This is a Construction Bid Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget's State Facilities Administration Design and Construction Division for the EGLE Jamestown Automotive project in Jamestown, MI (File #761/19135.SAR). The addendum modifies the original bid documents by adding specifications for well abandonment work, with a bid opening date of July 17, 2019. The project involves demolition and remediation work at two structures - a former fire station and library. The scope includes asbestos abatement of multiple materials found in both buildings, including floor tiles, wall adhesives, window caulk, and other materials that were identified through a detailed hazardous materials survey. The work also includes abandonment of one 4-inch potable well estimated at 100 feet depth.

The bid schedule includes 21 line items covering various aspects of demolition, site work, and remediation including geotechnical investigation, structural monitoring, temporary closures, utility work, soil/groundwater removal and disposal, backfill, and surface restoration. A provisionary allowance of $60,000 is included for unforeseen site conditions. The hazardous materials survey identified significant quantities of regulated materials requiring special handling, including asbestos-containing materials and lead-based paint with concentrations up to 24% lead content. Pricing must be provided on a lump sum basis for most items, with some unit pricing for quantities of materials to be removed and disposed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

838650 DTMB Addendom No. 1

DTMB-0414 (Rev 12/17)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 1

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

7/3/2019

PROJECT NAME

EGLE Jamestown Automotive, Jamestown MI, FILE NUMBER

761/19135.SAR

PROFESSIONAL

Fleis & VandenBrink Engineering, Inc.

PROJECT DIRECTOR

Project Director

BID OPENING DATE:

7/17/2019

ATTACHMENTS:

Revised Bid Summary Pre-Bid Meeting Sign-In List (Plan Holders List) Hazardous Materials Survey Asbestos Building Investigation Well Abandonment Spec

SPECIFICATION CHANGES:

ITEM NO. 1:

Section 01025 Measurement and Payment

3. Measurement and Payment Schedule:, Add:

21. Item 21: Well Abandonment:

a. Payment: Payment for this item shall be paid for on a Lump Sum basis for the CONTRACTOR’s costs to provide well abandonment of one (1) potable well as itemized in Contractor’s Schedule of Values. Four (4) inch potable well assumed depth of 100 feet below grade surface.

b. Measurement: Shall include all labor and materials as required.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: DATE: Click to enter date

APPROVED BY:

PROJECT DIRECTOR: DATE: Click to enter date http://www.michigan.gov/SIGMAVSS

FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS

BID SCHEDULE Rev 070319

Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:

Base Bid Item No.

Bid Quantity

Description (Bidder to write price in Words)

Unit Price

Item Bid Price

1 1 Lsum GENERAL CONDITIONS, BONDS, INSURANCE, WORK PLAN, PERMITS

2 1 Lsum MOBILIZATION, 4% MAX

3 1 Lsum DEMOBILIZATION

4 1 Lsum GEOTECHINCAL INVESTIGATION, SOLDIER PILE DESIGN &

STRUCTURAL MONITORING

5 1 Lsum VIDEO SURVEY & TIME LAPSE

IMAGERY

6 1 Lsum TEMPORARY LANE CLOSURES

7 1 LSUM PROJECT FENCING

8 1 LSUM UTILITY RELOCATES AND

CLOSURES

9 1 Lsum DEMOLITION

10 950 Syd PAVEMENT RESTORATION

11 230 Lft SOLDIER PILE

12 15,000 Ton SOIL REMOVAL

13 15,000 Ton SOIL DISPOSAL

14 40,000 Gal GROUNDWATER REMOVAL

15 40,000 Gal GROUNDWATER DISPOSAL

16 200 Lft PERFORATED PLASTIC TILE AND

MANHOLE STRUCTURE

17 15,000 Ton BACKFILL

18 800 Ton CRUSHED AGGREGATE

19 1 Lsum SURFACE RESTORATION

20 Provisionary

Allowance

Provisionary Allowance for

Unforeseen Site Conditions

$60,000

21 1 Lsum WELL ABANDONMENT

TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $

Base Bid (Sum of Item Bid Prices for all Base Bid Items):

__________________________________________________________________ Dollars $__________________________ (use words) (in figures)

Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:

Alternate Item No.

Bid Quantity

Description (Bidder to write price in Words)

Unit Price

Item Bid Price

The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.

Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.

Item No.

Units or Quantity

Description

(Bidder to write price in Words)

Bidder’s Bid

Price

Price Proposed

By the Owner

Library

PCB Materials

Material Description Approximate Quantity

Light Ballasts – PCB or unknown 10

Batteries

Battery Type Approximate Quantity

Rechargeable Battery-Operated Walkie Talkies 3

Pesticides

There were no pesticides observed in the building.

Mercury-Containing Equipment

Equipment Type Approximate Quantity

Mercury Bulb Thermometers 1

Mercury Lamps

Lamp Type Approximate Quantity

Fluorescent Light Tubes 48

Exterior Sodium/Mercury Vapor Security Lights 0

Compact Fluorescent Lightbulbs 3

Smoke Detectors

Detector Type Approximate Quantity

Ceiling Mounted 1

Compressed Gas/Pressurized Cylinders

There were no compressed gas or pressurized cylinders observed in the building.

Refrigerated Equipment

Equipment Description Approximate Quantity

Mini Fridge 1

Chemical Containers

Description Container Quantity

Laserjet Ink Cartridge -- 1

Lubrication Tubes Unk. 16

Bathroom Disinfectant 19 oz. 1

Hand Soap 800 oz. 5

Other Materials

Description Approximate Quantity

Desktop Computer 1

Furnace 1

Firehouse Garage

PCB Materials

Material Description Approximate Quantity

Light Ballasts – PCB or unknown 3

Batteries

Household Batteries 4

Pesticides

Killem Bacteria Fluid – 16 oz. 2

Mercury-Containing Equipment

There were no mercury containing equipment observed in the building.

Mercury Lamps

Lamp Type Approximate Quantity

Fluorescent Light Tubes 43

Compact Fluorescent Lightbulbs 6

Smoke Detectors

Detector Type Approximate Quantity

Ceiling Mounted 1

Compressed Gas/Pressurized Cylinders

Cylinder Type Approximate Quantity

Pressure Tanks 2

Refrigerated Equipment

There were no refrigerated equipment observed in the building.

Chemical Containers

Description Container Quantity

Rustoleum 11 oz. 1

Unknown Fluid 5 gal. 7

Motor Oil 128 oz. 10

Tele-mat Fog Fluid 1 gal. 1

Unknown Fluid 1 gal. 1

Pool Repair Fluid Unk. 1

CO2 Containers Unk. 5

Battery Protector Fluid 11.75 oz. 1

Veedol Motor Oil 1 qt. 11

Charcoal Lighter Fluid 1 qt. 1

Power Steering Fluid 1 qt. 1

Sta-bil Fuel Stabilizer Fluid 1 oz. 1

Brake Fluid 32 oz. 1

Floor Enamel 1 qt. 1

Paint 1 qt. 6

Rustoleum ½ pt. 1

Rustoleum 1 pt. 4

Rustoleum 1 qt. 3

Compressor Lube 1 gal. 2

Antifreeze 1 gal. 2

Acrylic Latex Paint 5 gal. 1

Hydraulic Oil 2.5 gal. 1

Unknown Fluid 2.5 gal. 6

Rustoleum Stain 12 oz. 1

Butane 5.5 oz. 1

Acrylic Latex Caulk 10.1 oz. 1

Paint 1 gal. 1

Acrylic Spray Paint 12.8 oz. 1

Bathroom Disinfectant 19 oz. 1

Disinfectant 32 oz. 1

Scent Freshener 16 oz. 1

Hand Soap 20 oz. 1

Hand Soap 5 oz. 1

Foam Liquid Concentrate ¼ gal. 1

Other Materials

Description Approximate Quantity

Electric Garage Door Motors 2

Electric Car Jumper 1

Septic System 1

Fire Suppression System 1

Furnace 1

Library - Outdoor Indoor Other Hazardous Materials Mounted Sodium Vapor Lights Lamp Posts CFL Building Location/Room FL Tubes Ballasts CFL Bulbs Smoke Detectors Library Garage

1 Library 1 Laserjet ink cartridge 4 batteries

Southeast (office) 32 2 1 1 desktop computer 1 water heater

Firehouse Garage - Outdoor 1 mini fridge 11 oz. Rustoleum

Mounted Sodium Vapor Lights Lamp Posts CFL Northeast (bathroom) 2 3 battery operated walkie talkies 2 - 5 gal. unknown buckets of fluid

2 16 unkown size lubrication tubes 10 - 128 oz. motor oil

West (conference 16 8 1 furnace 1 gal. tele-mat fog fluid room) 19 oz. can bathroom disinfectant 1 gal. uknown fluid

5 - 800 oz. hand soap 1 uknown size pool repair fluid

Subtotal 48 10 2 1 1 thermostat 5 CO2 containers

2 - 16 oz. killem bacteria fluid

Firehouse 1 - 11.75 oz. battery protector

Garage South garage 12 1 11 - 1 qt. veedol motor oil

1 qt. charcoal lighter

North garage 13 1 1 qt. power steering fluid

1 oz. sta-bil fuel stabilizer

Bathroom 10 1 32 oz. brake fluid

1 qt. floor enamel

Hallway 8 2 1 6 - 1qt. Paint

1/2 pt. Rustoleum

Basement 2 4 - 1 pt. Rustoleum

3 - 1 qt. Rustoleum

Subtotal 43 3 4 1 2 - 1 gal. compressor lube

TOTAL 91 13 6 2 2 - 1 gal. antifreeze

5 gal. acrylic latex paint

2.5 gal. hydraulic oil

6 - 2.5 gal unknown barrel

2 - electrical garage door motors

12 oz. Rustoleum stain

5.5 oz. butane

10.1 oz. acrylic latex caulk

5 gal. unknown

1 gal. paint

12.8 oz. acrylic spray paint

19 oz. bathroom disinfectant

32 oz. disinfectant

16 oz. scent freshener

20 oz. hand soap

5 oz. hand soap

4 - 5 gal. barrel of unknown

1/4 gal. foam liquid concentrate

1 electric car jumper

2 pressure tanks

1 septic system

1 fire suppression system

1 furnace

Hazardous Materials Survey Field Notes Jamestown - Library & Firehouse Garage

Notes: 6/6/2019

This report is for the explicit use of Fleis & Vandenbrink Other use is strictly prohibited without the written consent of BDN Industrial Hygiene Consultants, Inc.

Prepared by:

Travis Noa David Steger Industrial Hygienist Industrial Hygienist Accreditation Number – A38262 Accreditation Number – A1788 BDN Industrial Hygiene Consultants, Inc. BDN Industrial Hygiene Consultants, Inc.

ASBESTOS BUILDING INSPECTION

For

Fleis & Vandenbrink At

3240 24th Avenue Jamestown, Michigan 49427

BDN JOB NO. 18286

COPYRIGHT 2019 BDN INDUSTRIAL HYGIENE CONSULTANTS, INC.

TABLE OF CONTENTS

EXECUTIVE SUMMARY

INTRODUCTION

FIELD ACTIVITIES

ANALYTICAL RESULTS

REGULATORY COMPLIANCE AND OBLIGATIONS

CONCLUSIONS AND RECOMMENDATIONS

LIST OF APPENDICES

Appendix A CAD Diagrams Appendix B Photographic Documentation Appendix C Functional Space Summary Appendix D Analytical Results – Asbestos Appendix E Analytical Results – Lead

EXECUTIVE SUMMARY

BDN Industrial Hygiene Consultants, Inc. of Portage, Michigan was retained by Fleis & Vandenbrink, in Grand Rapids, Michigan to conduct a building surveys for asbestos at two structures in Jamestown, Michigan. The intent of the survey was to identify any suspected asbestos-containing building materials and heavy metals in paint coatings prior to demolition. The survey was conducted on May 29, 2019.

Four (4) building materials sampled from the former fire station were found to contain asbestos. An adhesive identified under wood wall panels in the office area, an adhesive identified under Formica wall panels in the restroom, a black floor underlayment in the office area, and 12”x12” floor tile and mastic located on the stairs to the basement.

Two (2) building materials sampled from the former library were found to contain asbestos. The 9”x9” floor tile and mastic located under carpet in the east room and an interior brown window caulk in the west room.

A detailed inventory of building materials, locations and quantities is described within the body of this report and in Appendix C.

The asbestos-containing materials identified in the survey that may be disturbed during demolition activities are required to be removed prior to the commencement of such activities. If suspect ACMs not identified within the report are encountered during renovation activities for which no analytical data exists, BDN recommends the material(s) remain undisturbed until the asbestos content of the material(s) is determined in accordance with USEPA and OSHA regulations.

Four (4) paint samples were collected from the buildings. All the samples collected were found to contain concentrations of regulated heavy metals. The OSHA construction standard does not specifically list a concentration that is considered a hazardous level. Michigan Department of Corrections is obligated to inform contractors that lead and other regulated heavy metals were detected at the site and provide them with a copy of the analytical report. The employer of the construction crews is required to perform monitoring for their employees depending on the scope of work when lead and other heavy metals are present on a jobsite in compliance with the OSHA standard.

COPYRIGHT 2019 BDN INDUSTRIAL HYGIENE CONSULTANTS, INC. 1

INTRODUCTION

BDN Industrial Hygiene Consultants, Inc. of Portage, Michigan was retained by Fleis & Vandenbrink, in Grand Rapids, Michigan to conduct a building surveys for asbestos at two structures in Jamestown, Michigan. The intent of the survey was to identify any suspected asbestos-containing building materials and heavy metals in paint coatings prior to demolition. An inspection is required prior to any demolition or renovation by the US EPA under the NESHAP standard and enforced by the Environmental, Great Lakes & Energy (EGLE) department in the State of Michigan. The survey was conducted by Travis Noa, asbestos inspector accreditation number A38262 and David Steger, asbestos inspector accreditation number A1788 of BDN, on May 29, 2019.

FIELD ACTIVITIES

Field inspection alone is not conclusive to identify asbestos-containing materials. Samples of suspected asbestos-containing building materials were obtained using EPA/OSHA protocols by a State of Michigan, accredited inspector and analyzed to determine if asbestos fibers were present, and if found, the types and percentages of asbestos were reported.

The former fire station is a single-story building with a partial basement. The building consists of a concrete foundation, block walls and steel beam construction. The interior walls are drywall, wood panel, Formica, and concrete block. Flooring consists of concrete, linoleum, and floor tile. The exterior walls of the structure are concrete block. The roof consists of rubber membrane.

The former library is a single-story building. The building consists of a concrete foundation, brick walls and wood beam construction. The interior walls are wood panel. Flooring consists of carpet on concrete, linoleum, and floor tile. The exterior walls of the structure are brick and the roof asphalt shingle.

The buildings were divided into functional spaces, and building materials that could possibly contain asbestos were identified and categorized as homogenous areas.

Representative samples of suspect asbestos-containing materials were collected and locations marked on a diagram, and included with this report as Appendix A - CAD Diagrams. Photographs of asbestos containing materials can be found in Appendix B - Photographic Documentation. The information is also included in Appendix C - Functional Space Summary. The laboratory data for asbestos is presented in this report as Appendix D - Analytical Results - Asbestos. The laboratory data for lead is presented in this report as Appendix E - Analytical Results – Lead.

COPYRIGHT 2019 BDN INDUSTRIAL HYGIENE CONSULTANTS, INC. 2

ANALYTICAL RESULTS

Asbestos Results

Building material samples collected from the both structures were submitted to the asbestos laboratory at BDN Industrial Hygiene Consultants in Portage, Michigan.

Laboratory descriptions of materials analyzed by Polarized Light Microscopy (PLM) method for asbestos content was based upon the microscopists’ visual observations of bulk samples that were homogenized and prepared for analysis. Due to the preparation of the sampled materials and the minute level of observation by the laboratory personnel, the descriptions in the analytical report may not match the sample descriptions recorded by BDN in the field. BDN’s sample descriptions and locations should be used to identify materials that were sampled and BDN’s sample numbers should be used to correlate analytical results for the sampled materials.

Asbestos-Containing Materials: Former Fire Station

Description of Asbestos-Containing Material

Location of Material Total Quantity

12”x12” Floor Tile and Mastic Stairwell to basement 35 sq. ft.

Wood Wall Panel Adhesive East office area 99 sq. ft.

Formica Wall Adhesive Restroom walls

118 sq. ft.

Flooring Underlayment - Black East office area 363 sq. ft.

COPYRIGHT 2019 BDN INDUSTRIAL HYGIENE CONSULTANTS, INC. 3

Asbestos-Containing Materials: Former Library

Description of Asbestos-Containing Material

Location of Material Total Quantity

9”x9” Floor Tile and Mastic East room 364 sq. ft.

Interior Window Caulk - Brown West room

Windows:

(2) 2’x3’

(2) 3’x6’

Quantities in this table represent materials that were accessible at the time of the survey.

Additional quantities and materials may exist that were not accessible at the time of the survey based on our project scope.

Lead, Cadmium, Chromium Results

Paint samples were collected from interior surfaces of the buildings. These samples were submitted for analysis to GPI Laboratories, Inc. in Grand Rapids, Michigan. A total of four

(4) paint samples were collected and analyzed. All four samples were found to contain Lead and Chromium. The sample data is present in the table below:

Sample Number Sample

Description/Location

Lead Analysis (by weight)

Chromium Analysis (by weight)

Cadmium Analysis (by weight)

18286-L1 Grey color – Concrete Slab Floor

– Main Level

0.023% 0.0033% BDL

18286-L2 Yellow color – Brick Walls – Main

Floor

0.26% 0.044% BDL

18286-L3 White color – Brick Walls – Main

Floor

0.076% 0.21% BDL

18294-L4 Off-White/Yellow color – Metal

Trusses

24% 0.0053% BDL

BDL: Below Detection Limit

The OSHA construction standard does not specifically list a metals concentration that is considered a hazardous level. The building owner is obligated to inform any contractors that lead and Chromium were detected at the site and provide them with a copy of the analytical report. The employer of construction crews is required to perform monitoring for their employees, depending on the scope of work, when lead and other heavy metals are present on a jobsite.

COPYRIGHT 2019 BDN INDUSTRIAL HYGIENE CONSULTANTS, INC. 4

REGULATORY COMPLIANCE AND OBLIGATIONS

The OSHA Asbestos Standard for Construction, (29 CFR 1926.1101) and Part 602, the MIOSHA Asbestos Standard, requires that all building facilities (excluding residential owner-occupied homes) constructed prior to 1981, where employees may enter, work, or contact building materials must be inspected for asbestos-containing building materials (ACBM). Also, all such vacant buildings scheduled for renovation or demolition must have an asbestos building survey completed prior to the start of the renovation or demolition.

The survey/inspection must adhere to the Asbestos Hazard Emergency Response Act (AHERA) inspection protocol and be performed by a Michigan accredited asbestos building inspector or Certified Industrial Hygienist (CIH). The building survey must also include the presence, location, and quantity of all suspected ACBM. Additionally, laboratory analysis information should be a part of the building survey document.

Building owners removing asbestos-containing materials from their own structure are not required to be a Michigan licensed asbestos abatement contractor. However, the building owner’s employees performing the work must comply with the requirements of Part 602, the MIOSHA Asbestos Standards for Construction.

The Asbestos Abatement Contractors Licensing Act (i.e., Act 135, P.A. 1986, as amended) requires asbestos abatement contractors and exempt trade groups to notify the MLARA- Asbestos Program of any asbestos abatement project exceeding 10 linear feet or 15 square feet, or both, of friable asbestos materials. This requires a 10-calendar-day notice.

The Notification of Intent to Renovate/Demolish form required by the USEPA NESHAP regulations must be prepared and submitted to the EGLE-AQD at least 10 working days prior to demolition of a building, regardless of whether or not ACMs are present in the building. If ACM is present and included for removal and the quantity is greater than 260 linear feet and/or 160 square feet, a 10 working-day notice is required.

CONCLUSIONS AND RECOMMENDATIONS

If suspect ACMs not identified within the report are encountered during demolition activities for which no analytical data exists, BDN recommends the material(s) remain undisturbed until the asbestos content of the material(s) is determined in accordance with USEPA and OSHA regulations. BDN’s quantities are intended to be “Order of Magnitude” estimates and the estimated quantities and other information in this report should not be used as an exclusive source of information for bid formulation or for notification to regulatory agencies.

It should be noted that many asbestos-containing materials are currently available for purchase and may be inadvertently installed into a building. Some protection can be obtained by reviewing the Safety Data Sheets (SDS) for each suspect material before it is installed in the building. Examples of building materials to check BEFORE installation are:

COPYRIGHT 2019 BDN INDUSTRIAL HYGIENE CONSULTANTS, INC. 5

ceiling tiles, floor tile, roofing materials, dry wall, joint compounds, and any other materials that need to be durable or heat resistant. The manufacturer is required to disclose if a material contains asbestos in the SDS under “Hazardous Materials”. To obtain an SDS for a particular product, contact the merchant or the manufacturer.

If there are any questions regarding this report, please contact us.

END OF REPORT

Jamestown, Michigan

APPENDIX A

CAD Diagrams

Not To Scale

NNegative Asbestos Sample Location

Lead Paint Sample Location

FS # Function Space

3240 24th Avenue Jamestown, MI

BDN Project No.

Positive Asbestos Sample LocationFormer Fire Station

Note:

Floor plans are only general representations of the items depicted and should not be the only resource used for quantification or material locations.

Appendix:

18286

A

18286-F-5.2

18286-F-5.1

18286-F-22.2 18286-F-7.1 18286-F-7.2

18286-F-21.1

18286-F-22.1

18286-F-4.2

18286-F-2.1 18286-F-3.1

18286-F-3.2

18286-F-9.1

18286-F-9.2

18286-F-4.1

18286-F-23.1 18286-F-23.2

18286-L-1

FS 1

FS 2

FS 1

18286-L-2

18286-F-20.1 18286-F-20.2

18286-F-19.1 18286-F-18.1

18286-F-18.2

18286-F-17.2 18286-F-17.1

18286-F-1.1

18286-F-1.2

Not To Scale

NNegative Asbestos Sample Location

Lead Paint Sample Location

FS # Function Space

3240 24th Avenue Jamestown, MI

BDN Project No.

Positive Asbestos Sample LocationFormer Library

Note:

Floor plans are only general representations of the items depicted and should not be the only resource used for quantification or material locations.

Appendix:

18286

A

18286-L-16.2

18286-L-16.1

18286-L-21.2

18286-L-6.118286-L-9.2

18286-L-4.1 18286-L-4.2

18286-L-9.1

18286-L-7.1

18286-L-7.2

18286-L-5.1

18286-L-2.1

18286-L-21.1

18286-L-6.2

18286-L-15.1

18286-L-17.1 18286-L-17.2

18286-L-18.1

18286-L-19.1 18286-L-19.2

18286-L-8.1

18286-L-8.2

18286-L-5.2

18286-L-5.3

18286-L-10.118286-L3

18286-L4

FS 1

FS 2

APPENDIX B

PHOTOGRAPHIC

DOCUMENTATION

Former Fire Station

18286-F-3.1 - 12”x12” Floor Tile and Mastic

Fo rm er F ir e

St at io n

4th

A ve nu e

Ja m es to w n, M I

As be st os

S ur ve y

BDN No.

18286

Appendix

B

18286-F-7.1 - Wood Wall Panel Adhesive

18286-F-22.1 – Formica Wall Adhesive er F ir e

St at io n

4th

A ve nu e

Ja m es to w n, M I

As be st os

S ur ve y

BDN No.

18286

18286-F-23.1 – Black Underlayment Layer er F ir e

St at io n

4th

A ve nu e

Ja m es to w n, M I

As be st os

S ur ve y

BDN No.

18286

Former Library

18286-L-7.1 – 9”x9” Floor Tile – Tan with Cream Streaks with Mastic er L ib ra ry

4th

A ve nu e

Ja m es to w n, M I

As be st os

S ur ve y

BDN No.

18286

18286-L-21.1 – Interior Window Caulk - Brown er L ib ra ry

4th

A ve nu e

Ja m es to w n, M I

As be st os

S ur ve y

BDN No.

18286

APPENDIX C

FUNCTIONAL SPACE

SUMMARY

Sorted by Space Fleis and Vandenbrink

Dowagiac Schools

Former Fire Station

BDN Job No. 18286

June 2019

Floor

Space

Code Space Name Description of Material Qty. in

Space

Qty.

Damaged

Sample

Number

Sample

Result Response Notes

1 1

Garage Area &

Mezzanine Concrete Slab Floor — — —

18286-F-1.1

18286-F-1.2

None

Detected

None

Detected None —

1 1

Garage Area &

Mezzanine

Concrete Block Wall

Mortar — — — 18286-F-5.1

None

Detected None —

1 1

Garage Area &

Mezzanine Metal Door 1 door (s) — — — None No suspect insulation

1 1

Garage Area &

Mezzanine Metal Deck Ceiling — — — — — None —

1 1

Garage Area &

Mezzanine Metal Garage Doors 4 door (s) — — — None —

1 1

Garage Area &

Mezzanine Silicone Caulk - Clear — — — — — None

Around metal access door

1 1

Garage Area &

Mezzanine Wood Floor — — — — — None Mezzanine floor

1 2 East Office Area

Epoxy Floor - Tan with

Speckles 363 sq. ft.

18286-F-2.1

18286-F-2.2

None

Detected

None

Detected None Flooring on wood

1 2 East Office Area

Cove Base - 4" - Dark

Brown with Adhesive 55 ln. ft.

18286-F-4.1

18286-F-4.2

Cove Base:

None

Detected

Adhesive:

None

Detected

Cove Base:

None

Detected

Adhesive:

None

Detected None —

1 2 East Office Area

Concrete Block Wall

Mortar — — — 18286-F-5.2

None

Detected None —

1 2 East Office Area Wood Wall Panels 99 sq. ft. — — — None —

Former Fire Station

BDN Job No. 18286

June 2019

Floor

Space

Code Space Name Description of Material Qty. in

Space

Qty.

Damaged

Sample

Number

Sample

Result Response Notes

1 2 East Office Area

Wood Wall Panel

Adhesive 99 sq. ft. —

18286-F-7.1

18286-F-7.2

8%

Chrysotile

10%

Chrysotile

Remove

Prior to

Demolition

Adhesive on unfinished drywall under wood wall panels

1 2 East Office Area Metal Door 2 door (s) — None No suspect insulation

1 2 East Office Area

Ceiling Tile - 1'x1' -

White - Rough Finish 363 sq. ft. —

18286-F-9.1

18286-F-9.2

None

Detected

None

Detected None Stapled, no glue pods

1 2 East Office Area

Formica Walls - Cream with Gold 118 sq. ft. — — — None Bathroom wall

1 2 East Office Area Silicone Caulk - Clear 1 ln. ft. — — — None

Above metal door to office area - silicone

1 2 East Office Area Drywall 99 sq. ft. — 18286-F-21.1

None

Detected None —

1 2 East Office Area Formica Wall Adhesive 118 sq. ft. —

18286-F-22.1

18286-F-22.2

10%

Chrysotile

10%

Chrysotile

Remove

Prior to

Demolition

Adhesive on unfinished drywall under formica wall panels

1 2 East Office Area

Underlayment Layer -

Black 363 sq. ft. —

18286-F-23.1

18286-F-23.2

12%

Chrysotile

10%

Chrysotile

Remove

Prior to

Demolition

Black layer under epoxy floor on wood

Base ment 3 Basement Concrete Slab Floor — — — — — None —

Base ment 3 Basement

Floor Tile - 12"x12" -

Cream with Grey Flakes with Mastic 35 sq. ft. —

18286-F-3.1

18286-F-3.2

Floor Tile:

5%

Chrysotile

Mastic: None

Detected

Floor Tile:

5%

Chrysotile

Mastic: 3%

Chrysotile

Remove

Prior to

Demolition Stairs to basement

Base ment 3 Basement

Concrete Block Wall

Mortar — — — — — None —

Former Fire Station

BDN Job No. 18286

June 2019

Floor

Space

Code Space Name Description of Material Qty. in

Space

Qty.

Damaged

Sample

Number

Sample

Result Response Notes

Base ment 3 Basement Wood Truss Ceiling — — — — — None —

Exteri or 4 Building Exterior

Concrete Block Wall

Mortar — — — — — None —

Exteri or 4 Building Exterior Exterior Brick Mortar — — —

18286-F-17.1

18286-F-17.2

None

Detected

None

Detected None —

Exteri or 4 Building Exterior

Exterior Garage Door

Caulk - Dark Grey 60 ln. ft. —

18286-F-18.1

18286-F-18.2

None

Detected

None

Detected None Around garage doors

Exteri or 4 Building Exterior

Exterior Window Caulk -

White 10 ln. ft. — 18286-F-19.1

None

Detected None SE window - (1) 2'x3'

Exteri or 4 Building Exterior

Exterior Wall Caulk -

Tan 15 ln. ft. —

18286-F-20.1

18286-F-20.2

None

Detected

None

Detected None

Concrete block seam on north wall

Roof 5 Roof Asphalt Flat Roof 4 sq. ft. — 18286-F-24.1

None

Detected None —

Roof 5 Roof Roof Patch Material 2,162 sq. ft. — 18286-F-25.1

None

Detected None —

Roof 5 Roof Roof Insulation 2,162 sq. ft. — 18286-F-26.1

None

Detected None

Layer under roof material

Former Library

BDN Job No. 18286

June 2019

Floor

Space

Code Space Name Description of Material Qty. in

Space

Qty.

Damaged

Sample

Number

Sample

Result Response Notes

1 1 East Room Carpet — — — — — None —

1 1 East Room

Linoleum Flooring - Yellow with Green Square Pattern 25 sq. ft. — 18286-L-2.1

Linoleum:

None Detected

Mastic: None

Detected None

In front of southeast door

1 1 East Room Wood Panel Walls — — — — — None

No adhesive on wood wall panels

1 1 East Room Concrete Block Walls — sq. ft. —

18286-L-4.1

18286-L-4.2

None Detected

None Detected None —

1 1 East Room Plaster Ceiling 364 sq. ft. — 18286-L-5.1 None Detected None —

1 1 East Room Window Glazing 20 ln. ft. — 18286-L-6.1 None Detected None (2) 2'x3' windows

1 1 East Room

Floor Tile - 9"x9" - Tan with

Cream Streaks with Mastic 364 sq. ft. —

18286-L-7.1

18286-L-7.2

Floor Tile:

20% Chrysotile

Mastic: 5%

Chrysotile

Remove

Prior to

Demolition Under carpet

1 1 East Room Glue Pods - Light Brown 1,449 sq. ft. — 18286-L-9.1 None Detected None

Under wood wall panels, under styrofoam insulation on concrete block

1 1 East Room Duct Adhesive - Yellow 2 sq. ft. — 18286-L-10.1 None Detected None

On duct above southeast door

1 1 East Room Metal Doors 1 door (s) — — — None No suspect insulation

1 1 East Room Wood Doors 1 door (s) — — — None No suspect insulation

1 2 West Room Carpet — — — — — None

Concrete slab floor under carpet

1 2 West Room Wood Panel Walls — — — — — None

No adhesive on wood wall panels

Former Library

BDN Job No. 18286

June 2019

Floor

Space

Code Space Name Description of Material Qty. in

Space

Qty.

Damaged

Sample

Number

Sample

Result Response Notes

1 2 West Room Plaster Ceiling 840 sq. ft. —

18286-L-5.2

18286-L-5.3

None Detected

None Detected None —

1 2 West Room Window Glazing 50 ln. ft. — 18286-L-6.2 None Detected None

Windows:

(2) 2'x3'

(2) 3'x6'

1 2 West Room Concrete Slab Floor — — —

18286-L-8.1

18286-L-8.2

None Detected

None Detected None —

1 2 West Room Glue Pods - Light Brown 1,044 sq. ft. — 18286-L-9.2 None Detected None

Under wood wall panels, under styrofoam insulation on concrete block

1 2 West Room Wood Doors 1 door (s) — — — None No suspect insulation

1 2 West Room

Interior Window Caulk -

Brown 50 ln. ft. —

18286-L-21.1

18286-L-21.2

12% Chrysotile

15% Chrysotile

Remove

Prior to

Demolition —

Attic 3 Attic Area Blown-in Insulation — — —

18286-L-19.1

18286-L-19.2

None Detected

None Detected None —

Attic 3 Attic Area Wood Trusses — — — — — None —

Exteri or 4

Building

Exterior Exterior Ceramic Tile Walls — — — — — None —

Exteri or 4

Building

Exterior Window Caulk - Brown 10 ln. ft. — 18286-L-15.1 None Detected None

(1) 2'x3' Window -

North wall

Exteri or 4

Building

Exterior Window Caulk - White/Yellow 36 ln. ft. —

18286-L-16.1

18286-L-16.2

None Detected

None Detected None

(2) 3'x6' Windows -

West wall

Roof 5 Roof Asphalt Shingles 1,600 sq. ft. —

18286-L-17.1

18286-L-17.2

None Detected

None Detected None —

Former Library

BDN Job No. 18286

June 2019

Floor

Space

Code Space Name Description of Material Qty. in

Space

Qty.

Damaged

Sample

Number

Sample

Result Response Notes

Roof 5 Roof Chimney Caulk - Dark Grey 3 sq. ft. — 18286-L-18.1 None Detected None

Around base of chimney

APPENDIX D

ANALYTICAL RESULTS -

ASBESTOS

ASBESTOS BULK ANALYTICAL LABORATORY REPORT

EPA 600/R-93/116

Laboratory ID # 101016

Samples will be archived for 30 days, then destroyed.

Grace Kiel, Lab Coordinator

CREATING SAFE WORK

8105 Valleywood Lane •Portage, MI 49024 • 269 329-1237 • www.bdnihc.com

Attn: Eric Walters Laboratory Report No: 19-3042B Fleis & Vandenbrink Date Received by Lab: May 30, 2019 2960 Lucerne Drive SE Date Samples Analyzed: June 5, 2019 Suite 100 BDN Job #: 18286 Grand Rapids, MI 49546

Project: Jamestown Fire Station Analyst: Grace Kiel

Sample # Client Sample Description Asbestos ID

18286-F-1.1 Concrete Floor Garage

None Detected

Lab Sample #: 19-15210 Notes: Sample was homogenized for analysis Analyst Sample Description: Beige Cementitious

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz; Calcite/Silica

18286-F-1.2 Concrete Floor Garage

None Detected

Lab Sample #: 19-15211 Notes: Sample was homogenized for analysis Analyst Sample Description: Beige Cementitious

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz; Calcite/Silica

18286-F-2.1 Epoxy Floor East Office Area

None Detected

Lab Sample #: 19-15212 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Solid

Other Fibrous Materials: Cellulose; Natural Fibers

Non-Fibrous Materials: Calcite/Mastic

18286-F-2.2 Epoxy Floor East Office Area

None Detected

Lab Sample #: 19-15213 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Solid

Other Fibrous Materials: Cellulose; Natural Fibers

Non-Fibrous Materials: Calcite/Mastic

18286-F-3.1 12”x12” Floor Tile Basement

Layer 1 – 5% Chrysotile, Floor Tile Layer 2 – None Detected, Adhesive

Lab Sample #: 19-15214 Notes: Sample was analyzed in homogenous layers Analyst Sample Description: L1 – Grey Cementitious L2 – Black Adhesive

Other Fibrous Materials: L1 – Cellulose L2 – Cellulose

Non-Fibrous Materials: L1 – Calcite/Quartz L2 – Calcite/Mastic; Calcite/Quartz

18286-F-3.2 12”x12” Floor Tile Basement

Layer 1 – 5% Chrysotile, Floor Tile Layer 2 – 3% Chrysotile, Mastic

Lab Sample #: 19-15215 Notes: Sample was analyzed in homogenous layers Analyst Sample Description: L1 – Grey Cementitious L2 – Black Adhesive

Other Fibrous Materials: L1 – Cellulose L2 – Cellulose; Synthetic Fibers

Non-Fibrous Materials: L1 – Calcite/Quartz L2 – Calcite/Mastic; Calcite/Quartz

CREATING SAFE WORK

8105 Valleywood Lane •Portage, MI 49024 • 269 329-1237 • www.bdnihc.com

Attn: Eric Walters Laboratory Report No: 19-3042B Fleis & Vandenbrink Date Received by Lab: May 30, 2019 2960 Lucerne Drive SE Date Samples Analyzed: June 5, 2019 Suite 100 BDN Job #: 18286

18286-F-4.1 Base Cove Molding East Office Area

Layer 1 – None Detected, Base Cove Layer 2 – None Detected, Adhesive

Lab Sample #: 19-15216 Notes: Sample was analyzed in homogenous layers Analyst Sample Description: L1 – Grey Solid L2 – White Adhesive

Other Fibrous Materials: L1 – Cellulose L2 – Cellulose

Non-Fibrous Materials: L1 – Calcite/Silica L2 – Calcite/Mastic

18286-F-4.2 Base Cove Molding East Office Area

Layer 1 – None Detected, Base Cove Layer 2 – None Detected, Adhesive

Lab Sample #: 19-15217 Notes: Sample was analyzed in homogenous layers Analyst Sample Description: L1 – Grey Solid L2 – White Adhesive

Other Fibrous Materials: L1 – Cellulose L2 – Natural Fibers

Non-Fibrous Materials: L1 – Calcite/Quartz; Calcite/Silica L2 – Calcite/Mastic

18286-F-5.1 Concrete Block Mortar East Office Area

None Detected

Lab Sample #: 19-15218 Notes: Sample was homogenized for analysis Analyst Sample Description: Beige Cementitious

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz; Calcite/Silica

18286-F-5.2 Concrete Block Mortar East Office Area

None Detected

Lab Sample #: 19-15219 Notes: Sample was homogenized for analysis Analyst Sample Description: Beige Cementitious

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz; Calcite/Silica

18286-F-7.1 Wood Panel Adhesive East Office Area

8% Chrysotile

Lab Sample #: 19-15220 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Adhesive

Other Fibrous Materials: Natural Fibers

Non-Fibrous Materials: Calcite/Mastic; Calcite/Quartz

18286-F-7.2 Wood Panel Adhesive East Office Area

10% Chrysotile

Lab Sample #: 19-15221 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Adhesive

Other Fibrous Materials: Cellulose; Natural Fibers

Non-Fibrous Materials: Calcite/Mastic; Calcite/Quartz

CREATING SAFE WORK

8105 Valleywood Lane •Portage, MI 49024 • 269 329-1237 • www.bdnihc.com

Attn: Eric Walters Laboratory Report No: 19-3042B Fleis & Vandenbrink Date Received by Lab: May 30, 2019 2960 Lucerne Drive SE Date Samples Analyzed: June 5, 2019 Suite 100 BDN Job #: 18286

18286-F-9.1 1’x1’ Ceiling Tile East Office Area

None Detected

Lab Sample #: 19-15222 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Fibrous, White Solid

Other Fibrous Materials: Cellulose; Natural Fibers

Non-Fibrous Materials: Calcite/Silica

18286-F-9.2 1’x1’ Ceiling Tile East Office Area

None Detected

Lab Sample #: 19-15223 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Fibrous, White Solid

Other Fibrous Materials: Cellulose; Natural Fibers

Non-Fibrous Materials: Calcite/Silica

18286-F-17.1 Exterior Brick Mortar Building Exterior

None Detected

Lab Sample #: 19-15224 Notes: Sample was homogenized for analysis Analyst Sample Description: White Cementitious

Other Fibrous Materials: Cellulose; Wollastonite

Non-Fibrous Materials: Calcite/Quartz; Calcite/Silica

18286-F-17.2 Exterior Brick Mortar Building Exterior

None Detected

Lab Sample #: 19-15225 Notes: Sample was homogenized for analysis Analyst Sample Description: White Cementitious

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz; Calcite/Silica

18286-F-18.1 Exterior Garage Door Caulk Building Exterior

None Detected

Lab Sample #: 19-15226 Notes: Sample was homogenized for analysis Analyst Sample Description: Black Caulk

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Silica

18286-F-18.2 Exterior Garage Door Caulk Building Exterior

None Detected

Lab Sample #: 19-15227 Notes: Sample was homogenized for analysis Analyst Sample Description: Black Caulk

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Silica

CREATING SAFE WORK

8105 Valleywood Lane •Portage, MI 49024 • 269 329-1237 • www.bdnihc.com

Attn: Eric Walters Laboratory Report No: 19-3042B Fleis & Vandenbrink Date Received by Lab: May 30, 2019 2960 Lucerne Drive SE Date Samples Analyzed: June 5, 2019 Suite 100 BDN Job #: 18286

18286-F-19.1 Exterior Window Caulk, White Building Exterior

None Detected

Lab Sample #: 19-15228 Notes: Sample was homogenized for analysis Analyst Sample Description: White Caulk

Other Fibrous Materials: Cellulose; Natural Fibers

Non-Fibrous Materials: Calcite/Silica

18286-F-20.1 Exterior Wall Caulk, Tan Building Exterior

None Detected

Lab Sample #: 19-15229 Notes: Sample was homogenized for analysis Analyst Sample Description: Tan Caulk

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Silica

18286-F-20.2 Exterior Wall Caulk, Tan Building Exterior

None Detected

Lab Sample #: 19-15230 Notes: Sample was homogenized for analysis Analyst Sample Description: Tan Caulk

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Silica

18286-F-21.1 Drywall East Office Area

None Detected

Lab Sample #: 19-15231 Notes: Sample was homogenized for analysis Analyst Sample Description: White Powder

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Gypsum

18286-F-22.1 Formica Wall Adhesive East Office Area

10% Chrysotile

Lab Sample #: 19-15232 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Adhesive

Other Fibrous Materials: Cellulose; Natural Fibers

Non-Fibrous Materials: Calcite/Silica

18286-F-22.2 Formica Wall Adhesive East Office Area

10% Chrysotile

Lab Sample #: 19-15233 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Adhesive

CREATING SAFE WORK

8105 Valleywood Lane •Portage, MI 49024 • 269 329-1237 • www.bdnihc.com

Attn: Eric Walters Laboratory Report No: 19-3042B Fleis & Vandenbrink Date Received by Lab: May 30, 2019 2960 Lucerne Drive SE Date Samples Analyzed: June 5, 2019 Suite 100 BDN Job #: 18286

18286-F-23.1 Black Layer Under Epoxy Floor East Office Area

12% Chrysotile

Lab Sample #: 19-15234 Notes: Sample was homogenized for analysis Analyst Sample Description: Black Adhesive

Other Fibrous Materials: Cellulose; Natural Fibers

Non-Fibrous Materials: Calcite/Silica

18286-F-23.2 Black layer Under Epoxy Floor East Office Area

10% Chrysotile

Lab Sample #: 19-15235 Notes: Sample was homogenized for analysis Analyst Sample Description: Black Adhesive

Other Fibrous Materials: Cellulose; Natural Fibers

Non-Fibrous Materials: Calcite/Mastic

18286-F-24.1 Roof Patch Roof

None Detected

Lab Sample #: 19-15236 Notes: Sample was homogenized for analysis Analyst Sample Description: Black Tar

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Tar

18286-F-25.1 Roof Sheet Roof

None Detected

Lab Sample #: 19-15237 Notes: Sample was homogenized for analysis Analyst Sample Description: Black Solid, Tar

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz; Tar

18286-F-26.1 Roof Insulation Roof

None Detected

Lab Sample #: 19-15238 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Fibrous

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Perlite

18286-L-2.1 Linoleum East Room

Layer 1 – None Detected, Floor Layer 2 – None Detected, Mastic

Lab Sample #: 19-15239 Notes: Sample was analyzed in homogenous layers Analyst Sample Description: L1 – Tan Cementitious L2 – Black Adhesive

Other Fibrous Materials: L1 – Cellulose; Fiberglass L2 – Cellulose

Non-Fibrous Materials: L1 – Calcite/Quartz; Calcite/Silica L2 – Calcite/Mastic; Calcite/Silica

CREATING SAFE WORK

8105 Valleywood Lane •Portage, MI 49024 • 269 329-1237 • www.bdnihc.com

Attn: Eric Walters Laboratory Report No: 19-3042B Fleis & Vandenbrink Date Received by Lab: May 30, 2019 2960 Lucerne Drive SE Date Samples Analyzed: June 5, 2019 Suite 100 BDN Job #: 18286

18286-L-4.1 Concrete Mortar East Room

None Detected

Lab Sample #: 19-15240 Notes: Sample was homogenized for analysis Analyst Sample Description: Beige Cementitious

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz

18286-L-4.2 Concrete Mortar East Room

None Detected

Lab Sample #: 19-15241 Notes: Sample was homogenized for analysis Analyst Sample Description: Beige Cementitious

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz

18286-L-5.1 Plaster Ceiling East Room

Layer 1 – None Detected, Skim Coat Layer 2 – None Detected, Plaster

Lab Sample #: 19-15242 Notes: Sample was analyzed in homogenous layers Analyst Sample Description: L1 – White Cementitious L2 – Grey Cementitious

Other Fibrous Materials: L1 – Natural Fibers L2 – No Fibers Detected

Non-Fibrous Materials: L1 – Calcite/Gypsum; Calcite/Silica L2 – Calcite/Quartz; Calcite/Silica

18286-L-5.2 Plaster Ceiling West Room

Layer 1 – None Detected, Skim Coat Layer 2 – None Detected, Plaster

Lab Sample #: 19-15243 Notes: Sample was analyzed in homogenous layers Analyst Sample Description: L1 – Tan Cementitious L2 – Grey Cementitious

Other Fibrous Materials: L1 – Natural Fibers L2 – Cellulose

Non-Fibrous Materials: L1 – Calcite/Gypsum; Calcite/Silica L2 – Calcite/Quartz; Calcite/Silica

18286-L-5.3 Plaster Ceiling West Room

Layer 1 – None Detected, Skim Coat Layer 2 – None Detected, Plaster

Lab Sample #: 19-15244 Notes: Sample was analyzed in homogenous layers Analyst Sample Description: L1 – Tan Cementitious L2 – Grey Cementitious

Other Fibrous Materials: L1 – Cellulose; Natural Fibers L2 – Cellulose

Non-Fibrous Materials: L1 – Calcite/Gypsum; Calcite/Silica L2 – Calcite/Quartz; Calcite/Silica

18286-L-6.1 Window Glazing East Room

None Detected

Lab Sample #: 19-15245 Notes: Sample was homogenized for analysis Analyst Sample Description: Red Solid

CREATING SAFE WORK

8105 Valleywood Lane •Portage, MI 49024 • 269 329-1237 • www.bdnihc.com

Attn: Eric Walters Laboratory Report No: 19-3042B Fleis & Vandenbrink Date Received by Lab: May 30, 2019 2960 Lucerne Drive SE Date Samples Analyzed: June 5, 2019 Suite 100 BDN Job #: 18286

18286-L-6.2 Window Glazing West Room

None Detected

Lab Sample #: 19-15246 Notes: Sample was homogenized for analysis Analyst Sample Description: Grey Solid

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz

18286-L-7.1 Floor Tile East Room

Layer 1 – 20% Chrysotile, Floor Tile Layer 2 – 5% Chrysotile, Mastic

Lab Sample #: 19-15247 Notes: Sample was analyzed in homogenous layers Analyst Sample Description: L1 – Brown Cementitious L2 – Black Adhesive

Other Fibrous Materials: L1 – Cellulose L2 – Cellulose

Non-Fibrous Materials: L1 – Calcite/Quartz L2 – Calcite/Mastic; Calcite/Quartz

18286-L-7.2 Floor Tile East Room

Layer 1 – 20% Chrysotile, Floor Tile Layer 2 – 3% Chrysotile, Mastic

Lab Sample #: 19-15248 Notes: Sample was analyzed in homogenous layers Analyst Sample Description: L1 – Brown Cementitious L2 – Black Adhesive

Other Fibrous Materials: L1 – Cellulose L2 – Cellulose

Non-Fibrous Materials: L1 – Calcite/Quartz L2 – Calcite/Mastic; Calcite/Quartz

18286-L-8.1 Concrete Slab West Room

None Detected

Lab Sample #: 19-15249 Notes: Sample was homogenized for analysis Analyst Sample Description: White Cementitious

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz; Calcite/Silica

18286-L-8.2 Concrete Slab West Room

None Detected

Lab Sample #: 19-15250 Notes: Sample was homogenized for analysis Analyst Sample Description: White Cementitious

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz; Calcite/Silica

18286-L-9.1 Glue Pods, Light Brown East Room

None Detected

Lab Sample #: 19-15251 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Adhesive

Non-Fibrous Materials: Calcite/Mastic; Calcite/Silica

CREATING SAFE WORK

8105 Valleywood Lane •Portage, MI 49024 • 269 329-1237 • www.bdnihc.com

Attn: Eric Walters Laboratory Report No: 19-3042B Fleis & Vandenbrink Date Received by Lab: May 30, 2019 2960 Lucerne Drive SE Date Samples Analyzed: June 5, 2019 Suite 100 BDN Job #: 18286

18286-L-9.2 Glue Pods, Light Brown West Room

None Detected

Lab Sample #: 19-15252 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Adhesive

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Mastic; Calcite/Silica

18286-L-10.1 Duct Adhesive, Yellow East Room

None Detected

Lab Sample #: 19-15253 Notes: Sample was homogenized for analysis Analyst Sample Description: Yellow Adhesive

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Mastic; Calcite/Silica

18286-L-15.1 Exterior Window Caulk, North Building Exterior

None Detected

Lab Sample #: 19-15254 Notes: Sample was homogenized for analysis Analyst Sample Description: White Solid

Other Fibrous Materials: Cellulose; Natural Fibers

Non-Fibrous Materials: Calcite/Silica

18286-L-16.1 Window Caulk, White/Yellow Building Exterior

None Detected

Lab Sample #: 19-15255 Notes: Sample was homogenized for analysis Analyst Sample Description: Beige Solid

Other Fibrous Materials: Cellulose; Wollastonite

Non-Fibrous Materials: Calcite/Mastic

18286-L-16.2 Window Caulk, White/Yellow Building Exterior

None Detected

Lab Sample #: 19-15256 Notes: Sample was homogenized for analysis Analyst Sample Description: Beige Solid

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Mastic

18286-L-17.1 Asphalt Shingle Roof

None Detected

Lab Sample #: 19-15257 Notes: Sample was homogenized for analysis Analyst Sample Description: Black Fibrous, Tar

Other Fibrous Materials: Fiberglass

Non-Fibrous Materials: Calcite/Quartz; Tar

CREATING SAFE WORK

8105 Valleywood Lane •Portage, MI 49024 • 269 329-1237 • www.bdnihc.com

Attn: Eric Walters Laboratory Report No: 19-3042B Fleis & Vandenbrink Date Received by Lab: May 30, 2019 2960 Lucerne Drive SE Date Samples Analyzed: June 5, 2019 Suite 100 BDN Job #: 18286

18286-L-17.2 Asphalt Shingle Roof

None Detected

Lab Sample #: 19-15258 Notes: Sample was homogenized for analysis Analyst Sample Description: Black Solid, Tar

Other Fibrous Materials: Cellulose; Natural Fibers

Non-Fibrous Materials: Tar

18286-L-18.1 Chimney Caulk Room

None Detected

Lab Sample #: 19-15259 Notes: Sample was homogenized for analysis Analyst Sample Description: Black Solid

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz; Tar

18286-L-21.1 Window Caulk, Rope West Room

12% Chrysotile

Lab Sample #: 19-15260 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Caulk

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz; Calcite/Silica

18286-L-21.2 Window Caulk, Rope West Room

15% Chrysotile

Lab Sample #: 19-15261 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Caulk

Other Fibrous Materials: Cellulose

Non-Fibrous Materials: Calcite/Quartz; Calcite/Silica

18286-L-19.1 Blown-In Insulation Attic

None Detected

Lab Sample #: 19-15262 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Fibrous

Other Fibrous Materials: Cellulose; Natural Fibers

Non-Fibrous Materials: N/A

18286-L-19.2 Blown-In Insulation Attic

None Detected

Lab Sample #: 19-15263 Notes: Sample was homogenized for analysis Analyst Sample Description: Brown Fibrous

Non-Fibrous Materials: N/A

APPENDIX E

ANALYTICAL RESULTS - LEAD

838650 Well Abandonment SP 02001 02001-1 WELL ABANDONMENT

SECTION 02001

WELL ABANDONMENT

PART 1 - GENERAL

1.01 SCOPE OFWORK:

The work to be done shall consist of furnishing all labor, materials and equipment for the complete and satisfactory plugging of potable well.

1.02 REGISTRATION:

Only Michigan registered water well drilling contractors may conduct abandoned well plugging activities (including removal of obstructions from well). The CONTRACTOR shall comply with all federal, state and local laws and ordinances relating to performance of the work. Unless otherwise provided for in these contract specifications or under written directive from the State, all work is to be done in accordance with Part 127, Michigan Water Well Construction and Pump Installation Code, 1978 PA 368, as amended (Act 368), and the specifications described therein.

1.03 UTILITIES FOR CONSTRUCTION:

Unless otherwise provided for in these specifications, the CONTRACTOR shall furnish his own source of electricity, fuel, and water required to perform the work and shall bear the cost of these services.

1.04 SITE CLEANUP AND RESTORATION:

The CONTRACTOR shall provide all material and labor to maintain the sites in an orderly condition. The CONTRACTOR shall remove and properly dispose of all pumping equipment, drop pipes, pitless adapter parts, seals, pump rods, or other materials or obstructions removed from the well/cistern. Where a well or cistern pit is exposed above ground surface, the CONTRACTOR shall demolish and/or remove the concrete or other pit material to 1 foot below grade and haul it off-site for disposal/recycling.

Where the LANDOWNER requests to keep the pump or parts removed, the CONTRACTOR shall honor the request. The CONTRACTOR shall keep the site free from accumulation of waste materials, rubbish, or other debris resulting from the work.

The CONTRACTOR shall assure that each Site is properly restored, including removal of access grout material and grout packaging, filling and leveling of excavations, placement of topsoil and seed, and repair of damage to landscaping. Special site restoration activities that may be deemed necessary shall be listed in the prebid specifications.

1.05 SAFETY:

The CONTRACTOR shall comply with all applicable laws and regulations governing the furnishing and use of safeguards, safety devices, and protection equipment. The CONTRACTOR shall take any necessary precautions to protect the life and health of employees and the public in the performance of the work.

838650 Well Abandonment SP 02001 02001-2 WELL ABANDONMENT

PART 2 – MATERIALS

2.01 PLUGGING MATERIALS

A. Bentonite grout (slurry) - a mixture of…