This is an Invitation for Bids (IFB) document issued by the City of Williamsburg, Virginia for the Walnut Hills Stream Restoration project funded by the U.S. Environmental Protection Agency through the FY22 Community Project Funding program. The project consists of water quality improvements to stabilize and restore approximately 800 linear feet of perennial, intermittent, and ephemeral stream channel through natural channel design techniques within a 1,347-linear-foot stream corridor on an unnamed tributary of College Creek. The project site is located within City drainage easements at four locations: 1014 Jamestown Road, 21-23 Walnut Hills Circle, and 106, 108, 204, and 206 Governors Drive. The bid includes 31 line items encompassing mobilization, stakeout and surveying, traffic maintenance, clearing and grubbing, excavation, fill materials, aggregate base, streambed substrate, boulders, log structures, riprap, erosion control measures, utility protection, construction entrance, road stabilization, temporary stream crossings, tree protection, silt fencing, dewatering operations, check dams, protective coverings, seeding, and plantings. The City will receive sealed bids until 2:00 p.m. local time on September 30, 2026, with a non-mandatory pre-bid conference scheduled for September 16, 2026, at 10:00 a.m. Work must be substantially completed within 180 calendar days of notice to proceed, with final completion required within 210 calendar days. Award will be made to the lowest responsive and responsible bidder.

Bidders must submit bids on the prescribed form with bid security equal to five percent of the total bid amount, along with Performance and Payment Bonds at 100% of the contract price. Liquidated damages are set at $300 per calendar day after substantial completion and $500 per calendar day after final completion. The project is subject to Hampton Roads Planning District Commission Regional Construction Standards, Sixth Edition, as modified by project-specific special provisions. Contractor registration in Virginia is required, and bidders must provide certification regarding debarment, compliance with immigration laws, non-collusion affidavits, and safety certification forms. Insurance requirements include workers' compensation at statutory limits, employer's liability of $100,000, commercial general liability of $500,000 combined single limit with the City named as additional insured, and automobile liability of $500,000 combined single limit if motor vehicles will be used. There is no Disadvantaged Business Enterprise goal requirement for this project. The City of Williamsburg reserves the right to waive minor informalities, reject any or all bids, and negotiate with the lowest responsive and responsible bidder if the bid exceeds available funds. Bids remain subject to acceptance for 90 days after opening, with the option to extend an additional 90 days with the consent of the apparent low bidder and surety.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RETURN THIS PAGE WITH YOUR BID OFFER

INVITATION FOR BIDS (IFB)

Issue Date: September 9, 2026

Sealed Solicitation Title:

Walnut Hills Stream Restoration EPA Community Grant No. 95342001

Issuing Office:

City of Williamsburg Office of the Public Works & Utilities Director 401 Lafayette Street Williamsburg, Virginia 23185-3617 Voice (757)220-6140 Fax (757)259-3798

Location of where work will be performed: City of Williamsburg, 23185

Sealed bids will be received until the date and time noted above for furnishing the construction services described herein and then opened in public.

All inquiries for information should be directed to the Public Works & Utilities Department. Written questions related to the project will be accepted up to five (5) business days prior to the closing date; it is the City’s discretion to respond to any inquiries beyond this time. Emails are an acceptable form of written documentation.

IF BIDS ARE MAILED, SEND DIRECTLY TO ISSUING OFFICE NOTED ABOVE. IF BIDS ARE HAND

DELIVERED, DELIVER TO:

401 Lafayette Street Williamsburg Municipal Building, 2nd Floor Public Works & Utilities Department Williamsburg, VA 23185

Include the IFB number on the outside of all sealed bids delivered to the City’s Public Works & Utilities Department.

Any bid submittal without the IFB number may be deemed non-responsive by the City.

In compliance with this Invitation For Bids and to all the conditions imposed therein, the undersigned offers and agrees to furnish the goods/services at the price(s) indicated in the Bid Form section.

Name and Address of Firm:

__________________________________________ Date: ________________________________________

__________________________________________ By: ________________________________________

__________________________________________ (Signature In Ink)

_______________________ Zip Code: __________ Name: _______________________________________

FEI/FIN NO. ________________________________ (Please Print)

Telephone Number: (____)_____________________ Title: ______________________________________

E-Mail Address:_____________________________

NON-MANDATORY PRE-BID CONFERENCE: Pre-bid conference will be held September 16, 2026 at 10:00 a.m., local time at City of Williamsburg Municipal Building, 2nd floor Main Conference Room, 401 Lafayette St., Williamsburg, VA 23185. Bidders may contact Jamie Clark, Public Works Engineer, at jclark@williamsburgva.gov for any questions

IFB NO:

06-4101-27

PRE-BID CONFERENCE:

September 16, 2026

10:00 a.m.

CLOSING DATE:

September 30, 2026

CLOSING TIME:

2:00 p.m.

PROCUREMENT OFFICER:

Cindy Webber

PHONE: 757-220-6182

IFB Submission Form

City of Williamsburg Walnut Hills Stream Restoration

EPA Community Grant No. 95342001

IFB #06-4101-27

Issue Date: September 9, 2026 Due Date: September 30, 2026 @ 2:00 PM Local Time

Submitter’s Name

Mailing Address

City State Zip Code

Phone Email Address

Website (optional)

Attachment Checklist You must include the following documentation with your submission.

IFB Cover Page IFB Submission Form Bid Form Bid Bond Certificate of Debarment Non-Collusion Affidavit

This submittal accurately represents my plans, and I/we are fully prepared and capable of working as described within a time frame that will be agreed upon by myself and the City of Williamsburg.

Signature Date

Printed Name

- YOU MUST RETURN THIS COMPLETED FORM WITH YOUR SUBMISSION -

September 2026 TOC - 1

Walnut Hills Stream Restoration

EPA Community Grant No. 95342001

IFB 06-4101-27

REGIONAL CONSTRUCTION STANDARDS

Sixth Edition

TABLE OF CONTENTS

Page

IFB Cover Page 1 of 1

IFB Submission Form 1 of 1

Table of Contents TOC-1 to TOC-5

DIVISION 1 - GENERAL PROVISIONS

Section 101 - Definitions of Terms 101-1 to 101-4

I General Definitions

Section 102 - Bidding Requirements and Conditions 102-1 to 102-29

I Invitation for Bids

II Instructions to Bidders

III Bid Form

IV Bid Bond

V Questionnaire

VI Certification Regarding Debarment

VII Certification of Compliance with Immigration Laws and Regulations

VIII Safety Certification Form

Section 103 - Award and Execution of Agreement 103-1 to 103-20

I Award and Execution of Agreement

II Notice of Award

III Agreement

IV Performance Bond

V Payment Bond

VI Notice to Proceed

VII Notice of Intent to Award

VIII Escrow Agreement

Section 104 - Scope of Work 104-1 to 104-4

I Intent of Agreement

II Amending and Supplementing Contract Documents

III Explorations and Reports

IV Underground Facilities

V Subsurface Conditions

VI Site Security

VII Clean-up, Disposal and Restoration

September 2026 TOC - 2

EPA Community Grant No. 95342001

Section 105 - Control of Work 105-1 to 105-18

I Reuse of Contract Documents

II Copies of Contract Documents

III Contract Documents

IV Shop Drawings and Submittals

V Record Drawings

VI Access to Project

VII Surveys and Reference Points

VIII Working Hours

IX Project Coordination

X Supervision

XI Uncovering Work

XII Removal of Unacceptable Work

XIII Substantial Completion

XIV Use of Completed Portions

XV Final Inspection

XVI Claims

XVII Engineer’s Status

XVIII Documentation of Preconstruction Conditions

XIX Notice to Comply Order

XX Stop Work Order

Section 106 - Control of Material 106-1 to 106-2

I Tests and Inspections

II Labor, Materials and Equipment

III Work by Owner

Section 107 - Legal Relations and Responsibility to the Public 107-1 to 107-10

I Permits and Regulations

II Land, Easements, and Rights-of-Way

III Protection of Work, Property & Persons

IV Environmental Stipulations

V Temporary Facilities

VI Emergencies

VII Warranty and Guarantee

VIII Opening Sections of Projects to Traffic

IX No Waiver of Legal Rights

Section 108 - Prosecution and Progress of Work 108-1 to 108-10

I Patent Fees and Royalties

II Taxes

III Notice to Proceed

IV Pre-Construction Conference

V Construction Progress Schedule

VI Subcontracts

September 2026 TOC - 3

EPA Community Grant No. 95342001

VII Commencement and Prosecution of Work

VIII Suspension of Work

IX Termination of Agreement

X Liquidated Damages

XI Separate Contracts by Owner

XII Indemnification

Section 109 - Measurement and Payment 109-1 to 109-16

I Measurement and Payment Procedures

II Change Orders and Field Orders

III Change Order Form

IV Application for Payment

VI Affidavit of Payment of Claims

VII Certificate of Substantial Completion

VIII Statement of Surety Company

IX Contractor’s Release

X Manhole/Structure Protective Coating Post Installation Certification

XI Standard Bid Items and Units

Section 110 – Special Provisions (added by Locality) 110-1 to 110-14

I Federal Provisions

II Construction Drawings

III HRPDC Regional Construction Standards

IV Measurement and Payment for Items Specified on Drawings

V Technical Specifications

VI Traffic Management Plan

APPENDICES

A. Technical Specifications 33 pages

B. DBRA Requirements for Contractors and Subcontractors

Under EPA Grants 12 pages

C. Wage Decision VA20260195 5 pages

D. Traffic Management Plan TMP-1 to TMP-2

(The following Divisions are incorporated by reference)

DIVISION 2 - PRODUCTS AND MATERIALS

Section

200A. Division Table of Contents 200A-1 to 200A-2

200. Products and Materials 200-1 to 200-74

September 2026 TOC - 4

EPA Community Grant No. 95342001

DIVISION 3 - ROADWAY CONSTRUCTION

300A. Division Table of Contents 300A-1 to 300A-3

301. Clearing and Grubbing 301-1 to 301-5

302. Drainage Structures 302-1 to 302-9

303. Earthwork 303-1 to 303-19

305. Subgrade and Shoulders 305-1 to 305-2

309. Aggregate Base Course 309-1 to 309-3

310. Tack and Prime Coat 310-1 to 310-4

313. Asphalt Surface Treatment 313-1 to 313-4

315. Asphalt Concrete Pavement 315-1 to 315-14

317. Pavement Patching 317-1 to 317-3

DIVISION 4 - MISCELLANEOUS

400A. Division Table of Contents 400A-1

406. Reinforcing Steel 406-1 to 406-2

414. Riprap 414-1 to 414-3

DIVISION 5 - INCIDENTAL CONSTRUCTION

500A. Division Table of Contents 500A-1 to 500A-3

501. Underdrains 501-1 to 501-2

502. Concrete Items 502-1 to 502-13

505. Guardrail and Steel Median Barriers 505-1 to 505-3

507. Fences 507-1 to 507-2

510. Relocating or Modifying Existing Miscellaneous Items 510-1 to 510-3

511. Allaying Dust 511-1 to 511-2

512. Maintaining Traffic 512-1 to 512-6

513. Mobilization/Demobilization 513-1 to 513-1

515. Planing or Milling Pavement 515-1 to 515-4

521. Pavers 521-1 to 521-12

530. Abandonment of Existing Pipelines and Structures 530-1 to 530-6

531. Contaminated Groundwater Management 531-1 to 531-4

DIVISION 6 - LANDSCAPING

600A. Division Table of Contents 600A-1 to 600A-2

602. Topsoil 602-1 to 602-2

603. Seeding 603-1 to 603-3

September 2026 TOC - 5

EPA Community Grant No. 95342001

604. Sodding 604-1 to 604-2

605. Planting 605-1 to 605-5

606. Rolled Erosion Control Products (RECP) 060-1 to 606-2

608. Mowing 608-1 to 608-2

DIVISION 7 - TRAFFIC CONTROL DEVICES

700A. Division Table of Contents 700A-1

700. Traffic Control Devices 700-1 to 700-4

704. Pavement Markings and Markers 704-1 to 704-2

DIVISION 8 - WATER AND WASTEWATER UTILITIES

800A. Division Table of Contents 800A-1 to 800A-7

801. Water Distribution Systems 801-1 to 801-25

802. Sanitary Gravity Sewer Systems 802-1 to 802-19

803. Sanitary Force Main Systems 803-1 to 803-18

804. Boring and Jacking 804-1 to 804-4

805. Separation of Water Mains and Sewers 805-1 to 805-2

806. Horizontal Directional Drilling 806-1 to 806-11

Sanitary Sewer Rehabilitation (Sections 810-822)

810. Sewer Line Cleaning 810-1 to 810-8

811. Television Inspection 811-1 to 811-8

812. Bypass Pumping 812-1 to 812-5

813. Pipe Rehabilitation by Cured-in-Place Method 813-1 to 813-15

814. Not Used

815. Pipe Bursting 815-1 to 815-9

816. Sewer Pipe Joint Testing 816-1 to 816-7

817. Chemical Grouting 817-1 to 817-10

818. Point Repair by Excavation 818-1 to 818-4

819. Insitu Structural Point Repair 819-1 to 819-3

820. Insitu Point Repair by Sectional Lining 820-1 to 820-3

821. Sanitary Sewer Service Reconnections 821-1 to 821-7

822. Manhole Rehabilitation 822-1 to 822-12

823. Sliplining 823-1 to 823-9

824. Sewer Lateral Rehabilitation by Cured in Place Method 824-1 to 824-9

STANDARD DETAILS

Standard Details Table of Contents SD-1 to SD-3

End of Table of Contents

September 2026 101 - 1

EPA Community Grant No. 95342001

City of Williamsburg

SECTION 101

DEFINITIONS OF TERMS

I. GENERAL DEFINITIONS

Wherever used in the Contract Documents, the following terms shall have the meanings indicated and shall be applicable to both the singular and plural thereof:

1.1 Addenda - Written or graphic instruments issued prior to the opening of Bids which clarify, correct or change the Bid Documents or the Contract Documents.

1.2 Agreement - The written agreement between the Owner and the Contractor covering the Work to be performed; other Contract Documents are attached to the Agreement and made a part thereof as provided therein.

1.3 Application for Payment - The form provided in the Contract Documents which is to be used by the

Contractor in requesting progress and final payments and which is to include such supporting documentation as is required by the Contract Documents.

1.4 Bid - The offer or proposal of the Bidder submitted on the prescribed form setting forth the prices for the Work to be performed.

1.5 Bid Documents - Documentation issued prior to the bid date, including documentation accompanying the Bid (Drawings, Project Specifications, HRPDC Regional Construction Standards, Addenda, and

Special Provisions) and any Post-Bid documentation submitted prior to the Notice of Award.

1.6 Bidder - Any person, firm or corporation submitting a Bid for the Work.

1.7 Bonds - Performance and Payment Bonds furnished by the Contractor and the Contractor's surety in accordance with the Contract Documents.

1.8 Bid Security - Bid Bonds and other instruments of surety, furnished by the Contractor or the

Contractor's surety in accordance with the Contract Documents.

1.9 Change Order - A written order to the Contractor authorizing an addition, deletion, or revision in the

Work within the general scope of the Contract Documents that authorizes an adjustment in the

Contract Price and/or Contract Time, issued on or after the Effective Date of the Agreement.

1.10 Completion Date - The date specified in the Notice to Proceed for final completion of the Work.

1.11 Contaminated Effluent – Effluent from construction dewatering activities that is impacted with contaminants of concern and require special handling in accordance with applicable federal, state and local regulations.

1.12 Contaminated Groundwater - Groundwater that is impacted with contaminants of concern and require special handling in accordance with applicable federal, state and local regulations.

September 2026 101 - 2

EPA Community Grant No. 95342001

City of Williamsburg

IFB 06-4101-27

1.13 Contract Documents - The Agreement, including the Bid Documents, Notice of Award, Notice to

Proceed, Field Orders, Change Orders, and Modifications.

1.14 Contract Price - The total monies payable to the Contractor under the terms and conditions of the

Agreement.

1.15 Contract Time - The number of calendar days stated in the Agreement for the completion of the

Work. Calendar days shall be understood to be consecutive.

1.16 Contractor - The person, firm or corporation with whom the Owner has executed the Agreement.

1.17 Day - A calendar day of twenty-four hours measured from midnight to the next midnight. Calendar days shall be understood to be consecutive.

1.18 Defective - An adjective, which when modifying the word Work, refers to Work that is unsatisfactory, faulty or deficient, or does not conform to the Contract Documents, or does not meet the requirements of any inspection, reference standard, test or approval referred to in the Contract

Documents, or has been damaged prior to the Owner’s acceptance.

1.19 Drawings - The plans that show the character and scope of the Work to be performed.

1.20 Effective Date of the Agreement - The date indicated in the introductory paragraph of the Agreement.

1.21 Engineer - The person, firm or corporation named as such in the Agreement. In the event the Owner should not require the services of the Engineer, then the powers, duties, and responsibilities conferred in the Contract Documents to the Engineer shall be construed to be those of the Owner.

1.22 Field Order - A verbal or written order effecting a change in the Work not involving an adjustment in the Contract Price or an extension of the Contract Time, issued by the Engineer or Owner to the

Contractor during construction.

1.23 Final Completion - All work, including punch list items noted at the final inspection, is complete to the satisfaction of the Owner.

1.24 Groundwater Effluent - Groundwater that is pumped from the ground during construction.

1.25 Laws and Regulations - Any and all applicable laws, rules, regulations, ordinances, codes and orders of any and all governmental bodies, agencies, authorities and courts having jurisdiction.

1.26 Liens - Liens, charges, security interests or encumbrances upon real or personal property.

1.27 May - The term "may" is permissive.

1.28 Notice - All written notices, demands, instructions, claims, approvals, and disapprovals required to obtain compliance with the Contract Documents. Any written notice by either party to the

Agreement shall be sufficiently given if delivered to or at the last known business address of the person, firm or corporation constituting the party to the Agreement, or to his, their, or its authorized agent, representative or officer, or when enclosed in a postage envelope addressed to such last known business address and deposited in a United States mailbox. Notice shall be deemed received within 3 business days of U.S. Mail Service postmark date.

September 2026 101 - 3

EPA Community Grant No. 95342001

City of Williamsburg

IFB 06-4101-27

1.29 Notice to Proceed - A written notice given by the Owner to the Contractor (with a copy to the

Engineer, if appropriate) fixing the date on which the Contract Time will commence to run and on which the Contractor shall start to perform its obligations under the Agreement.

1.30 Owner - The public body or authority, corporation, association, firm or person with whom the

Contractor has entered into the Agreement and for whom the Work is to be provided.

1.31 Owner's Representative - The person, firm or corporation named by the Owner to act as the Owner’s agent.

1.32 Partial Utilization - Use by the Owner of a substantially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work.

1.33 Project - The entire Work as described in the Contract Documents, including Work that is necessary and incidental to the furnishing of all materials, services, equipment, labor and supplies required to install, perform, and complete all items of Work in accordance with Contract Documents.

1.34 Reference Standards - Those bulletins, standards, rules, methods of analysis or tests, codes, and specifications of other agencies, engineering societies, or industrial associations referred to in the

Contract Documents. These refer to the latest edition, including amendments in effect and published at the time the Project was advertised, unless specifically referred to by edition, volume, or date.

1.35 Regional Construction Standards - The construction standards, published by the Hampton Roads

Planning District Commission (HRPDC) as amended from time to time.

1.36 Responsible Bidder - A person or firm who, in the sole opinion of the Owner, has the capability in all respects, to fully perform the contractual requirements as well as the moral and business integrity and reliability to assure good faith performance.

1.37 Responsive Bidder - A person or firm who has submitted a bid that conforms in all material respects to the Bid Documents.

1.38 Resident Project Representative - The authorized representative of the Engineer or Owner who is assigned to the Project or any part thereof.

1.39 Roadway Prism - All of the land or area within the right of way that needs to be cut, filled, graded, or otherwise disturbed to produce the design cross section, including, but not limited to, areas for curbs, ditches, sidewalks, paths, and slopes to match existing grade.

1.40 Rock - Any indurated material with a minimum compressive strength of 200 psi that requires drilling, wedging, blasting, or other methods of brute force for excavation.

1.41 Shall - The term "shall" is mandatory.

1.42 Shop Drawings - All drawings, diagrams, illustrations, schedules, specified design related submittals, and other data or information which are specifically prepared or assembled by or for the Contractor and submitted by the Contractor to illustrate some portion of the Work.

1.43 Special Provisions - Requirements in addition to or modification of the HRPDC Regional

Construction Standards.

September 2026 101 - 4

EPA Community Grant No. 95342001

City of Williamsburg

IFB 06-4101-27

1.44 Specifications - Those portions of the Contract Documents or HRPDC Regional Construction

Standards consisting of written technical descriptions of materials, equipment, construction systems, standards and workmanship as applied to the Work and certain administrative details applicable thereto.

1.45 Standard Details - Those portions of the HRPDC Regional Construction Standards consisting of drawings, explanatory of another drawing, indicating in detail and at a larger scale, the design, location, composition and correlation of elements and materials.

1.46 Subcontractor - A person, firm or corporation having a direct contract with the Contractor or with any other Subcontractor for the performance of a part of the Work at the site.

1.47 Substantial Completion - That date certified by the Owner when the construction of the Project or a specified part thereof is sufficiently completed in accordance with the Contract Documents, including completion of all tests, so that the Project or specified part can be utilized for the purpose for which it is intended.

1.48 Successful Bidder - The lowest, responsible and responsive Bidder to whom the Owner (on the basis of the Owner's evaluation as hereinafter provided) makes an award.

1.49 Supplier - Any person or organization that supplies materials or equipment for the Work, including that fabricated to a special design.

1.50 Underground Facilities - All pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments, and any encasements containing such facilities which have been installed underground to furnish any of the following services or materials: electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems or water.

1.51 Work - All labor, materials, equipment, transportation, supervision, or other facilities, duties or incidentals necessary for execution and completion of the Project in compliance with the Contract

Documents.

End of Section

September 2026 102 - 1

EPA Community Grant No. 95342001

SECTION 102

BIDDING REQUIREMENTS AND CONDITIONS

I. INVITATION FOR BIDS

PROJECT: Walnut Hills Stream Restoration

EPA Community Grant No. 95342001

LOCATION: City of Williamsburg, Virginia

DATE: September 9, 2026

The City of Williamsburg, Virginia will receive sealed Bids for the above titled Project at the office of the

Director of Public Works and Utilities, located at 401 Lafayette Street, Williamsburg, Va. 23185, until

2:00 p.m. local time on September 30, 2026, at which time the Bids will be publicly opened and read aloud.

Any Bids received after the specified time and date will not be considered. Include the IFB number on the outside of all sealed bids delivered to the City’s Public Works & Utilities Department. Any bid submittal without the IFB number may be deemed non-responsive by the City.

The Work under this Project generally consists of a water quality improvement project to stabilize and restore approximately 800 linear feet of perennial, intermittent, and ephemeral stream channel by implementing natural channel design techniques within a 1,347 LF stream corridor--an unnamed tributary of College Creek. The project site is located within City drainage easements at 1014

Jamestown Rd, 21-23 Walnut Hills Circle, and 106, 108, 204 & 206 Governors Drive.

Bid Documents may be examined at the offices of the Director of Public Works and Utilities located at 401

Lafayette Street, Williamsburg, Va. 23185. Bid Documents may be obtained from the City of

Williamsburg website http://www.williamsburgva.gov. Neither the Owner nor any of its representatives shall be responsible for full or partial sets of Contract Documents, including addenda, obtained from any other source.

Offerors may submit bids in paper form or electronically via eVA using the following link:

https://eva.virginia.gov/. Ensure that the IFB/RFP number and title are included in the file name for electronic submissions. Submission via eVA requires Offerors to be registered with eVA. Instructions for eVA registration can be found at the following link: https://eva.virginia.gov/i-sell-to-virginia.html.

Registering successfully and timely with eVA and successful electronic submission of the proposal via eVA are the sole responsibility of each Offeror.

The Hampton Roads Planning District Commission’s Regional Construction Standards, Sixth Edition, December 2010, are hereby referenced and are part of the Bid Documents, except as may be modified by the

Special Provisions of this Project or as may be shown by bold type for additions and strike-throughs for deletions. Copies of the Regional Construction Standards may be purchased at the offices of the HRPDC, 723 Woodlake Drive, Chesapeake, VA 23320 (Telephone 757-420-8300) or Executive Tower, Suite 1-C, 2101 Executive Drive, Hampton, VA 23666 (Telephone 757-262-0094). The latest edition of the Regional

Construction Standards and Publication Updates may be downloaded at the HRPDC website https://www.hrpdcva.gov/556/Hampton-Roads-Regional-Construction-Stan.

Bidders must be aware that these Bid Documents incorporate a number of changes, which supplement, modify, or replace language and/or Standard Details found in the HRPDC Regional Construction Standards.

http://www.williamsburgva.gov/ https://eva.virginia.gov/ https://eva.virginia.gov/i-sell-to-virginia.html https://www.hrpdcva.gov/556/Hampton-Roads-Regional-Construction-Stan

September 2026 102 - 2

EPA Community Grant No. 95342001

Details shown on the Drawings replace corresponding Standard Details found in the Regional Construction

Standards. Changes from the Regional Construction Standards that appear in these Bid Documents are shown as bold for additions, and strikethroughs for deletions. Also, see Section 110 for additional references to Special Technical Provisions incorporated into this Project.

This project is funded partially by the U.S. Environmental Protection Agency (EPA) through the FY22

Community Project Funding (CPF) program. Additional Federal provisions and requirements of the funding program are incorporated in these Bid Documents.

The City of Williamsburg in accordance with the provisions of Title VI of the Civil Rights Act of 1964

(78 Stat. 252, 42 US.C.§§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that they will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. There is no DBE goal requirement for this project.

All work shall be substantially completed within 180 calendar days of notice to proceed. Final completion of the work shall be within 210 calendar days of Notice to Proceed.

Bid Security in the amount of five percent (5 %) of the Bid shall be submitted with each Bid.

A NON-MANDATORY PRE-BID CONFERENCE will be held on September 16, 2026, at 10:00 a.m. local time at City of Williamsburg Municipal Building, 2nd floor Main Conference Room, 401 Lafayette St., Williamsburg, VA 23185. Written questions related to the project must be submitted no less than five

(5) business days prior to date of opening. Emails are an acceptable form of written documentation.

Contractor registration in accordance with Title 2.2 Chapter 43, Code of Virginia is required. The Bidder shall include in its Bid the following notation: "Licensed Virginia Contractor No. ."

Withdrawal of Bids due to error shall be subject to and in accordance with Section 2.2-4330 of the Code of

Virginia and the Contract Documents.

The Owner reserves the right to waive minor non-substantive informalities in the Bid and to reject any/or all

Bids.

The City of Williamsburg does not discriminate in the solicitation or awarding of contracts on the basis of race, religion, color, sex. national origin, age, disability, sexual orientation, gender identity, military status, or any other basis prohibited by state or federal law.

By: Jack Reed

Director of Public Works & Utilities

September 2026 102 - 3

EPA Community Grant No. 95342001

II. INSTRUCTIONS TO BIDDERS

1. Bid Documents

1.1 Complete sets of Bid Documents shall be used in preparing Bids. Neither the Owner nor the

Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bid Documents.

1.2 The Owner, in making copies of the Bid Documents available on the above terms does so only for the purpose of obtaining Bids on the Work and does not confer or license or grant permission for any other use.

1.3 The Special Provisions for this Project as set forth in Section 110 were prepared by

The City of Williamsburg and are dated September 2026. Additional Special Provisions for this

Project appear as modifications to the HRPDC Regional Construction Standards by strike-throughs for deletions and bold type for additions in Sections 100 through 109.

1.4 The Drawings for this Project, prepared by Stantec and dated August 12, 2026, are defined as follows:

1 COVER

2 ENVIRONMENTAL RESOURCE INVENTORY

3 PLAN AND PROFILE – P1

4 PLAN AND PROFILE – P2

5 TYPICAL SECTIONS AND CROSS SECTIONS

6 DETAILS (1)

7 DETAILS (2)

8 DETAILS (3)

9 DETAILS (4)

10 EROSION AND SEDIMENT CONTROL PHASE 1

11 EROSION AND SEDIMENT CONTROL PHASE 2

12 EROSION AND SEDIMENT CONTROL NOTES

13 EROSION AND SEDIMENT CONTROL DETAILS

14 PLANTING PLAN

15 PLANTING NOTES AND DETAILS

2. Examination of Contract Documents and Project Site

2.1 It is the responsibility of each Bidder before submitting a Bid:

A. To examine thoroughly the Bid Documents;

B. To become familiar with and satisfy the Bidder as to the general, local and site conditions that may affect cost, progress, performance, or furnishing of the Work;

C. To study and carefully correlate the Bidder’s knowledge and observations with the Bid

Documents and such other related data; and, D. To promptly notify the Owner of all conflicts, errors, ambiguities or discrepancies which the

Bidder has discovered in or between the Bid Documents and such other related documents or field/site conditions.

September 2026 102 - 4

EPA Community Grant No. 95342001

2.2 Reference is made to Sections 104 III and 104 IV, for information relating to reports, explorations, underground facilities, and easements. On request, at the discretion of the Owner, the Owner will provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. The Bidder shall fill all holes and clean up and restore the site to its former condition, including reseeding and/or resodding any disturbed areas upon completion of such explorations, investigations, tests and studies, and hold the Owner harmless from any damage to property or injury to persons resulting from or arising out of such exploration, investigation, tests, and studies. The Bidder shall obtain and comply with all local and state permitting requirements.

3. Interpretations and Addenda

3.1 No oral explanation in regard to the meaning of the Contract Documents will be made, and no oral instructions will be given before the award of the Work. Discrepancies, omissions or doubts as to the meaning of the Contract Documents shall be communicated in writing to the Owner for interpretation. Bidders should act promptly and allow sufficient time for a reply to reach them before the submission of their Bids. Any interpretation made will be in the form of an addendum to the

Contract Documents, which will be forwarded to all known Bidders, and its receipt shall be acknowledged on the Bid form. All questions shall be received no later than 7 days prior to the date for opening of Bids.

3.2 Addenda may also be issued to modify the Contract Documents.

3.3 Subsurface Exploration – Subsurface boring data may be included in the Appendix. The Bidder shall be responsible for conducting any further subsurface investigations that he deems necessary.

Geotechnical exploration and analysis information included, in whole or in part, in these Bid

Documents gives the physical data on subsurface conditions as obtained for the Owner only, and in no event is this information to be considered as part of the Contract. It is expressly understood that neither the Owner nor the Engineer will be responsible for any interpretation or conclusions drawn therefrom by the Contractor.

Bidders are cautioned that the subsurface boring data was used for general design purposes only and may be inadequate for the purposes of bidding the Contract items. It is strongly recommended that the Contractor perform his own subsurface investigation(s) to the extent necessary to satisfy himself as to the subsurface conditions.

4. Bid Security

4.1 Each bid shall be accompanied by a Bidder’s bond issued by a company authorized and licensed to transact business as surety in the Commonwealth of Virginia, a certified check, or cash escrow, in an amount equal to not less than five (5) percent of the total amount of the bid, made payable to the

City of Williamsburg, Virginia. Upon approval of the Owner’s attorney, in accordance with

Section 2.2-4338, Code of Virginia, 1950, as amended, and with Section of the Code of the City/County of , Virginia, as amended, a Bidder may furnish a personal bond, property bond, or bank or savings and loan association’s letter of credit on certain designated funds for the amount required for the Bid Security. The Bid Security shall be accompanied by a certified copy of the power of attorney for the surety attorney-in-fact. Said bid security shall be left with the Owner, subject to the conditions specified herein, as a guarantee of good faith on the part of the Bidder that if the bid is accepted, the Bidder shall execute the contract. If a certified check is offered as guarantee, it shall be made payable to City of Williamsburg, Virginia.

September 2026 102 - 5

EPA Community Grant No. 95342001

4.2 The Bid Security shall be returned to all except the three (3) lowest Bidders within ten (10) days after the date of Bid opening. The Bid Security will be returned to the three (3) lowest Bidders within five (5) days after the execution of an Agreement and Performance and Payment Bonds and

Certificates of Insurance have been approved by the Owner. None of the three (3) lowest Bids shall be deemed rejected, notwithstanding acceptance of one of the Bids, until the Agreement has been executed by both the Owner and the Successful Bidder.

5. Liquidated Damages

5.1 Provisions for liquidated damages are set forth in Section 108-X and in Section 102 III (Bid form).

6. Preparation of Bid

6.1 All blanks on the Bid form shall be completed in ink.

6.2 Bids by corporations shall be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.

6.3 Bids by unincorporated organizations shall be executed in the organization’s name and signed by an individual having authority to enter into a contract on behalf of such organization, whose title shall appear under the signature and the official address of the organization shall be shown below the signature. For example, if such organization is a Limited Liability Company, the Bid shall be signed by a member or by its manager, as authorized in its operating agreement; in the case of a manager-led

Limited Liability Company, the Bid shall be signed by its manager; or if such organization is a

Limited Partnership, the Bid shall be signed by a general partner.

6.4 All names shall be typed or printed in ink below the signature. All names shall be the legal name of the corporation, unincorporated organization and/or individual.

6.5 The Bid shall contain an acknowledgment of receipt of all Addenda (the numbers of which shall be filled in on the Bid form).

6.6 The address, telephone number, e-mail address and fax number for communications regarding the

Bid shall be provided.

6.7 It is understood and agreed that, in the event an Agreement is executed for the supplies, equipment or services included in the Bid, no indication of such sales or services to the Owner shall be used in any way in product literature or advertising without the written consent of the Owner.

7. Quantities and Unit Prices

7.1 The Owner reserves the right to increase or decrease the amount of any class or portion of the Work.

No such change in the Work shall be considered as a waiver of any condition of the Agreement nor shall such change invalidate any of the provisions thereof. Payment will be made at the unit or lump sum prices under the Agreement only for the Work actually performed or materials furnished and accepted.

7.2 Bidders shall include in their Bid prices the entire cost of each item set forth in the Bid, and it is understood and agreed that there is included in each lump sum or unit price bid item the entire cost

September 2026 102 - 6

EPA Community Grant No. 95342001 necessary or incidental to the completion of that portion of the Work, unless such incidental Work is expressly included in other lump sum or unit price bid items.

8. General Equipment or Material Specification.

When the Bid Documents specify one or more manufacturer's brand names or makes of materials, devices or equipment as indicating a quality, style, appearance or performance, with the statement "or equal," the Bidder shall base the Bid on either one of the specified brands or an alternate brand which the Bidder intends to substitute. Use of an alternate shall not be permitted unless it has been found to be equal or better by the Owner and at no additional cost to the Owner. The Owner will not prequalify any substitute materials or equipment submitted by the Bidders. Only substitute items submitted by the successful Bidder after the date of the Contract Award will be considered by the

Owner or his representative.

8.1 The burden of proof as to the comparative quality and suitability of alternative equipment, articles or materials shall be upon the Bidder. The Bidder shall furnish at its own expense, such information relating thereto as may be required by the Owner. The Owner shall be the sole judge as to the comparative quality and suitability of alternative equipment, articles or materials and the Owner’s decisions shall be final. Any other brand, make or material, device or equipment which, in the opinion of the Owner is recognized to be the equal of that specified, considering quality, workmanship and economy of operation and is suitable for the purpose intended, shall be accepted.

In the event of any adverse decision by the Owner, no claim of any sort shall be made or allowed against the Engineer or Owner. Samples, if requested by the Bidder, may be returned at the Bidder’s expense.

8.2 If in the sole discretion of the Owner an item proposed by the Contractor does not qualify as an “or-equal” item it may be considered as a proposed substitute item. The Contractor shall furnish the

Owner any such information as the Owner may request to evaluate the substitute item to include estimates of costs or credits, redesign, claims or schedule impacts, warranty or maintenance issues or payment of any license or royalty that could directly or indirectly result from acceptance of the substitute. Any cost or time impacts to the project schedule caused by the Contractor’s submission of a substitute shall be borne by the Contractor. Any costs incurred by the Owner or by the Owner’s

Engineer in reviewing the suitability of the substitute item shall be borne by the Contractor. The

Owner may refuse to accept a substitute unless an acceptable adjustment in the Contract Price is offered by the contractor.

9. Proprietary Material and Equipment Specification.

Where any item of equipment or material is specified by proprietary name, trade name, catalog reference, or name of one or more manufacturers, without the addition of such expressions as "or equal," it is to be understood that those items are so specified for reasons of standardization in maintenance and operation, or for reasons of obtaining desirable features best suited to the require-ments of the Specifications. This specific equipment shall form the basis of the Bid and be furnished under the Agreement. Where two or more items of equipment or material are named, the Contractor has the option to use either.

September 2026 102 - 7

EPA Community Grant No. 95342001

10. Additive/Alternate Bids

10.1 Additive Bids

Additive bid items are those in addition to the base Bid items. Bidders shall submit additive Bids on all items as shown on the Bid form. Award shall be based on the lowest responsive and responsible

Bid for base Bid plus all additive bid items listed and in accordance with any criteria in the Special

Provisions. noted on the Bid Form.

10.2 Alternate Bids

Alternate bid items are those where more than one type of improvement may be considered for a portion or all of the Work due to the character of the improvement and uncertainties which may be encountered during construction. If alternate Bids are requested for a portion of or all of the Work, Bidders shall submit alternate Bids for all alternate(s) the Bidder or its Subcontractor is qualified to perform. Award shall be based on the lowest responsive and responsible Bid for the base Bid plus the amount added or deleted for the alternate bid items selected by the Owner and in accordance with any criteria in the Special Provisions. The alternates selected shall be at the sole discretion and in the best interests of the Owner.

11. Submission of Bids

11.1 Bids shall be submitted at the time and place indicated in the Invitation for Bids and shall be sealed, marked with the Project title and name and address of the Bidder, and accompanied by the bid guarantee and other required documents. The Bid may not be changed by markings on the envelope.

Only the amounts indicated on the Bid form will be considered in determining the final Bid amount.

11.2 It will be the responsibility of Bidder to see that its Bid is submitted to the Owner by the specified time and date. There will be no exceptions. Date of postmark will not be considered. Phone or telegraphic bids (including FAX) will not be accepted.

11.3 When a license is required, the Bidder shall include in its Bid over the Bidder’s signature the following notation: "VIRGINIA LICENSED CONTRACTOR NO. ___________" (Ref. Title 2.2, Chapter 43, and Title 54.1, Chapter 11, Code of Virginia).

11.4 When a license is not so required and a person who is not the holder of a License enters a Bid, such person shall include in its Bid over the Bidder’s signature the following notation: "LICENSING

NOT REQUIRED UNDER VIRGINIA STATE CODE."

11.5 The Bidder shall complete and submit the Debarment Certification form. A copy of the form is included in Section 102, VI at the end of this Section.

11.6 The Bidder shall complete and submit the Certificate of Compliance with Immigration Laws and

Regulations form. A copy of the form is included in Section 102, VII in this section.

11.7 The Bidder shall complete and submit the Non Collusion Affidavit form. A copy of the form is included in Section 102, III.K in this section

11.8 Offerors may submit bids in paper form or electronically via eVA using the following link:

https://eva.virginia.gov/. Ensure that the IFB/RFP number and title are included in the file name for electronic submissions. Submission via eVA requires Offerors to be registered with eVA. Instructions for eVA registration can be found at the following link:

September 2026 102 - 8

EPA Community Grant No. 95342001 https://eva.virginia.gov/i-sell-to-virginia.html. Registering successfully and timely with eVA and successful electronic submission of the proposal via eVA are the sole responsibility of each

Offeror.

12. Receipt and Opening of Bids

12.1 Bids will be received by the Issuing Office (paper) or successfully submitted through eVA

(optional electronic files) and opened publicly at the time and place and under the conditions stated in the Invitation for Bids. The Owner's Representative whose duty it is to open Bids will decide when the specified time has arrived. The official time and date used in the receipt of the Bids is that time and date stamped by the Owner when the Bid is submitted. Date/time stamps marked after the designated time and date of receipt will not be considered. No responsibility will be attached to any such person for the premature opening of a Bid not properly addressed and identified. It is the responsibility of the Bidder to assure that the Bid is delivered to the designated place of receipt prior to the time set for the receipt of Bids.

12.2 Proposals received or submitted electronically after the due date and time will not be opened or considered.

12.3 Bids will be opened and read aloud publicly. Interested parties are invited to be present at the opening.

12.4 As-Read results will be posted on the City’s Purchasing website as soon as possible on the day of the reading.

13. Bids to Remain Subject to Acceptance

13.1 All Bids shall remain subject to acceptance for 90 Days after the day of the Bid opening, but the

Owner may, in its sole discretion, release any Bid and return the Bid Security prior to that date, or extend the acceptance period an additional 90 days with the consent of the apparent low Bidder and surety.

14. Withdrawal of Bids

14.1 Withdrawal of Bids filed with the Owner may be made only by a representative of the firm submitting the Bid, who shall appear in person prior to the deadline designated in the advertisement for receipt of Bids. Such representative shall furnish satisfactory identification and proof that they are authorized to withdraw the Bid. Telephone, e-mail, or facsimile notices will not be considered.

Additions and/or deletions marked on the outside of the Bid envelope will not be considered.

14.2 In accordance with Section 2.2-4330(A)(i) of the Code of Virginia, as amended, if the Bid price was substantially lower than the other Bids solely to a mistake therein, provided the Bid was submitted in good faith, and the mistake was a clerical mistake as opposed to a judgment mistake, and was actually due to an unintentional arithmetic error or an unintentional omission of a quantity of work, labor, or material made directly in the compilation of a bid, which unintentional arithmetic error or unintentional omission can be clearly shown by objective evidence drawn from inspection of original work papers, documents, and materials used in the preparation of the Bid sought to be withdrawn and provided further the Bidder shall give notice in writing of his claim of right to withdraw within two

(2) business days after the Bid opening, then the Bid may be withdrawn. The Bidder shall, within the following two (2) business days provide the subjective data required in this section to satisfy the

Owner’s representative that the grounds for such withdrawal do exist.

https://eva.virginia.gov/i-sell-to-virginia.html

September 2026 102 - 9

EPA Community Grant No. 95342001

14.3 Should the Bidder refuse to enter into the Agreement after notification of award, the Bid Security shall be forfeited.

14.4 No Bid may be withdrawn under this section when the result would be the awarding of the

Agreement on another Bid to the same Bidder or to another Bidder in which the ownership of the withdrawing Bidder is more than five percent.

14.5 If a Bid is withdrawn under the authority of this section, the remaining Bids shall be evaluated to determine the lowest responsive and responsible Bidder.

14.6 No Bidder who is permitted to withdraw a Bid shall, for compensation, supply any material or labor to or perform any subcontract or other work agreement for the person or firm to whom awarded, or otherwise benefit, directly or indirectly, from the performance of the Project for which the withdrawn

Bid was submitted.

14.7 If withdrawal of any Bid is denied, the Bidder shall be notified in writing stating the reasons for this decision. Any Bidder who desires to appeal a decision denying withdrawal of Bid shall, as sole remedy, institute legal action provided by Section 2.2-4358 and Section 2.2-4364(B), Code of

Virginia, 1950, as amended.

15. Evaluation of Bids

15.1 In evaluating Bids, the Owner shall consider the qualifications of the Bidders, whether or not the

Bids comply with the prescribed requirements, unit and lump sum prices, and additive/alternate bid items if requested in the Bid form.

15.2 The Owner may consider the qualifications and experience of subcontractors and other persons and organizations (including those who are to furnish the principal items of material or equipment) proposed for those portions of the Work for which the identity of Subcontractors and other persons and organizations shall be submitted as specified in the Bid Documents.

15.3 The Owner may conduct such investigations as deemed necessary to establish the responsibility, qualifications and financial ability of the Bidders, proposed Subcontractors and other persons and organizations to do the Work in accordance with the Bid Documents to the Owner's satisfaction within the prescribed time.

15.4 Bids will be based upon the estimated quantities shown in the Bid form. Bids will be compared on the basis of a total computed price; arrived at by taking the sum of the estimated quantities of each

Bid Item, multiplied by the corresponding unit price bid, and any lump sum Bids on the individual items. Discrepancies between the multiplication of units of work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of words. The right to reject any or all Bids or to accept any Bid considered of advantage to the Owner is reserved.

15.5 Unless all Bids are canceled or rejected, the Owner reserves the right granted by Section 2.2-4318 of the Code of Virginia as amended, to negotiate with the lowest responsible, responsive Bidder to obtain a Contract Price within the funds budgeted for the construction project. Negotiations with the lowest Bidder may include both modification of the Contract Price and the Scope of

Work/Specifications to be performed. The Owner shall initiate such negotiations by Written Notice to the lowest responsible, responsive Bidder that its Bid exceeds the available funds and that the

September 2026 102 - 10

EPA Community Grant No. 95342001

Owner wishes to negotiate a lower Contract Price. The Owner and the lowest responsive, responsible Bidder shall agree to the times, places, and manner of negotiations.

15.6 The acceptance of a Bid will be a notice in writing, signed by the Owner, and no other act shall constitute the acceptance of a Bid.

15.7 The Owner reserves the right to waive minor informalities as defined in Virginia Code Section 2.2-

4301 in the Bid, to reject any/or all Bids, to award any Bid in whole or in part, and to award the Bid considered to be in the best interest of the Owner.

15.8 More than one Bid for the same Work from an individual or entity under the same…