LSBRP: Removal and Replacement of Concrete Curb and Sidewalk in the Business Districts
Solicitation number
1195636
Issued by
Montgomery County, Maryland

About this file

This Invitation for Bids (IFB #1195636) is issued by Montgomery County, Maryland, Department of Transportation for removal and replacement of concrete curb and sidewalk improvements in business districts countywide. The solicitation seeks to establish fixed-price unit pricing for labor and materials related to new construction, rehabilitation, and safety improvements of concrete curbs, gutters, sidewalks, ADA ramps, and driveway aprons. The IFB was issued on October 14, 2026, with bids due on November 18, 2026, at 11:00 a.m. EST. A pre-submission conference is scheduled for October 28, 2026, at 2:00 p.m., and technical questions are due by November 5, 2026. The contract term is one year from execution, with the Director of Procurement authorized to renew for two additional one-year periods at their discretion. Bidders must attend the bid opening, and work will be assigned via task orders as determined by the County, with no guaranteed minimum purchase amount.

This is a requirements contract reserved exclusively for certified local small businesses registered with Montgomery County's Local Small Business Reserve Program (LSBRP). Bid security of $50,000 and performance/payment bonds of $200,000 each are required. The contractor must perform a minimum of fifty percent of work with its own forces and must employ at least one American Concrete Institute (ACI) Certified Flatwork Concrete Finisher/Technician on all concrete work. Prices are firm for one year; thereafter, price adjustments may not exceed the Consumer Price Index (CPI) for the Washington-Arlington-Alexandria metropolitan area. The contract includes liquidated damages of $500 per calendar day for delays beyond scheduled completion dates. All work must comply with prevailing wage requirements. Contractors must have a minimum of five years' documented experience in concrete patching, repair, milling, and overlay work for local, state, and county jurisdictions and must provide three references from work performed within the past year.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

Montgomery County Government

Local Small Business Reserve Program (LSBRP) Invitation for Bids (IFB) for

#1195636

Removal and Replacement of Concrete Curb and Sidewalk in the Business Districts Countywide Department of Transportation

IFB # 1195636

NOTICE OF LSBRP INVITATION FOR BIDS

IFB #1195636 Removal and Replacement of Concrete Curb and Sidewalk in the Business

Districts Countywide

IFB SUMMARY Montgomery County, Maryland is launching an LSBRP IFB to establish contract unit pricing for the labor and materials required for new construction, rehabilitation and safety improvements of concrete curbs and gutters, sidewalks, ADA ramps, driveway aprons and any related work for the County’s business districts.

IFB ISSUE DATE 10/14/2026

BID DUE DATE Bids are due on 11/18/2026 no later than 11:00 am EST Zone Bidders are invited to attend the Bid Opening. Bid Opening Link

BID INTENT Establish a Fixed Price

BID TYPE Services Contract Construction Contract Goods Contract

☐YES ☒ NO

☒ YES ☐ NO ☐ YES ☒ NO

Non-Professional Services

METHOD OF

AWARD

(Choose One)

☒ The contract will be awarded to the responsible bidder submitting the lowest responsive bid, as determined by the Director, Office of Procurement. The lowest bidder is determined by the aggregate amount of the unit prices extended by the quantities set forth on the Quotation Sheet. Bidders must bid each item in order to be eligible for an award.

WAGE LAW

APPLICABILITY

Services Contract (Wage Requirements Law)

Construction Contract (Prevailing Wage Law) Goods Contract

☐ YES ☒ NO ☒ YES ☐ NO Not Applicable

PRE-

SUBMISSION

CONFERENCE

A pre-submission conference will be held on 10/28/2026 at 2:00 PM. Bidders are invited to attend. Pre-Submission Conference Link

IFB QUESTIONS Technical Questions Contact Timothy Serrano, Contract Administrator from the Department of Transportation at 240-777-7602 or email at timothy.serrano@montgomerycountymd.gov.

Procurement Questions Contact Michael Greve at 240-777-9923 or via email at michael.greve@montgomerycountymd.gov

IFB QUESTIONS

DUE DATE

11/5/2026

BID SECURITY ☒ YES ☐ NO

A bid security $50,000.00 is required.

PERFORMANCE

BOND AND

PAYMENT BOND

☒ YES ☐ NO

A Performance Bond in the amount of $200,000.00 (see Attachment F) is required.

A Payment Bond of $200,000 is required (See Attachment G) https://teams.microsoft.com/meet/295388962611151?p=8peh89jEXbD843q2Eo https://teams.microsoft.com/meet/252896948842208?p=uAk7BbjOtuozRzO20g mailto:michael.greve@montgomerycountymd.gov

BID

SUBMISSION

PROCESS

Prospective bidders must submit their bid electronically via BidNet Direct.

https://www.bidnetdirect.com/maryland/montgomerycounty

TABLE OF CONTENTS

Page

NOTICE OF LSBRP INVITATION FOR BIDS

LOCAL SMALL BUSINESS RESERVE PROGRAM (LSBRP) NOTICE

BID AND CONTRACT AWARD PAGE

SECTION 1. SCOPE OF WORK

SECTION 2. SPECIAL TERMS AND CONDITIONS

SECTION 3. PRICING AND DELIVERY SCHEDULE

APPENDIX 1. MANDATORY SUBMISSION INSTRUCTIONS

APPENDIX 2. ADDITIONAL INSTRUCTIONS AND CONDITIONS FOR BIDDERS

ATTACHMENT A. MONTGOMERY COUNTY, MARYLAND, GENERAL TERMS AND CONDITIONS

OF CONTRACT

ATTACHMENT B. QUOTATION SHEET AND DELIVERY SCHEDULE

ATTACHMENT C. MANDATORY INSURANCE REQUIREMENTS

ATTACHMENT D. REFERENCES

ATTACHMENT E. WEBLINKS FOR DOCUMENTS AND FORMS

ATTACHMENT F. PERFORMANCE BOND

ATTACHMENT G PAYMENT BOND

ATTACHMENT H.(MCDOT-DHS Form) EXPERIENCE AND EQUIPMENT CERTIFICATION FORM . 75

ATTACHMENT I. INFORMATIONAL WAGE RATES – PREVAILING WAGES………………………….81

LOCAL SMALL BUSINESS RESERVE PROGRAM (LSBRP) NOTICE

#1195636 for

Removal and Replacement of Concrete Curb and Sidewalk in the Business Districts Countywide

This solicitation is reserved for only application submitted/certified local small businesses timely registered with the County’s LSBRP. This solicitation thus comes under County Code, sections 11B-17A; 11B-65; 11B-66A; 11B-70 and Executive Regulation 21-05AM. These documents can be accessed through the LSBRP web site.

LSBRP criteria are based on a firm’s location, ownership status, number of employees and annual revenue amount. Submitting a bid/proposal constitutes willfully stating your firm has an application submitted or is a certified Local Small Business. Therefore, if you wish to submit a bid/proposal for this solicitation adhering to the LSBRP, you must:

1. Submit an application as a LSBRP firm prior to the bid’s/proposal’s due date. If your LSBRP status is not application submitted/certified in our database prior to the bid’s/proposal’s due date and time, then your bid will be deemed non-responsive and rejected or your proposal will be deemed unacceptable and removed from consideration. Go to the LSBRP web site and follow the instructions under “Registration/Certification.”

2. After the RFP closes and upon notification by the County, you must provide within three (3) business days the LSBRP documentation of:

• All of its business location(s) (if more than one),

• Number of employees by location,

• Annual gross revenue of the business for the past three fiscal years.

Preferred documents: a copy of a lease, Maryland Unemployment Insurance Contribution Report (summary or quarterly), and Financial Statement/Tax Returns. At the discretion of the LSBRP, alternative type of documents might be accepted.

If, after receipt of these documents, the LSBRP finds that your firm does not meet the LSBRP requirements, then your bid will be deemed non-responsive and rejected or your proposal will be deemed unacceptable and removed from further consideration. For questions, contact the LSBRP Program Manager at 240-777-9913 or send an email at lsbrp@montgomerycountymd.gov https://www.montgomerycountymd.gov/office-procurement/division-business-relations-compliance-dbrc/local-small-business-reserve-program-lsbrp https://www.montgomerycountymd.gov/office-procurement/division-business-relations-compliance-dbrc/local-small-business-reserve-program-lsbrp mailto:lsbrp@montgomerycountymd.gov

BID AND CONTRACT AWARD PAGE

Contract Document

THE FOLLOWING DOCUMENTS ARE HEREBY INCORPORATED BY REFERENCE INTO AND

MADE PART OF ANY CONTRACT AWARDED. In the event of any conflict among the provisions of the bid documents, or those documents comprising the resultant Contract, the conflict must be resolved by giving precedence to the below documents in the following order:

1. Attachment A. General Conditions of Contract between County and Contractor.

2. The specifications/scope of work shown in Section 1 of this document (See page 6).

3. All solicitation amendments that change Section 1 will supersede in the event of a conflict.

4. All representations and certifications listed in this document.

5. This Bid and Contract Award Page and the attached solicitation Quotation Sheet(s) and Delivery

Schedule (See Attachment B1 and B2).

Signature for Bid and Contract The bidder’s signature on the contract, amendment(s) or related correspondence, must conform to the following:

All signatures must be made by an authorized officer, partner, manager, member, or employee. The signing of this bid or a contract is a representation by the person signing that the person signing is authorized to do so on behalf of the bidder or contractor.

Business Firm's Legal Name (printed)

Business Firm Legal Address

Printed Name, Title of Person Authorized to Sign Proposal E-Mail of Person Authorized to Sign Proposal

Signature

Date

Printed Name of Contracting Officer

Signature

Date

Contract Number

Acknowledgment of Solicitation Amendments The Bidder acknowledges receipt of all amendment(s) to the solicitation:

Amendment Number(s) Date

SECTION 1. SCOPE OF WORK

1.1. Scope of Work

1.1.1. Background

This solicitation is for the Removal & Replacement of Concrete Curb & Sidewalk in Business Districts County Wide on an ongoing maintenance / construction contract with Montgomery County. The goal of the work is to execute required maintenance and safety improvements in the County’s business district for existing curb and gutters, sidewalks, ADA ramps and driveway aprons when applicable. The work may also include the installation of new concrete curbs and gutters, sidewalks, ADA ramps, driveway aprons and other work as determined by the County.

1.1.2. IFB Intent

This Invitation for Bids will establish a firm fixed price requirements contract with established unit prices from the awarded vendor for a comprehensive list of pay items related to the execution of maintenance and safety improvements. This contract and its pricing will be in effect for one year and at the Director of Procurement’s discretion may be renewed annually for a total of two (2) renewals.

The Vendor is allowed to request price adjustments at the end of each year in relation to the Consumer Price Index (CPI) cost of living increases (See Section 2.1 of the IFB).

The Contractor acknowledges and understands that the County maintains the sole authority to determine program/project scope, pay items, and estimated/final quantities of each item for all Task Orders. Additionally, the County intends to utilize any item, regardless of bid price or quantity stated in the IFB to ensure the County receives the best value in each project scenario. The Contractor shall not rely on previous quantities used, historical quantities or combination of items, previous agreements or previous Contracts, when entering into this agreement or as a basis to dispute project scope, use of items, or sequence of work.

1.1.3. General Requirements

The Contractor is expected to conduct its operations in a professional and safe manner that complies with all relevant regulatory standards and requirements. The Contractor shall comply with all local, State and Federal laws and regulations whether stated in this document or not. The Contractor is required to meet the insurance requirements, comply with business registration and operations rules and meet all procurement submission requirements. It is the responsibility of the Contractor to be knowledgeable of the variety and scope of the County roadway infrastructure at the time of bid.

1.1.4. Service Requirements

The Contractor will be required to provide service and materials for the removal of existing and / or the installation of new curb and gutters, sidewalks, ADA ramps and driveway aprons.

1.1.5. Performance Metrics and Contract Management

MFD Requirements Prevailing Wage Requirements.

1.1.6. Mandatory Contractor Qualifications

• Only corporate vendor experience will be considered. Individual employee experience while employed with other vendors will not be counted towards corporate experience.

• Vendors shall list their successfully completed multiple year “requirements” type contracts of similar scope within the last five (5) years along with references.

Vendors must certify they have the resources and capacity to handle multiple Task Order assignments concurrently.The Contractor must provide evidence of certification, for at least one on-site crew member, as an American Concrete Institute Certified Flatwork Concrete Finisher/Technician, or an approved equal.

1.1.7. Contractor’s Responsibilities

The Contractor’s responsibilities for the entire contract and each Task Order include:

• Determining the means and methods for staging and construction.

• Managing daily operations, including scheduling, site maintenance, traffic management, assignment of the personnel and equipment required for the removal and / or installation.

• Maintaining the site in a safe and orderly manner including removal of trash, equipment and any hazards created by the work to ensure public safety.

• Communicating any issues related to the work, payment or safety with the County’s Contract Administrator or Designee and assist in resolving problems.

• Responsiveness: The Contractor must have the capability to be contacted by the County and respond outside of regular hours.

• Ensuring the protection of utilities.

1.1.8. County’s Responsibilities

• The County is responsible for assigning Task Orders.

• The repair and/or replacement of infrastructure components are limited to those identified by the Contract Administrator or Designee.

• The County determines program/project scope, pay items, and estimated/final quantities of each item for all Task Orders.

SECTION 2. SPECIAL TERMS AND CONDITIONS

2.1. ANNUAL PRICE ADJUSTMENT (CPI)

Prices quoted are firm for a period of one year after execution of the contract. Any request for a price adjustment after this one-year period is subject to the following:

• Approval or rejection by the Director, Office of Procurement or designee.

• Must be submitted in writing to the Director, Office of Procurement, and accompanied by supporting documentation justifying the Contractor’s request. A request for any price adjustment may not be approved unless the contractor submits to the County sufficient justification to support that the Contractor’s request is based on its net increase in costs in delivering the goods/services to the County under the contract terms.

• Must be submitted sixty (60) days prior to the contact expiration date, if the contract is amended.

• May not be approved in an amount that exceeds the annual percentage change of the Consumer Price Index (CPI) for the twelve-month period immediately prior to the date of the request. The request must not exceed the CPI for all urban consumers issued for the Washington-Arlington-Alexandria, DC-VA-MD-WV Metropolitan area by the United States Department of Labor, Bureau of Labor Statistics for ALL ITEMS, unless a commodity or service group is specifically stated below:

Annual Price Adjustment: ALL ITEMS

• The County will approve only one price adjustment for each contract term, if a price adjustment is approved.

• Should be effective sixty (60) days from the date of receipt of the contractor’s request.

• Must be executed by written contract amendment.

2.2. CLEANING OF SITE

The Contractor must always keep the premises free from accumulation of waste materials or rubbish caused by the work performed. Upon completion of the work, waste materials, rubbish, and tools, equipment, machinery and surplus materials must be removed from and about the project (job) site. Waste materials and rubbish must be properly disposed of by the Contractor. All building surfaces and work areas are to be left "broom clean."

2.3. CONTRACT ADMINISTRATOR

A Contract Administrator will be designated by the Director, Office of Procurement or authorized representative. Along with the duties and responsibilities outlined in Section 8 – Contract Administration of the General Conditions for Contract between County and Contractor, the Contract Administrator is responsible for:

2.3.1. Instructing the Contractor of the details of work required including the labor and the material/equipment to be used;

2.3.2. Approving the Contractor’s maintained record of time and material used for the job. The Administrator must sign and date these records;

2.3.3. Approving the rental of equipment and/or tools that may be considered "not customary" to the trade;

2.3.4. Inspecting all work performed and authorizes payment upon acceptance.

The designated Contract Administrator for the Department of Transportation is Timothy Serrano, Phone: 240-777-7602, Email:

timothy.serrano@montgomerycountymd.gov. The Contract Administrator for any other department will be identified in an applicable Purchase Order or a Contract Amendment.

2.4. CONTRACT TERM

The term of the contract is for ONE (1) from the date of signature by the Director, Office of Procurement. Before the contract term ends, the Director may (but is not required to) renew this contract, if the Director determines that renewal is in the best interests of the County. The Contractor’s satisfactory performance does not guarantee renewal of this Contract. The Director may exercise this option to renew for TWO (2) additional one-year periods.

2.5. CONTRACT VALUE

This is a Requirements Contract and the County will place orders for goods/services as needed. The estimated quantities and/or annual expenditure for such requirements as stated on the Quotation Sheet represents only the County's best estimates. The County may purchase more or fewer of the goods and/or services provided under this contract. No guarantee of purchases of any specific quantity or total dollar amount is made. All purchases are contingent upon the appropriate fiscal funding.

2.6. CORRECTION OF WORK AFTER FINAL PAYMENT

The Contractor must remedy any defects due to faulty material or workmanship and pay for any damage to other work resulting there-from, which shall appear or occur within the guarantee period beginning with the date of final payment, or from the date of the County's substantial usage of the project, whichever is earlier. The County will give notice of observed defects with reasonable promptness.

2.7. CORRECTION OF WORK BEFORE FINAL PAYMENT

The Contractor must promptly remove from the premises all work and materials condemned by the County as failing to conform to the contract, whether incorporated or not, and the Contractor shall promptly replace and re-execute condemned work in accordance with the contract and without expense to the County and shall bear the expense of making good all work of other Contractors destroyed or damaged by such removal or replacement.

2.8. DELAYS AND EXTENSION OF TIME

If the Contractor is delayed at any time in the delivery of Supplies, Material, Equipment and/or Services by any act or neglect of any separate Contractor employed by the County, or by changes ordered in the Supplies, Materials, Equipment and Services, or by strikes, lockouts, fires, unusual delay in transportation, unavoidable casualties or any causes beyond the Contractor's control, or by delay authorized by the County, the County shall decide the extent of such delay or the justification of any other delay, then the time of completion shall be extended for such reasonable time as the County may decide.

2.9. DEPARTMENTS AUTHORIZED TO USE CONTRACT(S)

The primary user of this contract will be the Department named on the Notice for Invitation for Bids, under the Technical Questions Contact. This agency is authorized to use its own internal Job Release System and Financial Department methods. All other users of this contract must route their usage through THE CONTRACTING OFFICER, or Designee. Contractors are cautioned not to perform work for any other than the primary user without written authorization from the Director, Office of Procurement.

2.10. FAILURE TO PERFORM/DELIVER

The Contractor acknowledges and agrees that delayed performance or failure to make timely delivery under this Contract, without prior agreement of the County, will cause real and significant damage to the County, the extent of which would be impossible, or extremely difficult, to reasonably ascertain due to the nature of such damages. Therefore, in lieu of actual damages, the parties agree that the County may assess liquidated damages at the rate of $500.00 per day for each day of delay beyond the established performance/delivery date.

The parties affirm that these liquidated damages are not intended to be a penalty, are solely intended to compensate for damages, and that the measure of liquidated damages specified herein is a reasonable approximation of the actual damages which the County, as the non-breaching party, is likely to incur as a result of the failure by the Contractor to perform its obligations under this Contract.

In the event that liquidated damages are assessed by the County Contract Administrator, the County may reduce the amount owed or paid to the Contractor, and reduce or withhold from payment to the Contractor, the applicable liquidated damages amount. Any disputes regarding liquidated damages must be resolved via the dispute process set forth in Section 14.2 of the Montgomery County Procurement Regulations.

The assessment of liquidated damages by the County does not preclude the County from exercising its legal rights to: (1) make an open market purchase of the goods and/or services which were to be delivered by the Contractor; (2) charge as damages the difference between the contract price and the actual cost incurred by the County; (3) terminate the Contract for default pursuant; and/or (4) pursue any other remedies legally available to the County. Any assessment of liquidated damages by the County will terminate upon the County’s receipt of the required goods and/or services.

2.11. INVOICES

All true and corrected invoices and all inquiries regarding payment are to be sent in accordance with Provision 2.55 and 2.57. Failure to submit timely and/or accurate invoices may delay payment.

2.12. METHOD OF ORDERING

It is the intention of the County to issue written purchase orders or blanket purchase order(s) to the contractor(s). If blanket purchase order(s) is/are issued, written individual releases against such blanket order(s) will be made by the using agency as required. Issuance of all purchase orders will be contingent upon appropriation of funds by the Montgomery County Council and encumbrance of such funds after July 1, of each year, as provided by the Montgomery County Code.

2.13. NET PRICES

Prices are net, inclusive of all charges for transportation FOB Destination, freight prepaid and allowed, and inside delivery, and all other charges necessary for performance under the Contract. Prices are less Federal, State, and Local taxes.

The County will not pay gross receipts or heavy equipment taxes.

2.14. NEW MATERIALS

Unless this contract specifies otherwise, the Contractor represents that the supplies and components are new and are not of such age or so deteriorated as to impair their usefulness or safety.

2.15. ORDERING TERMS

Orders for goods/services that are placed before the expiration of the contract term and are to be started and/or completed before the expiration of the contract are to be honored with all terms, conditions, and prices of the Contract in effect until the final delivery of goods and/or completion of the work is made and accepted by the County.

With respect to task order contracts, in the event there is an open task order(s) as of the date of contract termination, the contract will remain open, with all terms and conditions in effect, for the sole and limited purpose of completion of any outstanding task order(s). No new task orders may be initiated following the date of contract termination.

2.16. PERFORMANCE BOND

No contract shall exist until the County receives a duly executed Performance Bond or Irrevocable Letter of Credit prepared on an approved form in the amount indicated on the Notice of Invitation for Bids. The bond must be made payable to Montgomery County, as security for the faithful performance of the contract and having as surety thereon such surety company or companies as are acceptable to the County and as are authorized to transact business in the State of Maryland. In the event the Performance Bond is not delivered within ten (10) days of Notice of Award then the offer may be ruled null and void and the award made to the next lowest responsive bidder. The County reserves the right of approval of any instrument offered as a Performance Bond.

The Performance Bond must provide assurance of faithful performance and discharge of all duties and responsibilities attendant thereto required by law or as provided herein by the Contractor of all ASPECTS, TERMS AND CONDITIONS of the contract and shall be maintained in full force and effect until the termination of this agreement. See Attachment F. Leave date of Bond blank, County will fill in date of contract execution.

2.18. PROTECTION OF EXISTING FACILITIES

The Contractor shall take all necessary precautions during the period of service to protect existing County facilities from damage by the Contractor, Contractor’s employees, subcontractor or subcontractor’s employees and shall repair or replace, at the Contractor's own expense, any damaged property caused by the Contractor, Contractor's employees, subcontractor or subcontractor’s employees.

2.19. PURCHASE OF GOODS BY NON-PROFIT ORGANIZATIONS

Pursuant to the requirements set forth in the Montgomery County Code, Chapter 11B-49, the Contractor agrees to extend the same terms, conditions, and prices for the goods provided by the Contractor pursuant to this contract to those Non-Profit organizations which may need the goods to perform a contract with the County. Non- Profit Organizations are defined as those organizations that are exempt from taxation under Section 501(c) (3) of the Internal Revenue Code but are not defined as a "public entity" under subsection (n) of Chapter 11B-1 of the Montgomery County Code.

2.20. WARRANTY

The Contractor must warrant, for a minimum of one year from the County’s acceptance, all goods, services, and construction provided under the Contract, including any products or materials used in the course of providing the goods, services, and/or construction, The Contractor must also guarantee that all products offered (or used in the installation of those products) carry a warranty against any and all defects for a minimum of one year from date of acceptance by the County.

Should a manufacturer's or service provider’s warranty or guarantee exceed the requirements stated above, that guarantee or warranty will be the primary one used in the case of defect. Copies of manufacturer's or service provider’s warranties must be provided upon request. The Contractor must provide, with the bid submission, a detailed listing of items that will be covered under a manufacturer’s or service provider’s warranty, along with the terms thereof.

2.21. ABBREVIATIONS

i. AAN American Association of Nurserymen

ii. AAPA American Association of Port Authorities

iii. AAR Association of American Railroads

iv. AASHTO American Association of State Highway and Transportation

Officials

v. ACI American Concrete Institute

vi. AIA American Institute of Architects

vii. AIEE American Institute of Electrical Engineers

viii. AISC American Institute of Steel Construction

ix. AISI American Iron and Steel Institute

x. ANSI American National Standards Institute

xi. ARA American Railway Association

xii. AREA American Railway Engineering Association

xiii. ASCE American Society of Civil Engineers

xiv. ASHRAE American Society of Heating, Refrigeration and Air-

Conditioning Engineers

xv. ASLA American Society of Landscape Architects

xvi. ASME American Society of Mechanical Engineers

xvii. ASTM American Society for Testing and Materials

xviii. ATA American Transit Association

xix. AWWA American Water Works Association

xx. AWS American Welding Society

xxi. AWPA American Wood Preservers Association

xxii. AGC Associated General Contractors of America

xxiii. BOCA Building Officials Conference of America

xxiv. COMAR Code of Maryland Regulations

xxv. CRSI Concrete Reinforcing Steel Institute

xxvi. DED Dutch Elm Disease

xxvii. EEI Edison Electric Institute xxviii. EIA Electronic Industries Association

xxix. EPA Environmental Protection Agency

xxx. FAA Federal Aviation Administration, U.S. Department of Transportation

xxxi. FCC Federal Communications Commission

xxxii. FHWA Federal Highway Administration, U.S. Department of Transportation xxxiii. FRA Federal Railway Administration, U.S. Department of

Transportation

xxxiv. FSS Federal Specifications and Standards, General

Services Administration

xxxv. FTA Federal Transit Administration

xxxvi. IEEE Institute of Electrical and Electronic Engineers xxxvii. IES Illuminating Engineers Society xxxviii. IMSA International Municipal Signal Association

xxxix. IPCEA Insulated Power Cable Engineers Association

xl. IRT Institute for Rapid Transit xli. MBMA Metal Building Manufacturers' Association xlii. NCHRP National Cooperative Highway Research Program xliii. MCDOT Montgomery County Department of Transportation xliv. M-NCPPC Maryland-National Capital Park and Planning Commission xlv. MSHA Maryland State Highway Administration.

xlvi. MSMT Maryland Standard Method of Tests (as developed by the State Highway Administration) xlvii. MdMUTCD Maryland Manual on Uniform Traffic Control

Devices xlviii. NBFU National Board of Fire Underwriters xlix. NBS National Bureau of Standards

l. NEC National Electric Code

li. NESC National Electric Safety Code lii. NEMA National Electrical Manufacturers' Association liii. NFPA National Fire Protection Association liv. OSHA Occupational Safety and Health Administration

lv. RLMI Reflector and Lamp Manufacturers' Institute lvi. SAE Society of Automotive Engineers lvii. SAWP Society of American Wood Preservers lviii. SSPC Society for Protective Coatings lix. UL Underwriters Laboratories, Incorporated

lx. QPL Qualified Products List lxi. WSSC Washington Suburban Sanitary Commission

2.24. CONTRACTOR’S PERSONNEL

The Contractor will provide a sufficient work force to successfully meet the terms of the Contract. The Contractor must provide supervision for all personnel on the work site when any work is being performed. The Contractor shall provide the County’s Contract Administrator with the contact information of the permanent, full-time Superintendent assigned to the Contract by the Contractor.

2.25. CONTRACTOR’S RESPONSIBILITY FOR COMMUNICATING WITH THE COUNTY.

The Contractor must have the capability to receive messages from the County and respond and/or send messages to the County via electronic mail (e-mail). Upon receiving an email communication from the County, the Contractor has until 12:00 noon the next business day to respond. If the Contractor fails to respond to the County within the time constraint specified, the County may take corrective action.

The Contractor must provide the Contract Administrator or Designee with prompt written notice (within 24 hours of the occurrence) for any additional Contract Sum and/or additional Contract Time or claims for damages that may be made by the Contractor or paid to the Contractor for any delay, disruption, inefficiency, interference or hindrance from any cause whatsoever, whether foreseeable or not, including (i) acts or omissions by the Owner, its agents, employees or consultants,

(ii) Contract Documents that are negligently prepared or contain inaccurate statements, or (iii) force majeure and circumstances beyond the Contractor’s control.

The sole remedy for delays, disruptions or hindrances will be non-compensable time extensions for completion of the Work. Failure to notify within the time period will waive any extension of time.

2.26. CONTRACTOR'S RESPONSIBILITY FOR UTILITY PROPERTY AND SERVICES

At points where the Contractor's operations are adjacent to properties of railway, transit, public utilities of any kind to include but not be limited to telegraph, telephone, water, sewer, cable, communication and power companies, or are adjacent to other property, damage to which might result in expense, loss or inconvenience, work shall not be commenced until all arrangements necessary for the protection thereof have been made by the Contractor.

The Contractor must cooperate with the owners of any underground or overhead utility lines in their removal and rearrangement operations for these operations to progress in a reasonable manner, that duplication or rearrangement work may be reduced to a minimum and that services rendered by those parties will not be unnecessarily interrupted.

In the event of interruption to utility services because of accidental breakage or because of being exposed or unsupported, the Contractor shall promptly notify the proper authority and shall cooperate with the said authority in the restoration of service. No work shall be undertaken around fire hydrants until provisions for continued service have been approved by the local fire authority.

2.27. CONTRACTOR'S RESPONSIBILITY FOR WORK

Except as herein elsewhere provided, until final acceptance of the work by the County, the Contractor shall have the charge and care thereof and shall take every reasonable precaution against injury or damage to any part thereof by the action of the elements, or from any other cause, whether rising from the execution or from the non-execution of the work, including in cases of suspension of work. The Contractor, except as herein elsewhere provided, shall rebuild, repair, restore, and make good all injuries or damages to any portion of the work before final acceptance and shall bear the expense thereof. Material lost, or structures damaged because of faulty temporary drainage during construction or the action of the elements shall be replaced or repaired by the Contractor at no cost to the County. The Contractor shall make good or replace at his/her own expense and as required any County furnished material which may be broken, lost through fire, theft, or otherwise damaged, or in any way made useless for the purpose and use intended subsequent to delivery to the Contractor by the County and prior to final acceptance of the work.

2.28. CONTRACTOR’S WORKERS, METHODS AND EQUIPMENT

The Contractor shall employ sufficient labor and equipment to complete work in the manner and time required by the Contract and/or individual Task Order(s).

Contractors employees must have sufficient skill and experience to properly perform the work assigned to them.

The Contractor shall be solely responsible for the performance of the Contractor’s and/or sub-Contractor’s employees, suppliers and third parties. The County’s Contract Administrator reserves the right to request the Contractor remove any of its’ employees or sub-contractor’s employees that do not perform in accordance with terms of the contract. In the event this type of request is not honored by the Contractor, the County Contract Administrator may withhold the Contractor’s invoices.

Equipment to be used on the work shall meet the requirements of the work and produce a satisfactory quality of work. All equipment used shall be properly maintained and regularly inspected in accord with the manufacturer and/or regulatory agency. The Contract Administrator or Designee may order the removal and require replacement of any unsatisfactory equipment. Defective work produced through the use of unsatisfactory equipment must not be measured for payment and shall be removed from the work site immediately, entirely at the expense of the Contractor and at no cost to the County.

When the methods and equipment to be used by the Contractor in accomplishing the work are not prescribed in the Contract, the Contractor may proceed with any methods or equipment that he/she demonstrates to the satisfaction of the Contract Administrator or Designee will accomplish the Contract work in conformity within the requirements of the Contract. When the Contract specifies the work be performed using certain methods and equipment, such methods and equipment shall be used unless others are authorized by the Contract Administrator or Designee in writing. If the Contractor desires to use a method or type of equipment other than those specified in the Contract, they may request authority from the Contract Administrator or Designee to do so. The request must include a full description of the methods and equipment proposed to be used and an explanation of the reasons for desiring to make the change. If approval is given, it will be on the condition that the Contractor will be fully responsible for producing construction work in conformity with Contract requirements.

If, after trial use of the substituted methods or equipment, the Contract Administrator or Designee determines that the work produced does not meet Contract requirements, the Contractor must discontinue the use of the substituted method or equipment and complete the remaining construction with the specified methods and equipment. The Contractor must remove the deficient work and replace it with work of specified quality or take such other corrective action as the Contract Administrator or Designee may direct.

No change will be made in basis of payment for the construction items involved nor in Contract time as the result of authorizing a change in methods or equipment under these provisions.

2.29. CONTRACTOR’S TASK ORDER SCHEDULING CHART / CPM

The Contractor shall provide an Activities Chart Task Order Schedule in conformance with the Technical Requirements’ Section 110– Activities Chart Project Schedule, for each individual Task Order and/or a Critical Path Project Schedule in conformance with Section 109 – Critical Path Method Project Schedule, of the current MSHA “Standards Specifications for Construction and Materials”, based on the project. The type of schedule(s) shall be at the sole discretion of the Contract Administrator or Designee.

Any Activities Chart Task Order Schedule and/or Critical Path Method (CPM) schedule shall be detailed to the satisfaction of the Contract Administrator or Designee.

The Task Orders will be calculated with calendar days. The schedule must be submitted a minimum of seven (7) calendar days prior to the specified work commencement date.

This Schedule is to break down into detail the Contract time required to perform and complete all the work activities of the Task Order within the specified time duration.

The required Schedule must be approved by the Contract Administrator, or Designee, prior to any work commencing on the assigned Task Order. As the work progresses, the Contractor will provide written updates to the Schedule(s) as specified in Sections 109 and/or 110 of the Technical Requirements of this Contract Document or as directed by the Contract Administrator, or Designee.

Task Order assignments exceeding the calendar daytime duration, as established by the County, will be subject to assessment of liquidated damages.

Failure to adhere to the latest approved Schedule will be cause for the County to deny requests for additional compensation or extension of the Task Order time duration.

When the Contractor has multiple assignments through this contract or other County contracts; the Contractor must, at the request of the Contract Administrator, provide a master schedule demonstrating how all work/Task Order(s) activities are to be performed within the durations of each assignment. A narrative shall be provided to include a detailed description of a work plan to include all resources such as labor force, types of crews, number of crews, subcontractors, equipment, and materials necessary to complete each task assignment and its relationship to the scheduling of critical activities for all assignments throughout all County contracts which the Contractor may hold.

The Contractor must have sufficient resources available to begin work on the Task Order within 14 calendar days from the date of issuance of the Notice-to-Proceed by the County. Should the Contractor fail to begin work within 14 calendar days, the County will have the right to withdraw the Task Order from the Contractor and obtain other resources as necessary to perform the work.

It may be necessary for the Contractor to provide multiple crews working concurrently on the same Task Order if the Contractor falls behind schedule, at no fault to the County, and is not maintaining the Task Order’s specified completion date.

2.30. DETERMINATION AND EXTENSION OF TASK ORDER TIME

The Contractor shall complete the work contracted for in an acceptable manner within the number of working days, calendar days, or calendar date as specified in the Invitation for Bids and/or specified in the Notice-to-Proceed for the assigned Task Order.

The Contract Administrator or Designee will make available to the Contractor each week a record, such as the Daily Construction Log, showing the number of days charged to the Contract for the preceding week. The Contractor will be allowed one week in which to contest and 30 days in which to file a written statement, setting forth in what respects time charges are incorrect.

If satisfactory fulfillment of the Task Order requires the performance of work in greater quantities than specified in the Task Order estimate, the Contract time allowed for performance may be adjusted based on the quantities, cost, and the nature of the work involved.

Time used in performing work of an emergency nature ordered by the Contract Administrator or Designee for the convenience of the traveling public or for the production or delivery of materials for storage, if performed during the period of suspension, will not be charged against the Contract time.

Following the date on which all work has been completed, no time will be charged against the Contract until it is again permissible to proceed with the work, except for

(1) those landscaping items on which work is restricted to specified seasons and

(2) when inspection and acceptance for maintenance is being deferred pending completion of those landscaping items, and for no other reason. However, time will be charged during any extensions of the specified season that may be granted the Contractor.

2.31. COOPERATION BY CONTRACTOR

The Contractor shall give the Task Order the constant attention necessary to facilitate the progress thereof and shall cooperate with the Contract Administrator or Designee and his/her inspectors in every way possible.

The Contractor must assign to the Contract as their agent, a competent superintendent capable of communicating in English and capable of reading and thoroughly understanding the Contract Documents. The superintendent must be thoroughly experienced in the type of work activities being performed and able to receive instructions from the Contract Administrator or Designee or their authorized representatives. The superintendent must have full authority to execute the order or directions of the Contract Administrator or Designee without delay, and to promptly supply such materials, equipment, tools, labor and incidentals as may be required.

Such superintendence must be furnished irrespective of the amount of work sublet.

Said Superintendent must be on the project site at all times when the work is in progress.

2.32. DAMAGE TO ADJACENT PROPERTY

The Contractor’s activities and operations shall be confined to the properties owned or under the control of the Montgomery County Department of Transportation, Division of Highway Services. If any damage occurs to adjacent properties as a result of the Contractor’s operations, it is the Contractor’s responsibility to repair and restore, to its original condition. The replacement and restoration must be acceptable to the Contract Administrator or Designee and the adjacent property owner.

The Contractor is solely responsible for the restoration of any area that is utilized for the storage of equipment and/or materials. No payment shall be made for this work;

however, it must be a requirement of this Contract that all such areas (if any) are to be restored to their original condition when so directed by the Contract Administrator or Designee.

The Contractor has no additional right-of-way for the project. Whenever improvements are scheduled beyond the right-of-way, written authorization from the Owner will be on file. In all other instances, the Contractor is to limit his/her operations to the existing right-of way limits.

2.33. DISINCENTIVE PAYMENT REDUCTIONS

Payment reductions for pavement density not meeting the specifications will be based on individual sublot core test data for a given lot and the lot average density as specified in the Contract and Table 504A. Payment reductions for density and for mixture will be made by adjusting the payment for the Asphalt Mix. Payment reductions for density will be waived for portions of the pavement where a poor foundation is determined as the cause for inadequate density. Prior to the placement of any Asphalt Mix, the Contract Administrator or Designee and the Contractor shall determine and locate any areas of distressed roadway that could have a negative impact on the final asphalt mix density values. Any claims of poor foundation made by the Contractor after the placement of Asphalt Mix shall be considered null and void.

At the discretion of the Contract Administrator or Designee, Asphalt Mix that does not meet the specified pavement density requirements and/or the approved asphalt mix design, shall be completely removed and replaced entirely at the Contractor’s expense and at no cost to the County.

2.34. EXPERIENCE, PERSONNEL AND EQUIPMENT REQUIREMENTS

For this Contract, the Contractor must be prepared to perform a minimum of fifty percent (50%) of the work in any Task/Job Order assigned to them.

All bidders for this Invitation for Bids must have a minimum of five (5) years’ experience in the successful patching, repair, milling, and overlay of streets and roadways, and all required Maintenance of Traffic for local, state, and county jurisdictions, and have the capacity to verify through written documentation the minimum five (5) year experience requirement.

Every concrete crew must have a minimum of one finisher or finishing supervisor who is an American Concrete Institute (ACI) Certified Flatwork Concrete Finisher/Technician, or an approved equal, on site for the entire duration of any concrete placement and finishing. A copy of each individual’s certifications must be provided upon award and must also be submitted to the Contract Administrator or Designee, for review and acceptance, prior to the commencement of any work. A change in the appointment of any finisher or finishing supervisor throughout the duration of the Contract will require the individual’s certifications to be provided for review and approval. No concrete shall be placed at any time the certified Flatwork Concrete Finisher/Technician is not on site and not in control of the proposed concrete placement and finishing. Any delay to a task/job order due to the Contractor failing to provide a certified Flatwork Concrete Finisher/Technician for any concrete placement and finishing will be considered an inexcusable delay and subject to liquidated damages, and/or cancellation of the task/job order.

The Contractor must have sufficient resources available to begin work on the Task/Job Order within 14 calendar days from the date of issuance of the Notice-to- Proceed by the County.

The Contractor must have sufficient resources of personnel and equipment to complete the Job Order in the specified time. Any delay in completing the Job Order, within the specified time limit due to the Contractor failing to provide the necessary resources, will be considered an inexcusable delay and subject to liquidated damages.

It may be necessary for the Contractor to provide multiple crews working concurrently on same Task/Job Order if the Contractor falls behind schedule at no fault to the County and is not maintaining the Task/Job Order’s specified completion date.

2.35. FAILURE TO MAINTAIN ENTIRE PROJECT

Failure on the part of the Contractor, at any time, to comply with the provisions of Maintenance of Work during Construction, will result in the Contract Administrator or Designee immediately notifying the Contractor to comply with the required maintenance provisions. In the event that the Contractor fails to remedy unsatisfactory maintenance within 24 hours after receipt of such notice, the Contract Administrator or Designee will immediately proceed with adequate forces and equipment to maintain the project, and the entire cost of this maintenance will be deducted from monies due the Contractor.

Additionally, an appropriate deduction will be made from the Contractor's next progress estimate for each day or portion thereof that Maintenance of Traffic deficiencies exist and will continue until the deficiencies are satisfactorily corrected and accepted by the Contract Administrator or Designee. Any portion of a day will be assessed a full day deduction.

The above noted deduction will be assessed on the next progress estimate if the Contractor does not take action to correct the deficiencies and properly assume the responsibilities of maintaining the project (as determined by the Contract Administrator or Designee) within four hours of receiving a notice to comply with the required maintenance provisions.

The deduction will be the daily limits established in Section 2.41 Liquidated Damages ($500.00 a day) and will continue until the deficiencies and proper assumption of the required maintenance provisions are satisfactorily corrected and accepted by the Contract Administrator or Designee. The amount of monies deducted will be a permanent deduction and are not recoverable.

2.36. FINAL ACCEPTANCE AND FINAL PAYMENT

A. When the Contractor has completed a Task/Job Order, the County will have thirty days to perform any final inspections, calculate final quantities, and notify the Contractor in writing of any deficiencies (including material clearances and certifications) that must be corrected prior to acceptance for payment to start the warranty period.

B. The Contractor shall then have a period of 30 days from the date of receiving the aforementioned tabulation and notice of deficiencies from the County, in which:

1. To decide whether or not to accept final payment upon such a basis, and

2. To notify the County, in writing, of the decision. The Contractor may request an additional period up to 30 days in which to notify the County of the decision. In the event the Contractor notifies the County that they contest final payment on such a basis, that notification shall outline the reasons for said protest.

C. If under the provisions of paragraph (B) above, the Contractor notifies the County of their contestation and non-acceptance of the data submitted to them, the County shall pay the Contractor a semi-final estimate, or an additional semi-final estimate in the event a semi-final estimate has already been paid based upon the data noted in paragraph (A) above, with deductions for all prior payments and also deducting the quantities in question and are determined by the Contract Administrator or Designee not to be in compliance with the Contract requirements. The acceptance of such semi-final estimate, or additional semi-final estimate, shall not be considered a waiver on the part of the Contractor of their right to pursue contestation and press for acceptance and final payment.

D.