Project 93330 - Clearfield Congestion Improvements
This is a proposal report for a Pennsylvania Department of Transportation (PennDOT) state highway construction project located in Clearfield County. The project involves improvements to State Route 153, Section N46, spanning approximately 7,460 linear feet (1.4 miles) across Clearfield Borough and Lawrence Township, with additional work on SR 0322, SR 0879, and SR 1004. Construction activities include upgrading existing traffic signals and supports, installing ADA-compliant curb ramps, implementing drainage improvements, performing asphalt and concrete paving, constructing concrete curbing and sidewalks, applying pavement markings and legends, and completing miscellaneous construction as detailed in the approved drawings. The bid package includes over 200 line items encompassing clearing and grubbing, excavation, pavement work, drainage infrastructure, traffic signals, lighting systems, and various miscellaneous construction items. The scheduled bid opening is September 17, 2026, at 11:00 AM at the Commonwealth Keystone Building in Harrisburg, Pennsylvania. The anticipated notice to proceed is November 2, 2026, with a required completion date of October 17, 2028.
The project cost is estimated between $5,000,000 and $7,499,999.99, with no required set-aside for Disadvantaged Business Enterprises (DBE). Prequalification is required for bidders. The project is federally funded under PENNDOT Oversight (Non-NHS classification) and is subject to federal contract provisions, including Buy America and Build America, Buy America Act requirements. Contractors must comply with prevailing wage requirements, erosion and sediment pollution control provisions, and post-construction stormwater management specifications. All material certifications must be submitted electronically through ECMS, and contractors must submit Worker Protection and Investment Certification Forms (BOP-2201) within seven calendar days of the bid opening. The project is administered through PennDOT's Electronic Contractor Management System (ECMS), with all addenda posted electronically.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL Report - Project 93330
August 26, 2026 08:19:07 AM Page 1 of 122
PROPOSAL REPORT
Project: 93330 Bid
Package: 1
Current Let: 09/17/2026 11:00:00 AM
Version: Current Addendum
Count: 0
District: 02 County: Clearfield
SR/SEC/
Group ID: 153/N46/---
Description
Clfd. Congestion Imprv
August 26, 2026 08:19:07 AM Page 2 of 122
TABLE OF CONTENTS
BID PACKAGE SUMMARY
PROJECT ITEMS AND QUANTITIES
SPECIAL PROVISIONS
G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW G401A - a00401 ADVANCE NOTICE OF TRAFFIC RESTRICTIONS G901B - a00901 ALTERNATE EROSION AND SEDIMENT POLLUTION CONTROL PLAN G1101B - a01101 CONSTRUCTION PROCEDURES - EROSION AND SEDIMENT POLLUTION
CONTROL
G1601A - a01601 E.E.O. COVERED AREA G2302A - a02302 Worker Protection and Investment C164A - a07000 CHANGES TO SPECIFICATIONS: SECTION 106 C166A - a07010 CHANGES TO SPECIFICATIONS: SECTIONS 107 AND 608 C172A - a07020 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876 C168A - a07030 CHANGES TO SPECIFICATIONS: SECTIONS 110, 404, AND 507 C170A - a07040 CHANGES TO SPECIFICATIONS: SECTIONS 110, 501, 506, 530, 703, and 704 C171A - a07050 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413 ... 53 C169A - a07060 CHANGES TO SPECIFICATIONS: SECTION 419 C167A - a07070 CHANGES TO SPECIFICATIONS: APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
00 - a08250 CONSTRUCTION RESTRICTIONS - NIGHT WORK 00 - a10600 CONSTRUCTION RESTRICTIONS - PROPERTY ACCESS AND COORDINATION G100B - a14200 CONSTRUCTION RESTRICTIONS DUE TO AREA SPECIAL EVENTS G101F - a14250 CONSTRUCTION RESTRICTIONS P1061D - b01061 Electronic Submission of Material Certifications through ECMS P1062D - b01062 Electronic Submission of Material Certifications through ECMS for Lump Sum Component items
S3099C - b03130 SECTION 313/413 - SUPERPAVE MIXTURE DESIGN S6012B - b06012 - SECTION 601.3(f) BACKFILLING TRENCH S6092B - b06092-SECTION 609.2(f) MISCELLANEOUS MATERIALS I6091L - c00100 ITEM 0609-0009 - EQUIPMENT PACKAGE I677D - c00200 ITEM 4677-0004 - SELECTED MATERIAL SURFACING USE SUBBASE I802B - c00300 ITEM 4802-0001 - TOPSOIL FURNISHED AND PLACED (VISUAL ACCEPTANCE) . 75 00 - c00400 ITEM 0901-0001 - MAINTENANCE AND PROTECTION OF TRAFFIC DURING
CONSTRUCTION
00 - c00500 ITEM 4910-5055 - 2” DIRECT BURIAL CONDUIT, PVC 00 - c00600 ITEM 4931-0002 - POST MOUNTED SIGNS, TYPE B, STEEL CHANNEL BAR POST, MOUNTED TO STRUCTURE
00 - c00700 ITEM 4935-0400 - FLASHING WARNING SIGNS BLACK
August 26, 2026 08:19:07 AM Page 3 of 122
00 - c00800 ITEM 4936-0200 - STRUCTURE MOUNTED FLAT SHEET ALUMINUM SIGNS BLACK . 78 00 - c00900 ITEM 4936-0350 - LED BLANK OUT SIGN BLACK 00 - c01000 ITEM 4936-0351 - LED RED SIGNAL AHEAD BLACK 00 - c01100 ITEM 4952-1020 - NEMA TS-1 CONTROLLER ASSEMBLY, TYPE 1 MOUNTING
SPECIAL CONTROLLER, POWDER
00 - c01200 ITEM 4952-3001 - CONTROLLER MODIFICATION, CONTROLLER UPGRADE, SPECIAL CONTROLLER
00 - c01400 ITEM 4953-0407 - CELLULAR COMMUNICATIONS SYSTEM, DEPARTMENT
SUPPLIED MODEMS AND ANTENNAS
00 - c01500 ITEM 4953-0600 - MANAGED NETWORK SWITCH, FIELD SWITCH TYPE A, COMNET/AMG
00 - c01600 ITEM 4954-0402 - ELECTRICAL SERVICE, TYPE B BLACK 00 - c01700 ITEM 4954-0403 - ELECTRICAL SERVICE, TYPE C BLACK 00 - c01800 ITEM 4954-0500 - DIRECTIONAL BORING AND 6 INCH HDPE CONDUIT 00 - c01900 ITEMS 4955-3206 THRU 4955-3210 - VEHICULAR SIGNAL HEAD, XXXX 12”
SECTION, BLACK
00 - c02300 ITEM 4955-3722 - LED COUNTDOWN PEDESTRIAN SIGNAL HEAD, TYPE A BLACK. 85 00 - c02400 ITEM 4956-0601 - RADAR DETECTOR, WAVETRONIX, BLACK 00 - c02500 ITEM 4956-0712 - OMNI-VIEW VIDEO DETECTION SYSTEM BLACK 00 - c02600 ITEM 4956-0790 - ACCESSIBLE PEDESTRIAN SIGNALS BLACK 00 - c02700 ITEM 5201-1000 - ITS DEVICE FIELD ENCLOSURE, GROUND MOUNT, REVISED
COMPONENTS
00 - c02800 ITEM 5204-0100 - STANDARD FIBER OPTIC CABLE, 12 STRAND 00 - c02900 ITEM 5230-2650 - ITS CHANGEABLE MESSAGE SIGN, 12" TEXT, FRONT-ACCESS, 30-DEG, TYPE A
00 - c03000 ITEM 9000-0055 - PIPE CONNECTION TO EXISTING INLET 00 - c03100 ITEM 9000-0136 - RESET USPS COLLECTION BOX 00 - c03200 ITEM 9000-0137 - TRENCH AND BACKFILL, TYPE IV, RAILROAD TRACKS 00 - c03250 ITEMS 9000-XXXX - X" WATERBORNE HIGH BUILD PAVEMENT MARKINGS 00 - c03300 ITEM 9000-0505 - LEASED COMMUNICATION COORDINATION SERVICES 00 - c03400 ITEM 9000-0507 - CELLULAR COMMUNICATIONS SYSTEM 00 - c03500 ITEM 9000-0520 - REMOTE POWER SWITCH 00 - c03600 ITEM 9000-0524 - FIBER OPTIC TERMINATION PANEL 00 - c03700 ITEM 9000-0528 - LED LUMINAIRE, 250 WATT EQUIVALENT, ARM MOUNT, BLACK .. 99 00 - c03800 ITEM 9000-0541 - RETROFIT EXISTING JUNCTION BOX 00 - c03900 ITEM 9000-0546 - AERIAL SIGNAL CABLE ATTACHED TO EXISTING UTILITY
POLES
00 - c04000 ITEM 9000-0547 - TEMPORARY CURB RAMPS 00 - c04100 ITEM 9000-0571 - UTILITY COORDINATION AND PAYMENT 00 - c04200 ITEM 9000-0579 - ITS COMMUNICATION JUNCTION BOX, 17" X 30" X 30" 00 - c04300 ITEM 9000-0605 - LIGHTING CONTROL PANEL ASSEMBLY – TYPE I 00 - c04400 ITEM 9000-0606 - LIGHTING CONTROL PANEL ASSEMBLY – TYPE II
August 26, 2026 08:19:07 AM Page 4 of 122
00 - c04500 ITEM 9000-0607 - LED LUMINAIRE 16,000 LUMENS, TYPE III, ARM MOUNT 00 - c04600 ITEM 9000-0608 - RESET DECORATIVE LIGHT POLE ON NEW FOUNDATION 00 - c04700 ITEM 9000-0609 - UNFORESEEN HIGHWAY LIGHTING ELECTRICAL DISTRIBUTION
ADJUSTMENTS
00 - c04800 ITEM 9000-0610 - REMOVE EXISTING SIGN LIGHTING AND POWER SUPPLY 00 - c04900 ITEM 9000-0611 - MODIFY TRAFFIC SIGNAL POWER SUPPLY 00 - c05000 ITEM 9000-0612 - REMOVE EXISTING INTERCONNECT EQUIPMENT 00 - c05100 ITEM 9000-0613 - INSTALL NEW CONDUIT INTO EXISTING ENCLOSURE 00 - c05200 ITEM 9000-0614 - PROOFING EXISTING CONDUITS 00 - c05300 ITEM 9000-0615 - MODIFY ITS POWER SUPPLY 00 - c05400 ITEM 9000-0616 - FLEXIBLE DELINEATOR POST, GROUND-MOUNT TYPE GM-2, PENNDOT ELECTRIC
00 - c05500 ITEM 9000-0617 - UNFORESEEN CONDUIT CLEANING AND REPAIRS 00 - c05600 ITEM 9000-1003 - UTILITY TEST HOLE 00 - c05700 ITEM 9000-1053 - WATER LATERAL REPLACEMENT 00 - c05800 ITEM 9000-1056 - CUT AND CAP ABANDONED GAS LINE I68C - c05900 ITEM 9000-5101 - ELECTRONIC TICKETING (E-TICKETING) FOR
CONSTRUCTION AGGREGATE
I70C - c06000 ITEM 9000-5103 - ELECTRONIC TICKETING (E-TICKETING) FOR
CONSTRUCTION CONCRETE
August 26, 2026 08:19:07 AM Page 5 of 122
BID PACKAGE SUMMARY
Project: 93330 Bid Package: 1
Project Type: Standard Posted:
Federal Project Status: PENNDOT Oversight Non-NHS State Type of Work: MISCELLANEOUS
Prequalification Required: Yes Pre-Bid Meeting: None
408 Version: 2026-IE
Scheduled Let: 09/17/2026 11:00:00 AM Project Cost Range: $5,000,000.00 - $7,499,999.99 Anticipated NTP: 11/02/2026 Structure Work: 0.00%
Required Completion: 10/17/2028 DBE: 0% Wage Rates: Yes
Description:
The description and location of the project is as follows: For the improvement of STATE ROUTE 153, SECTION N46, in Clearfield County, Clearfield Borough and Lawrence Township with a construction length of approximately 7460 linear feet (1.4 miles).Work is located on SR 0153, SR 0322, SR 0879, and SR 1004.Construction includes upgrade of existing traffic signals and supports, ADA curb ramps, drainage improvements, asphalt paving, concrete curbing, sidewalks, pavement markings and legends and miscellaneous construction as indicated on the approved drawings.
Additional Information:
This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to contact Contract Awards and be escorted to the 7th Floor Contract Awards Room. Contract Awards can be reached at 717-395-9754.
Due to recent changes in the Keystone Building, there is no longer a reception on the 5th Floor to greet and check-in visitors.
August 26, 2026 08:19:07 AM Page 6 of 122
PROJECT ITEMS AND QUANTITIES
Alt Item Work Class Code Unit Of
Measure Quantity Unit Price PDP Spec
Prov Add Action
0201-0002 A Lump Sum 1.0000 N
CLEARING AND GRUBBING
0203-0001 C Cubic Yard 1,213.0000 N
CLASS 1 EXCAVATION
0203-0006 G4 Linear Foot 3,356.0000 N
SAW CUTTING
0204-0001 C1, H Cubic Yard 13.0000 N
CLASS 2 EXCAVATION
0205-0285 C1 Cubic Yard 13.0000 N
SELECTED BORROW EXCAVATION, COARSE AGGREGATE, NO. 57
0212-0001 C3, H, M2 Linear Foot 159.0000 N
GEOTEXTILE, CLASS 1
0212-0014 C3, H, M2 Square Yard 205.0000 N
GEOTEXTILE, CLASS 4, TYPE A
0220-0010 K1 Cubic Yard 4.0000 N
FLOWABLE BACKFILL, TYPE B
0313-0422 E Square Yard 376.0000 N SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALs, 25.0 MM MIX, 4" DEPTH
0313-0437 E Ton 572.0000 N SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALs, 25.0 MM MIX
0350-0106 C, E Square Yard 263.0000 N
SUBBASE 6" DEPTH (NO. 2A)
0350-0121 C, E Ton 376.0000 N
SUBBASE (NO. 2A)
0413-0245 F Square Yard 1,221.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALS, 9.5 MM MIX, 1 1/2"
DEPTH, SRL-H
0413-6045 F Square Yard 205.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALS, 19.0 MM MIX, 2 1/2"
DEPTH
0460-0003 F4 Square Yard 2,369.0000 N
ASPHALT TACK COAT (NTT/CNTT)
0501-0020 G, G1, K Square Yard 91.0000 N
PLAIN CEMENT CONCRETE PAVEMENT, 4" DEPTH
0501-0024 G Square Yard 67.0000 N
August 26, 2026 08:19:07 AM Page 7 of 122
PLAIN CEMENT CONCRETE PAVEMENT, 6" DEPTH
0601-7014 H Linear Foot 303.0000 N
18" REINFORCED CONCRETE PIPE, TYPE A, 15' - 2' FILL, 100 YEAR DESIGN LIFE
0601-7509 H Linear Foot 152.0000 N 18" REINFORCED CONCRETE PIPE, TYPE A, 7' - 3' FILL, SHORE/TRENCH BOX, 100 YEAR DESIGN LIFE
0605-2401 K Set 1.0000 N
MANHOLE FRAME AND COVER
0605-2731 K Set 11.0000 N
TYPE M CONCRETE TOP UNIT AND BICYCLE SAFE GRATE
0605-2850 K Each 20.0000 N
STANDARD INLET BOX, HEIGHT < /= 10'
0605-3011 K Each 1.0000 N
TYPE 4 MANHOLE, STORM WATER, HEIGHT >5' AND < /= 10'
0605-5701 K Set 1.0000 N
TYPE C CONCRETE TOP UNIT, 4" CURB HEIGHT AND BICYCLE SAFE GRATE
0605-5711 K Set 9.0000 N
TYPE C CONCRETE TOP UNIT, 6" CURB HEIGHT AND BICYCLE SAFE GRATE
0605-5721 K Set 2.0000 N
TYPE C CONCRETE TOP UNIT, 8" CURB HEIGHT AND BICYCLE SAFE GRATE
0607-0013 K Vertical Foot 4.0000 N
REBUILT INLET BOX
0608-0001 X Lump Sum 1.0000 N
MOBILIZATION
0609-0003 X Lump Sum 1.0000 N
INSPECTOR'S FIELD OFFICE AND INSPECTION FACILITIES, TYPE B
0609-0009 X Lump Sum 1.0000 N Std
EQUIPMENT PACKAGE
0610-7002 H2 Linear Foot 159.0000 N
6" PAVEMENT BASE DRAIN
0618-0021 H Each 1.0000 N
CONCRETE COLLAR FOR 15" PIPE EXTENSION
0618-0022 H Each 1.0000 N
CONCRETE COLLAR FOR 18" PIPE EXTENSION
0619-0459 J1, J3 Each 1.0000 N
PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 3, TANGENT (MASH)
0620-0503 C1, J Linear Foot 50.0000 N
REMOVE EXISTING GUIDE RAIL (CONTRACTOR'S PROPERTY)
August 26, 2026 08:19:07 AM Page 8 of 122
0620-1600 J Linear Foot 175.0000 N
TYPE 31-S GUIDE RAIL
0630-0025 K Linear Foot 23.0000 N
PLAIN CEMENT CONCRETE CURB, 4" HEIGHT, INCLUDING REMOVAL OF EXISTING CURB
0630-0031 K Linear Foot 314.0000 N
PLAIN CEMENT CONCRETE CURB, 6" HEIGHT
0630-0035 K Linear Foot 1,794.0000 N
PLAIN CEMENT CONCRETE CURB, 6" HEIGHT, INCLUDING REMOVAL OF EXISTING CURB
0630-0041 K Linear Foot 129.0000 N
PLAIN CEMENT CONCRETE CURB, 8" HEIGHT
0633-0200 K Linear Foot 230.0000 N
PLAIN CONCRETE MOUNTABLE CURB, TYPE A
0676-0001 K Square Yard 1,556.0000 N
CEMENT CONCRETE SIDEWALK
0677-0002 C1, E Ton 15.0000 N
SELECTED MATERIAL SURFACING
4677-0004 C1, E Ton 17.0000 N Std
SELECTED MATERIAL SURFACING USE SUBBASE
0686-0020 X Lump Sum 1.0000 N
CONSTRUCTION SURVEYING, TYPE B
0689-0003 X Lump Sum 1.0000 N
CPM SCHEDULE
0690-0001 X Dollar 1,000.0000 $1.00 Y
INTERNAL FACILITATION
0695-0004 K Square Foot 715.0000 N
DETECTABLE WARNING SURFACE, POLYMER COMPOSITE
4802-0001 C1, M Cubic Yard 270.0000 N Std
TOPSOIL FURNISHED AND PLACED (VISUAL ACCEPTANCE)
0804-0036 M3 Pound 105.0000 N
SEEDING AND SOIL SUPPLEMENTS - FORMULA B RESIDENTIAL MIX
0805-0022 M3 Ton 2.0000 N
MULCHING - STRAW
0811-0003 J2, M Linear Foot 75.0000 N
TEMPORARY PROTECTIVE FENCE
0845-0001 M2 Dollar 3,100.0000 $1.00 Y
UNFORESEEN WATER POLLUTION CONTROL
0849-0010 C1 Each 2.0000 N
ROCK CONSTRUCTION ENTRANCE
August 26, 2026 08:19:07 AM Page 9 of 122
0860-0000 M2 Each 34.0000 N
INLET FILTER BAG FOR TYPE M INLET
0860-0002 M2 Each 26.0000 N
INLET FILTER BAG FOR TYPE C INLET
0867-0012 M2 Linear Foot 1,290.0000 N
COMPOST FILTER SOCK, 12" DIAMETER
0901-0001 Q Lump Sum 1.0000 N Proj
MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION
0901-0202 Q Each 4.0000 N
FLOODLIGHTS
0901-0231 Q Day 180.0000 N
ADDITIONAL WARNING LIGHTS, TYPE B
0901-0240 Q, R Square Foot 300.0000 N
ADDITIONAL TRAFFIC CONTROL SIGNS
0901-0331 O Linear Foot 3,439.0000 N
6" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, WHITE
0901-0334 O Linear Foot 57.0000 N
24" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, WHITE
0901-0460 Q Each 4.0000 N
FULL-MATRIX CHANGEABLE MESSAGE SIGN WITH TELECOMMUNICATIONS
0910-0001 C1, P8 Each 15.0000 N
JUNCTION BOXES J.B.-1
0910-0002 C1, P8 Each 7.0000 N
JUNCTION BOXES J.B.-2
0910-0154 P8 Each 8.0000 N
POLE FOUNDATION, TYPE FC
E 0910-0330 P8 Each 8.0000 N
STEEL LIGHTING POLE WITH 15-FOOT BRACKET ARM (40-FOOT MOUNTING HEIGHT) TYPE A
O 0910-1130 P8 Each 8.0000 N
ALUMINUM LIGHTING POLE WITH 15-FOOT BRACKET ARM (40-FOOT MOUNTING HEIGHT) TYPE A
0910-4111 P8 Linear Foot 2,064.0000 N
AWG 1/0 UNDERGROUND CABLE, COPPER, 1 CONDUCTOR
0910-4114 P8 Linear Foot 1,116.0000 N
AWG 4 UNDERGROUND CABLE, COPPER, 1 CONDUCTOR
0910-4115 P8 Linear Foot 536.0000 N
AWG 6 UNDERGROUND CABLE, COPPER, 1 CONDUCTOR
0910-4116 P8 Linear Foot 18,444.0000 N
August 26, 2026 08:19:07 AM Page 10 of 122
AWG 8 UNDERGROUND CABLE, COPPER, 1 CONDUCTOR
0910-4117 P8 Linear Foot 1,681.0000 N
AWG 10 UNDERGROUND CABLE, COPPER, 1 CONDUCTOR
0910-5055 C1, P8 Linear Foot 1,230.0000 N
2" DIRECT BURIAL CONDUIT
4910-5055 C1, P8 Linear Foot 1,087.0000 N Proj
2" DIRECT BURIAL CONDUIT , PVC
0910-5175 C1, P8 Linear Foot 10.0000 N
2" EXPOSED CONDUIT
0910-5500 C1, P8 Each 1.0000 N
BURIED CABLE AND CONDUIT MARKER
0910-7210 P8 Lump Sum 1.0000 N
TESTING OF ENTIRE LIGHTING SYSTEM
0931-0001 R Square Foot 224.0000 N
POST MOUNTED SIGNS, TYPE B
4931-0002 R Square Foot 7.0000 N Proj
POST MOUNTED SIGNS, TYPE B, STEEL CHANNEL BAR POST MOUNTED TO STRUCTURE
0935-0001 R Square Foot 116.0000 N
POST MOUNTED SIGNS, TYPE F
4935-0400 P8 Each 1.0000 N Proj
FLASHING WARNING SIGNS BLACK
4936-0200 R Square Foot 731.0000 N Proj
STRUCTURE MOUNTED FLAT SHEET ALUMINUM SIGNS BLACK
4936-0350 P3 Each 1.0000 N Proj
LED BLANK OUT SIGN BLACK
4936-0351 P8 Each 1.0000 N Proj
LED RED SIGNAL AHEAD BLACK
0937-0104 J, R Each 1.0000 N
GUIDE RAIL MOUNTED DELINEATOR TYPE B, (Y/B)
0937-0106 J, R Each 3.0000 N
GUIDE RAIL MOUNTED DELINEATOR TYPE B, (W/B)
0937-0300 R Each 5.0000 N FLEXIBLE DELINEATOR POST, SURFACE-MOUNT TYPE SM-1, WHITE POST WITH WHITE SHEETING
0937-0301 R Each 4.0000 N FLEXIBLE DELINEATOR POST, SURFACE-MOUNT TYPE SM-1, YELLOW POST WITH YELLOW SHEETING
0937-0339 R Each 1.0000 N FLEXIBLE DELINEATOR POST, GROUND-MOUNT TYPE GM-2, RED POST WITH WHITE/BLANK SHEETING
August 26, 2026 08:19:07 AM Page 11 of 122
0941-0001 R Each 20.0000 N
RESET POST MOUNTED SIGNS, TYPE B
0942-0002 R Each 5.0000 N
RESET POST MOUNTED SIGNS, TYPE C
0944-0003 R Each 1.0000 N
RESET POST MOUNTED SIGNS, TYPE E
0945-0001 R Each 95.0000 N
RESET POST MOUNTED SIGNS, TYPE F
0951-0225 P Each 9.0000 N
TRAFFIC SIGNAL SUPPORT, 25' MAST ARM, POWDER COATED
0951-0230 P Each 2.0000 N
TRAFFIC SIGNAL SUPPORT, 30' MAST ARM, POWDER COATED
0951-0235 P Each 5.0000 N
TRAFFIC SIGNAL SUPPORT, 35' MAST ARM, POWDER COATED
0951-0240 P Each 3.0000 N
TRAFFIC SIGNAL SUPPORT, 40' MAST ARM, POWDER COATED
0951-0245 P Each 2.0000 N
TRAFFIC SIGNAL SUPPORT, 45' MAST ARM, POWDER COATED
0951-0255 P Each 1.0000 N
TRAFFIC SIGNAL SUPPORT, 55' MAST ARM, POWDER COATED
0951-2225 P Each 9.0000 N TRAFFIC SIGNAL SUPPORT, 25' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0951-2230 P Each 3.0000 N TRAFFIC SIGNAL SUPPORT, 30' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0951-2235 P Each 2.0000 N TRAFFIC SIGNAL SUPPORT, 35' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0951-2240 P Each 1.0000 N TRAFFIC SIGNAL SUPPORT, 40' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0951-2245 P Each 2.0000 N TRAFFIC SIGNAL SUPPORT, 45' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0951-2260 P Each 1.0000 N TRAFFIC SIGNAL SUPPORT, 60' MAST ARM WITH LUMINAIRE ARM (30' MOUNTING HEIGHT), POWDER COATED
0951-3901 P Each 3.0000 N
TRAFFIC SIGNAL SUPPORT, STRAIN POLE WITH LUMINAIRE ARM (30' MOUNTING HEIGHT) 1,000 POUNDS DESIGN
TENSION, POWDER COATED
0951-4104 P Each 22.0000 N
TRAFFIC SIGNAL SUPPORT, 12' PEDESTAL, POWDER COATED
0951-4110 P Each 32.0000 N
PEDESTRIAN STUB POLE, TYPE A, POWDER COATED
August 26, 2026 08:19:07 AM Page 12 of 122
0951-4112 P Each 2.0000 N
PEDESTRIAN STUB POLE, TYPE B, POWDER COATED
0951-4118 P Each 8.0000 N
PEDESTRIAN STUB POLE, TYPE E, POWDER COATED
0951-4600 P Each 2.0000 N
TRAFFIC SIGNAL SUPPORT, STRAIN POLE, 1,000 POUNDS DESIGN TENSION, POWDER COATED
0951-7305 P Each 1.0000 N TRAFFIC SIGNAL SUPPORT, 30' & 55' MAST ARMS WITH LUMINAIRE ARM (30' MOUNTING HEIGHT) POWDER COATED
4952-1020 P Each 10.0000 N Proj
NEMA TS-1 CONTROLLER ASSEMBLY, TYPE 1 MOUNTING SPECIAL CONTROLLER, POWDER COATED
4952-3001 P Each 4.0000 N Proj
CONTROLLER MODIFICATION, CONTROLLER UPGRADE , SPECIAL CONTROLLER
4953-0407 P Lump Sum 1.0000 N Proj
CELLULAR COMMUNICATIONS SYSTEM , DEPARTMENT SUPPLIED MODEMS AND ANTENNAS
4953-0600 P Each 12.0000 N Proj
MANAGED NETWORK SWITCH, FIELD SWITCH TYPE A , COMNET/AMG
0953-0802 P Lump Sum 1.0000 N
UNIFIED COMMAND AND CONTROL INTEGRATION
0954-0012 P8 Linear Foot 3,726.0000 N
2 INCH CONDUIT
0954-0013 P8 Linear Foot 2,660.0000 N
3 INCH CONDUIT
0954-0014 P8 Linear Foot 180.0000 N
4 INCH CONDUIT
0954-0102 P8 Linear Foot 1,000.0000 N
SIGNAL CABLE, 12 AWG, 5 CONDUCTOR
0954-0151 C1, P8 Linear Foot 1,576.0000 N
TRENCH AND BACKFILL, TYPE I
0954-0152 C1, P8 Linear Foot 2,030.0000 N
TRENCH AND BACKFILL, TYPE II
0954-0153 C1, P8 Linear Foot 1,970.0000 N
TRENCH AND BACKFILL, TYPE III
0954-0201 P8 Linear Foot 10,115.0000 N
SIGNAL CABLE, 14 AWG, 3 CONDUCTOR
0954-0202 P8 Linear Foot 19,868.0000 N
SIGNAL CABLE, 14 AWG, 5 CONDUCTOR
0954-0203 P8 Linear Foot 1,947.0000 N
August 26, 2026 08:19:07 AM Page 13 of 122
SIGNAL CABLE, 14 AWG, 7 CONDUCTOR
0954-0302 P8 Each 59.0000 N
JUNCTION BOX, JB-27
0954-0402 P8 Each 1.0000 N
ELECTRICAL SERVICE, TYPE B
4954-0402 P8 Each 6.0000 N Proj
ELECTRICAL SERVICE, TYPE B BLACK
4954-0403 P8 Each 5.0000 N Proj
ELECTRICAL SERVICE, TYPE C BLACK
0954-0500 C6, P8 Linear Foot 264.0000 N
DIRECTIONAL BORING
4954-0500 C6, P8 Linear Foot 103.0000 N Proj
DIRECTIONAL BORING AND 6 INCH HDPE CONDUIT
0954-0600 P8 Each 5.0000 N
UNINTERRUPTIBLE POWER SUPPLY (UPS)
0954-0800 P8 Each 1.0000 N
INSTALLATION OF CONDUIT TO EXISTING TRAFFIC SIGNAL SUPPORT
4955-3206 P Each 2.0000 N Proj
VEHICULAR SIGNAL HEAD, ONE 12" SECTION BLACK
4955-3208 P Each 69.0000 N Proj
VEHICULAR SIGNAL HEAD, THREE 12" SECTIONS BLACK
4955-3209 P Each 4.0000 N Proj
VEHICULAR SIGNAL HEAD, FOUR 12" SECTIONS BLACK
4955-3210 P Each 6.0000 N Proj
VEHICULAR SIGNAL HEAD, FIVE 12" SECTIONS BLACK
4955-3722 P Each 78.0000 N Proj
LED COUNTDOWN PEDESTRIAN SIGNAL HEAD, TYPE A BLACK
4956-0601 P Each 21.0000 N Proj
RADAR DETECTOR WAVETRONIX, BLACK
4956-0712 P Each 6.0000 N Proj
OMNI-VIEW VIDEO DETECTION SYSTEM BLACK
4956-0790 P Each 78.0000 N Proj
ACCESSIBLE PEDESTRIAN SIGNALS BLACK
0958-0281 P, Q Each 1.0000 N
TEMPORARY TIMING ADJUSTMENTS TO EXISTING PERMANENT TRAFFIC SIGNAL CONTROLLER
0958-0282 P, Q Each 1.0000 N
August 26, 2026 08:19:07 AM Page 14 of 122
0958-0283 P, Q Each 1.0000 N
0958-0361 P, Q Each 1.0000 N TEMPORARY MODIFICATIONS TO EXISTING PERMANENT TRAFFIC SIGNAL (4 OR MORE APPROACHES)
0958-0362 P, Q Each 1.0000 N
0958-0363 P, Q Each 1.0000 N
0958-0364 P, Q Each 1.0000 N
0958-0365 P, Q Each 1.0000 N
0958-0366 P, Q Each 1.0000 N
0958-0367 P, Q Each 1.0000 N
0958-0368 P, Q Each 1.0000 N
0958-0369 P, Q Each 1.0000 N
0958-0370 P, Q Each 1.0000 N
0960-0101 O2 Each 1.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "ONLY", 8' - 0"
0960-0220 O2 Each 4.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "STRAIGHT ARROW", 12' - 0" X 1' - 8"
0960-0222 O2 Each 14.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "RIGHT ARROW", 12' - 0" X 3' - 0"
0960-0224 O2 Each 9.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "LEFT ARROW", 12' - 0" X 3' - 0"
0960-0226 O2 Each 4.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "THRU AND RIGHT ARROW", 20' - 0" X 3' - 7"
0960-0228 O2 Each 8.0000 N
WHITE HOT THERMOPLASTIC LEGEND, "THRU AND LEFT ARROW", 20' - 0" X 3' - 7"
0963-0001 O2, O3 Square Foot 1,655.0000 N
PAVEMENT MARKING REMOVAL
0963-0006 O2, O3 Linear Foot 7,000.0000 N
6" PAVEMENT MARKING REMOVAL
August 26, 2026 08:19:07 AM Page 15 of 122
0963-0010 O2, O3 Each 41.0000 N
PAVEMENT MARKING REMOVAL (LEGENDS AND SYMBOLS)
0971-0001 R Each 4.0000 N
REMOVE POST MOUNTED SIGNS, TYPE B
0975-0001 R Each 7.0000 N
REMOVE POST MOUNTED SIGNS, TYPE F
5201-1000 P1, P2, P4, P5 Each 1.0000 N Proj
ITS DEVICE FIELD ENCLOSURE, GROUND MOUNT , REVISED COMPONENTS
1201-3000 P1, P2, P3, P4, P5 Lump Sum 1.0000 N
ITS DEVICE TESTING, COMPLETE
1202-0001 P5 Lump Sum 1.0000 N
ATMS ITS DEVICE INTEGRATION
5204-0100 P4 Linear Foot 4,308.0000 N Proj
STANDARD FIBER OPTIC CABLE , 12 STRAND
5230-2650 P3 Each 1.0000 N Proj ITS CHANGEABLE MESSAGE SIGN, 12" TEXT, FRONT-ACCESS, 30-DEG , TYPE A WITH CONTROLLER IN SIGN HOUSING
9000-0055 H Each 3.0000 N Proj
PIPE CONNECTION TO EXISTING INLET
9000-0136 K Each 2.0000 N Proj
RESET USPS COLLECTION BOX
9000-0137 C1, P8 Linear Foot 100.0000 N Proj
TRENCH AND BACK FILL, TYPE IV, RAILROAD TRACKS
9000-0414 O Linear Foot 2,518.0000 N Proj
6" WHITE WATERBORNE HIGH BUILD PAVEMENT MARKINGS
9000-0418 O Linear Foot 24,236.0000 N Proj
4" YELLOW WATERBORNE HIGH BUILD PAVEMENT MARKINGS
9000-0422 O Linear Foot 470.0000 N Proj
24" YELLOW WATERBORNE HIGH BUILD PAVEMENT MARKINGS
9000-0440 O Linear Foot 2,404.0000 N Proj
24" WHITE WATERBORNE TRANSVERSE HIGH BUILD PAVEMENT MARKINGS
9000-0505 ZZ Dollar 10,000.0000 $1.00 Y Proj
LEASED COMMUNICATION COORDINATION SERVICES
9000-0507 P Each 1.0000 N Proj
CELLULAR COMMUNICATIONS SYSTEM
9000-0520 P8 Each 1.0000 N Proj
REMOTE POWER SWITCH
9000-0524 P4 Each 12.0000 N Proj
August 26, 2026 08:19:07 AM Page 16 of 122
FIBER OPTIC TERMINATION PANEL
9000-0528 P8 Each 22.0000 N Proj
LED LUMINAIRE, 250-WATT EQUIVALENT, ARM MOUNT, BLACK
9000-0541 P8 Each 12.0000 N Proj
RETROFIT EXISTING JUNCTION BOX
9000-0546 P8 Lump Sum 1.0000 N Proj
AERIAL SIGNAL CABLE ATTACHED TO EXISTING UTILITY POLES
9000-0547 F Each 3.0000 N Proj
TEMPORARY CURB RAMPS
9000-0571 ZZ Dollar 40,000.0000 $1.00 Y Proj
UTILITY COORDINATION AND PAYMENT
9000-0579 C1, P8 Each 3.0000 N Proj
ITS COMMUNICATION JUNCTION BOX, 17" X 30" X 30"
9000-0605 P8 Each 3.0000 N Proj
LIGHTING CONTROL PANEL ASSEMBLY - TYPE I
9000-0606 P8 Each 1.0000 N Proj
LIGHTING CONTROL PANEL ASSEMBLY - TYPE II
9000-0607 P8 Each 10.0000 N Proj
LED LUMINAIRE, 16,000 LUMENS, TYPE III, ARM MOUNT
9000-0608 P8 Each 1.0000 N Proj
RESET DECORATIVE LIGHT POLE ON NEW FOUNDATION
9000-0609 P8 Dollar 20,000.0000 $1.00 Y Proj
UNFORESEEN HIGHWAY LIGHTING ELECTRICAL DISTRIBUTION ADJUSTMENTS
9000-0610 P8 Lump Sum 1.0000 N Proj
REMOVE EXISTING SIGN LIGHTING AND POWER SUPPLY
9000-0611 P8 Each 1.0000 N Proj
MODIFY TRAFFIC SIGNAL POWER SUPPLY
9000-0612 P4 Lump Sum 1.0000 N Proj
REMOVE EXISTING INTERCONNECT EQUIPMENT
9000-0613 P Each 1.0000 N Proj
INSTALL NEW CONDUIT INTO EXISTING ENCLOSURE
9000-0614 P Lump Sum 1.0000 N Proj
PROOFING EXISTING CONDUITS
9000-0615 P8 Each 1.0000 N Proj
MODIFY ITS POWER SUPPLY
9000-0616 R Each 4.0000 N Proj
FLEXIBLE DELINEATOR POST, GROUND-MOUNT TYPE GM-2, PENNDOT ELECTRIC
August 26, 2026 08:19:07 AM Page 17 of 122
9000-0617 P Dollar 10,000.0000 $1.00 Y Proj
UNFORESEEN CONDUIT CLEANING AND REPAIRS
9000-1003 C1 Each 1.0000 N Proj
UTILITY TEST HOLE
9000-1053 H Each 1.0000 N Proj
WATER LATERAL REPLACEMENT
9000-1056 ZZ Each 2.0000 N Proj
CUT AND CAP ABANDONED GASLINE
9000-5101 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION AGGREGATE
9000-5103 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION CONCRETE
August 26, 2026 08:19:07 AM Page 18 of 122
SPECIAL PROVISIONS
Special Provision: G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) Addendum:
Action:
Item(s) Associated:
Header:
APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL)
Provision Body:
APPLICABLE DESIGNATED SPECIAL PROVISIONS. The following Designated Special Provisions are found in Appendix C and apply to this bid proposal.
DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects.
DSP8. F.A.R. - Required Contract Provisions Federal-Aid Construction Contracts FHWA-1273 (Revised October 23, 2023). Also attached to the Proposal/Contract.
DSP9. Special Supplement - Anti-Pollution Measures - August 26, 1999.
DSP12. Executive Order 11246, with Appendix A and B.
DSP13. Buy America.
DSP15. Commonwealth Standard Terms and Conditions.
DSP16. Lobbying Certification Form. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).
DSP17. Federal Audit Clause.
DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances.
DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities.
Project Specific Details:
Special Provision: G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW Addendum:
CONTRACT PROVISIONS - RIGHT TO KNOW LAW
Provision Body:
August 26, 2026 08:19:07 AM Page 19 of 122
I. Contract Provisions – Right to Know Law 8-K-1532
a. The Pennsylvania Right-to-Know Law (RTKL), 65 P.S. §§ 67.101-3104, applies to this Contract.
b. If the Department needs assistance in any matter arising out of the RTKL related to this Contract, the Department will notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Department.
c. Upon written notification from the Department that it requires assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor will:
1. Provide the Department, within 10 calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Department reasonably believes is Requested Information and may be a public record under the RTKL; and
2. Provide such other assistance as the Department may reasonably request, in order to comply with the RTKL with respect to this Contract.
d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, notify the Department and provide, within 7 calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.
e. The Department will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Department determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Department determine that the Requested Information is clearly not exempt from disclosure, provide the Requested Information within 7 calendar days of receipt of written notification of the Department’s determination.
f. Failing to provide the Requested Information within the time period required by these provisions, indemnify and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of this failure, including any statutory damages assessed against the Department.
g. The Department will reimburse the Contractor for any costs associated with complying with these provisions only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.
h. The Contractor may file a legal challenge to any Department decision to release a record to the public with the Office of Open Records, or in the Pennsylvania Courts, however, indemnify the Department for any legal expenses incurred by the Department as a result of such a challenge and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of the failure, including any statutory damages assessed against the Department, regardless of the outcome of such legal challenge. As between the parties, agree to waive all rights or remedies that may be available as a result of the Department’s disclosure of Requested information pursuant to the RTKL.
i. The Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Contract and continue as long as the Requested Information remains in the Contractor's possession.
Special Provision: G401A - a00401 ADVANCE NOTICE OF TRAFFIC RESTRICTIONS
August 26, 2026 08:19:07 AM Page 20 of 122
Header:
ADVANCE NOTICE OF TRAFFIC RESTRICTIONS
Provision Body:
Notify the Engineer at least 4 calendar days in advance of the start of any operation which will affect the flow of traffic and provide the Engineer with details of the work to be done. After notification, the District Office will advise the public of these traffic restrictions and possible delays.
Special Provision: G901B - a00901 ALTERNATE EROSION AND SEDIMENT POLLUTION CONTROL
PLAN
Addendum:
ALTERNATE EROSION AND SEDIMENT POLLUTION CONTROL PLAN
Provision Body:
Comply with these requirements when submitting an alternate plan for accomplishing equal or better temporary and permanent erosion and sediment pollution control. Do not start work until the alternate erosion and sediment pollution control plan, schedules, and operation methods have been approved by the Department and the Department of Environmental Protection, or by the Department and the County Conservation District, as applicable.
Apply for any earth disturbance permits or permit amendments not included in the proposal documents that are required because of the nature of the contemplated construction procedures.
Prepare and furnish, with the applications, plans and documents that are required by the Department of Environmental Protection or the County Conservation District.
Provide simultaneously to the District Executive a copy of all plans and documents that affect the construction requirements.
Provide immediately to the District Executive any modifications that are made to the plans and documents that are required by the Department of Environmental Protection or the County Conservation District.
Obtain the approval of the Department and the permit from the Department of Environmental Protection prior to beginning any work when a permit is required, and the approval of the Department and the County Conservation District when a permit is not required.
Acquire areas outside of the right-of-way that are necessary for erosion and sediment pollution control. Proceed with the agreement procedure described in Section 105.14 (Borrow Areas and Waste Areas).
Special Provision: G1101B - a01101 CONSTRUCTION PROCEDURES - EROSION AND SEDIMENT
POLLUTION CONTROL
August 26, 2026 08:19:07 AM Page 21 of 122
Addendum:
CONSTRUCTION PROCEDURES - EROSION AND SEDIMENT POLLUTION CONTROL
Provision Body:
I. Observe the applicable following procedures during the entire period of construction as directed:
(a) Conduct all operations as specified in the erosion and sediment pollution control plan and in such a manner to minimize turbidity in streams. Do not discharge water containing sediments or pollutants into the streams.
(b) Direct flowing water away from project construction areas.
(c) Limit movement of equipment through the streambed in accordance with the approved plan so as to prevent unnecessary siltation or disturbance. Permit equipment to cross flowing channels only on rock roadways and/or bridges to prevent constant turbulency and siltation.
Construct rock crossings, causeways or cofferdams with rock having a minimum size of 75 mm (3 inches) or larger as directed; also, the surface may be choked with stone aggregate having a minimum size of 9.5 mm (3/8-inch). Do not use earth or other materials which may cause sedimentation, for any crossings, causeways or cofferdams.
(d) Seed and/or stabilize all stream banks immediately upon completion of grading.
(e) Seed all cut and fill slopes when they have reached a vertical height of 4.5 m (15 feet). On areas where permanent seeding will not be performed within a period of 20 days after the excavation or embankment operations have been completed place temporary seeding (annual Ryegrass) and mulching on all soil areas.
(f) Control the entire grading area at all times during construction by placing the erosion and sediment pollution control devices that can be installed prior to disturbing the earth and the stabilization devices as soon as the required earthwork has been performed.
(g) For any excavation material stockpiled more than 20 days, take interim stabilization measures to minimize erosion of the stockpile slopes.
(h) Clean the sedimentation structures during construction as specified in Section 861. Dispose of silt fencing and sediment removed from the project, as directed.
(i) Separate all water originating outside of the project from that originating within.
(j) During the life of the contract, be responsible for the maintenance of all erosion and sediment pollution control devices.
(k) Seed all borrow and waste areas in accordance with the approved plans and with item (e) above.
Special Provision: G1601A - a01601 E.E.O. COVERED AREA
August 26, 2026 08:19:07 AM Page 22 of 122
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Header:
E.E.O. COVERED AREA
Provision Body:
For the purpose set forth in the Executive Order 11246 the covered area for this contract is Clearfield County which is within the Economic Area of Williamsport as listed in Appendix B of Designated Special Provision 12 (DSP12) entitled “Executive Order 11246 (with Appendix A and B)” in Appendix C of Pub 408.
Special Provision: G2302A - a02302 Worker Protection and Investment
Worker Protection and Investment
Provision Body:
In accordance with the Governor’s Executive Order 2021-06, Worker Protection and Investment, contractors and grantees of the Commonwealth must certify they are in compliance with Pennsylvania’s Unemployment Compensation Law, Worker’s Compensation Law, and all applicable Pennsylvania state labor and workforce safety laws including, but not limited to:
Construction Workplace Misclassification Act Employment of Minors Child Labor Act Minimum Wage Act Prevailing Wage Act Equal Pay Law Employer to Pay Employment Medical Examination Fee Act Seasonal Farm Labor Act Wage Payment and Collection Law Industrial Homework Law Construction Industry Employee Verification Act Act 102: Prohibition on Excessive Overtime in healthcare Apprenticeship and Training Act Inspection of Employment Records Law
To ensure compliance with these statutes, Contractors and Grantees are required to submit the Worker Protection and Investment Certification Form (BOP-2201) in response to all ECMS procurement solicitations. The form is available in the ECMS File Cabinet (in References Tab). If assistance with the Form is needed, contact the ECMS Help Desk at 855-783-8330 or at 717- 783-8330. ECMS Help Desk assistance is available 24 hours a day, 7 days a week.
This form must be completed for the Prime Contractor and all subcontractors and/or services.
The Prime Contractor must email the completed BOP-2201 Form to workprotect@pa.gov or fax the Form to 717-265-7207, signed by an authorized representative of the Contractor, possessing sufficient knowledge to make the representations and certifications on the BOP-2201 Form by 3:00 P.M. prevailing local time within 7 calendar days after the bid opening. When the seventh (7th) calendar day after the bid opening falls on a day that the Department offices are closed, submit the BOP-2201 Form by 3:00 P.M. prevailing local time on the next business day. Failure or refusal to provide the BOP-2201 Form, or inclusion on any Pennsylvania Department of Labor and Industry Worker Protection and mailto:workprotect@pa.gov
August 26, 2026 08:19:07 AM Page 23 of 122
Labor Law Non-Compliance List, will be considered a refusal to comply with bidding requirements and may result in rejection of the bid, and other appropriate consequences.
For Subcontractors/Services, the completed BOP-2201 Form must be attached with the Public Works Verification Act form and submitted in ECMS before a subcontractor request can be approved. A subcontractor/service identified on any Pennsylvania Department of Labor and Industry Worker Protection and Labor Law Non-Compliance List will not be approved.
The Pennsylvania Department of Labor and Industry has created a public list of businesses that have been found to be non-compliant with Pennsylvania state labor and workforce safety law which will be published on its public-facing website. The link to the Department of Labor and Industry’s website is: www.dli.pa.gov/Pages/Non-Compliance-List.aspx.
Questions regarding inclusion on the list should be directed to the appropriate bureau with the Department of Labor and Industry.
Special Provision: C164A - a07000 CHANGES TO SPECIFICATIONS: SECTION 106
CHANGES TO SPECIFICATIONS: SECTION 106
Provision Body:
SECTION 106—CONTROL OF MATERIAL
106.10(a) Buy America Provisions. Revise last paragraph to read as follows:
Products manufactured of foreign steel or iron materials may be used, provided the cumulative cost of such products as they are delivered to the project does not exceed 0.1% of the total contract amount, or $2,500, whichever is greater.
Add 106.11 BUILD AMERICA, BUY AMERICA ACT PROVISIONS.
106.11 BUILD AMERICA, BUY AMERICA ACT PROVISIONS—
(a) Build America, Buy America Act. The Federal Bipartisan Infrastructure Law (Public Law 117-58) includes the Build America, Buy America Act that requires all iron, steel, manufactured products, and construction materials used to be produced in the United States.
The term produced in the United States defined as:
1. Iron or Steel Products. All manufacturing processes from the initial melting stage through the application of coatings occurred in the United States according to Section 106.10(a).
2. Manufactured Product. Final assembly of all manufactured products permanently incorporated into the project must be manufactured in the United States.
2.a A manufactured product, not predominantly steel or iron, is defined as an article, material, or supply that has been processed into a specific form and shape, or combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies.
http://www.dli.pa.gov/Pages/Non-Compliance-List.aspx
August 26, 2026 08:19:07 AM Page 24 of 122
2.b Predominantly steel or iron is defined as greater than or equal to 50 percent of the total cost of the manufactured product.
2.c Manufactured products that are predominantly steel or iron must comply with Buy America provisions according to Section 106.10(a).
2.d If an article, material, or supply meets this definition but could also be classified as an excluded material or other product category, that article, material, or supply is not a manufactured product.
2.e Mixtures of excluded materials delivered to a work site without final form for incorporation into a project are also not manufactured products.
2.f Manufactured products where the final assembly did not occur in the United States may be used, provided the cumulative cost of such manufactured products is no more than the lesser of $1 million or 5% of total applicable costs for the project.
3. Construction Materials.
3.a All manufacturing processes for construction materials occurred in the United States.
3.b Construction materials includes an article, material, or supply that is or consists primarily of:
non-ferrous metals, plastic and polymer-based products including polyvinylchloride, composite building materials, and polymers used in fiber optic cables, glass including optic glass, lumber, or drywall
Items that consist of two or more of the listed materials that have been combined together through a manufacturing process, and items that include at least one of the listed materials combined with a material that is not listed through a manufacturing process, should be treated as manufactured products, rather than as construction materials.
3.c Limitation with Respect to Aggregates. Shall not include cement and cementitious materials, aggregates such as stone, sand, or gravel, or aggregate binding agents or additives.
3.d Construction materials where all manufacturing processes did not occur in the United States may be used, provided the cumulative cost of such construction materials is no more than the lesser of $1 million of 5% of total applicable costs for the project.
Special Provision: C166A - a07010 CHANGES TO SPECIFICATIONS: SECTIONS 107 AND 608
CHANGE TO SPECIFICATIONS: SECTIONS 107, AND 608
SECTION 107—LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
August 26, 2026 08:19:07 AM Page 25 of 122
Section 107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS. Revise to read as follows:
107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS—Install and maintain erosion and sediment (E&S) pollution control devices as indicated or submit an alternate plan for accomplishing equal or better temporary and permanent erosion and water pollution control. If an alternate plan is submitted, do not start work until the plan is approved by the County Conservation District and the Department. If a National Pollutant Discharge Elimination System (NPDES) Permit is involved, do not start work until the plan is approved by the DEP or the authorized County Conservation District and the Department. Concrete clean out areas, either contractor designed or indicated within the contract documents, are incidental to the contract items.
When a general or individual NPDES Permit is involved:
At the preconstruction conference, submit a Preparedness, Prevention and Contingency (PPC) Plan and identify a licensed professional (Professional Engineer, Geologist, Land Surveyor or Landscape Architect) registered in the Commonwealth and if applicable, their designee to be present onsite and responsible for implementing critical stages of the
Do not start earth disturbance activities until an environmental preconstruction meeting is held with DEP or delegated
CCD.
Within 14 days of completing the construction of a stormwater control measure (SCM) as determined by the licensed professional or designee, submit a completed Chapter 102 SCM Construction Certification Form for each SCM to the Representative through PPCC. Form CS-102 has information required to complete the Chapter 102 Form(s). Ensure the General Project and SCM Information, Construction Information, and Licensed Professional Certification sections are completed by the identified licensed professional responsible for overseeing the critical stages of the approved PCSM plan.
Prepare an as-built (record) PCSM Plan to be sealed and signed by the identified licensed professional registered in the Commonwealth. All construction survey, plan preparation, and engineering required for the as-built (record) PCSM Plan will be incidental to the contract items. The as-built (record) PCSM Plan must accurately reflect deviations from the approved PCSM Plan including, but not limited to, plan locations, dimensions, inverts/elevations, materials used and grading. Update the as-built (record) PCSM Plan as construction of the project’s PCSM features progresses. Have the identified licensed professional immediately notify the Representative of all deviations from the approved PCSM Plan. Deviations to the approved PCSM Plan must be submitted for approval. Assist with the determination and documentation if the as-built deviations require a permit amendment or if the PCSM features must be removed and replaced as indicated on the PCSM Plan.
Assist the Representative in performing visual site inspections weekly and after each precipitation event greater than 0.25 inches to ensure the project's E&S Best Management Practices (BMPs) are functioning properly. Immediately initiate corrective actions, at no additional cost to the Department, upon notification by the Representative of noncompliance with the provisions of this section that the Representative has determined requires immediate corrective action under Department policies. For all other notifications of noncompliance, initiate corrective actions within 24 hours. Failure or refusal to promptly comply with such notice upon receipt may, at the Department’s sole discretion, result in: the withholding payment of estimates for work completed until the requirements of the E&S Plan are met, assessment of E&S noncompliance liquidated damages as specified in Section 108.07(d) or issuance of a written order stopping all or part of the work until the corrective action has been taken and the requirements of the E&S Plan are met. No claims for extension of time, costs, or damages arising from, related to, or based upon such notices of noncompliance or stop orders will be granted, paid, or considered.
Nothing in this Section is to be interpreted to relieve the Contractor of its obligation to fully and timely comply with all applicable laws and any permits for the project. The time periods set forth in this Section do not supersede any more stringent time periods required by applicable laws or permits for the project.
If corrective action or noncompliance with the provisions of this Section result from design errors/omissions or a precipitation event exceeding the design storm criteria as specified in applicable Department publications; the cost and/or time required for the performance of the corrective actions for noncompliance notices or stop work orders will be considered as specified in Section 110.03 and Section 108.06, as applicable.
Utilize Department, DEP, or other authorized agency’s form(s) included in the contract or project permits unless directed otherwise by the Representative, DEP, the County Conservation District or other authorized regulatory agency.
For the purpose of determining compliance with the provisions of this section, “substantial completion” will be considered to have been attained when all of the following project milestones have been reached:
approved Post Construction Stormwater Management (PCSM) Plan.
August 26, 2026 08:19:07 AM Page 26 of 122
Either a semi-final or final inspection has been performed, physical work is complete, and an Environmental Commitments and Mitigation Tracking System (ECMTS) Sheet has been executed if applicable to the project.
Earth disturbance activity has been permanently stabilized and sufficient vegetative growth has been achieved to meet permit conditions (uniform 70% perennial vegetative cover) and agreed to by DEP or delegated CCD.
Installation of PCSM SCMs have occurred if applicable. Upon completion of PCSM conversions and facilities, the County Conservation District must approve the removal of all remaining E&S BMPs.
Once a project with a general or individual NPDES Permit has reached substantial completion, submit to the Representative a DEP Notice of Termination (NOT) Form ensuring Sections 2, 3, 4, 7 and 8, are fully executed. The NOT is to be accompanied by the required as-built (record) PCSM Plan, the final certification by the licensed professional and the Contractor’s executed portion of the ECMTS Construction Tracking Signature Sheet.
608 MOBILIZATION
Section 608.4(b)3. Revise to read as follows:
3. When all physical work has been satisfactorily completed and the following certificates and documents, as required, have been properly furnished, the final payment will be made as specified in Section 608.4(a):
Certified Payroll Records
Final DBE/DB payment amounts and, if necessary, shortfall justification
Material Certifications
Form CS-4225H, Highway Lighting In-Service Guarantee Notification
As built drawings for Design/Build projects
Form RW-397A, Right to Enter (a property) and Release Form from property owner, if applicable
Form CS-4345, Borrow and/or Waste Management
Contractor Evaluations of the design of the project; and
Work Order Information (i.e. Force Account documentation)
Post Construction Stormwater Management As-built drawings and all documentation required for submission of the Notice of Termination for projects with NPDES permits.
Special Provision: C172A - a07020 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876
Addendum:
CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876
August 26, 2026 08:19:07 AM Page 27 of 122
SECTION 107—LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS. Revise to read as follows:
107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS—Install and maintain erosion and sediment (E&S) pollution control devices as indicated or submit an alternate plan for accomplishing equal or better temporary and permanent erosion and water pollution control. If an alternate plan is submitted, do not start work until the plan is approved by the County Conservation District and the Department. If a National Pollutant Discharge Elimination System (NPDES) Permit is involved, do not start work until the plan is approved by the DEP or the authorized County Conservation District and the Department. Concrete clean out areas, either contractor designed or indicated within the contract documents, are incidental to the contract items.
When a general or individual NPDES Permit is involved:
At the preconstruction…