AMD02 Attachment 1- EPL - 842469473.xlsx
XLSX spreadsheet 32 KB Posted
- Solicitation number
- 842469473
- Issued by
-
Defense Information Systems Agency
About this file
This document is an Integrated Government Cost Estimate (IGCE) for a federal contract opportunity related to Post-Processor Software Licenses and Support Services, including Implementation, Installation, and Training for Fleet Readiness Center Southeast (FRCSE).
The IGCE outlines the required products and services, which include: fully functional post-processor software compatible with Siemens NX CAM software and the WFL M120 millturn at FRCSE, fully functional probing software with various probing cycles also compatible with the WFL M120 millturn, and a fully functional D'Andrea software kit that allows integration of the D'Andrea head tool into the machine's CNC functions. The contract includes a base period plus four one-year option periods. Pricing is provided for the base period and each option period, with a total estimated price of $0.00. The required delivery date is 30 days after contract award, with partial deliveries accepted. The contract opportunity is being managed by the Defense Information Systems Agency (DISA).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 842469473 RFQ AMD02.pdf | ||
| AMD01 Question and Answer - 842469473.pdf | ||
| 842469473 RFQ AMD01.pdf | ||
| Attachment 1 - EPL - 842469473.xlsx | XLSX spreadsheet | |
| Attachment 3 - PWS - 842469473.docx | DOCX document | |
| Attachment 2 - FAR DFARS Provisions andClauses - 842469473 - Final.docx | DOCX document | |
| Attachment 4 - QASP - 842469473.docx | DOCX document | |
| 842469473 RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
CUI
| COMPLETE THE FOLLOWING: | |
| Solicitation Title / Tracking Number | WFL Post Processor / 842469473 |
| Contract Vehicle | |
| Funding Document Number(s) | |
| Date | 8/27/24 |
| CLIN STRUCTURE SUMMARY | ||||||||
| CLIN Number | CLIN Description | Contract Type | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | Total Price |
| Software | FFP | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Travel | FFP | $ - 0 | $ - 0 | |||||
| Subtotal: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 9999 | Optional Surge Support up to 10% | $ - 0 | ||||||
| TOTAL ESTIMATED PRICE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 |
| REQUESTED DELIVERY DATE: | All items to be delivered no later than 30 days After Contract Award (Partial deliveries will be accepted) |
| DELIVER ITEMS TO: | |
| Ship to Address: | 101 Wasp St. Jacksonville, FL Naval Air Station Jacksonville, FL 32212 |
| Controlled By: DISA |
| Controlled By: PS8413 |
| CUI Category: PROCURE |
| Distribution/Dissemination Control: FEDCON |
| POC: disa.scott.ditco.mbx.ps84-new-requirements@mail.mil |
CUI
(CUI) IGCE-Base Period
CUI
| Period of Performance: Date of Award through one-year, plus four one-year option periods | |||||||||
| Base Period | |||||||||
| Brand Name (BN) Equal? | Maufactuer Name | CLIN # | Description | PWS Task(s) | Labor Category | Government Site / Contractor Site | Estimated Labor Hour Rate | Hours | Amount |
| Equal | AMS Collective | 0001 | System setup and onsite training (Machine Kit) 15004002 | PWS 6.2 | Programmer | Government Site | $ - 0 | 80 | $ - 0 |
| Equal | AMS Collective | 0002 | System setup and onsite training (D’Andrea Software Kit) 15004002 | PWS 6.2 | Programmer | Government Site | $ - 0 | 16 | $ - 0 |
| Equal | AMS Collective | 0003 | System setup and onsite training (Machine Probing Software Kit) 15005002 | PWS 6.2 | Programmer | Government Site | $ - 0 | 80 | $ - 0 |
| Total Labor | $ - 0 |
| Materials | |||||||||
| Brand Name (BN) Equal? | Maufactuer Name | CLIN | PWS (Task) | ITEM | DESCRIPTON | PART NUMBER | UNIT COST | QUANTITY | TOTAL AMOUNT |
| Equal | AMS Collective | 0006 | PWS 6.1 | Post Processor Software | Post Processor Software | 15001001 | $ - 0 | 1 | $ - 0 |
| Equal | AMS Collective | 0007 | PWS 6.1 | D'Andrea Software kit | D'Andrea Software kit | 15001002 | $ - 0 | 1 | $ - 0 |
| Equal | AMS Collective | 0008 | PWS 6.1 | Machine Probing Software Kit | Machine Probing Software Kit | 15005000 | $ - 0 | 1 | $ - 0 |
Materials Total $ - 0
| Travel/ODC | |||
| CLIN | PWS | Locations (To and From) | Total Amount |
| 0021 | PWS section 9 | Jacksonville FL. | $ - 0 |
| PWS section 9 | Denver CO | $ - 0 |
| PWS section 9 | Jacksonville FL. | $ - 0 |
| PWS section 9 | Denver CO | $ - 0 |
| Total Travel | $ - 0 | |
| Total Base Period | $ - 0 |
| Controlled By: DISA | |
| Controlled By: PS8413 | |
| CUI Category: PROCURE | |
| Distribution/Dissemination Control: FEDCON | |
| POC: disa.scott.ditco.mbx.ps84-new-requirements@mail.mil | |
| CUI |
When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY
Encl 6, IGCE 11 Sep 2018/v5
(CUI) IGCE-Option Period 1
| CUI | CUI |
| OPTION PERIOD 1 |
Period of Performance - 12 Months After Base Period
| Option Period 1 | |||||
| Materials | |||||
| CLIN | Description | Part Number | Unit Cost | Quantity | Total Amount |
| 1001 | Maintenance | 15003001 | $ - 0 | 1 | $ - 0 |
| 1002 | Maintenance | 15005001 | $ - 0 | 1 | $ - 0 |
| Materials Total | $ - 0 |
| Controlled By: DISA | |
| Controlled By: PS8413 | |
| CUI Category: PROCURE | |
| Distribution/Dissemination Control: FEDCON | |
| POC: disa.scott.ditco.mbx.ps84-new-requirements@mail.mil | |
| CUI |
When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY
(CUI) IGCE-Option Period 2
CUI
OPTION PERIOD 2
Period of Performance - 12 Months After Option Period 1
| Option Period 2 | |||||
| Materials | |||||
| CLIN | Description | Part Number | Unit Cost | Quantity | Total Amount |
| 2001 | Maintenance | 15003001 | $ - 0 | 1 | $ - 0 |
| 2002 | Maintenance | 15005001 | $ - 0 | 1 | $ - 0 |
TOTAL $ - 0
| Controlled By: DISA |
| Controlled By: PS8413 |
| CUI Category: PROCURE |
| Distribution/Dissemination Control: FEDCON |
| POC: disa.scott.ditco.mbx.ps84-new-requirements@mail.mil |
CUI
When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY
(CUI) IGCE-Option Period 3
CUI
OPTION PERIOD 3
Period of Performance - 12 Months After Option Period 2
| Option Period 3 | |||||
| Materials | |||||
| CLIN | Description | Part Number | Unit Cost | Quantity | Total Amount |
| 3001 | Maintenance | 15003001 | $ - 0 | 1 | $ - 0 |
| 3002 | Maintenance | 15005001 | $ - 0 | 1 | $ - 0 |
Materials Total $ - 0
| Controlled By: DISA |
| Controlled By: PS8413 |
| CUI Category: PROCURE |
| Distribution/Dissemination Control: FEDCON |
| POC: disa.scott.ditco.mbx.ps84-new-requirements@mail.mil |
CUI
When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY
(CUI) IGCE-Option Period 4
CUI
OPTION PERIOD 4
Period of Performance - 12 Months After Option Period 3
| Option Period 4 | |||||
| Materials | |||||
| CLIN | Description | Part Number | Unit Cost | Quantity | Total Amount |
| 4001 | Maintenance | 15003001 | $ - 0 | 1 | $ - 0 |
| 4002 | Maintenance | 15005001 | $ - 0 | 1 | $ - 0 |
Materials Total $ - 0
| Controlled By: DISA |
| Controlled By: PS8413 |
| CUI Category: PROCURE |
| Distribution/Dissemination Control: FEDCON |
| POC: disa.scott.ditco.mbx.ps84-new-requirements@mail.mil |
CUI
Salient Characteristics
| CUI |
| Salient Characteristics |
1) Fully functional post processor software that serves as the link between upstream CAM software (Siemens NX is the CAM software utilized by FRCSE and the post processor must be compatible with this) and the downstream WFL millturn. Post processor software shall be completely compatible and integrate with the WFL M120 millturn at FRCSE (S/N 28517301).
2) Fully functional probing software with probing cycles to include aligning surface, measure angle, calibrate probe random diameter, computation, setting number tracings, calibrating the probe, two point align, aligning the C-axis, measuring eccentricity, searching for characteristics, temperature compensation, testing characteristics, entry in zero offset shift, and contour cycles for Siemens 840D controller. Siemens NX is the CAM software utilized by FRCSE and the probing software must be compatible with this Machine probing software shall be completely compatible and integrate with the WFL M120 millturn at FRCSE (S/N 28517301).
3) Fully functional D'Andrea software kit that allowing for the D'Andrea head tool to be integrated into the machine's CNC functions and paths.Siemens NX is the CAM software utilized by FRCSE and the D'Andrea software kit must be compatible with this. D'Andrea software kit shall be completely compatible and integrate with the WFL M120 millturn at FRCSE (S/N 28517301).
| Controlled By: DISA |
| Controlled By: PS8413 |
| CUI Category: PROCURE |
| Distribution/Dissemination Control: FEDCON |
| POC: disa.scott.ditco.mbx.ps84-new-requirements@mail.mil |
CUI
File details come from the government source that posted it. Updated .