This Invitation for Bid (IFB 91006-271) is issued by the Wicomico County Board of Education, DBA Wicomico County Public Schools (WCPS), for a Carpentry Job Order Contract to perform various carpentry-related work at multiple WCPS sites in Wicomico County, Maryland. The scope of work encompasses finish carpentry, rough carpentry, metal framing, drywall, acoustical ceilings, insulation, demolition, caulking, windows and doors installation, roofing, exterior trim and siding, and systems furniture assembly and installation. Projects will be awarded on an as-needed basis throughout a twelve-month period to pre-qualified firms selected through this competitive bidding process. Sealed bids are due on November 12, 2026, by 2:00 PM EST, and submissions must be made electronically through the Wicomico Schools BonfireHub portal in two separate PDF files: a technical bid and a price bid. This is a multi-step bid process with no pre-bid conference scheduled. The initial contract period runs from award through December 31, 2029, with no renewal options. WCPS reserves the right to award the contract to multiple contractors to ensure availability and may conduct individual projects through a secondary competitive Task Order Request process.

Pricing is structured on billable labor rates, material margins, and subcontractor markups, all FOB destination and inclusive of delivery and installation costs. The successful contractor must maintain billable labor rates that include all small tools, taxes, insurance, supervision, overhead, and profit, with evening, weekend, and holiday rates not exceeding 150% of regular rates. Liquidated damages of up to $1,500 per calendar day may be imposed for project delays caused by the contractor's fault. The contractor must be bondable for up to $500,000 for future task orders and maintain commercial general liability insurance of $2,000,000 each occurrence, workers' compensation with employer's liability limits of $100,000/$100,000/$500,000, and business automobile liability of $2,000,000 combined single limit. A current Certificate of Insurance (ACORD format) must be provided with the bid submission. No prevailing wage or Davis-Bacon Act wage rates apply unless required by future task order funding sources. The WCPS encourages qualified Minority Business Enterprises (MBEs) certified by the Maryland Department of Transportation to respond and may use MBE status as a tie-breaker in cases of equal submissions. Bids may not be withdrawn for ninety days after opening, and all invoices must be submitted within sixty days of project completion or payment may be forfeited.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

91006-271

CARPENTRY

JOB ORDER CONTRACT

Procurement Office

Wicomico County Public Schools purchasing@mywcps.org mailto:purchasing@mywcps.org

IFB 91006-271 CARPENTRY JOC TOC -1

TABLE OF CONTENTS

BID DOCUMENTS: The Bid Documents consist of the following:

00030 – NOTICE TO BIDDERS

00090 – INSTRUCTION TO BIDDERS

00100 – SCOPE OF WORK

00200 – GENERAL CONDITIONS

00210 – SUPPLEMENTARY CONDITIONS

00300 – BID INSTRUCTIONS & BACKGROUND FORM

00301 – PRICING BID FORM

00330 – BID AFFIDAVIT

Rick Konrad Purchasing Manager

410-677-4571 rkonrad@mywcps.org

Business Support Services

NOTICE TO BIDDERS

The Wicomico County Board of Education DBA Wicomico County Public Schools (WCPS) will receive sealed Bids for Carpentry Job Order Contract Work at various WCPS sites in Wicomico County, Maryland on November 12, 2026, by 2:00 PM EST.

Bids received after that time will not be accepted.

This is a multi-step Bid.

• Step 1 is Technical Bid.

• Step 2 Is Price Bid.

NOTE: The Technical Bid and Price Bid are to be in separate PDF files submitted in the electronic portal indicated below.

There will not be a Pre-Bid Conference held.

Brief Description of Work:

Work consists of various Carpentry related work as needed.

Bid responses must be submitted electronically at:

https://wicomicoschools.bonfirehub.com/portal/?tab=openOpportunities

No Bidder may withdraw their Bid within ninety (90) days after the date and time of RFP opening.

The WCPS reserves the right to reject any or all Bids and waive formalities, informalities, and technicalities therein. The WCPS reserves the right to contact a Respondent for clarifications and may, at its sole discretion, allow a Respondent to correct any and all formalities, informalities and technicalities in the best interest of the WCPS.

Certified Minority Business Enterprises (MBE) are encouraged to respond to this solicitation notice.

Rick D Konrad Rick D Konrad, NIGP-CPP Procurement Manager purchasing@mywcps.org https://wicomicoschools.bonfirehub.com/portal/?tab=openOpportunities

IFB 91006-271 CARPENTRY JOC 00090-1

INSTRUCTIONS TO BIDDERS

1. CLARIFICATIONS: If any person who contemplates submitting an offer is in doubt as to the true meaning of any part of the Terms and Conditions, Bid Documents, and/or Invitation For Bid (IFB), they MUST submit a written request for an interpretation thereof, delivered to purchasing@mywcps.org with a cc to glathbur@mywcps.org no fewer than seven (7) working days prior to the time and date the offers are due. Answers will be provided via Addendum within three (3) working days of the solicitation deadline. No phone calls please.

WCPS will not be responsible for any other interpretations or explanations of the

Specifications that are not provided in writing via addendum.

2. EXCEPTIONS: It shall be the responsibility of the Contractor to include with their Bid a list and clarification of any deviations from or qualifications of the Terms and Conditions and Specifications. The list must be attached to the Bid Form - Price. Failure to provide a list of exceptions may result in the withdrawal of the award.

3. INTERPRETATION OF THE TERM "EQUAL": The Board of Education of Wicomico

County (WCPS) reserves the right to evaluate the quality of articles offered as alternate or equal and reserves the right to reject any or all articles judged not equal.

4. DETERMINATION OF GRADE OR QUALITY: WCPS reserves the right to award an item to other than the lowest Bid if, in its judgment, there is sufficient reason to believe that another item is a better grade, quality or that it will better serve the interests of the WCPS, whether based on product samples, objective test, subjective test, or experience.

5. EVALUATION OF BIDS: The Procurement Manager may request additional documentation during the evaluation of Bids. This additional information may include, but is not limited to, the following:

A. Schedule of Values

B. List of sub-contractors

C. Evidence of licensing of the Prime contractor and sub-contractors

D. Evidence of insurance, bonding (if applicable)

E. Business Reference Form

6. BID SUBMISSIONS: All Bids must include the Bid Form(s) included in the Bid

Documents signed by an official capable of committing the offeror to contractual relationships.

A. Any Bid may be withdrawn prior to the Bid’s due date and time; however, all Bids are considered final after the date and time for receipt of Bids.

mailto:glathbur@mywcps.org

IFB 91006-271 CARPENTRY JOC 00090-2

B. Final Bids may not be altered, withdrawn, or canceled, for a period of 90 days after the time and date designated for receipt of Bids.

C. Bids must be delivered to the Purchasing Department via the submission portal mentioned in the Notice to Bidders.

D. Bid submissions WILL NOT be accepted through eMaryland Marketplace, fax, email, or regular mail.

7. ANTI-COLLUSION: By signing the Bid Forms, the Bidder understands that, in accordance with the Annotated Code of Maryland Finance and Procurement Article 11-205; a person who, for the purpose of defrauding the WCPS, acts in collusion with another person in connection with the procurement process is liable for damages.

8. ANTI-BRIBERY/DEBARMENT: This procurement is subject to the Annotated Code of

Maryland Finance and Procurement Article 16 concerning Debarment of Contractors. By signing this Form of Bid, the offeror agrees that they understand and are in compliance with Article 16.

9. POLITICAL CONTRIBUTION DISCLOSURE: Election Law Article, §§14-101—14-108, Annotated Code of Maryland, requires that every person that enters into contracts, leases, or other agreements with the State of Maryland, including its agencies or a political subdivision of the State, during a calendar year in which the person receives in the aggregate $100,000 or more shall file with the State Board of Elections a statement disclosing contributions in excess of $500 made during the reporting period to a candidate for elective office in any primary or general election.

10. ASBESTOS CONTAINING BUILDING MATERIALS (If applicable): By submitting a Bid for this project, the Contractor agrees that no asbestos containing building materials will be used in this project by any contractor, sub-contractor, or sub-sub-contractor.

11. TOBACCO-FREE SCHOOLS POLICY: All contractors, sub- contractors, and sub-sub-contractors must comply with the WCPS's tobacco-free schools policy "ADC".

The policy states that "the sale or use of tobacco in any form is prohibited in all buildings and all outside seating areas owned or leased by the Board of Education of Wicomico County, at all times (24 hours a day, every day), regardless of whether or not students are present." The policy also states that "the use of tobacco in any form is prohibited on school grounds during the official school day (7 a.m. to 5 p.m.)."

Any contractors, sub-contractors, or sub-sub-contractors "which do not enforce this tobacco-free policy may be ... declared in default of their contract."

12. CHILD SEX OFFENDER NOTIFICATION: Maryland law requires certain child sex offenders to register with the local law enforcement agency. One of the purposes of this law, found in Article 17.792, is to inform school systems when a child sex offender is residing or working in the area. When the child sex offender registers, the local police are required to notify the Superintendent of Schools, and the Superintendent, in turn, is required to send a notice to school principals.

As a Contractor working for WCPS, we require that you do not employ convicted child sex offenders to work on projects for our school system if they, as a result, are required

IFB 91006-271 CARPENTRY JOC 00090-3

to perform delivery, installation, repair, construction or any other kind of services on WCPS property.

13. CRIMINAL BACKGROUND CHECK AND WORKER ASSIGNMENT:

A. Effective July 1, 2015, amendments to 6-113 of the Education Article of the Maryland Code further require that a contractor or subcontractor for a local school system may not knowingly assign an employee to work on school premises with direct, unsupervised, and uncontrolled access to children, if the employee has been convicted of, or pled guilty or nolo contendere to, a crime involving:

1) A sexual offense in the third or fourth degree under 3-307 or 3-308 of the

Criminal Law Article of the Maryland Code or an offense under the laws of another state that would constitute an offense under 3-307 or 3-308 of the Criminal Law Article if committed in Maryland.

2) Child sexual abuse under 3-602 of the Criminal Law Article, or an offense under the laws of another state that would constitute child sexual abuse under 3-602 of the Criminal Law Article if committed in Maryland; or

3) A crime of violence as defined in 14-101 of the Criminal Law Article, or an offense under the laws of another state that would be a violation of 14-101 of the Criminal Law Article if committed Maryland, including: (1) abduction; (2) arson in the first degree; (3) kidnapping; (4) manslaughter, except involuntary manslaughter; (5) mayhem; (6) maiming; (7) murder; (8) rape; (9) robbery; (10) carjacking; (11) armed carjacking; (12) sexual offense in the first degree; (13) sexual offense in the second degree; (14) use of a handgun in the commission of a felony or other crime of violence; (15) child abuse in the first degree; (16) sexual abuse of a minor; (17) an attempt to commit any of the crimes described in items (1) through (16) of this list; (18) continuing course of conduct with a child under 3-315 of the Criminal Law Article; (19) assault in the first degree; (20) assault with intent to murder; (21) assault with intent to rape; (22) assault with intent to rob; (23) assault with intent to commit a sexual offense in the first degree; and (24) assault with intent to commit a sexual offense in the second degree.

B. Also, effective July 1, 2015, amendments to 5-561 of the Family Law Article of the

Maryland Code mandate that each contractor and subcontractor shall require that any individual in its workforce must undergo a criminal background check if the individuals have direct unsupervised, and uncontrolled access to children.

14. BID AFFIDAVIT: In accordance with the State Procurement Regulation Mandatory

Written Solicitation Requirements, CoMar 21.505.08.07, this Bid requires a signed Bid Affidavit. This affidavit is attached to the Form of Bid. Submissions without this document may be considered non-responsive.

15. TAXES:

A. Nothing in these Terms and Conditions and Specifications shall be construed as relieving the Contractor of their responsibility in paying all applicable taxes.

IFB 91006-271 CARPENTRY JOC 00090-4

B. Sales of materials used to improve the realty of government entities are taxable. The Maryland Sales and Use Tax Exemption Certificate of the Wicomico County Board of Education should not be used by contractors performing such work.

16. MATERIALS:

A. Unless explicitly stated otherwise, all specified equipment and material comprising the work of this Contract, as being provided, furnished, or installed, shall imply the inclusion of all components, hardware, and accessories, required for complete installation and satisfactory operation as intended by the manufacturer. Wherever the method installation of any material is not explicitly specified, the installation shall be as recommended by the manufacturer.

B. Wherever in the Contract Documents it is provided that the Contractor shall furnish materials or equipment for which no detailed specifications are set forth, such materials or equipment shall be new and of the best grade for the respective purpose for which they will be used when incorporated in the work. Materials specified by reference to a number or symbol of a specific standard, such as A.S.M., Federal Specification, State Standard, Trade Association, or similar standards, shall comply with requirements in the latest revision thereof and any amendment or supplement in effect on the date of Bid opening.

C. None of the materials to be provided, furnished or installed on this project shall contain asbestos or any other "hazardous substance" as that term is defined by Federal or State law.

17. NONDISCRIMINATION:

A. NONDISCRIMINATION CLAUSE: In accordance with the Annotated Code of Maryland, State Finance and Procurement Article 13-219, discrimination on the basis of sex, race, age, color, creed, or national origin is prohibited under the terms of this contract by any contractor, sub-contractor, or sub-sub-contractor.

B. Contractors and sub-contractors are required to include similar notification in all sub-contracts for other than standard commercial supplies or raw materials and are required to post notice of this provision so that the notice will be available to the Contractor's and/or sub- contractor's employees and applicants.

18. MINORITY BUSINESS ENTERPRISE PROCEDURES:

A. The Wicomico County Public Schools encourages all qualified Minority Business Enterprises (MBE) to apply for certification with the Maryland Department of Transportation (MDOT).

B. All qualified MDOT Certified MBE’s are encouraged to respond to this solicitation notice.

C. WCPS encourages prime contractors submitting an offer to this IFB to develop a plan to utilize qualified MDOT certified MBE’s as sub-contractors.

IFB 91006-271 CARPENTRY JOC 00090-5

D. An MBE Plan is not required to be awarded this contract but in the event of equal submissions WCPS reserves the right to use MBE as a tie breaker. Please check the appropriate box on the Bid Form.

END INSTRUCTIONS TO BIDDERS

IFB 91006-271 CARPENTRY JOC 00100 - 1

SCOPE OF WORK

1. CARPENTRY – For the purposes of this bid, CARPENTRY will be defined as ‘carpentry and associated work’ including, but not limited to, the following activities.

Finish carpentry Rough Carpentry Metal Framing Drywall Acoustical ceilings Insulation Demolition Caulking Windows, doors, frames, and hardware

Metal and asphalt shingle roofing Exterior trim and siding Systems furniture assembly and installation

It is the expectation that the awarded Contractor would have on hand staff with the capability to perform each of these tasks on a small-scale job.

While the use of sub-contractors is not discouraged and at times may be required by the specific performance requirements of the project, it is the expectation of WCBOE that the Awarded Contractor will have the capability to self-perform the requested tasks if applicable.

2. JOB ASSIGNMENT

Projects throughout the twelve (12) month period may be awarded to any of the selected pre-qualified firms as long as WCBOE is satisfied with the service provided by the firm, the ability of the firm to execute additional work in a timely manner acceptable to WCBOE and for a fee that is fair, competitive and reasonable. WCBOE will evaluate a firm’s performance of services at the completion of a project and may be used as evaluation criteria on future small scale RFQ opportunities.

WCBOE will provide a scope of work or outline of the required services for a specific project and contact a prequalified firm to submit a proposal. Within a reasonable time frame, not in excess of seven (7) working days (unless otherwise specified) the firm shall provide a written proposal which shall include a description of the services to be provided, proposed time for completion, and personnel to be utilized for the project.

These services shall be negotiated on a per project basis and upon agreement of a fee, the scope of services required and the time frame for completion of the project a purchase order will be issued by WCBOE to initiate the work reflecting the agreed upon terms.

SERVICES under this contract will be for miscellaneous Carpentry related projects on an as-needed job-specific basis

3. TIME: On occasion, depending on the nature of a situation, there may be a need to provide immediate services. Under normal circumstances, the following shall appl:

A. Contractor is required to meet with the owner 48 hours from the time of notification.

B. Contractor is to provide proposal to the owner within 48 hours after the scope review meeting.

IFB 91006-271 CARPENTRY JOC 00100 - 2

C. Contractor shall be required to commence work and complete work in accordance with a schedule acceptable to the WCBOE.

4. WCBOE REQUIRED EVENING, WEEKEND OR HOLIDAY PROJECT SCHEDULE: The

Board may require the work to be performed during evenings, weekends or holidays due to inability to interrupt normal WCBOE business operation. The Project Manager will make this determination prior to the issuing of the Purchase Order.

5. BILLABLE LABOR RATES: Davis Bacon or Prevailing Wage Projects EXCLUDED

A. The Billable Labor Rates shall include all small tools, taxes, insurances, supervision, overhead, profit, etc.

B. The successful Contractor(s) shall invoice the Board at these labor rates for each project completed under this contract.

C. The WCBOE’s Project Manager and the successful Contractor shall establish the number of hours per project PRIOR to the start of each project.

D. Payment shall only be made for the hours spent on-site. NO TRAVEL.

E. Billing for Superintendent Rate must be approved by the WCBOE’s Project Manager PRIOR to the start of each project.

F. The Evening, Weekend or Holiday Billing Rates may not be greater than %150 of the Regular Hourly Billing Rates.

1) Overtime is weekday evenings after 5 P.M and Weekends.

2) Holidays - The following days are recognized for Holiday Rates as appropriate:

New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.

G. The WCBOE’s Project Manager may issue a change authorization to increase or decrease the amount of authorized billable hours if the scope of project is modified.

6. The successful Contractor(s) will be required to obtain all necessary pricing from suppliers and subcontractors. Minimums of two quote(s) are required. Suppliers and subcontractors may be selected by WCBOE. Full disclosure of all proposals/quotes may be required for review by WCBOE.

The owner reserves the right to purchase material directly from a supplier when practicable. Contractor will supply material list.

7. SUBCONTRACTOR MARGIN: The successful Contractor(s) shall invoice the WCBOE the actual cost plus the quoted percentage. The WCBOE’s Project Manager and the successful Contractor(s) shall create a per-project (Form of Proposal) as outlined in Appendix A of this bid for each project PRIOR to the start of each project. This proposal shall be approved by the WCBOE’s Project Manager. COPIES OF INVOICES MAY BE

REQUESTED BY THE WCBOE’S PROJECT MANAGER OR THE COMPTROLLER.

IFB 91006-271 CARPENTRY JOC 00100 - 3

8. MISCELLANEOUS MATERIALS MARGIN: The successful Contractor shall invoice the WCBOE the actual cost plus the quoted percentage. The WCBOE’s Project Manager and the successful Contractor(s) shall create a per-project (Form of Proposal) as outlined in Appendix A of this bid for each project PRIOR to the start of each project.

This proposal shall be approved by the WCBOE’s Project Manager. COPIES OF

INVOICES MAY BE REQUESTED BY THE WCBOE’S PROJECT MANAGER OR THE

COMPTROLLER.

9. RENTAL EQUIPMENT MARGIN: The successful Contractor shall invoice the WCBOE the actual cost plus the quoted percentage. The WCBOE’s Project Manager and the successful Contractor(s) shall create a per-project (Task Order Request) as outlined in Appendix A of this bid for each project PRIOR to the start of each project. This proposal shall be approved by the WCBOE’s Project Manager. COPIES OF INVOICES MAY BE

REQUESTED BY THE WCBOE’S PROJECT MANAGER OR THE COMPTROLLER.

END OF SCOPE OF WORK SECTION

IFB 91006-271 CARPENTRY JOC 00200 - 1

GENERAL CONDITIONS

1. DEFINITIONS:

Addendum: Written change or revision to the Bidding Documents issued to the prospective Bidders prior to the time of receiving bids.

Alternate: The sum to be added to, or deducted from, the Base Bid if the change in scope of work as described in Alternates is accepted by the Board.

Board: Wicomico County Board of Education also WCBE and WCPS.

Furnish: Purchase and deliver to the site of installation.

Holidays: The following days are recognized for Holiday Rates as appropriate: New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.

Install: Fix in place of materials; and fix in place and connect for equipment.

Owner: Wicomico County Board of Education (aka Wicomico County Public Schools).

Project: Collectively, future Work is to be accomplished by the Contractor in satisfaction with a requirement or group of related requirements pursuant to one or more purchase orders or other ordering instruments.

Project Manager: The Owner will designate a Project Manager for each approved Task Order. The Project Manager will serve as the Owners Representative and may make decisions related to the order work on behalf of the Owner.

Secure: Obtain.

Task Order Request (TOR): a request for a proposal for a specific project under this Job Order Contract issued to one or more contract holders to provide a proposal.

Work: The labor, material, equipment, and services necessary or convenient to the completion of future Task Orders.

2. PROJECT MANAGER: ARCHITECT (ENGINEER) AND/OR PROJECT MANAGER:

A. PROJECT MANAGER: On any project arising out of this Master Job Order Contract, all project correspondence, approvals, coordination, and contract administration shall be conducted through the Board's Project Manager. The Project Manager shall have authority, as outlined in the Bidding Documents, to act as agent for the Board.

B. The Architect (Engineer) and/or Project Manager is responsible for the overall design of the Projects arising from this contract and the final authority in judgments of

IFB 91006-271 CARPENTRY JOC 00200 - 2

aesthetic consideration. The working drawings, technical specifications, sketches, and other data necessary to define the work covered by these Contract Documents have been prepared by the Architect (Engineer) and/or Project Manager.

C. The Architect (Engineer) and/or Project Manager shall visit, inspect, and observe the construction to determine general compliance with the Bidding Documents, and interpret the drawings and specifications consistent with their intent. They shall evaluate the shop drawings, samples and other submittals required in the technical specifications, and maintain an up-to-date log of all such items processed. The Architect (Engineer) and/or Project Manager will consult with the Board, Contractors, and any state, county or city agency having jurisdiction over the work whenever necessary to further the best interests of the Project.

D. Should any dispute arise respecting the true value of any work done, or any work omitted, or of any extra work which said second party may be required to do, or respecting the size of any payment to said second party during the performance of this contract, said dispute shall be decided by the Architect (Engineer) and/or Project Manager, and the decision of the latter shall be final and conclusive.

E. WCPS will establish the Architect (Engineer) and/or Project Manager on the Purchase Order unless identified in the Bidding Documents.

F. The project manager shall conduct all project correspondence, approvals, coordination, and contract administration. The Board's Project Manager shall have the authority, as outlined in the Bidding Documents, to act as an agent for the Board.

3. CONTRACT DOCUMENTS:

A. The Bidding Documents as modified by any addenda shall become the Contract

Documents upon award by the Board.

B. JOB ORDER CONTRACTS: On projects arising out of this contract a Scope of Work (Technical Specifications) will be established, and a Task Order Request (TOR) will be issued to one or more contractors to provide a written proposal for a specific project.

The TOR response will become part of the original contract, and all aspects of the original contract documents are in force for any Task Order project awarded under this JOC.

C. The Contract Documents shall include the following: Bid Addenda, the completed Bid

Form and Pricing Sheets, insurance forms, the Invitation to Bidders, Instructions to Bidders, General Conditions, Supplementary Conditions, Scope of Work (Technical Specifications), Bidder's Questionnaire and any additional information required with the Bid Form.

Any Task Order, modification, amending, or extension of the work shall be as binding as if originally included in the Contract Documents.

IFB 91006-271 CARPENTRY JOC 00200 - 3

D. The Contract Documents are complementary, and anything required by one shall be as binding as if required by all. In case of conflicts within the Contract Documents, the order of precedence of interpretation shall be those established in the Supplementary Conditions having priority. In case of conflict within the drawings, larger-scale drawings shall govern smaller-scale drawings, and written dimensions shall govern over scaled dimensions.

E. Upon award notice the Contract is in place and no other documents are required unless requested by WCPS.

4. PRE-CONSTRUCTION CONFERENCE/PROGRESS MEETINGS:

A. Upon award of a future Task Order the Project Manager may require a pre-construction conference and request additional meetings, drawings, and details that are required to serve WCPS.

B. The following Project Management documentation shall be provided upon request:

1) Project Schedule per General Conditions.

2) Schedule of Values with MBE firms indicated (if applicable).

3) Sub-contractor list with MBE firms indicated (if applicable).

4) All required licenses, insurance, and bonds (if applicable).

C. The Prime Contractor and all Sub-contractors shall be represented by individuals that are authorized to commit the necessary resources to provide their portion of the project.

Attendance at all Pre-construction and progress meetings are mandatory unless prior approval is obtained from the Project Manager.

D. Upon the completion of any Task Order project the Project Manager may complete a

Contractor Performance Evaluation. This evaluation will be shared with the contractor. The evaluation may be used as evidence of the contractor’s ability to successfully perform future WCPS contracts.

5. MASTER MANDATORY PROVISIONS:

A. Any material, item, or piece of equipment mentioned, listed, or indicated without a definition of quality shall be consistent with the quality of adjacent or related materials, items, or equipment.

B. Any method of installation, finish, or workmanship of an operation called for, without definition of standard of workmanship, shall be followed or performed and finished in accordance with good practice and consistent with adjacent or related installations.

C. Any necessary material, item, piece of equipment, or operation not called for but reasonably implied as necessary for proper completion of the work shall be furnished, installed or performed and finished and shall be consistent with adjacent or related materials, items, or pieces of equipment, and following good practice.

IFB 91006-271 CARPENTRY JOC 00200 - 4

D. Names or numbered products are to be used according to the manufacturers' specifications, directions, or recommendations unless otherwise specified.

6. RESPONSIBILITY OF THE CONTRACTOR:

A. It shall be the responsibility of the Contractor to notify their sub-bidders at the time of request for bids on all portions of the Bidding Documents (future TORs) and any parts of other sections of specifications or plans that the Contractor intends to include as part of the subcontract.

B. All contact with students should be avoided.

C. The Contractor shall submit verification of a company-wide substance abuse policy upon written request by WCPS.

D. The Contractor shall be held strictly responsible for the proper performance of all work covered by the Contract, including the work performed by them and all their subcontractors.

E. The Contractor shall provide resumes, as part of any TOR submission, of

Superintendents and Project Managers that the bidder intends to assign to work on WCPS projects. Any changes thereafter must be submitted to the WCPS Project Manager for review and approval.

F. The Contractor shall perform all the work required by the Contract Documents and furnish all labor, materials, plant, equipment, tools, and appurtenances necessary to perform said work and complete it within the time specified.

The Contractor shall at all times perform the work of this Contract in a competent and workmanlike manner and, if not specifically stated, accomplish the work according to the best standards of construction practice.

G. SUPERVISION: The Contractor shall employ a full-time competent, English speaking, superintendent and necessary assistants who shall have complete authority to act for the Contractor on all matters pertaining to the work. The superintendent shall be on-site at all times and remain on-site, through the duration of the project. The contractor’s Project Superintendent and Project Manager must be accessible to the WCPS Project Managers by cell phone.

The superintendent shall be on-site 100% of the time and remain on-site, through the duration of the project, unless prior authorization is obtained from the Owner. The superintendent shall be satisfactory to the Owner and, if not satisfactory, shall be replaced by the Contractor with one that is acceptable. Also, the superintendent shall not be changed without the consent of the Owner unless the superintendent ceases to be employed by the Contractor.

H. Contractor shall make their own layout of lines and elevations and shall be responsible for the accuracy of both their and the subcontractors' work resulting

IFB 91006-271 CARPENTRY JOC 00200 - 5

there from. All dimensions affecting proper fabrication and installation of all contract work must be verified prior to fabrication by taking field measurements of the true conditions. The Contractor shall take and assist subcontractors in taking all field dimensions required in the performance of the work and shall verify all dimensions and conditions on the site. If there are any discrepancies between dimensions in drawings and existing conditions which will affect the work, the Contractor shall bring such discrepancies to the attention of the Project Manager for adjustment before proceeding with the work. The Contractor shall be responsible for the proper fitting of all work and for the coordination of all trades, subcontractors and persons engaged upon this Contract.

I. Contractor shall do all cutting, fitting, or patching of their work that may be required to make its several parts come together properly and fit it to receive or be received by work of other contractors as shown, or reasonably implied by, the Drawings and Specifications for the completed structure, and they shall make good after that as the Project Manager may direct. Any cost caused by defective or ill-timed work shall be borne by the party responsible.

J. DEMOLITION: When applicable, the Contractor shall remove and legally dispose of all items except those identified by the Owner to be reinstalled, salvaged, or to remain the Owner's property.

7. REPORTING TO SCHOOL ADMINISTRATION:

A. AT THE BEGINNING OF A TASK ORDER AWARD, THE CONTRACTOR MUST

NOTIFY THE BOARD'S PROJECT MANAGER AT LEAST 48-HOURS PRIOR TO

ARRIVAL AT THE BOARD'S FACILITY, AND SCHEDULE THE ACTIVITIES.

B. ALL CONTRACTORS, VENDORS and/or EMPLOYEES, shall upon entering any

WCPS facility show proof of identification, sign-in and obtain a WCPS numbered Contractor Security Badge and/or visitor’s badge.

C. Upon the completion of the project, ALL Contractor Security Badges must be returned before final payment can be made. Contractors that can provide their own verifiable, managed security identification program MAY be exempt from this requirement. PRIOR approval by the WCPS Project Manager is required.

D. If the Contractor considers it necessary or desirable to work on Saturday, Sunday or a holiday, they shall so notify the Board at least forty-eight (48) hours before the commencement of such work to provide the Project Manager the time necessary to make arrangements to allow Contractor access to the building.

8. USE OF BOARD FACILITIES:

A. The Contractor, sub-contractor, and sub-sub-contractor shall confine their operation to those areas permitted and authorized by the Project Manager. The use of Board's facilities (toilets, restrooms, lunchrooms, dumpsters, etc.) and utilities are strictly prohibited unless previously authorized and approved by the Project Manager.

IFB 91006-271 CARPENTRY JOC 00200 - 6

B. The Contractor, sub-contractor, sub-sub-contractor may park only in those areas designated by the Project Manager.

9. SUBCONTRACTORS:

A. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Board. The Board shall be deemed to be the third-party beneficiary of the contract between the contractor and the subcontractor. If the Contractor does not specify a Subcontractor for any portion of the work to be performed under this Contract, they agree to perform that portion of the work with their own forces.

B. The Contractor shall not substitute any other person or firm as a Subcontractor, other than those listed in the Task Order proposal submitted by them, without the written approval of the Board.

The Board reserves the right of approval of all subcontractors proposed for use on this Project, and to this end, may require financial, performance and additional information as is needed to secure this approval. If a Subcontractor is not approved, the Contractor shall promptly submit another of the same trade for approval.

C. The Contractor shall insert appropriate provisions in all subcontracts pertaining to work on this Project requiring the Subcontractors to be bound by all applicable terms of the Contract Documents. The Contractor shall be as fully responsible for the acts and omissions of their Subcontractors and of persons either directly or indirectly employed by them as they are for the acts and omissions of persons directly employed by them.

10 GOVERNING LAW AND VENUE:

A. The bid shall be construed in accordance with and interpreted under the Laws of the State of Maryland. Any lawsuit arising out of such a bid shall be filed in the appropriate State Court of competent jurisdiction located in Wicomico County, Maryland.

11. CLAIM AND DISPUTES:

A. The Owner shall in no way be obligated to enter into mediation proceedings with a Contractor for any purpose whatsoever. The Owner will reserve unto itself the right to determine what form of litigation, and its locations are appropriate at the time the dispute arises.

12. INSURANCE:

A. The Contractor shall not commence work under this contract until they have obtained all insurance required under this Article and such insurance has been approved by the Owner.

B. The Contractor shall provide to the Purchasing Manager a current Certificate of

IFB 91006-271 CARPENTRY JOC 00200 - 7

Insurance indicating the coverages below with their bid and they agree to maintain such insurance until the completion of the contract.

C. The minimum insurance coverages shall be:

1) Workmen's Compensation: The Contractor shall maintain throughout the life of the contract statutory Workers' Compensation, including Maryland benefits and employer's liability with limits of $100,000/$100,000/$500,000 for all of the Contractor's and any sub-contractor's employees who will be engaged in the work at the sites of the project.

2) Commercial General Liability: The Contractor shall establish and maintain throughout the life of the contract Commercial General Liability Insurance - $2,000,000 each occurrence/general aggregate covering all premises and operations and including Personal Injury, Completed Operations, Contractual Liability and where applicable to the project as determined by the Purchasing Agent, Products and Independent Contractors. The general aggregate limit is to apply per project; and

3) Business Automobile Liability: $2,000,000 Combined Single Limit (Owned, non-owned, and hired).

D. The Board requires a forty-five (45) day notice, in writing, of cancellation, non-renewal or change in insurance coverage affecting this project. This written notice shall be furnished by the Contractor's insurance carrier(s) or insurance agent(s) to the Board's Purchasing Agent.

E. All bidders will have a current Certificate of Insurance (ACORD certificates) on file in the Purchasing Office at the time of the bid opening or included with the bid. Failure to provide the ACORD certificate may result in the bidder's offer being considered non-responsive.

F. The Board (including its elected or appointed officials, agents, and employees) is to be named as an additional insured in the Contractor's General Liability Policy.

Coverage must be primary with respect to the Board, its agents, and employees.

13. CODES AND REGULATIONS:

A. The Contractor shall be knowledgeable of and comply with all codes, ordinances, regulations, or orders of properly constituted authority having jurisdiction over the work of this project. The Contractor shall examine the Contract Documents for compliance with these codes and regulations, and they shall promptly notify the Project Manager of any discrepancies. Changes in the drawings and specifications shall be made only by means of change orders, or modifications approved by the Board. Change order procedures shall be as described elsewhere in these Contract Documents. The contractor shall keep a copy of all applicable Code of Regulations at the job site at all times.

B. All work and materials shall be in full accordance with the latest rules and regulations and other applicable State laws or regulations. Nothing in these plans or specifications is to be construed to permit work not conforming to these Codes.

IFB 91006-271 CARPENTRY JOC 00200 - 8

1) Buildings and/or all other construction covered by this Contract shall meet all the regulations for access by physically handicapped.

14. PERMITS/PUBLIC UTILITIES:

A. The Contractor shall obtain and pay for all permits, fees, licenses, and inspections that are required in order to perform the work under this Contract. The Board shall pay connection charges and meter costs for new permanent utilities required by these Contract Documents.

B. The Contractor shall notify Board sufficiently in advance to submit requests for service to the appropriate utility companies so as to ensure connections or installation of utility services in accordance with the Project schedule.

15. PATENTS AND ROYALTIES: The Contractor shall pay for all royalties and patents and shall defend all suits or claims for infringement on any patent right and shall save the Board harmless from loss of account thereof.

16. SAFETY AND FIRE PREVENTION:

A. OCCUPATIONAL SAFETY AND HEALTH ACTS: Contractor(s) who perform any work under this contract shall fully comply with the provisions of the Federal Occupational Safety and Health Act of 1970 and any amendments thereto and regulations pursuant to the act, and also to the Maryland Occupational Safety and Health Act, Article 89, Sections 28 to 49A inclusive, Annotated Code of Maryland, as amended by Chapter 59, Laws of Maryland 1973 and any regulations pursuant thereto.

B. The Contractor shall provide proof of safety training programs for all employees to be used on any WCPS project and disclosure of the bidder’s safety EMR (Experience Modification Rate).

C. The Contractor shall take thorough precautions at all times for the protection of persons and property and shall be liable for all damages to persons or property, either on or off the site, which occur as a result of their prosecution of the work. The Contractor shall obtain permits for, install and maintain in safe condition barricades, walkways, fences, railings, and whatever other safeguards that may be necessary to protect persons and property from damage as a result of the construction under this Contract.

D. Contractor shall not endanger any work by cutting, excavating, or otherwise altering the work and shall not cut or alter the work of any other Contractor except with the consent of the Project Manager, nor overload any new or existing structures by the placing or storage of materials, equipment, or other items thereon, and if necessary, provide calculations proving the safety in so doing.

IFB 91006-271 CARPENTRY JOC 00200 - 9

E. If it is necessary to work at night, or where daylight is obscured, the Contractor shall provide and maintain lighting of adequate level to properly prosecute the work and to permit thorough inspection of same.

F. Contractor shall take extraordinary care to prevent fires and keep all flammable materials and oily rags in tightly closed metal containers. Contractor should exercise particular care when welding or cutting, and with regard to the disposition of waste materials, the nature and quantity of which might create or increase a fire hazard.

G. The Contractor and Subcontractors shall comply with Sections 6360, et. seq. of the Labor Code, together with Title 22 with regard to hazardous substances in the workplace. The Contractor and each Subcontractor shall supply to their employees and, where site is occupied, to Board, copies of Material Safety Data Sheets (MSDS) for hazardous substances that may be used in the course of the work, together with notice of actual hazardous substances to which employees may be exposed while performing work and appropriate protective measures.

17. HAZARDOUS MATERIALS:

A. This contract does not include the removal, handling, or disturbance of any hazardous substances or materials encountered in the new construction or on the project grounds. If such substances or materials are encountered, work shall cease in that area and the Board shall be notified to take appropriate action for removal or otherwise abating the condition in accordance with current regulations applicable to the Board.

B. All contractors performing work on Board of Education premises are required to make themselves aware of the locations of asbestos containing building materials that exist on the work site. Board personnel can supply such information prior to commencement of work.

1) General:

a) No asbestos, asbestos containing products or other hazardous materials shall be used in this construction or in any tools, devices, clothing, or equipment used to affect this construction.

b) Asbestos and/or asbestos containing products shall be defined as all items containing but not limited to chrysotile, crocidolite, amosite, anthophyllite, tremolite and actinolite.

c) Any or all material containing greater than one-tenth of one percent (> .1%) asbestos shall be defined as asbestos-containing material.

d) Any disputes involving the question of whether or not material contains asbestos shall be settled by electron microscopy; the costs of any such tests shall be paid by the contractor.

e) All work or materials found to contain asbestos, or work or material installed with asbestos containing equipment will be immediately rejected and this work will be removed at no additional cost to the Owner.

2) Decontamination and Removal of hazardous material from prior work:

IFB 91006-271 CARPENTRY JOC 00200 - 10

a) Decontamination and removal of work found to contain asbestos, or work installed with asbestos containing equipment shall be done only under the supervision of a qualified consultant, knowledgeable in the field of asbestos abatement and accredited by the Environmental Protection Agency.

b) The asbestos removal contractor shall be an EPA accredited contractor qualified in the removal of asbestos and shall be chosen and approved by the asbestos consultant who shall have sole discretion and final determination in this matter.

c) The asbestos consultant shall be chosen and approved by the Board, which shall have sole discretion and final determination in this matter.

d) The work will not be accepted until asbestos contamination is reduced to levels deemed acceptable by the asbestos consultant.

e) Cost of all asbestos removal from prior work, including but not necessarily limited to the cost of the asbestos removal contractor, the cost of the asbestos consultant, analytical and laboratory fees, time delays, and additional costs as may be incurred by the Board and/or its agent(s) shall be borne entirely by the Board.

3) Hold Harmless:

a) Interface of work under this contract with work containing asbestos shall be executed by the Contractor at their risk and at their discretion with full knowledge of the currently accepted standards, hazards, risks, and liabilities associated with asbestos work and asbestos containing products. By execution of this contract the Contractor acknowledges the above and agrees to hold harmless the Owner, their employees, agents and assigns for all asbestos liability which may be associated with this work and agrees to instruct their employees with respect to the above mentioned standards, hazards, risks and liabilities.

b) The Contractor shall, prior to commencement of this work, provide a duly signed and notarized affidavit that they have instructed their employees with respect to the above-mentioned standards, hazards, risks and liabilities and the contents and requirements of this portion of the contract documents.

4) Certification:

The Contractor agrees that materials containing asbestos or other hazardous materials as defined in Federal and State law, shall not be used in construction and will provide prior to final payment a notarized affidavit stating that no asbestos containing building materials or other hazardous materials as defined in Federal and State law were installed during the project by themselves, their sub-contractors, or sub-sub-contractors.

18. TEMPORARY FACILITIES:

A. The Contractor shall obtain permits for, install and maintain in safe condition whatever scaffolds, hoisting equipment, barricades, walkways, or other temporary structures which may be required to accomplish the work. Such structures shall be

IFB 91006-271 CARPENTRY JOC 00200 - 11

adequate for the intended use and capable of safely accepting all loads that may be imposed upon them. They shall be installed and maintained in accordance with all applicable state and local codes and regulations.

B. The Contractor shall provide and maintain temporary heat from an approved source whenever in the course of the work it may become necessary for curing, drying, or warming spaces as may be required for the installation of materials or finishes. The Contractor shall provide and maintain any and all facilities that may be required for dewatering in order that work may proceed on the project. If it is necessary for dewatering to occur continually, the Contractor shall have on hand whatever spare parts or equipment that may be required to avoid interruption of service.

C. The Contractor shall promptly remove all such temporary facilities when they are no longer needed for the work or on completion of the project. The Contractor shall repair any damage to premises or property which resulted from the construction, use, or removal of temporary facilities and shall restore said premises and property to their original condition.

19. SIGNS: No signs may be displayed on or about the Board's property (except those which may be required by law) without the Board's specific approval of size, content, and location. Any signs required by the Board will be designated in the scope of work.

20. TIME:

A. It shall be understood that time is of the essence of the Contract, and the Contractor must prosecute the work diligently and regularly at such a rate of progress as to ensure completion of this Project within, or sooner than, the time specified. The Contractor shall commence the work on the date indicated in the Notice to Proceed, and they agree to complete all work described by the Contract Documents within, or sooner than, the number of calendar days required in the Contract.

B. The Contractors and Subcontractors shall investigate and become aware of the amount of time required for the delivery of all equipment and materials required to perform the work under this Contract, and no extension of time shall be granted due to failure to order said equipment and materials sufficiently before their incorporation into the work so as to avoid delay to the Project.

C. The Contractors and Subcontractors shall provide and maintain enough workforce, materials, and equipment to ensure a rate of construction progress that will complete the Project within or sooner than the time specified and according to the schedule of work. If, in the Project Manager's opinion, the Contractor and/or their Subcontractors are not prosecuting the work at a sufficient rate of progress to meet the Project schedule, the Board may direct the Contractor to provide additional manpower, materials or equipment, or to work additional hours, holidays or weekends without additional cost to the Board until the work is progressing in a manner satisfactory to the Board. Failure to prosecute the work in a timely manner and according to the Project schedule is considered a breach of Contract and is cause for termination of the Contract according to the Article on "BOARD'S RIGHT TO TERMINATE

CONTRACT."

IFB 91006-271 CARPENTRY JOC 00200 - 12

21. CONSTRUCTION/PROJECT SCHEDULE:

A. Within fifteen (15) calendar days after the Award of Contract, the Contractor shall prepare and submit to the Project Manager, for approval, a construction schedule showing in detail how the Contractor plans to prosecute the work. The schedule shall include the work of all trades necessary for the construction of the Project, material delivery dates and shall be sufficiently complete and comprehensive to enable progress to be monitored on a day-by-day basis. The information for each activity shall include as a minimum the activity description, duration, start date and completion date.

B. The Contractor shall take care in the preparation of the schedule to ensure that it represents an accurate and efficient plan for accomplishing the work.

This is the start of the file's text. The full file is on GovTribe.