About this file
Johnson Elementary School Renovations - Project Summary
This is a Scope of Work document for Johnson Elementary School Renovations located in Henrico, Virginia. The project involves comprehensive renovations to the existing 1959-constructed elementary school campus at 5600 Bethlehem Road, Henrico, Virginia, 23230. The Work encompasses modernization of the cafetorium, library, multipurpose building, and administrative offices, with updates to classroom buildings and site circulation improvements. A new main security entry of approximately 1,238 square feet will be added to the administration building, and a new public entrance will be constructed at the front of the school. The renovation scope includes selective demolition and abatement, masonry and interior partition construction, window replacement, roofing repair and replacement, accessibility modifications, life safety enhancements, interior finish alterations, and upgrades to mechanical, electrical, and plumbing systems with modernization of the building energy management system. Site work includes reconfiguration of the parking area and bus loop with a new canopy, site lighting, fencing, grading, erosion and sediment control, stormwater management, site utilities, driveways, paving, sidewalks, signage, landscaping, and a new public shared use path along the right of way.
The school will remain occupied during construction, requiring a phased construction approach with temporary modular classrooms to accommodate ongoing operations. All renovations will conform to modern accessibility standards and current code requirements. The document specifies that the project involves significant infrastructure and building system upgrades across multiple structures within the campus, with emphasis on creating improved circulation patterns, enhanced security measures, and updated educational and administrative spaces suitable for contemporary school operations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual Version 4.13.26
Project Manual for
ITB No. 26-2985-7JL Johnson Elementary School Renovations
Department of Facilities
Henrico County Public Schools
September 4, 2026
Architect of Record:
Moseley, Inc.
3200 Norfolk Street
Richmond, VA 23230 Phone: 804-794-7555
Department of Facilities, Henrico County Public Schools
TOC-1
TABLE OF CONTENTS
1 Table of Contents TOC 2 List of Drawings LOD 3 Invitation to Bid ITB 4 Bid Form BF 5 Standard Construction Administration Forms SF
AIA Documents 6 Instructions to Bidders: AIA Document A701, 2018 Electronic Edition 7 General Conditions of the Contract for Construction: AIA Document A201, 2017
Electronic Edition 8 Contractor’s Qualification Statement: AIA Document A305, 2020 Electronic
Edition 9 Standard Form of Agreement between Owner and Contractor: AIA Document
A101, 2017 Electronic Edition
County Documents 10 County School Board of County of Henrico, Virginia Bid Bond 11 County School Board of County of Henrico, Virginia Standard Performance Bond 12 County School Board of County of Henrico, Virginia Standard Labor and
Material Payment Bond
Prevailing Wages
13 Davis Bacon General Wage Decision VA20260155 05/18/2026
Technical Specifications Division Division Title
VOLUME 1
DIVISION 1 – GENERAL REQUIREMENTS
010200 General Sitework Requirements 011000 Summary 012000 Price and Payment Procedures 012100 Allowances 012200 Unit Prices 012300 Additive Bid Items 012500 Substitution Procedures Substitution Request Form (After Receipt of Bids) 013000 Administrative Requirements 013216 Construction Progress Schedule 014000 Quality Requirements Statement of Special Inspections Schedule of Special Inspections
TOC-2
014200 Definitions and Reference Standards 014520 Testing, Adjusting, and Balancing for HVAC 015000 Temporary Facilities and Controls 016000 Product Requirements 017000 Execution and Closeout Requirements 017419 Construction Waste Management and Disposal 017800 Closeout Submittals 017900 Demonstration and Training 018119 Indoor Air Quality Requirements 018317 Exterior Building Enclosure Air Barrier Requirements
DIVISION 2 – EXISTING CONDITIONS
024100 Demolition 024113 Selective Site Demolition 028200 Asbestos Abatement 028210 Asbestos Air Monitoring and Testing 028220 Lead-Based Paint Disturbance
DIVISION 3 – CONCRETE
032519 Externally Bonded Fiber Reinforced Polymer (FRP) Reinforcement 033000 Cast-In-Place Concrete 032543 Polished Concrete Floor Finishing 034500 Precast Architectural Concrete
DIVISION 4 – MASONRY
040100 Maintenance of Masonry 042000 Unit Masonry
DIVISION 5 – METALS
051200 Structural Steel Framing 053100 Steel Deck 054000 Cold Formed Steel Framing – Structural (CFSF-S) 054003 Continuous Insulation (CI) Framing System - Clipped 055000 Metal Fabrications 055100 Metal Stairs 055133 Metal Ladders 055213 Pipe and Tube Railings 057300 Decorative Metal Railings
DIVISION 6 – WOOD PLASTICS AND COMPOSITES
061000 Rough Carpentry 064100 Architectural Woodwork and Casework
TOC-3
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
072100 Thermal Insulation 072736 Sprayed Foam (SPF) Air Barrier 074113 Metal Roof Panels 075300 EPDM Membrane Roofing 076200 Sheet Metal Flashing and Trim 077100 Roof Specialties 077200 Roof Accessories 078400 Firestopping 078426 Thermal Barriers for Plastics 079200 Joint Sealants 079513 Expansion Joint Cover Assemblies
DIVISION 8 – OPENINGS
081113 Steel Doors and Frames 081416 Flush Wood Doors 083100 Access Doors and Panels 084313 Aluminum-Framed Storefronts 084413 Glazed Aluminum Curtain Walls 087100 Door Hardware 088000 Glazing 089100 Louvers
DIVISION 9 – FINISHES
090160 Wood Flooring Refinishing 092216 Cold Formed Steel Framing - Non-Structural (CFSF-NS) 092900 Gypsum Board 093000 Tiling 095100 Acoustical Ceilings 096513 Resilient Base and Accessories 096519 Resilient Tile Flooring 096623 Resinous Matrix Terrazzo Flooring 096813 Tile Carpeting 096817 Textile Composite Flooring 097200 Wall Coverings 098430 Sound-Absorbing Wall and Ceiling Units 099100 Painting
DIVISION 10 – SPECIALTIES
101100 Visual Display Units 101400 Signage
102113.17 Solid Color Reinforced Composite (SCRC) Toilet Compartments 102123 Cubicle Curtains and Track
TOC-4
102600 Wall and Door Protection 102800 Toilet and Bath Accessories 104400 Fire Protection Specialties 107300 Protective Covers 107500 Flagpoles
DIVISION 11 – EQUIPMENT
113013 Residential Appliances
114000.01 Foodservice Equipment – Base Bid 1
114000.02 Foodservice Equipment – Additive Bid No. 4
115100 Library Furnishings 115213 Projection Screens 116143 Stage Curtains 116623 Gymnasium Equipment
DIVISION 12 – FURNISHINGS
122400 Window Shades 124813 Entrance Floor Mats
DIVISION 13 – SPECIAL CONSTRUCTION (not used)
DIVISION 14 – CONVEYING SYSTEMS (not used)
DIVISION 21 – FIRE SUPPRESSION (not used)
VOLUME 2
DIVISION 22 – PLUMBING
220500 Common Work Results for Plumbing 220513 Motors for Plumbing Equipment 220516 Expansion Fittings and Loops for Plumbing Piping 220517 Sleeves and Sleeve Seals for Plumbing Piping 220519 Meters and Gages for Plumbing Piping 220523 General-Duty Valves for Plumbing Piping 220529 Hangers and Supports for Plumbing Piping and Equipment 220553 Identification for Plumbing Piping and Equipment 220700 Plumbing Insulation 221113 Facility Natural Gas Piping 221116 Domestic Water Piping 221119 Domestic Water Piping Specialties 221316 Sanitary Waste and Vent Piping 221319 Sanitary Waste Piping Specialties 221413 Facility Storm Drainage Piping 223300 Electric Water Heaters
TOC-5
224000 Plumbing Fixtures
DIVISION 23 – MECHANICAL
230130.52 Existing HVAC Air Distribution System Cleaning
230500 Common Work Results for HVAC 230513 Motors for HVAC Equipment 230514 Variable Speed Drives 230517 Sleeves and Sleeve Seals for HVAC Piping 230519 Meters and Gages for HVAC Piping 230523 General-Duty Valves for HVAC Piping 230529 Hangers and Supports for HVAC Piping and Equipment 230548 Vibration and Seismic Control for HVAC 230553 Identification for HVAC Piping and Equipment 230700 HVAC Insulation 232113 Hydronic Piping 232123 Hydronic Pumps 232300 Refrigerant Piping 232500 HVAC Water Treatment 232533 Temporary Hydronic Sub-Micron Filtration 233113 Metal Ducts 233300 Air Duct Accessories 233423 HVAC Power Ventilators 233600 Air Terminal Units 233713 Diffusers, Registers, and Grilles 234100 Particulate Air Filtration 236423 Air-Cooled Scroll Chillers 237200 Air-to-Air Energy Recovery Equipment 237313 Modular Indoor Air Handling Units 237413 Packaged Air Handling Units 237416 Packaged Rooftop Units 238126 Ductless Mini-Split Air-Conditioning Units 238219 Fan Coil Units 238240 Electric Unit Heaters
DIVISION 25 – INTEGRATED AUTOMATION
255500 Building Automation System Allowance 255510 Building Automation System Equipment 255550 Sequence of Control for HVAC
DIVISION 26 – ELECTRICAL
260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems
TOC-6
260533 Raceways and Boxes for Electrical Systems 260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 260553 Identification for Electrical Systems 260923 Lighting Control Devices 262200 Low-Voltage Transformers 262416 Panelboards 262726 Wiring Devices 262813 Fuses 262816 Enclosed Switches and Circuit Breakers 263213 Engine Generators 263600 Transfer Switches 264313 Surge Protection for Low-Voltage Electrical Power Circuits 265119 LED Interior Lighting
DIVISION 27 – COMMUNICATIONS
270500 Common Work Results for Communications 271100 Communications Equipment Room Fittings 271500 Structured Cabling 271550 Telecommunications Cabling 275120 Student Dining Sound System / FM Assistance Hearing System
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
280500 Common Work Results for Electronic Safety and Security 280513 Conductors and Cables for Safety and Security 281350 Electronic Safety and Security Access Control, Video Surveillance and Intercom
Entry 281600 Intrusion Detection 283111 Digital, Addressable Fire-Alarm System
DIVISION 31 – EARTHWORK
311000 Site Clearing 312000 Earthwork 312500 Erosion Control 313116 Termite Control
DIVISION 32 – EXTERIOR IMPROVEMENTS
321216 Asphalt Paving 321313 Site Concrete 321700 Pavement Markings, Signs and Specialties 323113 Chain Link Fences and Gates (Galvanized)
323113.19 Chain Link Fences and Gates (PVC Clad)
323119 Decorative Metal Fences and Gates 329200 Lawns and Grasses
TOC-7
329300 Exterior Plants
DIVISION 33 – UTILITIES
331000 Exterior Water Systems 333000 Sanitary Sewerage 334100 Storm Drainage
Appendices Appendix A: Geotechnical Engineering Report – Revision 2 Appendix B: Hazardous Materials Reports
- END OF TABLE OF CONTENTS -
LOD-1
LIST OF DRAWINGS
Sheet Title
GENERAL
G0.1 COVER
G2.1 GENERAL INFORMATION - AIR BARRIER
LIFE SAFETY
LS1.0 CODE SUMMARY
LS1.1 LIFE SAFETY INFORMATION
LS2.0 LIFE SAFETY FIRE RESISTANT RATED ASSEMBLIES
LS2.1 LIFE SAFETY FIRE RESISTANT RATED ASSEMBLIES
CIVIL
C0.00 COVER SHEET
C0.01 SHEET INDEX
C1.00 LEGEND
C1.01 PROJECT DOCUMENTATION
C1.02 PROJECT DOCUMENTATION
C1.10 OVERALL PROPERTY MAP
C1.11 EASEMENTS AND ROW PLAN
C1.20 OVERALL SITE CONSTRUCTION SEQUENCE PLAN
C2.00 EXISTING CONDITIONS PLAN
C2.10 DEMOLITION PLAN
C2.11 UTILITY DEMOLITION PLAN
C3.00 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1
C3.10 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2
C3.20 HENRICO STD. EROSION CONTROL NOTES AND DETAILS
C3.21 HENRICO STD. EROSION CONTROL NOTES AND DETAILS
C3.22 HENRICO STD. EROSION CONTROL NOTES AND DETAILS
C3.23 EROSION CONTROL NOTES AND DETAILS
C3.24 EROSION CONTROL NOTES AND DETAILS
C3.30 SOIL MAP
C4.00 LAYOUT PLAN
C4.10 SIGNAGE AND STRIPING PLAN
C4.20 HENRICO STD. CONSTRUCTION NOTES AND DETAILS
C4.21 SITE NOTES AND DETAILS
C4.22 SITE NOTES AND DETAILS
C4.30 SIGHT DISTANCE PLAN
C4.31 SIGHT DISTANCE PLAN
C5.00 UTILITY PLAN
C5.10 UTILITY PROFILES
C5.20 UTILITY NOTES AND DETAILS
LOD-2
C5.21 UTILITY NOTES AND DETAILS
C5.22 UTILITY NOTES AND DETAILS
C6.00 GRADING AND DRAINAGE PLAN
C6.10 OVERALL SPOT SHOT PLAN
C6.11 SPOT SHOT PLAN
C6.12 SPOT SHOT PLAN
C6.20 ROADWAY CROSS SECTIONS
C6.21 ROADWAY CROSS SECTIONS
C6.30 STORM SEWER PROFILES
C6.31 STORM SEWER PROFILES
C6.40 STORM SEWER DRAINAGE AREA MAP
C6.50 DRAINAGE NOTES AND DETAILS
C6.60 DRY DETENTION POND PLAN
C6.61 DRY DETENTION POND PROFILE
C6.62 DRY DETENTION POND DOCUMENTATION
C7.00 CBPA PLAN
C7.01 PRE-DEVELOPMENT HYDROLOGY
C7.02 POST-DEVELOPMENT HYDROLOGY
C7.03 50-10 COMPLIANCE
C7.04 DOWNSTREAM STORM SEWER DRAINAGE MAP
C7.05 EXISTING STORM NETWORK PLAN
C7.06 EXISTING STORM PROFILES
C7.10 CALCULATIONS
C7.11 CALCULATIONS
C7.12 CALCULATIONS
C7.13 CALCULATIONS
C7.14 CALCULATIONS
C7.15 CALCULATIONS
C7.16 CALCULATIONS
C7.17 CALCULATIONS
C7.18 CALCULATIONS
L0.00 OVERALL TREE PRESERVATION PLAN
L0.01 TREE PRESERVATION PLAN
L0.02 TREE PRESERVATION PLAN
L0.03 TREE PRESERVATION PLAN CHART
L1.00 MINIMUM REQUIREMENTS PLANTING PLAN
L1.01 PLANTING PLAN
L1.02 PLANTING PLAN
L1.20 PLANTING NOTES AND DETAILS
L1.21 PLANTING NOTES AND DETAILS
HAZARDOUS MATERIALS
R2.0.1 ASBESTOS & LBP ABATEMENT OVERALL FLOOR PLAN
LOD-3
R2.0.2 ASBESTOS & LBP ABATEMENT BUILDINGS A
R2.0.3 ASBESTOS & LBP ABATEMENT BUILDINGS A
R2.0.4 ASBESTOS & LBP ABATEMENT BUILDINGS E & F
ARCHITECTURAL
A0.1 GENERAL ARCHITECTURAL INFORMATION
A0.2 WALL/PARTITION TYPES
A1.0.1 ARCHITECTURAL PHASING PLAN
A1.0.2 ARCHITECTURAL PHASING PLAN
A1.0.3 ARCHITECTURAL PHASING PLAN
A1.0.4 ARCHITECTURAL PHASING PLAN
A1.0.5 ARCHITECTURAL PHASING PLAN
A1.1.1 ARCHITECTURAL SITE PLAN
A1.1.2 ARCHITECTURAL ENLARGED SITE PLAN AND DETAILS
A1.1.3 ARCHITECTURAL ENLARGED SITE PLAN AND DETAILS
A1.1.4 ARCHITECTURAL ENLARGED SITE PLAN AND DETAILS
A1.1.5 ARCHITECTURAL ENLARGED SITE PLAN AND DETAILS
A1.1.6 ARCHITECTURAL CANOPY PLAN AND DETAILS - ADDITIVE BID NO. 3
A1.2.1 DEMOLITION PLAN - BUILDING E & F
A1.2.2 DEMOLITION PLAN - BUILDING A & B
A1.2.3 DEMOLITION PLAN - BUILDING C & D
A1.2.4 DEMOLITION FLOOR PLAN AND ROOF PLAN - BUILDING G ADDITIVE BID NO. 2
A1.2.5 DEMOLITION PLAN - OVERALL ROOF PLAN
A2.0.1 OVERALL FLOOR PLAN
A2.1.1 FLOOR PLAN - BUILDING E & F
A2.1.2 FLOOR PLAN - BUILDING A & B
A2.1.3 FLOOR PLAN - BUILDING C & D
A2.1.4 FLOOR PLAN - BUILDING G - ADDITIVE BID NO. 2
A2.2.1 ENLARGED PLAN DETAILS
A3.0.1 FINISH SCHEDULE
A3.0.2 FLOOR PATTERN PLAN
A3.0.3 FINISH PLAN - BUILDING E & F
A3.0.4 FINISH PLAN - BUILDING A & B
A3.0.5 FINISH PLAN - BUILDING C & D
A3.0.7 SITE WAYFINDING SIGNAGE PLAN
A3.0.8 SIGNAGE PLAN - BUILDINGS E & F
A3.0.9 SIGNAGE PLAN - BUILDINGS A & B
A3.0.10 SIGNAGE PLAN - BUILDINGS C & D
A3.0.11 SIGNAGE PLAN - BUILDING G
A3.1.1 DOOR AND FRAME SCHEDULE
A3.1.2 DOOR
A3.2.1 DOOR AND FRAME DETAILS
A3.2.2 DOOR AND FRAME DETAILS
LOD-4
A3.2.3 DOOR AND FRAME DETAILS
A4.1.1 BUILDING ELEVATIONS
A4.1.2 BUILDING ELEVATIONS
A4.1.3 BUILDING ELEVATIONS - BUILDING G - ADDITIVE BID NO. 2
A4.2.1 INTERIOR ELEVATIONS
A4.2.2 INTERIOR ELEVATIONS
A5.0.1 BUILDING SECTIONS
A5.0.2 BUILDING SECTIONS
A5.1.1 WALL SECTIONS
A5.1.2 WALL SECTIONS - BUILDING E
A5.1.3 WALL SECTIONS - BUILDING E
A5.1.4 WALL SECTIONS - BUILDINGS C & F
A6.1.1 ENLARGED STAIR & RAMP DETAILS
A7.1.1 TOILET ASSEMBLIES
A7.1.2 ENLARGED PLANS
A8.1 CASEWORK AND ELEVATIONS
A8.2 CASEWORK AND ELEVATIONS
A9.1.1 REFLECTED CEILING PLAN - BUILDING E & F
A9.1.2 REFLECTED CEILING PLAN - BUILDING A & B
A9.1.3 REFLECTED CEILING PLAN - BUILDING C & D
A9.1.4 REFLECTED CEILING PLAN - BUILDING G
A10.0.1 ROOF ASSEMBLIES
A10.1.1 ROOF PLAN - BUILDING E & F
A10.1.2 ROOF PLAN - BUILDING A
A10.1.3 ROOF PLAN - BUILDING G - ADDITIVE BID NO. 2
FOODSERVICE
QF001 FOODSERVICE TEMPORARY SERVING LINE EQUIPMENT & UTILITIES PLANS
QF100 FOODSERVICE EXISTING EQUIPMENT PLAN - BASE BID 1
QF100A FOODSERVICE EXISTING EQUIPMENT PLAN
QF101 FOODSERVICE POST RENOVATION EQUIPMENT PLAN - BASE BID 1
QF101A FOODSERVICE POST RENOVATION EQUIPMENT PLAN
QF201 FOODSERVICE PLUMBING & VENTILATION ROUGH-IN PLAN - BASE BID 1
QF201A FOODSERVICE PLUMBING & VENTILATION ROUGH-IN PLAN
QF202 FOODSERVICE ELECTRICAL ROUGH-IN PLAN - BASE BID 1
QF202A FOODSERVICE ELECTRICAL ROUGH-IN PLAN
QF301 FOODSERVICE EXHAUST HOOD DETAILS - BASE BID 1
QF301A FOODSERVICE EXHAUST HOOD DETAILS
QF302 FOODSERVICE EXHAUST HOOD DETAILS - BASE BID 1
QF302A FOODSERVICE EXHAUST HOOD DETAILS
QF303 FOODSERVICE FAN DETAILS - BASE BID 1
QF303A FOODSERVICE FAN DETAILS
LOD-5
STRUCTURAL
S0.0.1 GENERAL NOTES AND LEGENDS
S0.1.1 EXISTING CANOPY FOUNDATION PLAN
S0.1.2 EXISTING CANOPY FRAMING PLAN
S1.1.1 FOUNDATION PLAN - BLDG E
S1.1.2 FOUNDATION PLAN - BLDG F
S1.1.3 FOUNDATION PLANS - BLDG C & G
S2.1.1 ROOF FRAMING PLAN - BLDG E
S2.1.2 ROOF FRAMING PLANS - BLDG C & F
S2.1.3 ROOF FRAMING PLANS - CANOPY AT BLDG G
S3.0.1 TYPICAL FOUNDATION DETAILS
S3.0.2 TYPICAL SLAB DETAILS
S3.1.1 FOUNDATION SECTIONS
S4.0.1 TYPICAL MASONRY WALL AND LINTEL DETAILS
S4.0.2 TYPICAL FRAMING DETAILS
S4.1.1 FRAMING SECTIONS
S4.1.2 FRAMING SECTIONS
S4.1.3 FRAMING SECTIONS
PLUMBING
P0.1 LEGENDS
P1.0.1 DEMOLITION FOUNDATION PLANS - BUILDING E & F - PLUMBING
P1.0.2 DEMOLITION FOUNDATION PLANS - BUILDING B
P1.1.1 DEMOLITION PLANS - BUILDING E & F SANITARY
P1.1.2 DEMOLITION PLANS - BUILDING B
P1.1.3 DEMOLITION PLANS - BUILDING E & F - DOMESTIC
P1.1.4 DEMOLITION PLANS - BUILDING B
P1.1.5A DEMOLITION PLANS - BUILDING G - ADDITIVE BID NO. 2 - PLUMBING
P2.0.1 FOUNDATION PLANS - BUILDING E & F - PLUMBING
P2.0.2 FOUNDATION PLANS - BUILDING A & B - PLUMBING
P2.0.3 FOUNDATION PLANS - BUILDING C & D - PLUMBING
P2.1.1 FLOOR PLANS - BUILDING E & F - SANITARY
P2.1.2 FLOOR PLANS - BUILDING A & B - SANITARY
P2.1.3 FLOOR PLANS - BUILDING C & D - SANITARY
P2.1.4 FLOOR PLANS - BUILDING E & F - DOMESTIC
P2.1.5 FLOOR PLANS - BUILDING B
P2.1.6 FLOOR PLAN - BUILDING G - DOMESTIC
P2.1.6A FLOOR PLAN - BUILDING G - ADDITIVE BID NO. 2 - PLUMBING
P2.2.1 ROOF PLANS - BUILDING E & F - PLUMBING
P2.2.2 ROOF PLANS - BUILDING B
P4.1 ENLARGED PLANS & RISERS
P4.2 ENLARGED PLANS & RISERS
P4.3 ENLARGED PLANS & RISERS
LOD-6
P5.1 DETAILS
P6.1 SCHEDULES
P9.1 NATURAL GAS RISER DIAGRAMS
MECHANICAL
M0.1 LEGENDS
M0.2 SCHEDULES
M0.2A SCHEDULES - ADDITIVE BID NO. 1
M1.1 FLOOR PLANS - BUILDING E AND F - DEMOLITION
M1.2 FLOOR PLANS - BUILDING A AND B - DEMOLITION
M1.2A FLOOR PLANS - BUILDING A AND B - DEMOLITION - ADDITIVE BID NO. 1
M1.3 FLOOR PLANS - BUILDING C AND D - DEMOLITION
M1.3A FLOOR PLANS - BUILDING C AND D - DEMOLITION - ADDITIVE BID NO. 1
M1.4 FLOOR PLANS - BUILDING G - DEMOLITION
M2.0 OVERALL SITE PLAN - PIPING
M2.1 FLOOR PLANS - BUILDING E AND F
M2.2 FLOOR PLANS - BUILDING A AND B
M2.2A FLOOR PLANS - BUILDING A AND B - ADDITIVE BID NO. 1
M2.3 FLOOR PLANS - BUILDING C AND D
M2.3A FLOOR PLANS - BUILDING C AND D - ADDITIVE BID NO. 1
M2.4 FLOOR PLANS - BUILDING G
M4.1 SECTIONS
M5.1 DETAILS
M5.2 DETAILS
M6.1 SYSTEM SCHEMATICS
M7.1 CONTROLS
M7.2 CONTROLS
ELECTRICAL
E0.1 LEGENDS
E0.2 ELECTRICAL SITE PLAN
E0.3 ELECTRICAL SITE PLAN DETAILS
E0.4 ELECTRICAL SITE PLAN - EXISTING CONDITIONS
E0.5 COMMUNICATION SITE PLAN
E0.6 SITE PLAN - CANOPY LIGHTING
E1.1.1 BUILDING E & F FLOOR PLAN - ELECTRICAL DEMOLITION
E1.2.1 BUILDING A & B FLOOR PLAN - ELECTRICAL DEMOLITION
E1.3.1 BUILDING C & D FLOOR PLAN - ELECTRICAL DEMOLITION
E1.4.1 BUILDING G FLOOR PLAN - ELECTRICAL DEMOLITION
E1.5.1 KITCHEN PLAN - ELECTRICAL DEMOLITION - BASE BID 1
E1.5.2 KITCHEN PLAN - ELECTRICAL DEMOLITION
E2.1.2 BUILDING A FLOOR PLAN - POWER
E2.2.1 BUILDING B FLOOR PLAN - LIGHTING
LOD-7
E2.2.2 BUILDING B FLOOR PLAN - POWER
E2.3.1 BUILDING C FLOOR PLAN - LIGHTING
E2.3.2 BUILDING C FLOOR PLAN - POWER
E2.4.1 BUILDING D FLOOR PLAN - LIGHTING
E2.4.2 BUILDING D FLOOR PLAN - POWER
E2.5.1 BUILDING E FLOOR PLAN - LIGHTING
E2.6.1 BUILDING F BSMNT FLOOR PLAN - LIGHTING
E2.7.1 BUILDING F FIRST FLOOR PLAN - LIGHTING
E2.7.2 BUILDING F FIRST FLOOR PLAN - POWER
E2.7.3 BUILDING F ROOF PLAN - MECHANICAL POWER
E2.8.1 BUILDING G FLOOR PLAN - LIGHTING
E2.8.2 BUILDING G FLOOR PLAN - POWER
E2.8.3 BUILDING G FLOOR PLAN - COMMUNICATIONS
E3.1 KITCHEN PLAN - ELECTRICAL - BASE BID 1
E3.2 KITCHEN PLAN - ELECTRICAL
E3.3 KITCHEN ROOF PLAN
E3.4 KITCHEN ELECTRICAL DETAILS
E4.1 ELECTRICAL DETAILS
E4.2 ELECTRICAL DETAILS
E4.3 ELECTRICAL DETAILS
E4.4 ELECTRICAL DETAILS
E5.1 POWER ONE-LINE DIAGRAM
E5.2 PANELBOARD SCHEDULES
E5.3 PANELBOARD SCHEDULES
E5.4 PANELBOARD SCHEDULES
E5.10 MECHANICAL EQUIPMENT SCHEDULE
E6.0 LIGHT FIXTURE SCHEDULE
SECURITY
SE1.1 SECURITY ELECTRONICS SITE PLAN - CANOPY
SE2.1 SECURITY ELECTRONICS FLOOR PLAN
SE2.2 SECURITY ELECTRONICS FLOOR PLAN
SE2.3 SECURITY ELECTRONICS FLOOR PLAN
SE2.4 SECURITY ELECTRONICS FLOOR PLAN
SE3.1 CAMERA SCHEDULE AND DETAILS
- END OF LIST OF DRAWINGS -
ITB-1
INVITATION TO BID
ITB No. 26-2985-7JL
Henrico County Public Schools
Sealed bids for Johnson Elementary School Renovations, in accordance with the conditions, specifications, and instructions below and on the attached sheets hereto, will be received no later than 2:00 PM, local prevailing time, September 29, 2026 and then publicly opened and read immediately thereafter through a Microsoft Teams meeting. Sealed bids shall be submitted through Henrico County’s Electronic Documents Web Portal, ProcureWare, at https://henrico.procureware.com.
Bidders interested in participating in the bid opening shall send a request to be added to the meeting invitation to Oscar Knott via email at kno008@henrico.gov.
Time is of the essence, and any bidder that attempts to submit a bid after the appointed hour for submission, will be unable to, as ProcureWare automatically closes the bid. The time of receipt shall be determined by the time clock in ProcureWare. Bidders are responsible for ensuring that their bid is submitted in ProcureWare by the deadline indicated.
The Work consists of renovations to Johnson Elementary School located at 5600 Bethlehem Road, Henrico, Virginia, 23230, which was constructed in 1959. The existing one-story campus elementary school layout features four academic buildings, an administration building, cafetorium building, multipurpose building, and connecting canopies throughout. As a part of the Work, a new main security entry will be added to the existing administration building with approximately 1,238 square feet of new space. The Work will focus on modernization of the previously unrenovated cafetorium, library, multipurpose building, and administrative offices, and provide updates to the classroom buildings, and will include site circulation improvements including a full reconfiguration of the parking area and bus loop. A new public entrance will be added to the front of the school. The campus circulation will be reconfigured to provide public parking at the front of campus and will add a new modernized bus loop. Buildings will receive upgrades to restrooms, casework, ceilings, and finishes. Details of the work to the buildings include selective demolition and abatement, masonry and new interior partition construction, window replacement, roofing repair and replacement, accessibility modifications, life safety enhancements, interior finish alterations, mechanical, electrical, and selective plumbing system replacements, and modernization of the building energy management system. Details of the site work will include a new parking area and bus loop, bus loop canopy installation, site lighting, fencing, grading, erosion and sediment control, stormwater management, site utilities, driveways, paving and sidewalks, signage and landscaping, and a new public shared use path along the public right of way. All renovations will conform to modern accessibility standards and code requirements. The school will be occupied during construction and will require phased construction. Temporary modular classrooms are on site to accommodate students during the phased portions of the renovation. Construction shall not disrupt normal classroom activity. The finished project will encompass approximately 53,879 square feet of interior space.
Pursuant to Henrico County Code Section 16-43, the County School Board of Henrico County, Virginia shall be the awarding authority when the contract amount is over $200,000. Otherwise, the award will be made by the Purchasing Director. Contract award for Johnson Elementary School Renovations shall be made to the bidder that submits the lowest Total Bid Amount plus the total amount of the Additive Item(s), taken in https://henrico.procureware.com/ mailto:kno008@henrico.gov
ITB-2
sequence, which the Owner in its sole discretion decides to award, provided the bid does not exceed the funds available for the contract.
Normal working hours shall be between 6:00 am to 8:00 pm Monday through Friday. Work after normal working hours and may be scheduled only with the Henrico County Public Schools’ approval. Access will be provided to the whole site during off-hours; however, limitation shall be applied during school hours.
Bidding Documents consisting of Contract Drawings and Project Manuals may be obtained by visiting the Henrico County Electronic Document’s Web portal at https://henrico.procureware.com/home. Options are provided for downloading a complete set of documents or selected files from this web portal. The Contract Drawings and Project Manuals are provided in PDF Format, which may be shared electronically with your subcontractors, employees, and suppliers. The failure or omission of any bidder to download, receive or examine any form, instrument, addendum or other documents, or to acquaint itself with conditions existing at the site(s), shall in no way relieve any bidder from any obligations with respect to its bid or to the contract.
A virtual non-mandatory pre-bid conference will be held at 9:00 AM on September 14, 2026, via a Microsoft Teams meeting. Bidders interested in attending should email Oscar Knott at kno008@henrico.gov to receive an electronic invite to the meeting. A non-mandatory site visit will be held at is planned 9:00 AM on September 21, 2026 at Johnson Elementary School at 5600 Bethlehem Rd, Henrico VA 23230. Direct any questions concerning the Project Manual and Drawings in writing through the Questions function in ProcureWare.
Bids must be accompanied by either a cashier’s check or certified check or bid bond in the amount of 5% of the Total Bid and made payable to the County of Henrico, Virginia.
A bid may not be modified, withdrawn or cancelled by the bidder after the time and date designated for the receipt of bids and for 90 days thereafter except as provided by Va. Code § 2.2-4330. The following is the procedure for withdrawal of a bid: Va. Code § 2.2-4330(B)(1), as may be amended from time to time.
Nothing herein is intended to exclude any responsible bidder, its product or service or in any way restrain or restrict competition. Comments as to how bid documents, specifications or drawings can be improved are welcome.
If a contract is awarded, a separate performance bond and a payment bond, County School Board of County of Henrico, Virginia Standard Performance Bond County School Board of County of Henrico, Virginia Standard Labor and Material Payment Bond, for 100% of the contract amount shall be provided by the Successful Bidder.
The Owner reserves the right to waive informalities and/or reject all bids. In accordance with Va. Code, Section 2.2-4319, the Owner shall not reject all bids solely to avoid awarding a contract to a particular responsive and responsible bidder.
The Bidder hereby agrees that by submitting this bid that it will use the subcontractor selected by the Owner, as part of a separate bid/procurement process, for Allowance No. 2. The successful contractor agrees that it will be responsible for this subcontractor and its work as if the successful General Contractor itself had selected this subcontractor. Any adjustments in the Allowances shall be in accordance with Article 3.8 of the General Conditions and other contract provisions. The Base Bid shall include all cost associated with the https://henrico.procureware.com/home mailto:kno008@henrico.gov
ITB-3
management and coordination of work performed under the Allowances. Work under this allowance shall be provided by an assigned subcontractor to the general contractor. Contractor is required to contract with the selected subcontractor within 30 days of Notice to Proceed.
The Bidder must be a registered contractor in the Commonwealth of Virginia in accordance with Title 54.1, Chapter 11 of the Code of Virginia, as amended, at the time of bid submission, and shall possess a Virginia Contractor’s License Class A. The Bidder shall have bid and completed projects of comparable nature, size, complexity and construction cost. The Bidder should submit with its bid a completed AIA Document A305, Contractor’s Qualifications Statement, which shall document how the applicable projects meet or exceeds the size, complexity, and nature of this project; and includes details of the management staff and self-performed activities associated with the referenced projects. Only those projects which the Bidder performed the work as the General Contractor should be included in the AIA Document A305. Bidders are not required to submit AIA Document A305, Contractor’s Qualification Statement if they have submitted one within the last twelve (12) months as of the date of this bid.
- END OF INVITATION TO BID -
BF-1
BID FORM
FIXED PRICE CONTRACT
ITB No. 26-2985-7JL
Date: ____________________________
To: County of Henrico Department of Finance, Purchasing Office
8600 Staples Mill Road, Henrico, VA 23228-2360 PO Box 90775, Henrico, VA 23273-0775
Project: Johnson Elementary School Renovations
From (full name): __________________________________
(full address) __________________________________
Having carefully examined the site, the drawings, specifications and other documents, and in compliance with your "Invitation to Bid", Instructions to Bidders AIA701-2018 Edition, and this “Bid Form”, the undersigned proposes to furnish all labor, materials, supplies and equipment necessary for Johnson Elementary School Renovations. All shall be in accordance with Drawings prepared by Moseley, Inc.
dated May 29, 2026 and the Project Manual, dated September 4, 2026.
The Bidder must be a registered contractor in the Commonwealth of Virginia in accordance with Title 54.1, Chapter 11 of the Code of Virginia, as amended, at the time of bid submission, and shall possess a Virginia Contractor’s License Class A. The Bidder shall have bid and completed projects of comparable nature, size, complexity and construction cost. The Bidder should submit with its bid a completed AIA Document A305, Contractor’s Qualifications Statement, which shall document how the applicable projects meet or exceeds the size, complexity, and nature of this project; and includes details of the management staff and self-performed activities associated with the referenced projects. Only those projects which the Bidder performed the work as the General Contractor should be included in the AIA Document A305. Bidders are not required to submit AIA Document A305, Contractor’s Qualification Statement if they have submitted one within the last twelve (12) months as of the date of this bid.
The Work consists of renovations to Johnson Elementary School located at 5600 Bethlehem Road, Henrico, Virginia, 23230, which was constructed in 1959. The existing one-story campus elementary school layout features four academic buildings, an administration building, cafetorium building, multipurpose building, and connecting canopies throughout. As a part of the Work, a new main security entry will be added to the existing administration building with approximately 1,238 square feet of new space. The Work will focus on modernization of the previously unrenovated cafetorium, library, multipurpose building, and administrative offices, and provide updates to the classroom buildings, and will include site circulation improvements including a full reconfiguration of the parking area and bus loop. A new public entrance will be added to the front of the school. The campus circulation will be reconfigured to provide public parking at the front of campus and will add a new modernized bus loop. Buildings will receive upgrades to restrooms, casework, ceilings, and finishes. Details of the work to the buildings include selective demolition and abatement, masonry and new interior partition construction, window replacement, roofing repair and replacement, accessibility modifications, life safety enhancements, interior finish alterations, mechanical, electrical, and selective plumbing system replacements, and modernization of the building energy management system. Details of the site work
BF-2
will include a new parking area and bus loop, bus loop canopy installation, site lighting, fencing, grading, erosion and sediment control, stormwater management, site utilities, driveways, paving and sidewalks, signage and landscaping, and a new public shared use path along the public right of way. All renovations will conform to modern accessibility standards and code requirements. The school will be occupied during construction and will require phased construction. Temporary modular classrooms are on site to accommodate students during the phased portions of the renovation. Construction shall not disrupt normal classroom activity. The finished project will encompass approximately 53,879 square feet of interior space.
It shall be the responsibility of the Contractor to apply for and diligently pursue the applicable Building Permits from the County of Henrico. It shall be the responsibility of the Owner to pay for the Building Permits. However, in a cooperative and expedient effort, the Owner may apply and pay for the Building Permits prior to receipt of bids and should not be included in the bid amount. The Contractor will be responsible for obtaining and bearing the cost of all subcontractors permits.
The Bid Form must be completed in blue or black ink or by typewriter. The bid amounts shall be expressed in figures, only. The unit price of each item on the form, if requested, must be stated in figures. Discrepancies in the multiplication of units of work and the unit prices will be resolved in favor of the correct multiplication of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. My/Our lump sum price is as follows:
PRICES QUOTED SHALL BE FOB DESTINATION
TOTAL BID AMOUNT:
TOTAL BID: The Total Bid includes all Work required by the Bidding Documents for Johnson Elementary School Renovations in strict accordance with the Bidding Documents including the Drawings and Project Manual for the lump sum of:
$[Enter pricing electronically in ProcureWare] (Figure Only)
Price Schedule Base Bid Items
Description Lump Sum Price Base Bid 1 includes all Work required by the Bidding Documents for Johnson Elementary School Existing Building Renovations, including full abatement for known areas in strict accordance with the Bidding Documents including the Drawings and Project Manual with the exception of allowance items included below.
[Enter pricing electronically in ProcureWare]
Base Bid 2 includes all Work required by the Bidding Documents for Site construction in strict accordance with the Bidding Documents including the Drawings and Project Manual with the exception of allowance items included below.
[Enter pricing
Lump Sum Allowance Items
Description Lump Sum Price Lump Sum Allowance No. 1: Include the stipulated sum of $5,000 for additional panel signage, over or in addition to signage locations and types indicated in the Contract documents.
[An allowance value of $5,000 is already included
BF-3
Lump Sum Allowance No. 2: Include the stipulated sum of $500,000 for Building Automation System (BAS). Work under this allowances shall be provided by Owner assigned Subcontractor Automated Logic Corporation. Refer to Section 255000 "Building Automation System Allowance" for complete scope of Work for this Subcontractor.
[An allowance value of $500,000 is already included electronically in ProcureWare]
Lump Sum Allowance No. 3: Include the stipulated sum of $30,000 for Code Official required changes.
[An allowance value of $30,000 is already included
Unit Price Items (Reference Section 012200)
Description Quantity Unit Unit Price Extended Price
Unit Price Item No. 1:
Additional Excavation 2,000 Cubic
Yards
[Enter pricing
Pricing will automatically calculate in ProcureWare
Unit Price Item No. 2:
Additional Excavation in Trenches
50 Cubic Yards
[Enter pricing calculate in ProcureWare
Unit Price Item No. 3:
Additional Excavation in Footings
20 Cubic Yards
[Enter pricing calculate in ProcureWare
Unit Price Item No. 4:
Additional Subsurface Drainage 100 Linear
Feet
[Enter pricing calculate in ProcureWare
Unit Price Item No. 5: VDOT #57 Stone 50 Tons
[Enter pricing calculate in ProcureWare
Unit Price Item No. 6: Woven Geotextile Fabric 1,200 Square
Yards
[Enter pricing calculate in ProcureWare
Unit Price Item No. 7: Moisture Vapor Treatment 3,010 Square
Feet
[Enter pricing calculate in ProcureWare
Unit Price Item No. 8: Brick Replacement 60 Square
Feet
[Enter pricing calculate in ProcureWare
BF-4
Unit Price Item No. 9: Mortar Repointing 3,500 Square
Feet
[Enter pricing calculate in ProcureWare
Unit Price Item No. 10: Asbestos Containing Roofing Materials 3,200 Square
Feet
[Enter pricing calculate in ProcureWare
Unit Price Item No. 11: Asbestos Containing Underground Transite Pipes
300 Linear Feet
[Enter pricing calculate in ProcureWare
Unit Price Item No. 12: Asbestos Containing Pipe Insulation 300 Linear
Feet
[Enter pricing
Total Bid Amount (equals the sum of Base Bid 1 and 2 +
Lump Sum Allowance Items No. 1 – 3 + Unit Price Items No. 1 – 12)
Pricing will automatically
Additive Bid Items (Reference Section 012300)
Additive Bid Item No. 1: Provide an additive bid price for all work associated with replacement of existing mechanical equipment in Buildings A, B, C, and D, as identified in the Contract Documents.
[Enter pricing
ProcureWare]
Additive Bid Item No. 2: Provide an additive bid price for all work associated with selective interior and exterior finishes, roof, and electrical systems in Building G, as identified in the Contract Documents.
ProcureWare]
Additive Bid Item No. 3: Provide an additive bid price for renovation work to the existing building canopies, as identified in the Contract Documents.
ProcureWare]
Additive Bid Item No. 4: Provide an additive bid price for all work associated with replacement of kitchen equipment, as identified in the Contract Documents.
ProcureWare]
Additive Bid Item No. 5: Provide total additional costs associated with using Davis-Bacon Wage Rates, General Decision Number VA20260155 dated 05/18/2026, for the Total Bid Amount and Additive Bid Items 1 through 4, to include all administrative, compliance, reporting, and overhead costs required to implement these wage rates.
[Enter pricing
BID SECURITY:
Attached hereto is my bid security for five percent (5%) of the Total Bid, made payable to the County of Henrico, Virginia.
GENERAL:
BF-5
It is the intent of the County of Henrico to recommend the award of this contract to the lowest responsive and responsible bidder based upon the Total Bid, provided the bid does not exceed the funds available for the contract. Contract award for Johnson Elementary School Renovations shall be made to the bidder that submits the lowest Total Bid Amount plus the total amount of the Additive Item(s), taken in sequence, which the Owner in its sole discretion decides to award, provided the bid does not exceed the funds available for the contract.
If a contract is awarded, a separate performance bond and a payment bond County School Board of County of Henrico, Virginia Standard Performance Bond and County School Board of County of Henrico, Virginia Standard Labor and Material Payment Bond, for 100% of the contract amount, including any additions and/or deductions, shall be provided by the Successful Bidder.
The Successful Bidder agrees to use unit prices to determine changes to the Contract Sum when authorized changes are directed. Unit prices shall include all labor and materials, in place and complete. The source of the unit prices (other than those listed herein) shall be Means Open Shop Building Construction Cost Data, latest edition, R. S. Means Company, Inc., adjusted for Richmond, Virginia. The unit prices will be used as maximum limiting charges and minimum credits allowable for any change in the Work.
TIME OF COMPLETION:
The Work shall be Substantially Complete and certified by the Architect by December 31, 2027. Final Completion of all Work shall be within 30 calendar days after the date of Substantial Completion.
The Owner and the Contractor recognize that time is of the essence and that the Owner will suffer financial loss if the Work is not completed by the deadline for Substantial Completion. Both parties recognize the delays, expense, and damages involved in proving in a legal proceeding the actual loss suffered by the Owner if the Work is not completed on time. Accordingly, notwithstanding any other provisions of this Contract, the Owner and the Contractor agree, stipulate and fix as liquidated damages, but not as a penalty, the sum of Three Hundred Dollars ($300.00) per day, which the Contractor together with the Contractor's surety shall pay the Owner for each calendar day or part thereof after the Substantial Completion deadline until the Contractor achieves Substantial Completion of the entire Work. The Contractor hereby waives any defense as to the validity of liquidated damages stated in this Agreement on the grounds that such liquidated damages are void as penalties or are not reasonably related to actual damages, and the parties agree that the Owner's entitlement to liquidated damages shall be determined at the time of Substantial Completion.
(BID SIGNATURE SHEET FOLLOWS)
BF-6
BID SIGNATURE SHEET
My signature certifies that the bid as submitted complies with all requirements specified in this Invitation to Bid (“ITB”) No. 26-2985-7JL – Johnson Elementary School Renovations.
My signature also certifies that by submitting a bid in response to this ITB, the Bidder represents that in the preparation and submission of this bid, the Bidder did not, either directly or indirectly, enter into any combination or arrangement with any person or business entity, or enter into any agreement, participate in any collusion, or otherwise take any action in the restraining of free, competitive bidding in violation of the Sherman Act (15 U.S.C.
Section 1) or Sections 59.1-9.1 through 59.1-9.17 or Sections 59.1-68.6 through 59.1-68.8 of the Code of Virginia.
I hereby certify that I am authorized to sign as a legal representative for the business entity submitting this bid.
LEGAL NAME OF BIDDER (DO NOT USE TRADE NAME): ________________________________
ADDRESS: __________________________________________________________________________
SIGNATURE: ________________________________________________________________________
NAME OF PERSON SIGNING (PRINT): __________________________________________________
TITLE: ______________________________________________________________________________
TELEPHONE: ________________________________________________________________________
EMAIL ADDRESS: ____________________________________________________________________
DATE: ______________________________________________________________________________
VIRGINIA CONTRACTOR’S REGISTRATION NUMBER:______________________ CLASS: _____
Surety2000 Bond Number for Bid Bond (if applicable): _______________________________________
Bidder _____ is or ____ is not located in Henrico County? If so, have you obtained a County license to conduct or engage in business, trade or occupation in the County? _____ Yes _____ No
RECEIPT OF ADDENDA:
We acknowledge the receipt of the following Addenda:
Addendum No. Dated
Addendum No. Dated
Addendum No. Dated
Addendum No. Dated
BF-7
BUSINESS CATEGORY CLASSIFICATION FORM
Company Name: _______________________________________________________________
This form has been completed by:
Signature: _____________________________________________ Date: _________________
Title: _____________________________________________
Specify your Business Category by checking the appropriate business category classification below (check all that apply):
_____ Small Business
_____ Women-Owned Business
_____ Minority-Owned Business
_____ Military Family-Owned Business
_____ Service-Disabled Veteran Business
_____ Employment Services Organization
_____ Non-SWaM Business (if none of the above)
If certified by the Virginia Department of Small Business and Supplier Diversity (SBSD), provide your certification number and expiration date below:
Number: _________________________ Date: _________________________
For the purpose of determining the appropriate business category, please review the definitions provided by SBSD at: https://sbsd.virginia.gov/certification-division/swam/. “Employee services organization” is defined as s an organization that provides community-based employment services to individuals with disabilities that is an approved Commission on Accreditation of Rehabilitation Facilities (CARF) accredited vendor of the Department of Aging and Rehabilitative Services.
https://sbsd.virginia.gov/certification-division/swam/
BF-8
VIRGINIA STATE CORPORATION COMMISSION (SCC)
REGISTRATION INFORMATION
The Bidder:
is a corporation or other business entity with the following SCC identification number:
________________________________ -OR-
is not a corporation, limited liability company, limited partnership, registered limited liability partnership, or business trust -OR-is an out-of-state business entity that does not regularly and continuously maintain as part of its ordinary and customary business any employees, agents, offices, facilities, or inventories in Virginia (not counting any employees or agents in Virginia who merely solicit orders that require acceptance outside Virginia before they become contracts, and not counting any incidental presence of the Bidder in Virginia that is needed in order to assemble, maintain, and repair goods in accordance with the contracts by which such goods were sold and shipped into Virginia from Bidder’s out-of-state location) -OR-is an out-of-state business entity that is including with this bid/proposal an opinion of legal counsel which accurately and completely discloses the undersigned Bidder’s current contracts with Virginia and describes why those contracts do not constitute the transaction of business in Virginia within the meaning of §13.1-757 or other similar provisions in Titles 13.1 or 50 of the Code of Virginia.
Please check the following box if you have not checked any of the foregoing options but currently have pending before the SCC an application for authority to transact business in the Commonwealth of Virginia and wish to be considered for a waiver to allow you to submit the SCC identification number after the due date for bids:
BF-9
RESPONSIBLE BIDDER CERTIFICATION
Name of Bidder: __________________________________
“Responsible bidder” means a person who has the capability, in all respects, to perform fully the contract requirements and the moral and business integrity and reliability that will assure good faith performance, and who has been prequalified, if required.
In determining whether a Bidder is responsible, the County will consider whether the Bidder has defaulted on any government contract in the last five years; whether any government has terminated a contract with the Bidder for cause in the last five years; and whether the Bidder or any of its officers, directors, partners, or owners is currently barred from bidding on contracts by any federal, state, or local government agency.
As part of this submission, the Bidder certifies that:
It has not defaulted on any government contract in the last five years.
No government has terminated a contract with the Bidder for cause in the last five years.
Neither it nor any of its officers, directors, partners, or owners are barred from bidding on contracts by any federal, state, or local government agency.
If the Bidder cannot make any of the certifications required above, the Bidder must indicate the reason by selecting the appropriate box below.
It has defaulted on one or more government contract(s) in the last five years.
A government has terminated a contract with the Bidder for cause in the last five years.
It or one or more of its officers, directors, partners, or owners are barred from bidding on contracts by a federal, state, or local government agency.
If any of the above three boxes are checked, the Bidder must explain all defaults, terminations, and/or bars in reasonable detail and include the contact information for the government agency on whose contract the Bidder has defaulted, been terminated, or been barred from bidding.
Signature of Authorized Representative
Printed Name of Authorized Representative
BF-10
CERTIFICATION FOR DIRECT CONTACT WITH STUDENTS
Legal Name of Bidder/Offeror/Prospective Contractor: __________________________________
Pursuant to Va. Code § 22.1-296.1(E), as a condition of awarding a contract for the provision of services that require the contractor or employees of the contractor to have direct contact with students on school property during regular school hours or during school-sponsored activities, the contractor shall provide certification of whether any individual who will provide such services has been convicted of any violent felony set forth in the definition of barrier crime in Va. Code § 19.2-392.02(A); any offense involving the sexual molestation, physical or sexual abuse, or rape of a child, or the solicitation of any such offense; or any crime of moral turpitude. Any individual making a materially false statement regarding any such offense is guilty of a Class 1 misdemeanor and, upon conviction, the fact of such conviction is grounds for the revocation of the contract to provide such services and, when relevant, the revocation of any license required to provide such services. School boards shall not be liable for materially false statements regarding the certifications required by Va. Code § 22.1-296.1(E).1
For purposes of this certification, “services” means any work performed by an independent contractor wherein the service rendered does not consist primarily of acquisition of equipment or materials, or the rental of equipment, materials and supplies.2
The contractor is responsible for affirming certification information for his subcontractors.3
The contractor certifies that it will NOT provide services that require the contractor or employees of the contractor to have direct contact with students on school property during regular school hours or during school-sponsored activities.
CHECK BOX, if paragraph above is applicable:
Otherwise, move to next paragraph:
The contractor will provide services that require the contractor or employees of the contractor to have direct contact with students on school property during regular school hours or during school-sponsored activities and certifies as follows (SELECT ONE):
None of the individuals who will be providing services that require direct contact with students on school property during regular school hours or during school-sponsored activities have been convicted of any (i) offense involving the sexual molestation, physical or sexual abuse, or rape of a child, or the solicitation of any such offense; or (ii) violent felony or crime of moral turpitude set forth in the definition of barrier crime in Va. Code § 19.2-392.02(A).4
1 These requirements shall not apply to a contractor or his employees providing services to a school division in an emergency or exceptional situation, such as when student health or safety is endangered or when repairs are needed on an urgent basis to ensure that school facilities are safe and habitable, when it is reasonably anticipated that the contractor or his employees will have no direct contact with students. Va. Code § 22.1-296.1(E).
2 06-084 Op. Va. Att’y Gen. (Jan. 2007); Va. Code § 2.2-4301.
3 06-084 Op. Va. Att’y Gen. (Jan. 2007); Va. Code § 2.2-4301.
4 School Board is not prohibited from awarding a contract if this box is checked. See Va. Code § 22.1-296.1(F).
BF-11
At least one individual who will be providing services that require direct contact with students on school property during regular school hours or during school-sponsored activities was convicted of a violent felony…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .