837917padot94437.pdf
PDF 1 MB Posted
- Attached to
- Hollidaysburg Brush Run Bridge Rehabilitation
- Solicitation number
- 94437
- Issued by
- Blair County, Allentown City, Pennsylvania
About this file
This is a project description document for the Pennsylvania Department of Transportation (PennDOT) detailing the Hollidaysburg Brush Run Bridge Rehabilitation project in Blair County. The project encompasses three distinct bridge and roadway components: rehabilitation of the PA 36 bridge over Brush Run in Hollidaysburg Borough and Frankstown Township, including substructure repairs, debris removal, and floodplain re-establishment; milling and overlay work on SR 4003 (Logan Boulevard) over Mill Run in Altoona between Browning and Milton Avenues; and rehabilitation of the SR 4003 (Logan Boulevard) structure over Norfolk Southern Railroad in Altoona. The work locations are precisely defined by state route segments and offsets, with PA 36 Section 41B spanning from Segment 0290 Offset 0562 to Segment 0300 Offset 0867, SR 4003 Section 06B from Segment 0010 Offset 0535 to Segment 0010 Offset 1265, and SR 4003 Section 07B from Segment 0030 Offset 0823 to Segment 0030 Offset 1963. The project is based on approved drawings included in the bid package.
The document does not contain information regarding specific pricing terms, set-asides, response deadlines, bid due dates, site visit schedules, pre-bid meetings, or contract award dates within the portions provided. Funding sources, project budget amounts, and renewal options are not specified in this summary document. Contractors should refer to the complete bid package and related addenda for comprehensive details on financial requirements, submission timelines, and bidding procedures.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL Report - Project 94437
August 6, 2026 07:25:11 AM Page 1 of 103
PROPOSAL REPORT
Project: 94437 Bid
Package: 1
Current Let: 09/03/2026 11:00:00 AM
Version: Current Addendum
Count: 0
District: 09 County: Blair
SR/SEC/
Group ID: 36/41B/---
Description
Hburg Brush Run Bridge
August 6, 2026 07:25:11 AM Page 2 of 103
TABLE OF CONTENTS
BID PACKAGE SUMMARY
PROJECT ITEMS AND QUANTITIES
SPECIAL PROVISIONS
G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW C164A - a00164 CHANGES TO SPECIFICATIONS: SECTION 106 C166A - a00166 CHANGES TO SPECIFICATIONS: SECTIONS 107 AND 608 C167A - a00167 CHANGES TO SPECIFICATIONS: APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
C168A - a00168 CHANGES TO SPECIFICATIONS: SECTIONS 110, 404, AND 507 C169A - a00169 CHANGES TO SPECIFICATIONS: SECTION 419 C170A - a00170 CHANGES TO SPECIFICATIONS: SECTIONS 110, 501, 506, 530, 703, and 704 C171A - a00171 CHANGES TO SPECIFICATIONS: SECTIONS 313, 314, 360, 410, 412, and 413 ... 40 C172A - a00172 CHANGES TO SPECIFICATIONS: SECTIONS 107, 871, 872, 875, and 876 G311A - a00311 ROAD USER LIQUIDATED DAMAGES (RULD) G810A - a00810 MIXTURE ACCEPTANCE AND DENSITY ACCEPTANCE G1211B - a01211 Exx-9999 PERMIT G1601A - a01601 E.E.O. COVERED AREA G1902B - a01902 INSURANCE--GENERAL APPLICATION-ADDITIONAL COVERAGE LIMITS G2201A - a02201 RAILROAD COMPANY CONTACT PERSON G2302A - a02302 Worker Protection and Investment P1061D - b01061 Electronic Submission of Material Certifications through ECMS P1062D - b01062 Electronic Submission of Material Certifications through ECMS for Lump Sum Component items
S6012B - b06012 - SECTION 601.3(f) BACKFILLING TRENCH S6092B - b06092-SECTION 609.2(f) MISCELLANEOUS MATERIALS I515D - c0515 ITEM 4515-0001 SAWING AND SEALING OF ASPHALT OVERLAYS, BRIDGE I6091L - c0609 ITEM 0609-0009 EQUIPMENT PACKAGE 00 - c0620 ITEM 4620-2010 THRIE-BEAM GUIDE RAIL TO CONCRETE BRIDGE BARRIER
TRANSITION WITHOUT CURB, POSTS
I1A - c0901 ITEM 0901-0001 MAINTENANCE AND PROTECTION OF TRAFFIC DURING
CONSTRUCTION
00 - c1001 ITEM 5001-1120 CLASS A CEMENT CONCRETE NO. 8 COARSE AGGREGATE 00 - c1003 ITEM 5003-0002 DOWEL HOLES, 6" DEPTH ADHESIVE ANCHOR 00 - c1013 ITEM 5013-0001 ALUMINUM BRIDGE RAILING REPLACEMENT I1A - c1018 ITEM 1018-0050 REMOVAL OF PORTION OF EXISTING BRIDGE 00 - c1051 ITEM 5051-0000 DOWNSPOUTING REMOVE AND REPLACE I9000C - c9000 ITEM 9000-0005 UTILITY TEST HOLE
August 6, 2026 07:25:11 AM Page 3 of 103
00 - c9000 ITEM 9000-0011 SHORTENED THRIE-BEAM GUIDE RAIL TO CONCRETE BRIDGE
BARRIER TRANSITION WITHOUT
00 - c9000 ITEM 9000-0012 REMOVAL OF EXISTING CRASH BARRELS AND PORTION OF
EXISTING CONCRETE SLAB
00 - c9000 ITEM 9000-0055 UTILITY PROTECT IN PLACE - CITY OF ALTOONA HIGHWAY
LIGHTING
00 - c9000 ITEM 9000-0056 UTILITY PROTECT IN PLACE - CITY OF ALTOONA HIGHWAY
LIGHTING
00 - c9000 ITEM 9000-0057 CONCRETE ENCASEMENT OF VERIZON DUCT BANK 00 - c9000 ITEM 9000-0058 CLEAN AND FLUSH SCUPPERS I1B - c9000 ITEM 9000-0086 PRECOMPRESSED, SILICONE-AND-FOAM HYBRID JOINT
SEALING MATERIAL, 1" WIDTH
I1A - c9000 ITEM 9000-0096 THRIE-BEAM GUIDE RAIL TO EXISTING NJ SHAPE BRIDGE
BARRIER TRANSITION
I9705D - c9000 ITEM 9000-0105 SILICONE JOINT SEALING MATERIAL I1A - c9000 ITEM 9000-0113 REMOVAL OF DETERIORATED CONCRETE I1B - c9000 ITEM 9000-0120 SPECIAL MORTAR REPAIRS I9000C - c9000 ITEM 9000-0125 REINFORCEMENT BAR ANCHOR NO. 4 BAR I1D - c9000 ITEM 9000-0130 SPECIAL CONCRETE REPAIRS I1D - c9000 ITEM 9000-0136 SCARIFICATION, 1" DEPTH I9000D - c9000 ITEM 9000-0140 BEAM SPALL REPAIRS 00 - c9000 ITEM 9000-0151 FABRICATED ALUMINUM POSTS 00 - c9000 ITEM 9000-0152 3/8" TOGGLE BOLTS WITH NUT AND WASHER 00 - c9000 ITEM 9000-0160 ELASTOMERIC CONCRETE REPAIRS 00 - c9000 ITEM 9000-0165 SIDEWALK FRONT EDGE REPAIR I1C - c9000 ITEM 9000-0351 DIRECT HIRE FOR PROTECTIVE SERVICES (FLAGGING) I68C - c9000 ITEM 9000-5101 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION
AGGREGATE
I70C - c9000 ITEM 9000-5103 ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION
CONCRETE
I2032D - c9000 ITEM 9203-0101 TEMPORARY EXCAVATION SUPPORT AND PROTECTION
SYSTEM
00 - CONSTRUCTION RESTRICTIONS
N1D - d01 ADVANCE NOTICE TO CHANGE IN TRAFFIC CONTROL
N1B - MAINTENANCE AND PROTECTION OF RAILROAD TRAFFIC WITH 3RD PARTY
CONTRACTED FLAGGING
N1B - NORFOLK SOUTHERN RAILROAD SPECIAL PROVISION
N1B - NOTICE TO CONTRACTOR - WORKING HOURS
N1B - PROJECT FIELD OFFICE
N1A - SPOTTED LANTERNFLY QUARANTINE AREA
N1A - TEMPORARY PAVEMENT MARKINGS ON FINISHED WEARING SURFACES
N1A - TRAFFIC BARRIER PRE-INSTALLATION FIELD MARK-OUT
August 6, 2026 07:25:11 AM Page 4 of 103
BID PACKAGE SUMMARY
Project: 94437 Bid Package: 1
Project Type: Standard Posted:
Federal Project Status: PENNDOT Oversight NHS State Type of Work: DECK REHABILITATION
Prequalification Required: Yes Pre-Bid Meeting: None
408 Version: 2026-IE
Scheduled Let: 09/03/2026 11:00:00 AM Project Cost Range: $2,500,000.00 - $4,999,999.99 Anticipated NTP: 10/19/2026 Structure Work: 51.00%
Required Completion: 11/04/2027 DBE: 0% Wage Rates: Yes
Description:
This project is the Bridge Rehabilitation on PA 36 over Brush Run in Hollidaysburg Borough and Frankstown Township, Blair County, the Bridge Improvement including substructure repairs, debris removal, re-establishment of the elevated floodplain, milling and overlay of the approach roadways on SR 4003 (Logan Boulevard) over Mill Run between Browning and Milton Avenues in the City of Altoona, Blair County, and the Bridge Rehabilitation of a structure carrying SR 4003 (Logan Boulevard) over Norfolk Southern Railroad in the City of Altoona, Blair County. This work is indicated on the approved drawings included in the bid package for STATE ROUTE 0036, SECTION 41B from approximately Segment 0290 Offset 0562 to Segment 0300 Offset 0867, STATE ROUTE 4003, SECTION 06B from approximately Segment 0010 Offset 0535 to Segment 0010 Offset 1265, and STATE ROUTE 4003, SECTION 07B from approximately Segment 0030 Offset 0823 to Segment 0030 Offset 1963.
Additional Information:
This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to contact Contract Awards and be escorted to the 7th Floor Contract Awards Room. Contract Awards can be reached at 717-395-9754.
Due to recent changes in the Keystone Building, there is no longer a reception on the 5th Floor to greet and check-in visitors.
August 6, 2026 07:25:11 AM Page 5 of 103
PROJECT ITEMS AND QUANTITIES
Alt Item Work Class Code Unit Of
Measure Quantity Unit Price PDP Spec
Prov Add Action
0203-0001 C Cubic Yard 787.0000 N
CLASS 1 EXCAVATION
0203-0006 G4 Linear Foot 57.0000 N
SAW CUTTING
0204-0100 C1, S1, T1 Cubic Yard 60.0000 N
CLASS 3 EXCAVATION
0205-0292 C1, S4 Cubic Yard 50.0000 N
STRUCTURE BACKFILL
0205-0363 C1 Ton 30.0000 N
SELECTED BORROW EXCAVATION ROCK, CLASS R-3
0212-0014 C3, H, M2 Square Yard 279.0000 N
GEOTEXTILE, CLASS 4, TYPE A
0313-0423 E Square Yard 325.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALs, 25.0 MM MIX, 4 1/2"
DEPTH
0313-0426 E Square Yard 217.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALs, 25.0 MM MIX, 6" DEPTH
0350-0106 C, E Square Yard 542.0000 N
SUBBASE 6" DEPTH (NO. 2A)
0413-0245 F Square Yard 12,310.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALS, 9.5 MM MIX, 1 1/2"
DEPTH, SRL-H
0413-2074 F Ton 659.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE (LEVELING), PG 64S-22, 0.3 TO < 3 MILLION ESALS, 9.5
MM MIX, SRL-L
0413-6045 F Square Yard 217.0000 N
SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64S-22, 0.3 TO < 3 MILLION ESALS, 19.0 MM MIX, 2 1/2"
DEPTH
0460-0003 F4 Square Yard 23,429.0000 N
ASPHALT TACK COAT (NTT/CNTT)
0491-0012 F3 Square Yard 1,189.0000 N MILLING OF ASPHALT PAVEMENT SURFACE, 1 1/2" DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR
0491-0014 F3 Square Yard 10,295.0000 N MILLING OF ASPHALT PAVEMENT SURFACE, 2 1/2" DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR
0491-0019 F3 Square Yard 611.0000 N MILLING OF ASPHALT PAVEMENT SURFACE, VARIABLE DEPTH, MILLED MATERIAL RETAINED BY CONTRACTOR
August 6, 2026 07:25:11 AM Page 6 of 103
0501-0020 G, G1, K Square Yard 284.0000 N
PLAIN CEMENT CONCRETE PAVEMENT, 4" DEPTH
4515-0001 G1, G4 Linear Foot 351.0000 N Std
SAWING AND SEALING OF ASPHALT OVERLAYS BRIDGE
0608-0001 X Lump Sum 1.0000 N
MOBILIZATION
0609-0003 X Lump Sum 1.0000 N
INSPECTOR'S FIELD OFFICE AND INSPECTION FACILITIES, TYPE B
0609-0009 X Lump Sum 1.0000 N Std
EQUIPMENT PACKAGE
0619-0450 J3 Each 1.0000 N
PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 3, FLARED (MASH)
0619-0459 J1, J3 Each 3.0000 N
PERMANENT IMPACT ATTENUATING DEVICE, TYPE II, TEST LEVEL 3, TANGENT (MASH)
0620-0400 J Each 6.0000 N
TERMINAL SECTION, SINGLE
0620-0503 C1, J Linear Foot 724.0000 N
REMOVE EXISTING GUIDE RAIL (CONTRACTOR'S PROPERTY)
0620-1600 J Linear Foot 525.0000 N
TYPE 31-S GUIDE RAIL
0620-1635 J Linear Foot 100.0000 N
TYPE 31-SCC GUIDE RAIL
0620-1670 J Each 3.0000 N
TYPE 31-STRONG POST IN-LINE ANCHOR
0620-1680 J Linear Foot 125.0000 N
TYPE 31-S GUIDE RAIL TO TYPE 31-SCC GUIDE RAIL TRANSITION
0620-2010 J Each 1.0000 N
THRIE-BEAM GUIDE RAIL TO CONCRETE BRIDGE BARRIER TRANSITION WITHOUT CURB
4620-2010 J Each 1.0000 N Proj
THRIE-BEAM GUIDE RAIL TO CONCRETE BRIDGE BARRIER TRANSITION WITHOUT CURB , POSTS MOUNTED TO
CONCRETE
0627-3020 J1 Linear Foot 4,190.0000 N
TEMPORARY BARRIER, TEST LEVEL 3, BARRIER DEFLECTION DISTANCE < /=2'
0628-3020 J1 Linear Foot 1,489.0000 N
RESET TEMPORARY BARRIER, TEST LEVEL 3, BARRIER DEFLECTION DISTANCE < /=2'
0633-0200 K Linear Foot 2,480.0000 N
PLAIN CONCRETE MOUNTABLE CURB, TYPE A
August 6, 2026 07:25:11 AM Page 7 of 103
0643-0010 J1 Linear Foot 237.0000 N
TEMPORARY CONCRETE MEDIAN BARRIER, STRUCTURE MOUNTED, 32" HEIGHT
0644-0010 J1 Linear Foot 189.0000 N
TEMPORARY CONCRETE MEDIAN BARRIER, STRUCTURE MOUNTED, 32" HEIGHT, RESET
0680-0121 K2, S1 Square Yard 59.0000 N
MEMBRANE WATERPROOFING SYSTEM INSTALLED ON OTHER SURFACES
0686-0050 X Lump Sum 1.0000 N
CONSTRUCTION SURVEYING, TYPE D
0689-0005 X Lump Sum 1.0000 N
CPM SCHEDULE, WITH UPDATES
0690-0001 X Dollar 1,000.0000 $1.00 Y
INTERNAL FACILITATION
0696-0610 J1 Each 6.0000 N
TEMPORARY IMPACT ATTENUATING DEVICE, TYPE V (STANDARD), TEST LEVEL 3
0697-0610 J1 Each 6.0000 N
RESET TEMPORARY IMPACT ATTENUATING DEVICE, TYPE V (STANDARD), TEST LEVEL 3
0901-0001 Q Lump Sum 1.0000 N Std
MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION
0901-0203 Q Each 6.0000 N
ARROW PANEL
0901-0231 Q Day 75.0000 N
ADDITIONAL WARNING LIGHTS, TYPE B
0901-0240 Q, R Square Foot 600.0000 N
ADDITIONAL TRAFFIC CONTROL SIGNS
0901-0330 O Linear Foot 12,680.0000 N
4" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, WHITE
0901-0331 O Linear Foot 4,427.0000 N
6" STANDARD PAVEMENT MARKINGS, PAINT & BEADS, WHITE
0901-0451 Q Each 6.0000 N
3-LINE CHANGEABLE MESSAGE SIGN WITHOUT TELECOMMUNICATIONS
0937-0107 J, R Each 22.0000 N
GUIDE RAIL MOUNTED DELINEATOR TYPE B, (W/W)
0937-0114 J, R Each 22.0000 N
GUIDE RAIL MOUNTED DELINEATOR TYPE D, (W/W)
0937-0323 R Each 8.0000 N
FLEXIBLE DELINEATOR POST, GROUND-MOUNT TYPE GM-1, RED POST WITH WHITE SHEETING
0941-0001 R Each 4.0000 N
RESET POST MOUNTED SIGNS, TYPE B
August 6, 2026 07:25:11 AM Page 8 of 103
0962-1000 O Linear Foot 13,176.0000 N
4" WHITE WATERBORNE PAVEMENT MARKINGS
0962-1005 O Linear Foot 10,446.0000 N
4" YELLOW WATERBORNE PAVEMENT MARKINGS
0962-1062 O3 Each 2.0000 N
WHITE WATERBORNE PAVEMENT LEGEND, "LEFT ARROW", 12'-0" X 3'-0"
0963-0001 O2, O3 Square Foot 500.0000 N
PAVEMENT MARKING REMOVAL
0963-0004 O2, O3 Linear Foot 15,082.0000 N
4" PAVEMENT MARKING REMOVAL
1001-0980 G4, S9 Square Yard 381.0000 N
MECHANICAL TEXTURING WITH LONGITUDINAL SAWED GROOVES
1001-1000 S9 Cubic Yard 68.0000 N
CLASS AAAP CEMENT CONCRETE
5001-1120 S2 Cubic Yard 5.0000 N Proj
CLASS A CEMENT CONCRETE NO. 8 COARSE AGGREGATE
1001-1200 S2 Cubic Yard 19.0000 N
CLASS AA CEMENT CONCRETE, EXCEPT USE NO. 8 COARSE AGGREGATE
1002-0053 S7 Pound 16,536.0000 N
REINFORCEMENT BARS, EPOXY COATED
5003-0002 S2 Each 61.0000 N Proj
DOWEL HOLES, 6" DEPTH ADHESIVE ANCHOR
5013-0001 J2, S4 Linear Foot 68.0000 N Proj
ALUMINUM BRIDGE RAILING REPLACEMENT
1018-0050 T1 Lump Sum 1.0000 N Std
REMOVAL OF PORTION OF EXISTING BRIDGE
1019-0050 K2 Square Yard 302.0000 N
PROTECTIVE COATING FOR REINFORCED CONCRETE SURFACES (PENETRATING SEALERS, BRIDGE
SUPERSTRUCTURE)
1039-0010 S9 Square Yard 199.0000 N
CONCRETE BRIDGE DECK SURFACE PREPARATION, HYDRODEMOLITION
1042-0001 S3 Square Yard 202.0000 N
LATEX MODIFIED CONCRETE WEARING SURFACE, 1 1/4" DEPTH
1042-0060 S3 Cubic Yard 6.0000 N
LATEX MODIFIED CONCRETE, VARIABLE DEPTH
1050-0089 T8 Each 432.0000 N
SHEAR CONNECTORS
August 6, 2026 07:25:11 AM Page 9 of 103
5051-0000 T7 Linear Foot 52.0000 N Proj
DOWNSPOUTING REMOVE AND REPLACE
1070-0200 V Lump Sum 1.0000 N
PAINTING EXISTING STRUCTURAL STEEL
1072-0100 V2 Lump Sum 1.0000 N
CONTAINMENT
1072-0200 X Lump Sum 1.0000 N
WASTE MANAGEMENT
1072-0300 V2 Lump Sum 1.0000 N
WORKER HEALTH AND SAFETY
1090-1017 T5 Linear Foot 269.0000 N
NEOPRENE STRIP SEAL GLAND REPLACEMENT
9000-0005 X Each 16.0000 N Std
UTILITY TEST HOLE
9000-0011 J Each 2.0000 N Proj SHORTENED THRIE-BEAM GUIDE RAIL TO CONCRETE BRIDGE BARRIER TRANSITION WITHOUT CURB
9000-0012 C1, G4 Lump Sum 1.0000 N Proj
REMOVAL OF EXISTING CRASH BARRELS AND PORTION OF EXISTING CONCRETE SLAB
9000-0055 X Dollar 5,000.0000 $1.00 Y Proj
UTILITY PROTECT IN PLACE - CITY OF ALTOONA HIGHWAY LIGHTING
9000-0056 X Dollar 5,000.0000 $1.00 Y Proj
UTILITY PROTECT IN PLACE - CITY OF ALTOONA HIGHWAY LIGHTING
9000-0057 K2 Dollar 5,000.0000 $1.00 Y Proj
CONCRETE ENCASEMENT OF VERIZON DUCT BANK
9000-0058 T7 Each 2.0000 N Proj
CLEAN AND FLUSH SCUPPERS
9000-0086 S2, T6 Linear Foot 279.0000 N Std
PRECOMPRESSED, SILICONE-AND-FOAM HYBRID JOINT SEALING MATERIAL, 1" WIDTH
9000-0096 J Each 2.0000 N Std
THRIE-BEAM GUIDE RAIL TO EXISTING NJ SHAPE BRIDGE BARRIER TRANSITION
9000-0105 S2, S9, T6 Linear Foot 188.0000 N Std
SILICONE JOINT SEALING MATERIAL
9000-0113 S2 Square Foot 312.0000 N Std
REMOVAL OF DETERIORATED CONCRETE
9000-0120 S2 Square Foot 116.0000 N Std
SPECIAL MORTAR REPAIRS
9000-0125 S2, S7 Each 150.0000 N Std
REINFORCEMENT BAR ANCHOR, NO. 4 BAR
August 6, 2026 07:25:11 AM Page 10 of 103
9000-0130 S2 Square Foot 1,013.0000 N Std
SPECIAL CONCRETE REPAIRS
9000-0136 S2 Square Yard 199.0000 N Std
SCARIFICATION, 1" DEPTH
9000-0140 G3, S2, S9 Square Foot 515.0000 N Std
BEAM SPALL REPAIRS
9000-0151 J2 Each 8.0000 N Proj
FABRICATED ALUMINUM POSTS
9000-0152 S2 Each 38.0000 N Proj
3/8" TOGGLE BOLTS WITH NUT AND WASHER
9000-0160 S2 Cubic Foot 84.0000 N Proj
ELASTOMERIC CONCRETE REPAIRS
9000-0165 K Linear Foot 33.0000 N Proj
SIDEWALK FRONT EDGE REPAIR
9000-0351 X Dollar 86,000.0000 $1.00 Y Std
DIRECT HIRE FOR PROTECTIVE SERVICES (FLAGGING)
9000-5101 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION AGGREGRATE
9000-5103 X Lump Sum 1.0000 N Std
ELECTRONIC TICKETING (E-TICKETING) FOR CONSTRUCTION CONCRETE
9203-0101 C1, S5 Lump Sum 1.0000 N Std
TEMPORARY EXCAVATION SUPPORT AND PROTECTION SYSTEM
August 6, 2026 07:25:11 AM Page 11 of 103
SPECIAL PROVISIONS
Special Provision: G50B - a00050 APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL) Addendum:
Action:
Item(s) Associated:
Header:
APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL)
Provision Body:
APPLICABLE DESIGNATED SPECIAL PROVISIONS. The following Designated Special Provisions are found in Appendix C and apply to this bid proposal.
DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects.
DSP8. F.A.R. - Required Contract Provisions Federal-Aid Construction Contracts FHWA-1273 (Revised October 23, 2023). Also attached to the Proposal/Contract.
DSP9. Special Supplement - Anti-Pollution Measures - August 26, 1999.
DSP12. Executive Order 11246, with Appendix A and B.
DSP13. Buy America.
DSP15. Commonwealth Standard Terms and Conditions.
DSP16. Lobbying Certification Form. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).
DSP17. Federal Audit Clause.
DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances.
DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities.
Project Specific Details:
Special Provision: G113B - a00113 CONTRACT PROVISIONS - RIGHT-TO-KNOW LAW Addendum:
CONTRACT PROVISIONS - RIGHT TO KNOW LAW
Provision Body:
August 6, 2026 07:25:11 AM Page 12 of 103
I. Contract Provisions – Right to Know Law 8-K-1532
a. The Pennsylvania Right-to-Know Law (RTKL), 65 P.S. §§ 67.101-3104, applies to this Contract.
b. If the Department needs assistance in any matter arising out of the RTKL related to this Contract, the Department will notify the Contractor using the legal contact information provided in this Contract. The Contractor, at any time, may designate a different contact for such purpose upon reasonable prior written notice to the Department.
c. Upon written notification from the Department that it requires assistance in responding to a request under the RTKL for information related to this Contract that may be in the Contractor’s possession, constituting, or alleged to constitute, a public record in accordance with the RTKL (“Requested Information”), the Contractor will:
1. Provide the Department, within 10 calendar days after receipt of written notification, access to, and copies of, any document or information in the Contractor’s possession arising out of this Contract that the Department reasonably believes is Requested Information and may be a public record under the RTKL; and
2. Provide such other assistance as the Department may reasonably request, in order to comply with the RTKL with respect to this Contract.
d. If the Contractor considers the Requested Information to include a request for a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, or other information that the Contractor considers exempt from production under the RTKL, notify the Department and provide, within 7 calendar days of receiving the written notification, a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL.
e. The Department will rely upon the written statement from the Contractor in denying a RTKL request for the Requested Information unless the Department determines that the Requested Information is clearly not protected from disclosure under the RTKL. Should the Department determine that the Requested Information is clearly not exempt from disclosure, provide the Requested Information within 7 calendar days of receipt of written notification of the Department’s determination.
f. Failing to provide the Requested Information within the time period required by these provisions, indemnify and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of this failure, including any statutory damages assessed against the Department.
g. The Department will reimburse the Contractor for any costs associated with complying with these provisions only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.
h. The Contractor may file a legal challenge to any Department decision to release a record to the public with the Office of Open Records, or in the Pennsylvania Courts, however, indemnify the Department for any legal expenses incurred by the Department as a result of such a challenge and hold the Department harmless for any damages, penalties, costs, detriment or harm that the Department may incur as a result of the failure, including any statutory damages assessed against the Department, regardless of the outcome of such legal challenge. As between the parties, agree to waive all rights or remedies that may be available as a result of the Department’s disclosure of Requested information pursuant to the RTKL.
i. The Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Contract and continue as long as the Requested Information remains in the Contractor's possession.
Special Provision: C164A - a00164 CHANGES TO SPECIFICATIONS: SECTION 106
August 6, 2026 07:25:11 AM Page 13 of 103
Header:
CHANGES TO SPECIFICATIONS: SECTION 106
Provision Body:
SECTION 106—CONTROL OF MATERIAL
106.10(a) Buy America Provisions. Revise last paragraph to read as follows:
Products manufactured of foreign steel or iron materials may be used, provided the cumulative cost of such products as they are delivered to the project does not exceed 0.1% of the total contract amount, or $2,500, whichever is greater.
Add 106.11 BUILD AMERICA, BUY AMERICA ACT PROVISIONS.
106.11 BUILD AMERICA, BUY AMERICA ACT PROVISIONS—
(a) Build America, Buy America Act. The Federal Bipartisan Infrastructure Law (Public Law 117-58) includes the Build America, Buy America Act that requires all iron, steel, manufactured products, and construction materials used to be produced in the United States.
The term produced in the United States defined as:
1. Iron or Steel Products. All manufacturing processes from the initial melting stage through the application of coatings occurred in the United States according to Section 106.10(a).
2. Manufactured Product. Final assembly of all manufactured products permanently incorporated into the project must be manufactured in the United States.
2.a A manufactured product, not predominantly steel or iron, is defined as an article, material, or supply that has been processed into a specific form and shape, or combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies.
2.b Predominantly steel or iron is defined as greater than or equal to 50 percent of the total cost of the manufactured product.
2.c Manufactured products that are predominantly steel or iron must comply with Buy America provisions according to Section 106.10(a).
2.d If an article, material, or supply meets this definition but could also be classified as an excluded material or other product category, that article, material, or supply is not a manufactured product.
2.e Mixtures of excluded materials delivered to a work site without final form for incorporation into a project are also not manufactured products.
2.f Manufactured products where the final assembly did not occur in the United States may be used, provided the cumulative cost of such manufactured products is no more than the lesser of $1 million or 5% of total applicable costs for the project.
3. Construction Materials.
3.a All manufacturing processes for construction materials occurred in the United States.
3.b Construction materials includes an article, material, or supply that is or consists primarily of:
non-ferrous metals, plastic and polymer-based products including polyvinylchloride, composite building materials, and polymers used in fiber optic cables, glass including optic glass, lumber, or drywall
August 6, 2026 07:25:11 AM Page 14 of 103
Items that consist of two or more of the listed materials that have been combined together through a manufacturing process, and items that include at least one of the listed materials combined with a material that is not listed through a manufacturing process, should be treated as manufactured products, rather than as construction materials.
3.c Limitation with Respect to Aggregates. Shall not include cement and cementitious materials, aggregates such as stone, sand, or gravel, or aggregate binding agents or additives.
3.d Construction materials where all manufacturing processes did not occur in the United States may be used, provided the cumulative cost of such construction materials is no more than the lesser of $1 million of 5% of total applicable costs for the project.
Special Provision: C166A - a00166 CHANGES TO SPECIFICATIONS: SECTIONS 107 AND 608
CHANGE TO SPECIFICATIONS: SECTIONS 107, AND 608
Provision Body:
SECTION 107—LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS. Revise to read as follows:
107.28 EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND PERMITS—Install and maintain erosion and sediment (E&S) pollution control devices as indicated or submit an alternate plan for accomplishing equal or better temporary and permanent erosion and water pollution control. If an alternate plan is submitted, do not start work until the plan is approved by the County Conservation District and the Department. If a National Pollutant Discharge Elimination System (NPDES) Permit is involved, do not start work until the plan is approved by the DEP or the authorized County Conservation District and the Department. Concrete clean out areas, either contractor designed or indicated within the contract documents, are incidental to the contract items.
When a general or individual NPDES Permit is involved:
At the preconstruction conference, submit a Preparedness, Prevention and Contingency (PPC) Plan and identify a licensed professional (Professional Engineer, Geologist, Land Surveyor or Landscape Architect) registered in the Commonwealth and if applicable, their designee to be present onsite and responsible for implementing critical stages of the
Do not start earth disturbance activities until an environmental preconstruction meeting is held with DEP or delegated
CCD.
Within 14 days of completing the construction of a stormwater control measure (SCM) as determined by the licensed professional or designee, submit a completed Chapter 102 SCM Construction Certification Form for each SCM to the Representative through PPCC. Form CS-102 has information required to complete the Chapter 102 Form(s). Ensure the General Project and SCM Information, Construction Information, and Licensed Professional Certification sections are completed by the identified licensed professional responsible for overseeing the critical stages of the approved PCSM plan.
Prepare an as-built (record) PCSM Plan to be sealed and signed by the identified licensed professional registered in the Commonwealth. All construction survey, plan preparation, and engineering required for the as-built (record) PCSM Plan will approved Post Construction Stormwater Management (PCSM) Plan.
August 6, 2026 07:25:11 AM Page 15 of 103 be incidental to the contract items. The as-built (record) PCSM Plan must accurately reflect deviations from the approved PCSM Plan including, but not limited to, plan locations, dimensions, inverts/elevations, materials used and grading. Update the as-built (record) PCSM Plan as construction of the project’s PCSM features progresses. Have the identified licensed professional immediately notify the Representative of all deviations from the approved PCSM Plan. Deviations to the approved PCSM Plan must be submitted for approval. Assist with the determination and documentation if the as-built deviations require a permit amendment or if the PCSM features must be removed and replaced as indicated on the PCSM Plan.
Assist the Representative in performing visual site inspections weekly and after each precipitation event greater than 0.25 inches to ensure the project's E&S Best Management Practices (BMPs) are functioning properly. Immediately initiate corrective actions, at no additional cost to the Department, upon notification by the Representative of noncompliance with the provisions of this section that the Representative has determined requires immediate corrective action under Department policies. For all other notifications of noncompliance, initiate corrective actions within 24 hours. Failure or refusal to promptly comply with such notice upon receipt may, at the Department’s sole discretion, result in: the withholding payment of estimates for work completed until the requirements of the E&S Plan are met, assessment of E&S noncompliance liquidated damages as specified in Section 108.07(d) or issuance of a written order stopping all or part of the work until the corrective action has been taken and the requirements of the E&S Plan are met. No claims for extension of time, costs, or damages arising from, related to, or based upon such notices of noncompliance or stop orders will be granted, paid, or considered.
Nothing in this Section is to be interpreted to relieve the Contractor of its obligation to fully and timely comply with all applicable laws and any permits for the project. The time periods set forth in this Section do not supersede any more stringent time periods required by applicable laws or permits for the project.
If corrective action or noncompliance with the provisions of this Section result from design errors/omissions or a precipitation event exceeding the design storm criteria as specified in applicable Department publications; the cost and/or time required for the performance of the corrective actions for noncompliance notices or stop work orders will be considered as specified in Section 110.03 and Section 108.06, as applicable.
Utilize Department, DEP, or other authorized agency’s form(s) included in the contract or project permits unless directed otherwise by the Representative, DEP, the County Conservation District or other authorized regulatory agency.
For the purpose of determining compliance with the provisions of this section, “substantial completion” will be considered to have been attained when all of the following project milestones have been reached:
Either a semi-final or final inspection has been performed, physical work is complete, and an Environmental Commitments and Mitigation Tracking System (ECMTS) Sheet has been executed if applicable to the project.
Earth disturbance activity has been permanently stabilized and sufficient vegetative growth has been achieved to meet permit conditions (uniform 70% perennial vegetative cover) and agreed to by DEP or delegated CCD.
Installation of PCSM SCMs have occurred if applicable. Upon completion of PCSM conversions and facilities, the County Conservation District must approve the removal of all remaining E&S BMPs.
Once a project with a general or individual NPDES Permit has reached substantial completion, submit to the Representative a DEP Notice of Termination (NOT) Form ensuring Sections 2, 3, 4, 7 and 8, are fully executed. The NOT is to be accompanied by the required as-built (record) PCSM Plan, the final certification by the licensed professional and the Contractor’s executed portion of the ECMTS Construction Tracking Signature Sheet.
608 MOBILIZATION
Section 608.4(b)3. Revise to read as follows:
3. When all physical work has been satisfactorily completed and the following certificates and documents, as required, have been properly furnished, the final payment will be made as specified in Section 608.4(a):
Certified Payroll Records
Final DBE/DB payment amounts and, if necessary, shortfall justification
Material Certifications
Form CS-4225H, Highway Lighting In-Service Guarantee Notification
August 6, 2026 07:25:11 AM Page 16 of 103
As built drawings for Design/Build projects
Form RW-397A, Right to Enter (a property) and Release Form from property owner, if applicable
Form CS-4345, Borrow and/or Waste Management
Contractor Evaluations of the design of the project; and
Work Order Information (i.e. Force Account documentation)
Post Construction Stormwater Management As-built drawings and all documentation required for submission of the Notice of Termination for projects with NPDES permits.
Special Provision: C167A - a00167 CHANGES TO SPECIFICATIONS: APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
Addendum:
CHANGES TO SPECIFICATIONS : APPENDIX C—DESIGNATED SPECIAL PROVISIONS and APPENDIX C, DSP 20
Provision Body:
APPENDIX C—DESIGNATED SPECIAL PROVISIONS. Revise to read as follows:
APPENDIX C
DESIGNATED SPECIAL PROVISIONS
General: This appendix to Publication 408 contains standard required provisions. The Contractor shall comply with the below appendices, as applicable.
Standard Documents: Designated Special Provisions (DSPs) that are referenced in this Appendix are:
DSP4. Diverse Business (DB) Requirements for Non-Federally Funded Construction Projects. This provision is applicable to contracts funded with state funds, without federal funds.
DSP7. Disadvantaged Business Enterprise (DBE) Requirements for Federally-funded Construction Projects. This provision is applicable to any Federally-funded (in part or whole) contract for a construction project.
DSP8. F. A. R.—Required Contract Provisions Federal-Aid Construction Contracts – FHWA-1273 (Revised October 23, 2023). See attachments to the Proposal. This provision is applicable to any federally funded (in part or whole) contract for a construction project.
DSP9. Special Supplement—Anti-Pollution Measures – August 26, 1999. This provision is applicable to all contracts.
DSP12. Executive Order 11246, with Appendices A and B. This provision is applicable to contracts with federal funds (in part or whole).
DSP13. Buy America. This provision is applicable to contracts with federal funds (in part or whole, and to state-funded projects when any federal funds were allocated at any phase of the work on the overall-project but not under the current contract (for example, design), even if the construction contract is 100% state-funded.
August 6, 2026 07:25:11 AM Page 17 of 103
DSP15. Commonwealth Standard Terms and Conditions. This provision is applicable to all contracts.
DSP16. Lobbying Certification Form. This provision is applicable to contracts with federal funds and a contract amount $100,000 or greater. If applicable, the Contractor shall complete this form and return it to PennDOT during contract execution. (Form is located in ECMS File Cabinet and must be completed and uploaded to the Contractor Checklist in ECMS).
DSP17. Federal Audit Clause. This provision is applicable to contracts with federal funds. As used in this DSP, “[Name of Subrecipient]” refers to the Contractor.
DSP19. The United States Department of Transportation (USDOT) Standard Title VI/Non-Discrimination Assurances. This provision is applicable to contracts with federal funds. The Contractor’s signature on an agreement will be deemed a signature on this exhibit.
As used in this DSP, the term “Subrecipient” refers to the Contractor.
DSP20. FAR 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act- Covered Foreign Entities. This provision is applicable to contracts with federal funds (in part or whole).
APPENDIX C—DESIGNATED SPECIAL PROVISION 20 (DSP20) FAR 52.240-1 - PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED BY AMERICAN SECURITY DRONE ACT-COVERED FOREIGN ENTITIES (NOV 2024). Revise to read as follows:
APPENDIX C
DESIGNATED SPECIAL PROVISION 20 (DSP20)
FAR 52.240-1 -PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED
BY AMERICAN SECURITY DRONE ACT-COVERED FOREIGN ENTITIES (NOV 2024)
(a) Definitions. As used in this clause—
American Security Drone Act-covered foreign entity means an entity included on a list developed and maintained by the Federal Acquisition Security Council (FASC) and published in the System for Award Management (SAM) at https://www.sam.gov (section 1822 of the National Defense Authorization Act for Fiscal Year 2024, Pub. L. 118-31, 41 U.S.C. 3901 note prec.).
FASC-prohibited unmanned aircraft system means an unmanned aircraft system manufactured or assembled by an American Security Drone Act-covered foreign entity.
Unmanned aircraft means an aircraft that is operated without the possibility of direct human intervention from within or on the aircraft (49 U.S.C. 44801(11)).
Unmanned aircraft system means an unmanned aircraft and associated elements (including communication links and the components that control the unmanned aircraft) that are required for the operator to operate safely and efficiently in the national airspace system (49 U.S.C. 44801(12)).
(b) Prohibition. The Contractor is prohibited from—
(1) Delivering any FASC-prohibited unmanned aircraft system, which includes unmanned aircraft (i.e., drones) and associated elements (sections 1823 and 1826 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.);
(2) On or after December 22, 2025, operating a FASC-prohibited unmanned aircraft system in the performance of the contract (section 1824 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.); and
(3) On or after December 22, 2025, using Federal funds for the procurement or operation of a FASC-prohibited unmanned aircraft system (section 1825 of Pub. L. 118-31, 41 U.S.C. 3901 note prec.).
(c) Procedures. The Contractor shall search SAM at https://www.sam.gov for the FASC-maintained list of American Security Drone Act-covered foreign entities prior to proposing, or using in performance of the contract, any unmanned aircraft system. Additionally, the Contractor shall ensure any effort or expenditure associated with a FASC-prohibited unmanned aircraft system is consistent with a corresponding exemption, exception, or waiver determination expressly stated in the contract.
(d) Exemptions, exceptions, and waivers. The prohibitions in this clause do not apply where the agency has determined an exemption, exception, or waiver applies and the contract indicates that such a determination has been made. [See sections 1823
August 6, 2026 07:25:11 AM Page 18 of 103 through 1825 and 1832 of Public Law 118-31 (41 U.S.C. 3901 note prec.) for statutory requirements pertaining to exemptions, exceptions, and waivers.].
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.
Special Provision: C168A - a00168 CHANGES TO SPECIFICATIONS: SECTIONS 110, 404, AND 507
CHANGE TO SPECIFICATIONS: SECTIONS 110, 404, AND 507
Provision Body:
SECTION 110—PAYMENT
Section 110.06 MATERIAL STORED OR ON HAND. Revise to read as follows:
110.06 MATERIAL STORED OR ON HAND—
(a) Stored Material. The Representative may authorize payment for certain material, using Form CS-110, before its incorporation into the work. Upon the Contractor's request submitted through the PennDOT Project Collaboration Center’s (PPCC) Material-Stored Material (CS-110) workflow and the Representative's acceptance in PPCC, the Contractor may be paid 100% of the cost of the material, less the pro‑rata share of the retainage, if any; provided the quantity of stored material does not exceed the total estimated quantity required to complete the project and the cost is at least $1,000 but does not exceed 90% of the contract price of the applicable contract item or component item. Load-Transfer Units are only eligible for 90% of the cost of the material. The cost of the material is that amount to be paid by the Contractor as evidenced by invoices. Fabricated structural steel that is to receive a protective coating may be approved for prepayment at 75% of the contract price of the applicable contract item or component item, before application of the coating, provided the structure has been fully fabricated and preassembly of field connections has been made.
Payment for stored material will not be authorized until the material has been delivered to the project site or an approved location in the vicinity of the project, is inspected by the Representative to ensure the material is in a satisfactory condition and of sufficient quantity, is stored in an approved manner, and conforms to the requirements specified in this Section and Section 106.03. Identify stored material by project designation and set apart from other materials. Fabricated precast/prestressed bridge structure elements indicated on an S-number structure plan are eligible for prepayment when they are approved to ship. Other materials to be stored less than 30 days are not eligible for prepayment. In determining eligibility for prepayment, the beginning date for evaluating whether the required 30-day minimum storage period will be met will be the date the material is delivered to the project or approved storage location, or the date the invoice is submitted to the Department, whichever is the latter. Material originally determined to be ineligible for prepayment due to the minimum storage period requirement, that is then stored for more than 30 days, is eligible for prepayment on the next estimate, provided the invoice has been submitted to the Department. If the Representative determines, because of required fabrication at an off‑site location, that it is not feasible or practicable to store material in the vicinity of the project, the material may be stored at an approved location, which is not in the vicinity of the project, at the Contractor’s expense.
With the exception of structural steel to be incorporated into fabricated structural steel components for main bridge members, as specified in Section 110.06(a)1., only end product manufactured material or fully fabricated products that are awaiting installation and/ or incorporation into the finished work are eligible for prepayment. Ingredients of a finished product are not eligible for prepayment.
Aggregates, cements, and other bulk material are not eligible for prepayment. Beams containing precast components or secondary precast elements detailed on the structure component item schedule or both are eligible for prepayment. Living or perishable plant materials are not eligible for prepayment before planting.
Assume full control and responsibility for the protection of the stored material from the elements and against loss or damage by any cause. In the event any stored material becomes lost, stolen, impaired, or damaged while stored, the monetary value of the lost, August 6, 2026 07:25:11 AM Page 19 of 103 stolen, impaired, or damaged material as may have been paid for in a current estimate will be deducted from a subsequent estimate.
Retain the title to the prepaid material until issuance of the acceptance certificate.
Payment for acceptable stored material will be made on current estimates against the applicable contract item. The amount paid will be proportionately recouped as the material is incorporated into the work. The cost of surplus stored material previously paid on a current estimate but not ultimately incorporated in the final measured work will not be included in the final payment. Surplus stored material is the property of the Contractor. Remove surplus material from the project and dispose of in a satisfactory manner.
Pay the material provider the amount due, as shown on the invoices within 7 calendar days of receipt of payment from the Department. Provide evidence of payment upon request. Failure to make invoice payments as specified will cause the appropriate monies to be deducted from future estimates and will cause the disapproval of further prepayment requests.
1. Prepayment for Structural Steel. Structural steel to be incorporated into fabricated structural steel components for main bridge members may be approved for payment up to 60% of the contract price of the applicable contract item or component item; provided the quantity, cost, delivery, inspection, and storage requirements of Section 110.06(a) are met. The cost of the structural steel is that amount to be paid by the Fabricator as evidenced by invoices. Invoices for approved structural steel are to include the material quantity and Department project identification (i.e., ECMS number, SR & Section, and county), and must be accompanied by certification, as specified in Section 106.03(b)3., and proof of payment (e.g., a copy of a canceled check or receipt, or a certified letter from the structural steel supplier acknowledging receipt of payment).
Payment for approved structural steel will be made on current estimates against the applicable contract item. The amount paid will be proportionately recouped as the fabricated structural steel components are incorporated into the work. Pay the Fabricator the amount due, as shown on the invoices, within 7 calendar days of receipt of payment from the Department. When payment is made, the structural steel becomes the property of the Department. Have the Fabricator furnish a transfer of ownership document within 7 calendar days of receipt of payment and promptly submit the documentation to the Department.
Only approved structural steel to be incorporated into fabricated structural steel components for main bridge members is eligible for prepayment. Handling, transportation, and storage of structural steel materials including, but not limited to, any storage site rental, security, and weather protection, are to be borne by the Contractor and included in the contract price for the applicable contract item.
SECTION 404—EVALUATION OF ASPHALT PAVEMENT RIDE QUALITY AND PAYMENT OF INCENTIVE
Section 404.1 DESCRIPTION. Revise to read as follows:
404.1 DESCRIPTION. This work evaluates an asphalt pavement surface profile and determines the ride-quality incentive associated with the pavement surface profile.
(a) General Requirements. Determine the ride quality of finished pavement surfaces, including overlaid bridge approach slabs and overlaid bridge decks. At least two of the following construction operations must be indicated in areas included in ride-quality lot measurements:
Profile milling as specified in Section 492.
Asphalt Base course.
Asphalt Scratch course.
Asphalt Leveling course.
Asphalt Binder course.
Asphalt Wearing course.
In the presence of the Representative, measure the pavement surface profile according to PTM No. 428. Provide daily calibration results to the Representative before taking any measurements. Provide the raw unfiltered data files and a summary printout of the resultant International Roughness Index (IRI) data and Mean Roughness Index (MRI) values to the Representative within 24 hours of taking measurements. The Representative will determine payment for each ride-quality lot based on the MRI.
Measure the pavement surface of the following excluded areas separate from the pavement surface profile of ride-quality lots. The Representative will not include measurements from excluded areas to determine lot incentive payment.
Pavement surfaces not constructed as a full-depth overlay, as indicated, such as the vertical transition areas at the limits of paving and at the approaches to bridges.
Bridge decks unless overlaid.
August 6, 2026 07:25:11 AM Page 20 of 103
Ramps less than 1,500 feet in length and less than 12 feet wide.
Tapered pavements.
Shoulders, medians, and other pavement surfaces indicated.
Pavement from 5 feet before and up to 5 feet after any appurtenances such as water boxes, manholes, railroad tracks, and inlets extending out into the pavement.
Partial lots less than 100 feet
Roadways with a posted speed limit of 40 miles per hour or lower.
(b) Lot Size. A full lot is 528 feet of a single pavement lane. The Representative will designate lots starting at the beginning limit of paving and continuing to the ending limit of paving for each pavement lane and ramp that is 12 feet or wider. Do not include the length of excluded areas in the 528-foot lot.
The Representative will designate a partial lot at the ending limit of paving and at an excluded area, when the lot length is less than 528 feet. The Representative will evaluate a partial lot as a percentage of a full lot.
Section 404.3(a) Equipment and Operator. Revise to read as follows:
(a) Equipment and Operator. Provide pavement surface profile measuring equipment that has been verified by the Department according to PTM No. 428. In the presence of the Representative, calibrate the distance sensor and check the profile system calibration before each day’s testing.
Provide an operator that is Department certified according to PTM No. 428. The operator must carry their valid PennDOT certification card during pavement surface profiling.
Section 404.3(b) Testing. Revise to read as follows:
(b) Testing.
1. Lots. Provide the traffic control and station marking necessary to accommodate testing. Remove objects and equipment from the surface and sweep the surface as necessary to remove debris. For projects identified for verification as specified in Section 404.3(f), identify and delineate the profiling limits and excluded areas on the day of the verification. The Representative will verify the profiling limits are correct. Use traffic cones with reflective tape and reflective tape on the pavement at the beginning and end of each lane and excluded areas for triggering the start and stop locations of the profiler. In the presence of the Representative, determine the pavement surface profile for each lot according to PTM No. 428. At the completion of testing, immediately submit the lot IRI data and MRI values, according to PTM No. 428, to the Representative.
2. Excluded Areas. Provide the traffic control necessary to accommodate testing. Test the entire surface of each excluded area in stages using a 12-foot straightedge. At each stage, hold the straightedge in contact with the surface and parallel to the roadway centerline and, in successive positions, test the pavement surface profile from one side of the excluded area to the other. Advance the test location to the next stage by moving the straightedge along the roadway centerline not more than 6 feet.
Section 404.3(c)1. Lots. Revise to read as follows:
1. Lots. The Representative will compare the lot MRI to Table A in Section 404.4 to determine if the lot requires corrective action.
Additionally, perform corrective action on any individual bump (must grind) where the irregularity is more than 3/16 inch when tested with a 12-foot straightedge.
Section 404.3(d) Corrective Action. Revise to read as follows:
(d) Corrective Action. Do not produce a deviation, such as a ridge or valley with the adjacent pavement, of more than…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .