Course 3 in.

Section 413.3(m). Tests for Depth: Binder and Wearing Courses. Revise to read as follows:•

(m) Tests for Depth: Binder and Wearing Courses. Construct the pavement to the depth indicated and within the specified tolerances.

For courses with a designed course depth and density acceptance by non-movement or optimum rolling pattern, the Inspector will calculate the weight per square yard for verification of yield. If yield results indicate insufficient course depth, drill one 6-inch diameter core for each 500 tons of material placed to determine the extent of the deficient depth as defined below. Core locations will be determined according to PTM No. 1.

For courses with density acceptance by lots, the inspector will measure the depth of each sublot according to PTM No. 737 using the density acceptance samples. After the Inspector completes depth measurements, backfill, compact, and seal core holes with the mixture used to construct the course. Deficient depth core(s) resulting in defective work should not be submitted for density acceptance testing. Once the defective work has been removed and replaced, obtain a new density acceptance sample for the sublot(s) as specified in Section 413.3(j)4.c.

Pavement deficient in depth by more than 1/8 inch in three or more adjacent acceptance core locations is defective. The extent of the defective work is the entirety of all sublots represented by the adjacent deficient acceptance core samples. The defective course will be the full width of the affected lane.

Pavement deficient in depth by more than 1/4 inch at a single acceptance core location is defective. Immediately delineate the limits of pavement deficient in depth from the acceptance core location by proceeding longitudinally, forward and backward, obtaining additional pavement cores every 50 feet until the depth is within 1/4 inch of the design depth. The defective course will be the full width of the affected lane.

Section 413.3(o). Defective Work. Revise to read as follows:•

(o) Defective Work. As specified in Section 105.12 and as follows:

Department acceptance and QA testing will not relieve the Contractor of responsibility for material or work that the Representative determines is defective before the Department issues the acceptance certificate. Remove and replace or repair defective work as directed.

The BOCM, CQAD will review Representative determinations of defective material or work.

Remove and replace pavement defective for temperature as specified in Section 413.3(h)1.a. for pattern segregation as specified in Section 413.3(h)3, for flushing as specified in Section 413.3(h)4, surface tolerance as specified in Section 413.3(l) or Section 313.3(l) and depth as specified in Section 413.3(m), or Section 313.3(m). Remove and replace pavement defective for percent within limits or Payment Factor Percentages as specified in Tables H and I.

Special Provision: C172A - a00172 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876

Addendum:

Page 20 of 122November 3, 2026 16:09:46 PM

CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876

Provision Body:

SECTION 107—LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

Section 107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS. Revise to read as follows:•

107.28 EROSION AND SEDIMENT POLLUTION…