852212vadotB35_120997.pdf
PDF 3 MB Posted
- Attached to
- Bridge Rehabilitation, Rt 672 (Rt 693 to Rt 670)
- Solicitation number
- 120997
- Issued by
- Pittsylvania County, Virginia
About this file
This is a bridge rehabilitation project bid proposal and contract document issued by the Virginia Department of Transportation (VDOT) for Route 672 in Pulaski County, Salem District. The project involves bridge rehabilitation work extending 1.25 miles from 0.40 miles at the intersection of Route 693 to 1.65 miles at the intersection of Route 670. The scope of work includes embedded galvanic anodes, high-early-strength patching, expansion joint reconstruction and preparation, back wall reconstruction, concrete surface repairs and coatings, waterproofing, joint sealing, epoxy overlay maintenance, temporary traffic control, mobilization, and pavement markings. The bid was submitted on November 18, 2026, at 10:00 AM, with a project completion date of April 21, 2028. The contract is Federal-Aid eligible under FHWA Number BFP-962-2(134), with project number 0672-077-856, B644. Prequalification is required for all bidders. The contract documents specify compliance with Virginia Department of Transportation Road and Bridge Specifications (2020 and 2022 supplements), Virginia Work Area Protection Manual version 11.0, and Virginia MUTCD version 11.0.
Pricing shall be submitted on all line items shown in the proposal, with bid totals calculated for each section and a total contract bid amount required. A bid bond conforming to Section 102.07 specifications is required, set at five percent of the dollar value of the bid. The major contract items include epoxy overlay maintenance (4,405 square yards), concrete surface color coating (3,160 square yards), concrete superstructure surface repair (112 square yards), high-early-strength patching Type B (221 square yards), and embedded galvanic anodes (4,185 each). Davis-Bacon prevailing wage rates apply to the project, with rates established by the U.S. Department of Labor General Decision VA20260186. A Disadvantaged Business Enterprise (DBE) program applies to the contract with a minimum DBE participation goal of zero percent and total contract value to be determined by bid submissions. The contract is funded through Federal-Aid Highway funds. Environmental provisions include bat species exclusion requirements, as roosting bats have been identified in expansion joints of the existing bridge structure. Contractors must submit certified payrolls weekly, maintain records for three years after project completion, and comply with all applicable labor standards, nondiscrimination, and safety requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER NO.: B35
CONTRACT ID. NO.: C0000120997B44
Form C-6a
Rev. 3-22-05
CNSP (F) 1-9-06
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
BID PROPOSAL AND CONTRACT
ROUTE NUMBER: 672
FHWA NUMBER: BFP-962-2(134)
PROJECT NUMBER: 0672-077-856, B644
COUNTY: PULASKI
DISTRICT: SALEM
DESCRIPTION: BRIDGE REHABILITATION
FROM:
TO:
0.40 MI. INT. RT. 693
1.65 MI. INT. RTE. 670
DATE BID SUBMITTED: 10:00 AM WEDNESDAY, NOVEMBER 18, 2026
Form C-118
Rev. 8-10-2026
COMMONWEALTH OF VIRGINIA
NOTICE TO BIDDERS
As a matter of information, the bidder’s attention is directed to the points noted herein. Every point enumerated below is fully covered by proposal documents that describe them in detail. Bidders should check their proposal against all requirements, as strict compliance with all provisions is mandatory.
1. Bids shall be filed electronically through Bidx (https://bidx.com/site/home) at the times designated in the Notice of Advertisement for Bids. For information see (https://cabb.virginiadot.org/)
2. Unless otherwise specified or permitted in the proposal, prices shall be submitted on all items shown in the proposal.
3. Proposals conditioned by proposed alternates, other than those specified or permitted, or by reserving the right to accept or reject an award or to enter into a contract pursuant to an award will not be considered.
4. A bid total shall be shown in each space provided.
5. Bid bonds shall conform to Section 102.07. The bid bond number shall be placed in the appropriate space in your electronic bid. As an alternative, you may complete the bottom line of Form C-24. The form may be emailed to the Construction Division at VDOTContracts@vdot.virginia.gov and must be received prior to the opening of bids.
6. Joint venture proposals shall show the Firm Name of each party and shall be signed by an authorized representative of each Firm. A letter shall be filed with the prequalification office describing responsibility of each firm and the amount of maximum capacity pledge by each firm of a joint venture.
https://bidx.com/site/home http://cabb.virginiadot.org/
Form C-24
Rev. 7-6-05
PROPOSAL GUARANTY
KNOW ALL MEN BY THESE PRESENTS, THAT WE _______________________________________ as principal, and ________________________________________ Surety, are held and firmly bound unto the
Commonwealth of Virginia as obligee, in the amount of FIVE PERCENT OF THE DOLLAR VALUE OF THE
BID, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally and firmly by these presents.
SIGNED, sealed and dated this Day of , 20
WHEREAS, the above said principal is herewith submitting its proposal for:
PROJECT NUMBER: 0672-077-856, B644
NOW, THEREFORE, the condition of the above obligee is such, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the time specified in the Specifications after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise to remain in full force and effect and the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the liability exceed the penal sum hereof.
(Principal*) (Surety Company)
By: By:
(Officer, Partner or Owner) (Seal) (Attorney-in-Fact**) (Seal)
(Principal*) (Address)
(Officer, Partner or Owner) (Seal) (Surety Company)
(Principal*) (Attorney-in-Fact**) (Seal)
(Officer, Partner or Owner) (Seal) (Address)
*Note: If the principal is a joint venture, each party thereof must be named and execution made by same hereon. If there is more than one surety to the bid bond, each surety must be named and execution shall be made by same hereon.
Electronic Bid Only: In lieu of completing the above section of the Contract Performance Bond, the Principal shall file an Electronic Bid Bond when bidding electronically. By signing below the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the Commonwealth of Virginia under the same conditions of the bid bond as shown above.
Electronic Bid Bond ID# Company/Bidder Name Signature and Title
**Attach copy of Power of Attorney
Form C-48 Rev. 10-03-25
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION,
AND VENDOR SURVEY FORM (ALL VENDORS)
PROJECT NO. 0672-077-856, B644 CONTRACT I.D. NO. C0000120997B44
FHWA NO. BFP-962-2(134) DATE SUBMITTED
All vendors submitting a bid as a Prime Contractor shall complete and submit with their bids the following information as requested for (1) Subcontractor/Supplier Solicitation, and Utilization, and (2) for Vendor Survey.
The vendor certifies this form accurately represents its solicitation and utilization or non-utilization, as indicated, of the firms listed below for performance of work on this contract. The vendor also certifies he/she has had direct contact with the named firms regarding participation on this project.
Vendor Signature:
Vendor ID No. Title:
Vendor’s Address: ____________________________________
City: __________________
State: __________________ Zip Code: _________
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION (ALL)
VENDOR
NUMBER
NAME OF SUBCONTRACTOR/SUPPLIER TELEPHONE
NUMBER
UTILIZED
(Y/N)
NOTE: ATTACH ADDITIONAL PAGES, IF NECESSARY.
BIDDER MUST SIGN EACH ADDITIONAL SHEET TO CERTIFY ITS CONTENT AND COMPLETION OF FORM.
FEDERAL LAW REQUIRES ALL VENDORS SUBMITTING BIDS OR OFFERS PROVIDE THE INFORMATION
REQUESTED IN THIS FORM.
Form C-48 Rev. 10-03-25
VENDOR SURVEY
WHEN SUBMITTING A BID OR OFFER AS A PRIME CONTRACTOR, THE BIDDER MUST SUBMIT A
VENDOR SURVEY FOR THEMSELVES AND A VENDOR SURVEY FOR EACH SUBCONTRACTOR
AND SUPPLIER WHO SUBMITTED A BID OR QUOTE TO THE BIDDER.
VENDOR’S FULL LEGAL NAME: ________________________________________
VENDOR ID NO.: __________________
ADDRESS: ____________________________________
CITY: ____________________________________
STATE: _______________ ZIP CODE: _________
VENDOR’S YEARS IN BUSINESS: _____________
VENDOR’S ANNUAL GROSS RECEIPTS: ____ $ 0 - 25 million ____ $ 25 - 50 million ____ $ 50 - 75 million ____ More than $75 million
THE UNDERSIGNED, ON BEHALF OF VENDOR IDENTIFIED ABOVE, ACKNOWLEDGES AND CERTIFIES THAT THIS FORM ACCURATELY STATES THE INFORMATION CONTAINED HEREIN TO THE BEST OF VENDOR’S
KNOWLEDGE.
Printed Full Legal Name of Person Signing for Vendor
Signature: ____________________________________________
Form C-7
Rev. 2-2-24
SHEET 1
TERMS OF THE PROPOSAL\CONTRACT
SUBMITTED: 10:00 AM WEDNESDAY, NOVEMBER 18, 2026
ROUTE NUMBER: 672
FHWA NUMBER: BFP-962-2(134)
DESCRIPTION: BRIDGE REHABILITATION
FROM:
TO:
0.40 MI. INT. RT. 693
1.65 MI. INT. RTE. 670
DISTRICT: SALEM COUNTY: PULASKI
I/we declare that no other person, firm or corporation is interested in this proposal; that I/we have carefully examined the plans, job specifications, current Road and Bridge specifications, and all other documents pertaining thereto and thoroughly understand the contents thereof; that I/we meet the prequalification requirements for bidding on this proposal;
that I/we understand that the plans and current Road and Bridge specifications, are a part of this proposal; that all of the quantities shown herewith are a part of this proposal; that all the quantities shown herewith are approximate only; that I/we have examined the location of the proposed work and source of supply of materials; and that I/we agree to bind myself/ourselves upon award by the Commonwealth under this proposal to a contract with necessary surety bond to start work according to project specifications, and to complete all work in accordance with the plans, job specifications and current Road and Bridge Specifications within the time limit set forth in the contract.
COMPLETION DATE: APRIL 21, 2028
BID TOTAL $
Attached is a bond conforming to the requirements of the current Road and Bridge Specifications, it being understood that such bond is to be forfeited as liquidated damages if, upon acceptance of the terms of this proposal, I/we fail to execute the contract and furnish bond as provided in the current Road and Bridge Specifications.
(Names of Individual(S),Firm(S) Or Corporation)
Street Address City State Zip Code Vendor#/Fin#
Print Name Signature Title
In consideration of the commitments made as shown herein, the Commonwealth of Virginia by The Commonwealth Transportation Commissioner agrees to pay for all items of work performed and materials furnished at the unit price(s) and under the conditions set forth in this proposal, in witnessed by the affixing of the name below.
Contract Execution Date By
CHIEF ENGINEER
VIRGINIA DEPARTMENT OF TRANSPORTATION
Virginia Department of Transportation 10/13/2026Date Printed:
Schedule of Items Page: 2
Proposal ID: C0000120997B44 0672-077-856, B644
Order No.: B35
Oversight/State Project No.:
Federal Project No.: BFP-962-2(134)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0010 411SX20-0002
ZONE COAT. EX. STR.
(STR.NO. 6041)
LUMP SUM _________._____LUMP SUM
0020 411SX20-0005
ENV. PROT. & HEALTH &
SAFETY TYPE B (STR. NO.
6041)
LUMP SUM _________._____LUMP SUM
0030 411SX20-0006
DISPOSAL OF MATERIAL
TYPE B (STR. NO. 6041)
LUMP SUM _________._____LUMP SUM
0040 412SD20-0017
EMBEDDED GALVANIC
ANODES
EA
4,185.000
0050 412SD20-0034
H.E.S. PATCHING TYPE B SY
221.000
0060 412SD20-0036
H.E.S. PATCHING TYPE C SY
94.000
0070 412SD20-0042
EXPANSION JOINT
RECONSTRUCTION HES
LF
60.000
0080 412SD20-0043
EXPANSION JOINT
PREPARATION
LF
363.000
0090 412SD20-0046
BACK WALL
RECONSTRUCTION HES
LF
12.000
0100 412SD20-0049
CONC. SUPERSTR. SURFACE
REPAIR
SY
112.000
0110 412SD20-0061
CONCRETE SUBSTRUCT.
SURFACE REPAIR
SY
38.000
0120 412SD20-0066
CONCRETE SURFACE
COLOR COATING
SY
3,160.000
Schedule of Items Page: 3
Proposal ID: C0000120997B44 0672-077-856, B644
Order No.: B35
Oversight/State Project No.:
Federal Project No.: BFP-962-2(134)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0130 412SX20-0007
BR.SUPERSTR. WID./REPAIR
CONCRETE BOLSTER
REPAIR
LF
66.000
ATTD
0140 416SD20-0003
WATERPROOFING – EPOXY
RESIN TYPE EP-3B/EP-3T
SY
358.000
0150 420SD20-0020
ADHESIVE BASED JT.
SEALER CL. I, 2" MAINT.
LF
423.000
0160 431SD20-0002
EPOXY OVERLAY MAINT SY
4,405.000
0170 512SD20-0014
TEMPORARY SIGN SF
100.000
0180 512SD20-0024
GROUP 2 CHANNELIZING
DEVICES
DAY
10,295.000
0190 512SD20-0025
PORT.CHANGEABLE MESS.
SIGN
HR
370.000
0200 512SD20-0027
FLAGGER SERVICE HR
7,395.000
0210 512SD20-0042
ERADICATE LINEAR PVMT
MRKG
LF
6,235.000
0220 512SP20-0001
PORTABLE TEMPORARY
RUMBLE STRIP ARRAY
DAY
620.000
ATTD
0230 512SP20-0002
MAINTENANCE OF TRAFFIC -
MAINTENANCE OF
NAVIGATION
LUMP SUM _________._____LUMP SUM
ATTD
0240 513SD20-0001
MOBILIZATION LUMP SUM _________._____LUMP SUM
Schedule of Items Page: 4
Proposal ID: C0000120997B44 0672-077-856, B644
Order No.: B35
Oversight/State Project No.:
Federal Project No.: BFP-962-2(134)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0250 704SD20-0027
TYPE B CLASS VI PVMT LINE
MRKG 6"
LF
6,235.000
Section: 0001 _________._____Total:
Total Bid: _________._____
Page
Determination of Major Items
1C0000120997B44Contract ID:
ltem Description Item
Number
EPOXY OVERLAY MAINT431SD20-0002
CONCRETE SURFACE COLOR COATING412SD20-0066
CONC. SUPERSTR. SURFACE REPAIR412SD20-0049
H.E.S. PATCHING TYPE B412SD20-0034
EMBEDDED GALVANIC ANODES412SD20-0017
Form C-110
Rev. 07-31-24
COMMONWEALTH OF VIRGINIA
DBE REGULAR DEALER/DISTRIBUTOR AFFIRMATION FORM
Bidder / Contractor Name:
Project No. 0672-077-856, B644
FHWA No.: BFP-962-2(134)
Contract ID: C0000120997B44
Date Submitted:
*** INSTRUCTIONS ***
Submit this DBE Regular Dealer / Distributor Affirmation Form for each DBE listed as a regular dealer or distributor, on the Bidder’s Form C-111 within 5 days after the bid opening, along with Form C-112 - Certification of Binding Agreement. In the questions below, “you and “your” refer to the DBE.
Section 26.53(c)(1) of Title 49 Code of Federal Regulations requires the Virginia Department of Transportation to make a preliminary counting determination for each DBE listed as a regular dealer or distributor to assess its eligibility for 60 or 40 percent credit, respectively, of the cost of materials and supplies based on its demonstrated capacity and intent to perform as a regular dealer or distributor, as defined in 49 CFR § 26.55(e)(2)(iv)(A),(B),(C), and (3) under the contract at issue. The preliminary determination will be based on the DBE’s written responses to relevant questions and its affirmation that its subsequent performance of a commercially useful function will be consistent with the preliminary counting of such participation.
DBE Name:
DBE Authorized Representative:
Total Amount of DBE Subcontract / Purchase Order:
NAICS Codes Applicable to Items Sold / Leased:
1. Will all items sold or leased be provided from the on-hand inventory at your establishment?
☐ YES (If "YES," you have indicated that your performance will satisfy the regular dealer requirements and may be counted at 60%. STOP here. Read and sign the affirmation below.)
☐ NO (If "NO" Continue.)
(a) Are you selling bulk items (e.g., petroleum products, steel, concrete, concrete products, sand, gravel, asphalt, etc.) or items not typically stocked due to their unique characteristics (aka specialty items)?
☐ YES (If "YES," Go to Question 2.)
☐ NO (If "NO" Continue.)
(b) Will at least 51% of the items you are selling be provided from the inventory maintained at your establishment, and will the minor quantities of items delivered from and by other sources be of the general character as those provided from your inventory?
☐ YES (If "YES," you have indicated that your performance will satisfy the regular dealer requirements and may be counted at 60%. STOP here. Read and sign the affirmation below.
☐ NO * (*If 1,1(a), and 1(b) above are "NO," your performance on the whole will not satisfy the regular dealer requirements; therefore, only the value of items to be sold or leased from inventory can be counted at 60%. Go to Question 3, below, to determine if the items delivered from and by other sources are eligible for Distributor credit.)
Form C-110
2. Will you deliver all bulk or specialty items using distribution equipment you own (or under a long-term lease) and operate?
☐ YES (If "YES," you have indicated that your performance will satisfy the requirements for a regular dealer of bulk items and may be counted at 60%. STOP here. Read and sign the affirmation below.)
☐ NO (If "NO," your performance will not satisfy the requirements for a regular dealer of bulk items; the value of items to be sold or leased cannot be counted at 60%. Go to Question 3.)
3. Will the written terms of your purchase order or bill of lading from a third party transfer responsibility, including risk for loss or damage, to your company at the point of origin (e.g. a manufacture's facility)?
☐ YES ☐ NO
(a) Will you be using sources other than the manufacturer (or other seller) to deliver or arrange delivery of the items sold or leased?
☐ YES ☐NO
(If you responded "YES" to both 3 and 3(a), you have indicated that your performance will satisfy the requirements of a Distributor; therefore, the value of items sold or leased may be counted at 40%.)
(If you responded "NO" to either 3 or 3(a), your performance will not satisfy the requirements for a regular dealer and counting of your participation is limited to the reasonable cost of fees or commissions charged, including transportation charges for the delivery of materials or supplies;
the cost of materials or supplies may not be counted.)
For DBE:
I affirm that the information that I provided above is true and correct and that my company's subsequent performance of a commercially useful function will be consistent with the above responses. I further affirm that my company will independently negotiate price, order specified quantities, and pay for the items listed in the Bidder's Forms C-111 and C-112. This includes my company's responsibility for the quality of such items in terms of necessary repairs, exchanges, or processing of any warranty claims for damaged or defective materials.
Printed Name of DBE Owner/Authorized Representative Signature
For Bidder:
The Bidder acknowledges its responsibility for verifying the information provided by the DBE named above and ensuring that the counting of the DBE's participation is accurate. Any shortfall in DBE participation caused by errors in counting are the responsibility of the Bidder.
Printed Name of Bidder Owner/Authorized Representative Signature
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
Form C-111
Rev. 07-31-24
MINIMUM DBE REQUIREMENTS
PROJECT NO. 0672-077-856, B644 CONTRACT ID. NO. C0000120997B44
FHWA NO. BFP-962-2(134) ORDER NO. B35
* * * I N S T R U C T I O N S * * *
LIST THE DBE(S) WHO WILL PARTICIPATE IN THE CONTRACT, INDICATE THE WORK THEY WILL PERFORM, THEIR VENDOR ID AND DBE CERTIFICATION NUMBERS, AND THE DOLLAR AMOUNT OF PARTICIPATION, REDUCED AS NEEDED FOR REGULAR DEALERS (60%), DISTRIBUTORS (40%), AND BROKERS (FEES/COMMISSIONS). COUNT 100% FOR SUBCONTRACTORS AND MANUFACTURERS, AND FOR HAULERS THAT DELIVER MATERIALS AND SUPPLIES TO THE PROJECT SITE (EXCLUDING COST
OF THE MATERIALS AND SUPPLIES.
0.00 % X $ = $
DBE GOAL TOTAL CONTRACT VALUE MINIMUM DBE PARTICIPATION
DBE SUMMARY
DBE PARTICIPATION ATTAINED TOTAL: $__________
DBE PARTICIPATION ATTAINED PERCENTAGE: ___________%
I/WE CERTIFY THAT THE LISTED DBES WILL BE USED ON THIS CONTRACT AS STATED HEREIN AND THAT IN THE PERFORMANCE OF THE CONTRACT I/WE WILL MAKE GOOD FAITH EFFORTS TO MEET OR EXCEED THE
DBE GOAL ESTABLISHED FOR THE CONTRACT.
BY:
BIDDER'S NAME SIGNATURE DATE
Title:
NAME OF DBE
SUBCONTRACTOR
VENDOR
ID NO.
DBE
CERTIFICATION
NO.
SUBCONTRACT
VALUE
DBE USED AS
DOLLAR AMT
DBE CREDIT
SUBCONTR. (S)
MNFR. (M)
HAULER (H)
REG. DLR. (R)
DISTR. (D)
BROKER (B)
100%
100%
100%
60%
40%
Fees/Com
Form C-111
DBE ITEMS ENTRY
Instructions: For each DBE listed in the Summary on page 1, complete a DBE Item Entry form.
NOTE: To count toward the DBE goal, DBEs must be certified in NAICS codes applicable to kind of work they perform. A DBE's Certification number and NAICS Codes are shown in the DBE's listing in the DSBD DBE Directory at: https://directory.sbsd.virginia.gov/#/executiveExport
Full DBE Name: ______________________________________________
DBE Vendor ID No.: ___________ (DBE's number can be found on VDOT's List of Prequalified Vendors)
DBE Certification. No.: ____________________
DBE NAICS Code(s): _____________________________________________________________________
DBE Used As:
_______ Subcontractor (S) Eligible for 100% of Subcontract Value
_______ Manufacturer (M) Eligible for 100% of Subcontract Value
_______ Hauler (H) Eligible for 100% of Subcontract Value Excluding Materials
________ Regular Dealer (R) Eligible for 60%of Subcontract or PO Value
________ Distributor (D) Eligible for 40% of Subcontract or PO Value
________ Broker (B) Eligible for Fees / Commissions Only
WORK ASSIGNED TO DBE
Contract Bid Items Description Of Work QTY Unit DBE's Price Applicable
Dollar Amt
DBE Credit
DBE Credit Total: $ _______________________
BY:
BIDDER'S NAME
SIGNATURE
DATE
Title:
[ATTACH ADDITIONAL SHEETS AS NECESSARY, EACH OF WHICH MUST BE SIGNED AND DATED.]
https://directory.sbsd.virginia.gov/#/executiveExport
Form C-112 Rev. 3-1-11
CERTIFICATION OF BINDING AGREEMENT WITH
DISADVANTAGED BUSINESS ENTERPRISE FIRMS
FHWA NUMBER: BFP-962-2(134)
This form is to be submitted in accordance with the Department’s Special Provision for Section 107.15.
It is hereby certified by the below signed Contractors that there exists a written quote, acceptable to the parties involved preliminary to a binding subcontract agreement stating the details concerning the work to be performed and the price which will be paid for the aforementioned work. This document is not intended to, nor should it be construed to, contain the entire text of the agreement between the contracting parties.
This document does not take the place of, nor may it be substituted for, an official subcontracting agreement in those situations that may require such an agreement. A copy of the fully executed subcontract agreement shall be submitted to the Engineer within fourteen (14) working days after contract execution.
It is further certified that the aforementioned mutually acceptable quote and fully executed subcontract agreement represent the entire agreement between the two parties involved and that no conversations, verbal agreements, or other forms of non-written representations shall serve to add to, delete, or modify the terms as stated.
The prime Contractor further represents that the aforementioned mutually acceptable quote and fully executed subcontract agreement shall remain on file for a period of not less than one year following completion of the prime's contract with the Department or for such longer period as provisions of governing Federal or State law or regulations may require. For purposes of this form, the term Prime Contractor shall refer to any Contractor utilizing a DBE subcontractor, regardless of tier, in which they are claiming DBE credit toward the contract goal.
Contractors further jointly and severally represent that said binding agreement is for the performance of a "commercially useful function" as that term is employed in 49 C.F.R. Part 26.55 (c), (d).
TO BE SIGNED BY THE SUBCONTRACTOR TO THE PRIME CONTRACTOR, AND ANY LOWER TIER
SUBCONTRACTORS HAVING A CONTRACT WITH THE BELOW NAMED DBE FIRM
Prime Contractor:
By:
Signature Title
Date:
Form C-112 Rev. 3-1-11
First Tier Subcontractor If Applicable:
Second Tier
If Applicable:
Third Tier
If Applicable
DBE Contractor
FORMS and SCHEDULE OF ITEMS PRECEDE SPCNs, SPs and SUPPLEMENTAL SPECS.
CN100-000026-09 GEN. PROJ. REQUIRE., SSS/SPS/SPCNS 12-11-25 (SPCN) 1
CN103-000100-01 SEC 103.02—AWARD OF CONTRACT 6-17-25 (SPCN) 1
CN105-000140-00 SEC 105.14—MAINTENANCE DURING CONSTRUCTION 12-20-24 (SPCN) 2
CN105-000150-00 SECURITY REQUIREMENTS FOR PCMS 1-30-26 (SPCN) 3
CN245-000100-01 SEC 245.03—TESTING & DOCUMENTATION 1-10-24 (SPCN) 4
CQ107-000130-00 DRUG-FREE WORKPLACE 7-3-19 (SPCN) 5
CQ107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY 5-11-22 (SPCN) 6
CQ522-000100-03 PROTECTION OF BAT SPECIES 1-17-18 (SPCN) 6
EXCLUSION OF PROTECTED BAT SPECIES 5/28/25 7
CONCRETE BOLSTER REPAIR 04-07-26 (SPCN) 7
SP0F0-000100-00 PREDETERMINED MIN. WAGE RATES R-7-12-16 8
SP0F0-000130-03 FHWA 1273—CONTRACT PROVISIONS, FED-AID 7-9-26 13
SP0F0-000150-01 AFFIRMATIVE ACTION / EEO NOTICE 7-17-17 36
SP102-000120-00 NON-DISCRIMIN. EMPLOY. & CONTRACT. PRACTICES (EO-61) 1-10-17 42
SP107-000110-00 C-45–SWPPP GEN. PERMIT–CONTRACTOR CERTIFICATION R-10-27-16 43
SP107-000120-00 ELEC. SUBMISSION OF DBE AND PAYROLLS 1/21/20 44
SP107-001510-06 INTERIM DBE REQUIREMENTS 1-26-26 46
SP107-003100-01 MADE IN THE USA REQUIREMENTS 10-1-26 50
SP108-000100-01 PROG. SCHED. FOR CAT. I PROJECTS 3-21-22 57
SP109-000100-05 ASPHALT MATERIAL PRICE ADJUSTMENT 7-8-24 72
SP109-000110-00 OPTIONAL ADJUSTMENT FOR FUEL R-7-12-16 74
SP109-000120-01* PRICE ADJUSTMENT FOR STEEL 7-2-19 76
SP109-000130-01 ELECTRONIC OR PRINTED WEIGH TICKETS 3-10-25 81
*SP512-000130-00 EMPLOYMENT OF PTRS 1-24-19 87
SP522-000170-02 PROTECT NESTING MIGRA. BIRDS DURING BRIDGE MAINT. 9-2-20 89
SP801-000100-01 LANE CLOSE COORD (LCC)/LANE CLOSE IMPLEMENT (LCI) 9-20-17 90
SQ105-000611-02 SEC 105.06 — SUBCONTRACTING (FED FUNDED PROJECTS) 9-1-26 92
SQ107-001300-00 PREVAILING WAGE RATES 10-12-2023 93
SS109-002020-01 SEC 109 — MEASUREMENT AND PAYMENT 5-1-23 97
SS211-002020-03 SEC 211 – ASPHALT CONCRETE 3-18-24 100
SS220-002020-01 SEC 220 – CONCRETE CURING MATERIALS 8-28-20 106
SS223-002020-02 SEC 223 – STEEL REINFORCEMENT 4-4-23 107
SS234-002020-01 SEC 234 – GLASS BEADS AND RETROREFLECTIVE OPTICS 5-6-22 108
SS235-002020-01 SEC 235 – RETROREFLECTORS 5-6-22 109
SS236-002020-01 SEC 236 – WOOD PRODUCTS 5-14-21 110
SS246-002020-02 SEC 246 – PAVEMENT MARKING 5-6-22 114
SS248-002020-02 SEC 248 – STONE MATRIX ASPHALT CONCRETE 3-18-24 122
SS305-002020-02 SEC 305 – SUBGRADE AND SHOULDERS 12-20-23 124
SS308-002020-01 SEC 308 - SUBBASE COURSE 7-13-21 126
SS309-002020-01 SEC 309 - AGGREGATE BASE COURSE 7-13-21 127
SS315-002020-05 SEC 315 – ASPHALT CONCRETE PLACEMENT 5-27-25 128
SS317-002020-01 SEC 317— STONE MATRIX ASPHALT CONCRETE PLACEMENT 6-21-24 147
SS318-002020-01 SEC 318 — PAVEMENT INTERLAYERS 8-2-23 149
SS319-002020-02 SEC 319 – THIN HOT MIX ASPHALT CONCRETE OVERLAY 3-18-24 150
SS321-002020-02 SEC 321 – TRENCH WIDENING 5-4-23 154
SS407-002020-02 SEC 407 – STEEL & METAL STRUCT 11-01-22 156
SS411-002020-01 SEC 411 – PROT. COAT. OF METAL 11-01-22 158
SS512-002020-03 SEC 512 – MAINTAINING TRAFFIC 7-1-22 159
SS704-002020-02 SEC 704 – PAVEMENT MARKINGS AND MARKERS 5-6-22 172
MAINTENANCE OF NAVIGATION 1/4/19 178
NO PLAN ASSEMBLY 179
TABLE OF CONTENTS FOR PROVISIONS
cn100-000026-09 December 11, 2025 (SPCN)
GENERAL PROJECT REQUIREMENTS, SUPPLEMENTAL SPECIFICATIONS (SSs), SPECIAL PROVISIONS (SPs) AND SPECIAL PROVISION COPIED NOTES (SPCNs)
This project shall be constructed according to: the Plans; the Virginia Department of Transportation Road and Bridge Specifications, dated 2020 and the Supplement thereto, dated 2022; the Virginia Department of Transportation Road and Bridge Standards, dated 2016, with revisions issued online as of the advertisement date for this project incorporated; the Virginia Work Area Protection Manual, version 11.0;
the Virginia MUTCD version 11.0; and the Supplemental Specifications, Special Provisions and Special Provision Copied Notes in this Contract. The status in the Contract of each of these documents will be according to Section 105.12 of the Specifications.
Special Provision Copied Notes in this Contract are designated with “(SPCN)” after the date.
The information at the top and left of each Special Provision Copied Note in this Contract is file reference information for Department use only. The information in the upper left corner above the title of each Supplemental Specification and Special Provision in this Contract is file reference information for Department use only.
cn103-000100-01 June 17, 2025 (SPCN)
SECTION 103.02—AWARD OF CONTRACT of the Specifications is replaced in its entirety with the following:
103.02 – Award of Contract
The Board, or the Commissioner as authorized under § 33.2-209 of the Code of Virginia, will award the Contract to the lowest responsive and responsible bidder without discrimination on the grounds of race, color, gender, national origin, status as a military family, or other basis prohibited by law. In the event of a tie bid, the tie will be decided by lot.
The award date will not be later than midnight on the 60th day after the opening of bids. If the Board, or the Commissioner where authorized by law, has not awarded the Contract within this period due to any circumstances not attributable to the bidder, the bidder may withdraw his bid without penalty or prejudice unless the time limit is extended by mutual consent.
After approval for the award of contracts, the Department will provide written notice of award to the successful bidder and will post the Ballots on the Department’s bidding webpage. The Ballot serves as public Notice of Award for a contract. The date of the Notice of Award is the “Approved” date appearing at the top of the Ballot that lists the Contract.
cn105-000140-00 December 20, 2024 (SPCN)
SECTION 105.14—MAINTENANCE DURING CONSTRUCTION of the Specifications is amended by the following:
Section 105.14(a)3 – Flagging Traffic is replaced with the following:
3. Flagging Traffic: Flaggers shall be able to communicate to the traveling public in English while performing the job duty as a flagger at the flagger station.
All flaggers shall possess a valid, current flagger certification card, be it a physical or electronic card, at all times while performing flagging duties.
Flaggers shall be certified by the VDOT Basic or Intermediate Work Zone Traffic Control Training course or by the ATSSA’s classroom Flagger Certification Program.
The following constitutes a valid flagger certification card:
• Cards issued by VDOT following completion of the Basic Work Zone course;
• Cards issued by VDOT following completion of the Intermediate Work Zone course;
• Cards issued by ATSSA following completion of a Flagger course;
• Cards issued by VDOT following completion of the Flagger-only course, provided the cards were issued on or before December 31, 2024, and have not yet reached the expiration date
(two years after date of issuance).
Flaggers who fail to possess a valid, current, flagger certification card, or refuse to allow inspection of same upon request, shall be removed from the flagging site, and operations requiring flagging shall be suspended by the Engineer. Suspended operations requiring flagging may resume once a certified flagger arrives on-site to perform flagging duties in accordance with applicable requirements. Flaggers improperly performing duties may be subject to flagger certification revocation at the sole discretion of the Engineer.
cn105-000150-00 January 30, 2026 (SPCN)
SECURITY REQUIREMENTS FOR PORTABLE CHANGEABLE MESSAGE SIGNS — The Contractor shall secure portable changeable message sign (PCMS) control cabinets with a grade 3 or stronger standard lock at all times unless maintenance is actively being conducted on the sign.
A password shall be required to change the PCMS message. The Contractor shall change the manufacturer's default password for ALL electronic signs. Electronic signs that support the use of complex passwords shall include at least 14 characters consisting of the following criteria:
• At least one special character
• At least one alphabetical character
• At least one numerical character
• A combination of upper-case and lower-case letters
Electronic signs that do not support the use of complex passwords shall be changed using the maximum number of characters and character types permitted by the manufacturer.
Password credentials are prohibited from being stored, displayed, or written on or within the sign. Any QR codes affixed to the sign shall be removed.
For all PCMS with remote or wireless accessibility, the Engineer will authorize remote access prior to this functionality being enabled. Prior to authorization, the Contractor shall update the PCMS to the most recent compatible software and firmware version available from the manufacturer. Following authorization and prior to use, the Contractor shall establish a remote connection to verify that access to the PCMS is password protected.
Electronic signs shall only post approved and documented messages. The Contractor shall log all messages posted with date and times for each public message.
The Contractor has the option for their signs to be connected to the Department’s Operations Technology (OT) network for management by Traffic Operations Center (TOC) staff. By using this method, messages are transmitted and posted by the TOC control room staff with all records and logging managed within the VDOT Advanced Traffic Management System (ATMS). Electronic message signs connected to the OT network shall follow the security requirements described below:
1. All electronic signs connected to the network shall be secured with a digital lock installed on the sign control cabinet.
2. Connected signs shall only be remotely accessible through secure communications that originated from the Department’s OT network.
3. Connected signs shall only be posted with messages from the Department’s ATMS systems or designated backup systems.
4. Community strings (both public and private strings) shall be changed from default settings.
5. All vendor cloud connections shall be removed from the connected sign. TOC system administration staff will configure VPN connections exclusively to the Department’s OT network.
6. All connected electronic signs shall adhere to the Cabinet Security Standards found in the
Department’s OT Cybersecurity Program Manual.
cn245-000100-01 January 10, 2024 (SPCN)
SECTION 245.03—TESTING AND DOCUMENTATION of the Specifications is amended by the following:
Section 245.03(e) – Prefabricated Geocomposite Pavement Underdrain is replaced by the following:
Prefabricated Geocomposite Pavement Underdrain: Prefabricated geocomposite pavement underdrain shall consist of a polymeric drainage core allowing water inflow from both sides, encased in a nonwoven filter fabric envelope having sufficient flexibility to withstand bending and handling without damage.
Prefabricated geocomposite pavement underdrain shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the pavement environment and shall have a thickness of not less than 3/4 inch. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Properties Test Method Requirements
Compressive strength ASTM D1621, D2412, and D6364
Min. 40 psi at 20% max.
deflection immediately after 24 hrs of specimen conditioning at 0 deg F and at 125 deg F
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 0.1)
ASTM D4716 Min. 15 gal/min/ft width for 12-in specimen length
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over both sides of the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
Section 245.03(f) – Geocomposite Wall Drains is replaced by the following:
Geocomposite Wall Drains: Prefabricated geocomposite wall drain shall consist of a polymeric drainage core with a nonwoven filter fabric (single sided or double sided) having sufficient flexibility to withstand bending and handling without damage. Geocomposite wall drains shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the roadway. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Property Test Method Requirements
Compressive strength ASTM D1621, D2412, and D6364
Min. 40 psi at 20% max.
deflection immediately after 24 hrs of specimen conditioning at 0 degree F and at 125 degree F
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 1.0)
ASTM D4716 Min. 15 gal/min/ft width (for 12-in specimen length)
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
Section 245.03(g) – Geomembrane Moisture Barrier is replaced by the following:
Geomembrane Moisture Barrier: Geomembrane moisture barrier shall be resistant to biological attack.
Geomembrane shall be constructed of PVC and shall conform to the requirements of ASTM D7176 for PVC 30 or higher grades. In addition, geomembrane shall comply with the requirements of ASTM D7408 for bond seam strength and peel strength.
CQ107-000130-00 July 3, 2019 (SPCN)
DRUG-FREE WORKPLACE – The Contractor shall:
• Provide a Drug-Free Workplace for the Contractor’s employees.
• Post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition.
• State in all solicitations or advertisements for employees placed by or on behalf of the Contractor that the Contractor maintains a Drug-Free Workplace.
• Include the provisions of the foregoing clauses in every Subcontract or purchase order of over $10,000, so that the provisions will be binding upon each Subcontractor or vendor.
For the purposes of this provision, “Drug-Free Workplace” means a site for the performance of work done in connection with the Contract. The Contractors employees, and those of his Subcontractors, shall be prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession, or use of any controlled substance or marijuana during the performance of the Work.
CQ107-000150-00 May 11, 2022 (SPCN)
EQUAL EMPLOYMENT OPPORTUNITY
Section 107.14(a)1 – Required by §2.2-4201 and §2.2-4311 of the Code of Virginia is replaced with the following:
1. Required by §2.2-4201 and §2.2-4311 of the Code of Virginia: During the performance of this Contract, the Contractor agrees as follows:
a. The Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where religion, sex, or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause, including the names of all contracting agencies with which the Contractor has contracts of over $10,000.
b. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that such contractor is an equal opportunity employer. However, notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this chapter.
c. If the Contractor employs more than five employees, the Contractor shall (i) provide annual training on the Contractor's sexual harassment policy to all supervisors and employees providing services in the Commonwealth, except such supervisors or employees that are required to complete sexual harassment training provided by the Department of Human Resource Management, and (ii) post the Contractor's sexual harassment policy in (a) a conspicuous public place in each building located in the Commonwealth that the Contractor owns or leases for business purposes and (b) the Contractor's employee handbook.
The Contractor shall include the provisions of subdivisions a, b, and c in every subcontract or purchase order of over $10,000, so that such provisions shall be binding upon each subcontractor or vendor.
Nothing contained in this chapter shall be deemed to empower any agency to require any contractor to grant preferential treatment to, or discriminate against, any individual or any group because of race, color, religion, sex, or national origin on account of an imbalance that may exist with respect to the total number or percentage of persons of any race, color, religion, sex, or national origin employed by such contractor in comparison with the total number or percentage of persons of such race, color, religion, sex, or national origin in any community or in the Commonwealth.
CQ522-000100-03 January 17, 2018 (SPCN)
PROTECTION OF BAT SPECIES — If bats are observed roosting on a structure, the Contractor shall immediately notify the Engineer and suspend work in the immediate vicinity of the bats until authorized to continue.
UPC120997 5/28/2025 (SPCN)
EXCLUSION OF PROTECTED BAT SPECIES Roosting bats have been identified occupying VA STR 6021/Federal Structure 14600 Rt. 672 Lowmans Ferry Road over Claytor Lake/The New River in Pulaski County listed in this contract. The majority of the bats were documented in the expansion joints, particularly near Pier 3. Bats shall be excluded from suitable roosting habitat in the work area. Suitable roosting habitat is defined as cracks of other type openings greater than 1/2- inch found on the bridge, including but not limited to expansion joints over the piers, joints at the abutments, and spaces between the parapet walls.
Acceptable methods of exclusion include the application of polyethylene spray foam or the use of foam backer rod or similar type material in combination with spray foam to exclude bat species from roosting on the bridge. Netting shall not be used as an exclusionary method. The Contractor shall develop a detailed Bat Exclusion Plan which shall be submitted to the District Environmental Manager for review 60 days prior to any bat exclusion activity. Bat exclusion shall be maintained by the Contractor until bridge work has been completed and all the cost associated with the Bat Exclusion Plan, installation, and maintenance will be considered incidental to the bridge demolition. No separate payment will be made.
Any delays, schedule impacts, or additional costs resulting from presence of bat or bat roosting activity on the existing structure shall not be considered grounds for a contract time extension or additional compensation.
UPC120997 04-07-26 (SPCN)
CONCRETE BOLSTER REPAIR— Concrete Bolster Repair will be measured in units of linear feet and will be paid for at the Contract price per linear foot. The price shall include all labor, tools, and materials necessary for bolster sounding, removal and disposal; protection of adjacent traffic from debris; forming and grouting of bolster; and other items needed to complete the work.
SP0F0-000100-00 July 12, 2016
PREDETERMINED MINIMUM WAGE RATES
"General Decision Number: VA20260186 05/18/2026
State: Virginia
Construction Types: Highway
Counties: Virginia Counties of Pulaski
Modification Number Publication Date
0 01/02/2026
1 05/18/2026
ELEC0080-011 06/01/2025
Rates Fringes
ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION.........$ 36.85 14.13
SUVA2016-071 07/02/2018
Rates Fringes
TRUCK DRIVER: MULTI AXLE...........................$ 16.75 0.00
TRUCK DRIVER: HEAVY OVER 7 CY.....................$ 16.69 0.00
TRUCK DRIVER: FUEL AND LUBRICANT SERVICE...........$ 18.25 0.00
TRUCK DRIVER: 1/SINGLE AXLE TRUCK..................$ 15.19 0.00
TRUCK DRIVER : HEAVY 7CY & UNDER....................$ 15.36 0.00
TRAFFIC CONTROL: FLAGGER..........................$ 11.45 0.00
OPERATOR: BULLDOZER, INCLUDING UTILITY..............$ 17.81 0.00
OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR..........$ 17.25 0.00
OPERATOR: TRACTOR (UTILITY)........................$ 14.58 0.00
OPERATOR: SCREED...................................$ 22.13 4.89
OPERATOR: ROLLER (FINISHING).......................$ 14.80 0.00
OPERATOR: ROLLER...................................$ 15.85 0.00
OPERATOR: PILEDRIVER...............................$ 21.83 4.08
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND
CONCRETE)...........................................$ 16.66 0.00
OPERATOR: MILLING MACHINE..........................$ 23.12 3.60
OPERATOR: MECHANIC.................................$ 19.59 0.00
OPERATOR: LOADER...................................$ 22.22 0.00
OPERATOR: HYDROSEEDER..............................$ 16.64 0.00
OPERATOR: GRADER/BLADE.............................$ 26.13 0.00
OPERATOR: GRADALL..................................$ 18.65 0.00
OPERATOR: DRILL....................................$ 24.66 0.00
OPERATOR: CRANE....................................$ 25.82 0.00
OPERATOR: BROOM/SWEEPER............................$ 14.32 0.25
OPERATOR: BOBCAT/SKID STEER/SKID LOADER............$ 19.16 4.45
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE...............$ 20.53 0.00
LABORER: POWER TOOL OPERATOR.......................$ 15.69 0.00
LABORER: PIPELAYER.................................$ 15.11 0.00
LABORER: GRADE CHECKER.............................$ 15.07 0.00
LABORER: COMMON OR GENERAL.........................$ 14.85 0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER,
SPREADER AND DISTRIBUTOR............................$ 15.40 0.00
IRONWORKER, STRUCTURAL..............................$ 27.38 0.00
IRONWORKER, REINFORCING.............................$ 22.71 0.00
CEMENT MASON/CONCRETE FINISHER......................$ 19.94 0.00
CARPENTER, INCLUDES FORM WORK.......................$ 17.65 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and prevailing wage rates set by a state (or local)…